SORSOGON CITY WATER · PDF fileguidelines are based on the eligibility criteria specified in...
Transcript of SORSOGON CITY WATER · PDF fileguidelines are based on the eligibility criteria specified in...
1
SORSOGON CITY WATER DISTRICT Capitol Compound, Sorsogon City
Tel. Nos. (056)211-1570, 211-2024
GUIDELINES ON GRANTING OF PERFORMANCE-BASED BONUS FOR SORSOGON CITY WATER DISTRICT’S PERSONNEL
Rationale and Background
Human resources are an agency’s most valuable asset. They define the efficiency, effectiveness and over-all quality of service in any agency; hence the Local Water District is no exception. The need to establish an effective system that accurately evaluates the performance of its employees for the purpose of determining tenure, transfers or promotions, and appropriate incentives is of absolute urgency. The granting of the PBB links individual performance targets and accomplishments to strategic and organizational goals and accomplishment of all delivery units. These guidelines are based on the eligibility criteria specified in DBM-LWUA Memorandum Circular No.2014-02 dated August 29, 2014 which includes:
1. Achieve at least 90% of each one of their performance targets for the delivery of MFOs, Support to Operations (STP), and General Administration and Support Services (GASS) for the year; I. Per above-quoted circular there are three most significant indicators of
output/outcome under each MFO and its corresponding targets, to wit:
A. Water Facility Service Management i. PI 1 (Quantity) Access to potable water ii. PI 2 (Quality) Reliability of Service iii. PI 3 (Timeliness) Adequacy
B. Water Distribution Service Management i. PI 1 (Quantity) NRW ii. PI 2 (Quality) Potability iii. PI 3 (Timeliness) Adequacy/Reliability
II. Performance Indicators under Support to Operation (STO) with the
dimension of quality and timeliness of services.
A. Staff Productivity Index B. Reasonableness/Affordability of water rates to consumers with access
connectors C. Customer Satisfaction
2
III. General Administration and Support Services (GASS) A. Financial viability and sustainability (Collection Ratio , Operating ratio ,
and Current Ratio) B. Compliance with COA and LWUA reporting requirements in accordance
with content and period of submission
2. Satisfy 100% of the good governance conditions set by the AO 25 Interagency Task Force (IATF) for FY 2014; and Per DBM-LWUA Memorandum Circular No.2014-02 dated August 29, 2014 there are four good governance conditions : I. Transparency Seal II. PhilGEPS Posting III. Establishment of the Local Water District’s Citizen’s Charter IV. Submission of SALN
3. Payment of applicable taxes;
4. Rank of performance of delivery units and the personnel within these units Coverage: These guidelines cover all officials and employees of the District. Personnel who are in the government service and have rendered at least nine (9) months of service on the year of the grant of PBB. Personnel found guilty of administrative and/or criminal charges filed against him/her and meted penalty in FY 2014 shall not be entitled to the PBB. If the penalty meted out is only reprimand, such penalty shall not disqualify the employee concerned in the grant of PBB. Definition of Terms
A. Major Final Output (MFO) – a good or service that a water district is mandated to deliver to external clients through the implementation of programs, activities and projects. It may be a single output or group that is similar in nature, targeted at the same organizational/sector outcome and capable of being summarized by a common performance indicator.
B. MFO Performance Indicator (PI) – a characteristic of performance (quantity, quality, timeliness or cost) that is to be measured and will illustrate the standard by which a department is expected to deliver its MFP. As specified in EO No. 80, the MFO PIs should be verifiable, observable, credible, and sustainable, especially for front line functions of departments/agencies.
C. Performance target (PT) – a predetermined numerical target level of performance (quantity, quality and timeliness or cost) against which actual performance can be compared.
3
D. Delivery units – Departments and Divisions of the LWD responsible for the achievement of the LWD’s MFO and committed to performance targets which are tracked by a reporting system within the year and verified by LWUA.
E. Potability – the quality of water that renders it safe and fit for human consumption to the Philippine National Standards for Drinking Water (PNSDW) and all issuances and guidelines by the Department of Health (DOH) and the Local Water Utilities Administration (LWUA)
Performance and Evaluation Review Committee (PERC)
A. Composition of PERC 1. Division Manager Finance 2. Division Manager Administrative 3. Division Manager Planning 4. Division Manager Production 5. Division Manager Customer Service 6. Division Manager Billing and Collection 7. Second Level Representative 8. 1st Level Representative 9. Secretariat – Human Resource Officer
B. Functions/Responsibilities:
1. Implement the performance review and evaluation guidelines stipulated in these issuances;
2. For the purpose of ensuring maximum manpower utilization and rationalization of work load in the different organizational units, the PERC may initiate a review and a comparative assessment of approved employee performance particularly of those holding similar positions and may recommend necessary modifications or corrective action;
3. The PERC shall make the final review of performance standards adopted for each position in the different organizational units in the agency. This is to ensure adoption of uniform standards of measurement by the different organizational units in rating employees holding similar positions , performing similar functions and working under same conditions;
4. At the end of the rating period, the PERC is empowered to review documents, evaluate work accomplishments and performance ratings, conduct hearings, provide opportunities for an employee or supervisor to defend a particular rating and eventually determine an employee’s final rating.
5. Ensure reliability , completeness and correctness of date to be used as bases for performance review and evaluation
6. Regularly report to the head of office/unit on the status of performance review and evaluation and discuss pressing issues and concerns
4
Performance Evaluation and Review of Delivery Units For each organizational level, specific performance indicators were identified based on DBM-LWUA Memorandum Circular No.2014-02 dated August 29, 2014. Each Department/Divisions is considered as delivery units and shall be ranked accordingly. The District as a whole also must be ranked accordingly based on identified indicators using the Point System Scheme.
A. Agency level The District Performance Evaluation and Review Committee shall convene to do the actual determination of points based on the identified performance indicators guided by the following specific steps: Table 1 – Point System for the Agency Level Performance Indicators FY 2014
Target
FY 2014
Accomplishment
Maximum
Points
Rating
Scale
I. MAJOR FINAL OUTPUT (MFO) 40% A. Water Facility Service Management
a. Performance Indicator 1 – (Percentage of barangay with access to potable water against the total number of barangays within the coverage of the District.)
At least 50% of the 64 total barangays of Sorsogon City will be served with potable water
32 barangays out of 64 barangays were served
50% above
40%-49% 30%-39% 20%-29%
10 8 6 4
b. Performance Indicator 2 – (Percentage of household connections receiving 24/7 supply of water
50% of household connections receiving 24/7 supply of water
63% of household connections receiving 24/7 supply of water
50% above
40%-49% 30%-39% 20%-29%
10 8 6 4
5
Performance Indicators FY 2014
Target
FY 2014
Accomplishment
Maximum
Points
Rating
Scale
c. Performance Indicator 3 (Source Capacity to meet demands for 24/7 supply of water
Be able to produce 190lps total mo. Prod. with a ratio of 1:10
152 lps total source capacity ; 104 lps total source with 24/7 operation. Source and water demand ratio 1:18:1
I. MAJOR FINAL OUTPUT (MFO) B. Water Distribution Service Management
a. Performance Indicator 1 (Percentage of unbilled water to water production)
25% 31.40% 25%-Below
26%-30% 31%-35% 36%-40%
10 8 6 4
b. Performance Indicator 2(Average deviation from PNSDW –Chlorine residual requirements from Jan-Dec.2014)
Average of .30ppm Chlorine Residual
Average of .30ppm Chlorine Residual
.30ppm-Above
.25ppm-.29ppm
.20ppm-24ppm
.15ppm-.19ppm
10 8 6 4
c. Performance Indicator 3 (Average response time to restore service when there are interruptions based on the Citizen’s Charter)
Maximum of 2 hours based on the Citizen’s Charter
Maximum of 2 hours
Less than 2 hrs. 3 hours 4 hours 6 hours
10 8 6 4
II. Support to Operations (30%) a.Performance Indicator 1 (Staff Productivity Index: One (1) position for every (100) service connections for Category D and 120 service connections for Category A to C)
With atleast 135:1 ratio for Active Service Connection against No.of employees.
With 126.41 ratio
for Active Service
Connection against 84 employee per
POP (Category B w/ 10,619 service
connection against 84 employees)
121 above 115-120 110-114 105-109
10 8 6 4
6
Performance Indicators FY 2014
Target
FY 2014
Accomplishment
Maximum
Points
Rating
Scale
b. Performance Indicator 2
(Reasonableness/Affordability of water rates to consumers with access connections. Water Rate for the 1st cu.m. must not exceed 5% of the average income of LIG.)
Not to exceed 5% of Average Income of LIG
LIG – P 260.00/day min. water rate of P 191.00 – 2.4% of the Average Income of LIG
5% below 6% 7% 8%
10 8 6 4
c. Performance Indicator 3 (Customer Satisfaction: percentage of Customer Complaints acted upon against received complaints
100% of customer complaints to be acted against received complaints
100% of customer complaints acted upon against received complaints.
100% Above
90%-99% 80%-89% 70%-79%
10 8 6 4
III. General Administration and Support Services(30%) A.Performance Indicator 1(Financial Viability & Sustainability of District’s operation in terms of the ff: a. Collection Ratio b. Operating Ratio c. Current Ratio)
Collection Ratio = 90% Operating Ratio = 76% Current ratio = 2.56
Collection Ratio = 90% Operating Ratio = 75% Current ratio = 2.56
90% Above 85%-89% 80%-84% 75%-79% 75% below 76% 77% 78% 3.00 Above
2.50-2.99 2.00-2.49 1.50-1.99
10 8 6 4 10 8 6 4 10
8 6 4
B.Performance Indicator 2(Compliance with COA
reporting requirements in
accordance with content and period of submission
of the ff: 1. Financial Reports:
Submission of Financial reports
such as:
a.Balance Sheet;
b.Statement of Income and
Submission of Financial reports
such as: a.
Balance Sheet; b. Statement of
Income and Expenses; c.
7
a.Balance Sheet;
b.Statement of Income and Expenses; c. Statement of
Cash Flows; d. Statement
of Gov’t. Equity;e. Notes to Financial Statement
2. Report on Ageing of Cash Advances)
B.Performance Indicator
1(Compliance with the following LWUA reporting requirements in accordance to content and period of submission such as :a. Monthly Data Sheet, Financial Statements. 3.Approved WD Budget w/Annual Procurement Plan
Expenses; c.
Statement of Cash Flows; d.
Statement of
Gov’t. Equity;e. Notes to
Financial Statement on or
before Feb.14,2015
and Report on
Ageing of cash advances on or
before 25th day or 3rd week of
the following
quarter
Statement of Cash
Flows; d. Statement of
Gov’t. Equity;e.
Notes to Financial Statement on or
before January 23,2015 and
Report on Ageing of cash advances
on a quarterly
basis every 5th day of the following
quarter.
10 days & above before duedate 5 days before duedate Upon Duedate After duedate
10 8 6 4
Submission of
complete and
accurate Financial
Reports on or before the 20th
day of the
following month.
Submission of
approved budget on or
before 1st month of
Dec.2014
Submitted
complete and
accurate Financial reports on the 20th
day of the following month.
Submitted the
approved 2015 budget last Nov.
27 , 2014.
15th day of the ff. mo. 18th day of the ff. mo. 20th day of the ff. mo. 21st day onwards of the ff. mo. 10th day before duedate 5th day before duedate Upon duedate A day after duedate & onwards
10 8 6 4 10 8 6 4
C. Performance Indicator 3(Compliance with LWUA reporting requirements in accordance to content and period of submission of Microbiological test (Compliancwe with the LWUA reporting requirements in
Conduct
microbiological
Test every 1st Monday of the
3rd week and should meet the
potability
requirement by the
DOH/PNSDW
Conduct
annually and
Conducted
Microbiological
Test every 2nd Monday of the
Month and met the potability
requirement set by
the DOH/PNSDW.
Conducted annually which
passes the
1st Monday of the mo. w/o failure 1ST Monday of the mo. w/1 or 2 failure 1st Monday of the mo. w/ 3-4 failure 1st Monday of the mo. w/5-6 failure
10 8 6 4
8
accordance to content and period of submission of Physical/Chemical Report
should met the
physical and chemical
content of water
as per within the parameters
physical and
chemical requirements for
water potability
set by DOH.
After determining the weights and points of each unit, the
performance review and evaluation committee shall proceed of category using the weighted average.
The performance review and evaluation committee shall present the result of ranking before the Agency Head for approval and subsequent submission to the LWUA.
B. Delivery Units/Division/Department Performance Review and Evaluation.
Performance Indicator
Responsible Unit
FY 2014 Target
FY 2014 Accomplishme
nt
Maximum Points
Rating Scale
I. MAJOR FINAL OUTPUT (MFO) 40% A. Water Facility Service Management
a. Performance Indicator 1 – (Percentage of barangay with access to potable water against the total number of barangays within the coverage of the District.)
Operations Department
At least 50% of the 64 total barangays of Sorsogon City will be served with potable water
32 barangays out of 64 barangays were served
b. b. Performance Indicator 2 – (Percentage of
Operations Department
50% of household connectio
63% of household connections receiving 24/7
9
household connections receiving 24/7 supply of water
ns receiving 24/7 supply of water
supply of water
c. Performance Indicator 3 (Source Capacity to meet demands for 24/7 supply of water
Operations Department
Be able to produce 190lps total mo. Prod.with a ratio of 1:10
152 lps total source capacity ; 104 lps total source with 24/7 operation. Source and water demand ratio 1:18:1
B. Water Facility Service Management a. Performance
Indicator 1 (Percentage of unbilled water to water production)
Operations Department
25% 31.40%
b. Performance Indicator 2(Average deviation from PNSDW –Chlorine residual requirements from Jan-Dec.2014)
Operations Department
Average of .30ppm Chlorine Residual
Average of .30ppm Chlorine Residual
c. Performance Indicator 3 (Average response time to restore service when there are interruptions based on the Citizen’s Charter)
Commercial Department
Maximum of 2 hours based on the Citizen’s Charter
Maximum of 2 hours
II. Support to Operations (30%)
10
A.Performance
Indicator 1 (Staff Productivity Index: One (1) position for every (100) service connections for Category D and 120 service connections for Category A to C).
Administrative
Department/OGM
With
atleast 135:1
ratio for
Active Service
Commection against
No.of employees
.
With 126.41
ratio for Active Service
Connection
against 84 employee per
POP (Category B w/ 10,619
service connection
against 84
employees)
B.Performance Indicator 2 (Reasonableness/Affordability of water rates to consumers with access connections. Water Rate for the 1st cu.m. must not exceed 5% of the
average income of LIG.)
Commercial
Department
Not to
exceed
5% of Average
Income of LIG
LIG – P
260.00/day min.
water rate of P 191.00 – 2.4%
of the Average Income of LIG
Performance
Indicator
Responsible
Unit
FY 2014
Target
FY 2014
Accomplishme
nt
Maximu
m Points
Rating
Scale
III.General Administration and Support Services (30%) A.Performance Indicator 1(Financial Viability & Sustainability of District’s operation in terms of the ff: a. Collection Ratio b. Operating Ratio c. Current Ratio)
Finance Department
Collection Ratio = 90% Operating Ratio = 75% Current ratio = 2.56
Collection Ratio = 90% Operating Ratio = 75% Current ratio = 2.56
B.Performance Indicator
2(Compliance with COA
Finance Department
Submission of Financial
reports such as: a.Balance
Submission of Financial
reports such as: a.Balance
11
reporting
requirements in accordance with
content and
period of submission of the
ff: 1. Financial
Reports:a.Balance Sheet;
b.Statement of
Income and Expenses; c.
Statement of Cash Flows; d.
Statement of
Gov’t. Equity;e. Notes to Financial
Statement 2. Report on
Ageing of Cash Advances)
B. Performance
Indicator 1(Compliance
with the following LWUA reporting requirements in accordance to content and period of submission such as: a. Monthly Data Sheet, B. Financial Statements. 3.Approved WD Budget w/Annual
Finance
Department
Sheet;
b.Statement of Income
and
Expenses; c. Statement of
Cash Flows; d. Statement
of Gov’t. Equity;e.
Notes to
Financial Statement on
or before Feb.14,2015
and Report
on Ageing of cash
advances on or before 25th
day or 3rd week of the
following
quarter
Submission
of complete and accurate
Financial Reports on or
before the 20th day of
the following
month.
Submission
of approved
budget on or before 1st
month of
Sheet;
b.Statement of Income
and
Expenses; c. Statement of
Cash Flows; d. Statement
of Gov’t. Equity;e.
Notes to
Financial Statement on
or before January
23,2015 and
Report on Ageing of
cash advances on
a quarterly basis every
5th day of the
following month.
Submitted
complete and accurate
Financial reports on
the 20th day of the
following
month.
Submitted
the approved
2015 budget last Nov. 27,
2014.
12
Procurement Plan
Dec.2014
C.Performance Indicator 3(Compliance with LWUA reporting requirements in accordance to content and period of submission of Microbiological test (Compliance with the LWUA reporting requirements in accordance to content and period of submission of Physical/Chemical Report
Operations Department
Conduct microbiologic
al Test every 1st Monday of
the 3rd week
and should meet the
potability requirement
by the
DOH/PNSDW
Conduct
annually and should met
the physical
and chemical content of
water as per within the
parameters
Conducted Microbiologic
al Test every 2nd Monday
of the Month
and met the potability
requirement set by the
DOH/PNSDW.
Conducted
annually which pases
the physical
and chemical requirements
for water potability set
by DOH.
C. Individual Performance Review and Evaluation
Delivery units eligible to the PBB shall be forced ranked according to the
following categories: RANKING PERFORMANCE OF CATEGORY OF DELIVERY UNIT
Top 10% Best Delivery Unit 9-10 Next 25% Better Delivery Unit 7-8.99 Next 65% Good Delivery Unit 5-6.99
Individual performance review and evaluation shall apply only after
determining the rank of each individual delivery units, an individual forced ranking shall be undertaken to determine which among employees in each unit will fall under best, better and good.
Individual bonuses for employees shall be granted based on the
following scheme
13
PERFORMANCE CATEGORY OF
DELIVERY UNIT
INDIVIDUAL PERFORMANCE
Best Performer (Outstanding)
Better Performer (Very Satisfactory)
Good Performer (Satisfactory)
BEST DELIVERY UNIT P 35,000.00 (20%)
P 20,000.00 (35%)
P 10,000.00 (45%)
BETTER DELIVERY UNIT P 25,000.00 (15%)
P 13,500.00 (30%)
P 7,000.00 (55%)
GOOD DELIVERY UNIT P 15,000.00 (10%)
P 10,000.00 (25%)
P 5,000.00 (65%)
Using the existing performance assessment, all heads of delivery units
must undertake a serious and honest administration of assessment instrument to determine ne the ranking of its employees
Levels Assessment Instrument
Determination of Rank
A. General Manager PES Numerical Rating
B. Division Managers PES Numerical Rating
C. Supervisors PES Numerical Rating
D. Rank and File PES Numerical Rating
Rating Scale
Overall Rating Adjectival Rating 9.50 - 10.00 Outstanding 7.51 - 9.49 Very Satisfactory 4.01 - 7.50 Satisfactory 2.01 - 4.00 Unsatisfactory 2.00 below Poor
Range of Adjectival Rating: Outstanding - performance exceeding targets by 10% and above of planned targets.
14
Very Satisfactory - performance of100% to 109% of the planned targets. Satisfactory - performance of 75% to 99% of the planned targets. For accomplishments requiring 100% of the targets such as those pertaining to money or accuracy or those, which may no longer be exceeded , the rating for those who met targets will be 10 and for those who failed or fell short of the targets rating shall be 4. Unsatisfactory - performance of 51% to 74% of the planned targets: and. Poor - performance failing to meet the planned targets by 50% or below.