Solar pv Plant 50 Kw Detail Project Report
-
Upload
jaspal-singh-rattey -
Category
Documents
-
view
1.227 -
download
11
Transcript of Solar pv Plant 50 Kw Detail Project Report
50 Kw project50 Kw project50 Kw project50 Kw project Intro :- complete turnkey basis Development , financing support & EPC Optimum solution for low losses , max output . Benefits :- Govt promting , JNNMS mission
Subsidy – Rs 70/watt grid connection.
Rs 90 / watt Off- grid .
Or
30% Project cost which ever is less.
Soft loan at 5% Per annum .
Benchmark Price Rs 300 / Wp for off- grid . Rs 210 / Wp for Grid connection . Funding 70% on sanction . 30 % on completion. Approval mechanism . 45 days Beneficial Points
• Reduction in more that 60 tonnes Co2 emission
• Grid connection can save pto 20 – 30 % total cost in compare to off – grid battery type and battery losses too.
• Saving of Rs 26646.16 Per month , energy profit @ rate of 4.14 Rs Per month ,
Avrage saving annually is 3.19 Lakhs .
• 50 Kw , 30 day Sunlight for 5 hr / day
• Produces = 250 Kwh / day
i.e 7500 Kwh / month
7500 units
• Tracking system (optional) Dual Axis will increase the efficiency by 27 % w.r.t fixed type mounting system .
• Operational cost is very low than the capital investment
• Solar panels SUNGEN ( Hong Kong) , IEC Certified with 25 year of warranty on efficiency .
TUV , UL Certificate.
• Annual Energy feed 72.2 Mw , for grid connected .
� Metering – 15 min time interval , at output of inverter billing purpose net
export Export & import .
� Levelised Tariff - (Rs / Kwh ) 18 .45 or Rs / unit
� AC power is stepped up by 415 / 11Kv Feed it to the grid .
� Life – 25 Year , after that Efficiency reduced to 80- 75 %
� Excise duty is exempted as per MNRE consideration .
� Packing , forwarding , inland transport , insurance @ 2.5 % for all equipment .
COMPONENTS USED
1. Solar PV modules
2. Structure – MS Hot Dip Galvanized.
3. Field junction box.
4. Main junction box .
5. Grid – tie inverter – synchronized , meter equivalent and data logging
6. Ground fault protection system.
7. Cordless modem / Web box etc.
8. Cables
9. Lightning Arresters.
10. Earthning.
Energy Profits Array Type: Fixed Tilt
Station Identification
City: New Delhi
Country/Province: IND
Latitude: 28.58° N
Longitude: 77.20° E
Elevation: 216 m
Weather Data: IWEC
PV System Specifications
DC Rating: 50.0 kW
DC to AC Derate Factor: 0.770
AC Rating: 38.5 kW
Array Type: Fixed Tilt
Array Tilt: 28.6°
Array Azimuth: 180.0°
Energy Specifications
Energy Cost: 4.1400 rupee/kWh
Results
Month
Solar Radiation
(kWh/m2/day)
AC Energy (kWh)
Energy Value (rupee)
1 5.56 6192 25634.88
2 5.90 5778 23920.92
3 6.65 7046 29170.44
4 7.01 6995 28959.30
5 6.91 6925 28669.50
6 6.34 6139 25415.46
7 5.28 5332 22074.48
8 5.25 5376 22256.64
9 5.89 5843 24190.02
10 6.17 6400 26496.00
11 5.74 5864 24276.96
12 5.56 6053 25059.42
Year 6.02 73941 306115.72
Array Type: 1-Axis Tracking
Station Identification
City: New Delhi
Country/Province: IND
Latitude: 28.58° N
Longitude: 77.20° E
Elevation: 216 m
Weather Data: IWEC
PV System Specifications
DC Rating: 50.0 kW
DC to AC Derate Factor:
0.770
AC Rating: 38.5 kW
Array Type: 1-Axis Tracking
Array Tilt: 28.6°
Array Azimuth: 180.0°
Energy Specifications
Energy Cost: 4.1400 rupee/kWh
Results
Month
Solar Radiation
(kWh/m2/day)
AC Energy (kWh)
Energy Value (rupee)
1 6.56 7281 30143.34
2 7.07 6955 28793.70
3 8.05 8579 35517.06
4 8.63 8609 35641.26
5 8.49 8546 35380.44
6 7.89 7700 31878.00
7 6.23 6298 26073.72
8 6.21 6379 26409.06
9 6.96 6926 28673.64
10 7.33 7588 31414.32
11 6.77 6953 28785.42
12 6.47 7028 29095.92
Year 7.22 88842 367805.88
Array Type: 2-Axis Tracking
Station Identification
City: New Delhi
Country/Province: IND
Latitude: 28.58° N
Longitude: 77.20° E
Elevation: 216 m
Weather Data: IWEC
PV System Specifications
DC Rating: 50.0 kW
DC to AC Derate Factor:
0.770
AC Rating: 38.5 kW
Array Type: 2-Axis Tracking
Array Tilt: N/A
Array Azimuth: N/A
Energy Specifications
Energy Cost: 4.1400 rupee/kWh
Results
Month
Solar Radiation
(kWh/m2/day)
AC Energy (kWh)
Energy Value (rupee)
1 7.02 7729 31998.06
2 7.29 7156 29625.84
3 8.13 8668 35885.52
4 8.80 8779 36345.06
5 8.94 8981 37181.34
6 8.51 8276 34262.64
7 6.60 6656 27555.84
8 6.39 6557 27145.98
9 7.00 6975 28876.50
10 7.47 7720 31960.80
11 7.18 7309 30259.26
12 7.04 7557 31285.98
Year 7.53 92362 382378.66
Energy Profit on the basis for New Delhi- electricity Prices – 4.14 Rupee/ Kwh i.e - Avg solar radiation – 6.02
Break Even Point (including subsidy)
1st case – 19 yrs 2nd case – 16.6 yrs 3rd care – 16 yrs
� Estimated cost 85 Lakhs – based on normative cost Rs 17 Crore /Mw adopted by CERC notification Date 16th September.
50 Kw solar plant Specifications
Area for SPV Plant – 450 sq mtrs SPV Power Plant
-Output 50 kWp
-No. of modules 180 -No. of modules in series 6 -No. of parallel combination 30 -DC BUS 1 No. Technical details of a SPV Module (a) PV Module type
- Poly crystalline - 180 modules - Rs 87/ watt -7 x 26 string x modules.
(b) Physical Dimensions
-Length with frame 1957 mm -Width with frame 990 mm -Thickness 40 mm
(c)Electrical Parameter
-Maximum Power Rating = 280 kWp -Rated Current = 7.93 A -Rated Voltage = 35.3 V -Short Circuit Current = 8.76 A -Open Circuit Voltage = 43.77 V
Mounting Arrangement -Mounting Fixed Type -Surface azimuth angle of PV Module = 180o
-Tilt angle (slope) of PV Module = 28.32o
- Rs 49 Per Kg - MS Hot dip galvanized. - C/s “L” Section. Inverter specifications
- 7 inverters - 97 % peak efficiency - UL certification (UL 1741/IEEE 1547) - Grid voltage 420 and 11kv supply - Max. DC power 8.6 Kw - Nominal volt = 345 v - AC nominal power = 7.6 Kw - AC voltage range 211 – 264 V
244 – 305 V
- Max. output current = 32 - Max. efficiency = 96.3 %
96.5 % Cables and Transformers
- copper wiring - DC side 5 mm sq , loss = 0.55% - AC side 6 mm sq , loss 0.72% - Step up transformer
440v , 3ph , 50 Hz
COST OF GENERATION AND APPLICABLE TARIFF
Cost of Generation for Small Solar Systems
Summary of various parameter assumptions for the purpose of determination of
year-to-year cost of generation and levellised tariff thereof, is presented under
following table: (It is calculated for standard 1Mw capacity)
Table: Summary of Parameter assumptions
Parameters Unit Value Remarks
Plant Capacity MW 1
Capital Cost Rs Lakh/ MW 1740
Useful life years 25
Tariff Period years 25
Debt : Equity D:E 70 : 30
Debt component Rs Lakh/MW 1218
Equity component Rs Lakh/MW 522
Parameters Unit Value Remarks
Interest Rate % p.a. 13.37% SBAR (11.87%) +
150 basis points,
(based on wt. avg.
SBAR of 12.25% and
11.75% for the Loan tenure years 10
Depreciation % p.a. 7% for first 10 years
and 1.33% for
remaining period of
useful life
Return on equity % p.a. 19% for initial 10
years and 24% for
subsequent period
Pre-tax return on equity
Discount rate % 15.96% Equivalent to WACC
Interest on
working capital
% p.a. 12.87% SBAR (11.87%) +
100 basis points,
(based on wt. avg.
SBAR of 12.25% and
11.75% for the Working Capital
requirement
1 mth O&M expense 15% of O&M expense
as maintenance
spares and
receivables of 2
months
Capacity
Utilisation Factor
% p.a. 18%
Operation and
Maintenance
expense
Rs L/MW 11 For FY 2010-11
Parameters Unit Value Remarks
Escalation factor
for O&M expense
% p.a. 5.72%
The Levellised Cost of Generation for rooftop PV and other small solar
power projects, in accordance with the assumptions outlined above work out
to Rs 19.57 /kWh.
Applicable Tariff (Proposed):
Accordingly, it is proposed that Tariff for Small Solar Systems (< 1 MW)
may be determined as Rs 19.57/kWh to be valid for period of 25 years
from the date of commissioning provided that such small solar projects (<1
MW) are commissioned on or prior to March 31, 2012 in case of small solar
PV and on or prior to March 31, 2013 in case of small solar thermal power
projects.
Summary of Capital Cost
*(Land Price and subsidy not included)
Sr no..
Components Cost
1 Pv Modules 43.52 lakhs
2 Inverters 13.7 lakhs
3 Mounting structures 10.9 lakhs
4 Cables and Transformers 3.51 lakhs
5 Civil and generation cost 2.7 lakhs
6 Preliminary and pre-operative cost
5 lakhs
7 Operation and maintenance cost 0.60 lakhs escalates @ 5.72 % per year
8 TOTAL Approximate 85 - 90 lakhs
Subsidy :- Grid connected – 25 lakhs according to Rs 70 / watt OR 27 lakhs according 30 % Capital cost (Lesser value is considered ) Reference : CERC “Central Electricity Regulatory Commission ”