50 Kw project 50 Kw project 50 Kw project 50 Kw project Intro :- complete turnkey basis Development , financing support & EPC Optimum solution for low losses , max output . Benefits :- Govt promting , JNNMS mission Subsidy Rs 70/watt grid connection. Rs 90 / watt Off- grid . Or 30% Project cost which ever is less. Soft loan at 5% Per annum . Benchmark Price Rs 300 / Wp for off- grid . Rs 210 / Wp for Grid connection . Funding 70% on sanction . 30 % on completion. Approval mechanism . 45 days Beneficial Points Reduction in more that 60 tonnes Co2 emission Grid connection can save pto 20 – 30 % total cost in compare to off – grid battery type and battery losses too. Saving of Rs 26646.16 Per month , energy profit @ rate of 4.14 Rs Per month , Avrage saving annually is 3.19 Lakhs . 50 Kw , 30 day Sunlight for 5 hr / day Produces = 250 Kwh / day

Transcript of Solar pv Plant 50 Kw Detail Project Report

Page 1: Solar pv Plant 50 Kw Detail Project Report

50 Kw project50 Kw project50 Kw project50 Kw project Intro :- complete turnkey basis Development , financing support & EPC Optimum solution for low losses , max output . Benefits :- Govt promting , JNNMS mission

Subsidy – Rs 70/watt grid connection.

Rs 90 / watt Off- grid .

Or

30% Project cost which ever is less.

Soft loan at 5% Per annum .

Benchmark Price Rs 300 / Wp for off- grid . Rs 210 / Wp for Grid connection . Funding 70% on sanction . 30 % on completion. Approval mechanism . 45 days Beneficial Points

• Reduction in more that 60 tonnes Co2 emission

• Grid connection can save pto 20 – 30 % total cost in compare to off – grid battery type and battery losses too.

• Saving of Rs 26646.16 Per month , energy profit @ rate of 4.14 Rs Per month ,

Avrage saving annually is 3.19 Lakhs .

• 50 Kw , 30 day Sunlight for 5 hr / day

• Produces = 250 Kwh / day

Page 2: Solar pv Plant 50 Kw Detail Project Report

i.e 7500 Kwh / month

7500 units

• Tracking system (optional) Dual Axis will increase the efficiency by 27 % w.r.t fixed type mounting system .

• Operational cost is very low than the capital investment

• Solar panels SUNGEN ( Hong Kong) , IEC Certified with 25 year of warranty on efficiency .

TUV , UL Certificate.

• Annual Energy feed 72.2 Mw , for grid connected .

� Metering – 15 min time interval , at output of inverter billing purpose net

export Export & import .

� Levelised Tariff - (Rs / Kwh ) 18 .45 or Rs / unit

� AC power is stepped up by 415 / 11Kv Feed it to the grid .

� Life – 25 Year , after that Efficiency reduced to 80- 75 %

� Excise duty is exempted as per MNRE consideration .

� Packing , forwarding , inland transport , insurance @ 2.5 % for all equipment .

Page 3: Solar pv Plant 50 Kw Detail Project Report

COMPONENTS USED

1. Solar PV modules

2. Structure – MS Hot Dip Galvanized.

3. Field junction box.

4. Main junction box .

5. Grid – tie inverter – synchronized , meter equivalent and data logging

6. Ground fault protection system.

7. Cordless modem / Web box etc.

8. Cables

9. Lightning Arresters.

10. Earthning.

Page 4: Solar pv Plant 50 Kw Detail Project Report

Energy Profits Array Type: Fixed Tilt

Station Identification

City: New Delhi

Country/Province: IND

Latitude: 28.58° N

Longitude: 77.20° E

Elevation: 216 m

Weather Data: IWEC

PV System Specifications

DC Rating: 50.0 kW

DC to AC Derate Factor: 0.770

AC Rating: 38.5 kW

Array Type: Fixed Tilt

Array Tilt: 28.6°

Array Azimuth: 180.0°

Energy Specifications

Energy Cost: 4.1400 rupee/kWh

Results

Month

Solar Radiation

(kWh/m2/day)

AC Energy (kWh)

Energy Value (rupee)

1 5.56 6192 25634.88

2 5.90 5778 23920.92

3 6.65 7046 29170.44

4 7.01 6995 28959.30

5 6.91 6925 28669.50

6 6.34 6139 25415.46

7 5.28 5332 22074.48

8 5.25 5376 22256.64

9 5.89 5843 24190.02

10 6.17 6400 26496.00

11 5.74 5864 24276.96

12 5.56 6053 25059.42

Year 6.02 73941 306115.72

Page 5: Solar pv Plant 50 Kw Detail Project Report

Array Type: 1-Axis Tracking

Station Identification

City: New Delhi

Country/Province: IND

Latitude: 28.58° N

Longitude: 77.20° E

Elevation: 216 m

Weather Data: IWEC

PV System Specifications

DC Rating: 50.0 kW

DC to AC Derate Factor:

0.770

AC Rating: 38.5 kW

Array Type: 1-Axis Tracking

Array Tilt: 28.6°

Array Azimuth: 180.0°

Energy Specifications

Energy Cost: 4.1400 rupee/kWh

Results

Month

Solar Radiation

(kWh/m2/day)

AC Energy (kWh)

Energy Value (rupee)

1 6.56 7281 30143.34

2 7.07 6955 28793.70

3 8.05 8579 35517.06

4 8.63 8609 35641.26

5 8.49 8546 35380.44

6 7.89 7700 31878.00

7 6.23 6298 26073.72

8 6.21 6379 26409.06

9 6.96 6926 28673.64

10 7.33 7588 31414.32

11 6.77 6953 28785.42

12 6.47 7028 29095.92

Year 7.22 88842 367805.88

Page 6: Solar pv Plant 50 Kw Detail Project Report

Array Type: 2-Axis Tracking

Station Identification

City: New Delhi

Country/Province: IND

Latitude: 28.58° N

Longitude: 77.20° E

Elevation: 216 m

Weather Data: IWEC

PV System Specifications

DC Rating: 50.0 kW

DC to AC Derate Factor:

0.770

AC Rating: 38.5 kW

Array Type: 2-Axis Tracking

Array Tilt: N/A

Array Azimuth: N/A

Energy Specifications

Energy Cost: 4.1400 rupee/kWh

Results

Month

Solar Radiation

(kWh/m2/day)

AC Energy (kWh)

Energy Value (rupee)

1 7.02 7729 31998.06

2 7.29 7156 29625.84

3 8.13 8668 35885.52

4 8.80 8779 36345.06

5 8.94 8981 37181.34

6 8.51 8276 34262.64

7 6.60 6656 27555.84

8 6.39 6557 27145.98

9 7.00 6975 28876.50

10 7.47 7720 31960.80

11 7.18 7309 30259.26

12 7.04 7557 31285.98

Year 7.53 92362 382378.66

Page 7: Solar pv Plant 50 Kw Detail Project Report

Energy Profit on the basis for New Delhi- electricity Prices – 4.14 Rupee/ Kwh i.e - Avg solar radiation – 6.02

Break Even Point (including subsidy)

1st case – 19 yrs 2nd case – 16.6 yrs 3rd care – 16 yrs

� Estimated cost 85 Lakhs – based on normative cost Rs 17 Crore /Mw adopted by CERC notification Date 16th September.

50 Kw solar plant Specifications

Area for SPV Plant – 450 sq mtrs SPV Power Plant

-Output 50 kWp

-No. of modules 180 -No. of modules in series 6 -No. of parallel combination 30 -DC BUS 1 No. Technical details of a SPV Module (a) PV Module type

- Poly crystalline - 180 modules - Rs 87/ watt -7 x 26 string x modules.

(b) Physical Dimensions

-Length with frame 1957 mm -Width with frame 990 mm -Thickness 40 mm

Page 8: Solar pv Plant 50 Kw Detail Project Report

(c)Electrical Parameter

-Maximum Power Rating = 280 kWp -Rated Current = 7.93 A -Rated Voltage = 35.3 V -Short Circuit Current = 8.76 A -Open Circuit Voltage = 43.77 V

Mounting Arrangement -Mounting Fixed Type -Surface azimuth angle of PV Module = 180o

-Tilt angle (slope) of PV Module = 28.32o

- Rs 49 Per Kg - MS Hot dip galvanized. - C/s “L” Section. Inverter specifications

- 7 inverters - 97 % peak efficiency - UL certification (UL 1741/IEEE 1547) - Grid voltage 420 and 11kv supply - Max. DC power 8.6 Kw - Nominal volt = 345 v - AC nominal power = 7.6 Kw - AC voltage range 211 – 264 V

244 – 305 V

- Max. output current = 32 - Max. efficiency = 96.3 %

96.5 % Cables and Transformers

- copper wiring - DC side 5 mm sq , loss = 0.55% - AC side 6 mm sq , loss 0.72% - Step up transformer

440v , 3ph , 50 Hz

Page 9: Solar pv Plant 50 Kw Detail Project Report

COST OF GENERATION AND APPLICABLE TARIFF

Cost of Generation for Small Solar Systems

Summary of various parameter assumptions for the purpose of determination of

year-to-year cost of generation and levellised tariff thereof, is presented under

following table: (It is calculated for standard 1Mw capacity)

Table: Summary of Parameter assumptions

Parameters Unit Value Remarks

Plant Capacity MW 1

Capital Cost Rs Lakh/ MW 1740

Useful life years 25

Tariff Period years 25

Debt : Equity D:E 70 : 30

Debt component Rs Lakh/MW 1218

Equity component Rs Lakh/MW 522

Page 10: Solar pv Plant 50 Kw Detail Project Report

Parameters Unit Value Remarks

Interest Rate % p.a. 13.37% SBAR (11.87%) +

150 basis points,

(based on wt. avg.

SBAR of 12.25% and

11.75% for the Loan tenure years 10

Depreciation % p.a. 7% for first 10 years

and 1.33% for

remaining period of

useful life

Return on equity % p.a. 19% for initial 10

years and 24% for

subsequent period

Pre-tax return on equity

Discount rate % 15.96% Equivalent to WACC

Interest on

working capital

% p.a. 12.87% SBAR (11.87%) +

100 basis points,

(based on wt. avg.

SBAR of 12.25% and

11.75% for the Working Capital

requirement

1 mth O&M expense 15% of O&M expense

as maintenance

spares and

receivables of 2

months

Capacity

Utilisation Factor

% p.a. 18%

Operation and

Maintenance

expense

Rs L/MW 11 For FY 2010-11

Parameters Unit Value Remarks

Escalation factor

for O&M expense

% p.a. 5.72%

Page 11: Solar pv Plant 50 Kw Detail Project Report

The Levellised Cost of Generation for rooftop PV and other small solar

power projects, in accordance with the assumptions outlined above work out

to Rs 19.57 /kWh.

Applicable Tariff (Proposed):

Accordingly, it is proposed that Tariff for Small Solar Systems (< 1 MW)

may be determined as Rs 19.57/kWh to be valid for period of 25 years

from the date of commissioning provided that such small solar projects (<1

MW) are commissioned on or prior to March 31, 2012 in case of small solar

PV and on or prior to March 31, 2013 in case of small solar thermal power

projects.

Summary of Capital Cost

*(Land Price and subsidy not included)

Sr no..

Components Cost

1 Pv Modules 43.52 lakhs

2 Inverters 13.7 lakhs

3 Mounting structures 10.9 lakhs

4 Cables and Transformers 3.51 lakhs

5 Civil and generation cost 2.7 lakhs

6 Preliminary and pre-operative cost

5 lakhs

7 Operation and maintenance cost 0.60 lakhs escalates @ 5.72 % per year

8 TOTAL Approximate 85 - 90 lakhs

Page 12: Solar pv Plant 50 Kw Detail Project Report

Subsidy :- Grid connected – 25 lakhs according to Rs 70 / watt OR 27 lakhs according 30 % Capital cost (Lesser value is considered ) Reference : CERC “Central Electricity Regulatory Commission ”