Page 1: Socio-organo Complexity and Project Performance · implemented to investigate complexity and its effects on project performance. The investigation focused on the effects of complexity

Socio-organo Complexity and Project Performance

cxcx

Antoniadis D.N.(Project Manager)

Edum-Fotwe F.T.(Loughborough University)

Thorpe A.(Loughborough University)

DAnton-progmDAnton-progm

Page 2: Socio-organo Complexity and Project Performance · implemented to investigate complexity and its effects on project performance. The investigation focused on the effects of complexity

The speaker

D.N. Antoniadis

Working for a major Construction Company in UK.

Completed a part time PhD in Project Management

and Complexity at Loughborough University, with

over 25 years experience in Construction Project and

Programme Management, having worked at various

management levels, for Clients, Contractors, and

Consultants.

Page 3: Socio-organo Complexity and Project Performance · implemented to investigate complexity and its effects on project performance. The investigation focused on the effects of complexity

Why this subject

The selection of this subject has not been accidental.

Complexity is a subject for which we - practitioners

and academia - require to innovate and deliver much

more if we are to develop further Project Management

as a profession and improve the Project Management

Outcome and Project performance.

Page 4: Socio-organo Complexity and Project Performance · implemented to investigate complexity and its effects on project performance. The investigation focused on the effects of complexity

The background

•Lack of implementation

of processes

•Non-linearity of project

management

•Interfaces /

interconnections

•Formation of Boundaries

•Importance of Soft issues

Knowns

• Effects of Complexity on

project performance

• Tools to manage

Complexity

• Complexity of

interconnections

• Characteristics mirrored

in project management

Unknowns

Page 5: Socio-organo Complexity and Project Performance · implemented to investigate complexity and its effects on project performance. The investigation focused on the effects of complexity

Methodology - 1Five case studies were conducted, on construction projects covering all stages of the project life cycle, as part of a multi-methodology implemented to investigate complexity and its effects on project performance.

The investigation focused on the effects of complexity on project performance through the processes of selecting team members and structuring the teams, as well as the management style adopted.

The PMs had a minimum of 10 years experience.

Page 6: Socio-organo Complexity and Project Performance · implemented to investigate complexity and its effects on project performance. The investigation focused on the effects of complexity

Chemical removal plantCommissioningG1.2

Building – 28 luxury flatsConstructionG2.1

Redevelopment of Airport

Terminal Lounge

ConstructionG1.1.4

Airport Terminal Forecourt extension

Design / Early Construction

G1.1.2

Waste Water Treatment

works

FeasibilityG1.3

DescriptionProject StageCase Study

Methodology - 2

Page 7: Socio-organo Complexity and Project Performance · implemented to investigate complexity and its effects on project performance. The investigation focused on the effects of complexity

Case Study G2.1

Stage: Construction

Extract from a typical

case study programme

Page 8: Socio-organo Complexity and Project Performance · implemented to investigate complexity and its effects on project performance. The investigation focused on the effects of complexity

R17 - Clarity of communication / instruction cause confusion to the team which took some time

to react to the misunderstanding

Instability - structureC210

R16 - Communication between team and othersCo-evolution – structureD110

R15 - Problem with designUnpredictabilityB101

R14 - Problem from initial stages of project re-surfaced and caused delayUnpredictabilityB100

R13 - Line of command needed clarificationDownward causation – managementD420

R12 - Definition of work structure needed clarificationDownward causation – structureD410

R11 - Team selection could have been better in terms of tackling the taskDownward causation - team

selection

D400

R10 - Authoritative approach caused problem in teamNon-linear – managementC420

R09 - Structure of team required improvementNon-linear – structureC402

R08 - No expertise within the team – external input requestedAttractors / Non-equilibriumC500,

C300

R07 - Extensive time taken to resolve a problemAutonomous agentsC100

R06 - Lack of Flexibility within the team Co-evolution – teamD100

R05 - Team was not prepared (trained appropriately) to accept influences from the project

environment

Undefined values – teamB310

R04 - Inter-team issue (please elaborate)Undefined values – structureB300

R03 - Team cohesionEmergenceD700

R02 - Lack of appropriate level of trainingNon-linear, Self-reproductionC400,

D301

R01 - Lack of appropriate level of inductionSelf-reproductionD300

ReasonCharacteristicCode cxcx

Extract from list of ‘Reasons for activity delay’

Page 9: Socio-organo Complexity and Project Performance · implemented to investigate complexity and its effects on project performance. The investigation focused on the effects of complexity

Results

Page 10: Socio-organo Complexity and Project Performance · implemented to investigate complexity and its effects on project performance. The investigation focused on the effects of complexity

0%

26%22%24%23%

32%

29%

9%

26%

0

4

6 6

8 8 8

6

8

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

wk1 wk2 wk3 wk4 wk5 wk6 wk7 wk8 wk9

% D

rop in P

erf

orm

ance

0

2

4

6

8

10

Num

. of C

hara

cte

ristics

Drop in Performance

Num of Complexity Characteristics

Case study G1.3, % drop in performance against number of complexity characteristics

that affected performance

Modeling Performance

0

20

40

60

80

100

120

140

160

180

w k0 w k1 w k2 w k3 w k4 w k5 w k6 w k7 w k8 w k9

To

tal D

Us

Cum Plnd DUs

Cum Dus Achieved

Case study G1.3 modelling of performance based on Total Duration achieved

against time taken. Only 74% of the planned activity time was achieved

Case Study G1.3

Stage: Feasibility

Page 11: Socio-organo Complexity and Project Performance · implemented to investigate complexity and its effects on project performance. The investigation focused on the effects of complexity

Frequency of coded reasons for delay

0

1

2

3

4

5

6

7

8

9

R03 R04 R06 R11 R16 R18 R26 R27 R28 R29 R30

Nu

m.

of

Co

de

d R

ea

so

ns

fo

r d

ela

y

From this

Histogram of frequency of occurrence

of coded reasons for delay

Number of reasons causing delay

0

2

4

6

8

10

12

14

B3 C2 C3 C4 D1 D4 D7

Nu

m.

of

Co

mp

lex

ity

Re

as

on

s

cxcx

Frequency of complexity characteristics causing delay

To that

Case Study G1.3

Stage: Feasibility

Page 12: Socio-organo Complexity and Project Performance · implemented to investigate complexity and its effects on project performance. The investigation focused on the effects of complexity

Number of Complexity characteristics & % Drop in Performance

0%

43%

55%58%

56%50%

49%

52%

55%

50%

0

6

13

10

1110

11

13 13

12

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

Wk0 w k1 Wk2 w k3 w k4 w k5 w k6 w k7 w k8 w k9

% D

rop in P

erform

ance

0

2

4

6

8

10

12

14

Num

. of chara

cte

ristics

Drop in Performance

Num ofComplexity characteristics

Case study G1.1.2, % drop in performance

against number of Complexity characteristics

that affected performance

Modeling Performance

654

373

0

100

200

300

400

500

600

700

Wk0 wk1 Wk2 wk3 wk4 wk5 wk6 wk7 wk8 wk9

To

tal

Du

s

Cum. Planned Du

Cum Achieved Du

Case study G1.1.2, modelling of performance based on Total Duration

achieved against Time taken. Only 57% achieved

Case Study G1.1.2

Stage: Design/Early

Construction

Page 13: Socio-organo Complexity and Project Performance · implemented to investigate complexity and its effects on project performance. The investigation focused on the effects of complexity

Number of Complexity characteristics & % Drop in Performance

0%

41%

23%20%

29%

34% 35%

36%

41%42%

0

4

14

14 1414

12

11

5

4

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

Wk0 wk1 Wk2 wk3 wk4 wk5 wk6 wk7 wk8 wk9

% D

rop in P

erf

orm

ance

0

2

4

6

8

10

12

14

16

18

20

Num

of

chara

cte

ristics

Drop in Performance

Num of Complexity characteristics

Case study G1.1.4, % drop in performance

against number of complexity characteristics

that affected performance

Modeling Performance

679

401

0

100

200

300

400

500

600

700

800

Wk0 wk1 Wk2 wk3 wk4 wk5 wk6 wk7 wk8 wk9

To

tal D

us

Cum. Planned Du

Cum Achieved Du

Case study G1.1.4, modelling of performance based on Total Duration

achieved against time taken. Only 59% achieved

Case Study G1.1.4

Stage: Construction

Page 14: Socio-organo Complexity and Project Performance · implemented to investigate complexity and its effects on project performance. The investigation focused on the effects of complexity

Case study G2.1, % drop in performance against

number of complexity characteristics that affected performance.

Modelling Performance

590

252

0

100

200

300

400

500

600

700

Wk0 wk1 Wk2 wk3 wk4 wk5 wk6 wk7 wk8 wk9

To

tal

Du

s

Cum. Planned Du

Cum Achieved Du

Case study G2.1, modelling of performance based on Total Duration achieved

against time taken. Only 42% achieved

Case Study G2.1

Stage: Construction

Number of Complexity characteristics & % Drop in Performance

0%

57%58%58%59%

65%

61%67%

72%

62%

0

9

5

77

7

5

5 55

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

Wk0 wk1 Wk2 wk3 wk4 wk5 wk6 wk7 wk8 wk9

% D

rop in P

erform

ance

0

2

4

6

8

10

Num

. of re

asons

Drop in Performance

Num of Complexity characteristics

Page 15: Socio-organo Complexity and Project Performance · implemented to investigate complexity and its effects on project performance. The investigation focused on the effects of complexity

Number of Complexity characteristics & % Drop in Performance

0%

53%

27%

21%19% 19% 18% 17% 17%

40%

0

6

7

7 7 7 7

6 6 6

0%

20%

40%

60%

80%

100%

wk0 wk1 wk2 wk3 wk4 wk5 wk6 wk7 wk8 wk9

% D

rop in P

erf

orm

ance

0

2

4

6

8

10

Num

. of

Chara

cte

ristics

Drop in Performance

Num. of Complexity characteristics

Case study G1.2, % drop in performance

against number of complexity characteristics

that affected performance

Modeling Performance

154

128

0

20

40

60

80

100

120

140

160

180

wk0 wk1 wk2 wk3 wk4 wk5 wk6 wk7 wk8 wk9

To

tal

Du

s

Cum. Planned Du

Cum Achieved Du

Case study G1.2, modelling of performance based on Total Duration achieved

against time taken. Only 83% achieved

Case Study G1.2

Stage: Commissioning

Page 16: Socio-organo Complexity and Project Performance · implemented to investigate complexity and its effects on project performance. The investigation focused on the effects of complexity

Case Study Performance comparison

CS G2.1 - Cnstr

CS G1.1.2 - Cnstr

CS G1.3 - Dsgn

CS G1.2 - Cmsng

CS G1.1.4 - Cnstr

0%

20%

40%

60%

80%

100%

w k0 w k1 w k2 w k3 w k4 w k5 w k6 w k7 w k8 w k9

% D

rop in P

erf

orm

ance

Case studies summary; drop in performance due to the effects of complexity

Page 17: Socio-organo Complexity and Project Performance · implemented to investigate complexity and its effects on project performance. The investigation focused on the effects of complexity

% Drop in Performance - Only Construction Case Studies

0%

50%

56%58%

57%58%55%

59%56%

64%

0%

20%

40%

60%

80%

100%

w k0 w k1 w k2 w k3 w k4 w k5 w k6 w k7 w k8 w k9

% D

rop

in P

erf

orm

an

ce

Case Study G2.1 Case Study G1.1.2

Cnstr Average

Construction only performance drop curves, including average

Page 18: Socio-organo Complexity and Project Performance · implemented to investigate complexity and its effects on project performance. The investigation focused on the effects of complexity

Outcome

Page 19: Socio-organo Complexity and Project Performance · implemented to investigate complexity and its effects on project performance. The investigation focused on the effects of complexity

% Drop in Performance - Average of all Case Studies

0%

40%37%

40%

39%40%

39%

40% 39% 37%

0%

20%

40%

60%

80%

100%

w k0 w k1 w k2 w k3 w k4 w k5 w k6 w k7 w k8 w k9

% D

rop

in

Pe

rform

ac

e

Average % performance drop for all case studies

Harmonic oscillator with damping.

Case Studies Theory

Comparing Case study results to relevant theory

Page 20: Socio-organo Complexity and Project Performance · implemented to investigate complexity and its effects on project performance. The investigation focused on the effects of complexity

∆t

t

AMinimise drop in performance and reduce the spread of response

∴∴∴∴minimise ∆t by adjusting behaviours, fast enough response,

reducing wasted effort, faster implementation and acceptance of

change.

Therefore, and using the formula as a guide, a solution would be to:

a) Minimise the circular frequency element [sin(ω(√(1-ζ2t))+a)],

b) Identify the values of the damping ratio (ζ) and natural frequency (ω), which then c) Will make the exponential decay function to equal A.

Thus: Ae(-ζωt) = AIn project management this idealistically is interpreted as performance at 100%, or

otherwise 0% drop in performance.

Formula of motion:

x = [Ae(-ζωt)][sin(ω(√(1-ζ2t)) + a)]

Extrapolating from known theory

Page 21: Socio-organo Complexity and Project Performance · implemented to investigate complexity and its effects on project performance. The investigation focused on the effects of complexity

ConclusionsThe effect of complexity on project performance has similarities to the performance of underdamped systems

The results confirm once more the non-linearity of project management.

Current techniques do not address the effects of complexity of interconnections and very few actions are taken to manage these effects.

A complex environment requires implementation of a framework for the management of the effects of complexity.cxcx

cxcx

cxcx

Page 22: Socio-organo Complexity and Project Performance · implemented to investigate complexity and its effects on project performance. The investigation focused on the effects of complexity

Contact Details: Dimitris AntoniadisTel. No.: (++)44 7754 522 049

Email: [email protected]

Website: www.danton-progm.co.uk

Thank youThank you

DAnton-progmDAnton-progm