Snapshot of achieved work within the GREDOR project.

16
GREDOR Gestion des Réseaux Electriques de Distribution Ouverts aux Renouvelables Presentation and snapshot of achieved work FLEXIPAC meeting Bertrand Cornélusse, University of Liège December 2014 1

Transcript of Snapshot of achieved work within the GREDOR project.

Page 1: Snapshot of achieved work within the GREDOR project.

Sunday 30 June 13

GREDOR Gestion des Réseaux Electriques de

Distribution Ouverts aux Renouvelables

Presentation and snapshot of achieved work

FLEXIPAC meeting Bertrand Cornélusse, University of Liège

December 2014

1

Page 2: Snapshot of achieved work within the GREDOR project.

Sunday 30 June 13

GREDOR - Gestion des Réseaux Electriques de Distribution Ouverts aux Renouvelables2

P L A N I N V E S T M E N T S

P L A N O P E R A T I O N S

REAL-TIME CONTROL

Page 3: Snapshot of achieved work within the GREDOR project.

Sunday 30 June 13

GREDOR - Gestion des Réseaux Electriques de Distribution Ouverts aux Renouvelables3

DSO Consumer TSO

Retailer BRP ProducerBSP

P L A N I N V E S T M E N T S

P L A N O P E R A T I O N S

REAL-TIME CONTROL

Page 4: Snapshot of achieved work within the GREDOR project.

Sunday 30 June 13

GREDOR - Gestion des Réseaux Electriques de Distribution Ouverts aux Renouvelables

Main GREDOR aims

Study investment planning, operational planning and real-time control strategies from a functional perspective - what do we want to aid? - from a computational perspective - how do we optimise the decisions? - and from an organisational perspective - how do system actors interact?

We build IT tools to do so. These tools plugged into a simulation framework provide quantified recommendations for system evolution.

4

Page 5: Snapshot of achieved work within the GREDOR project.

Sunday 30 June 13

GREDOR - Gestion des Réseaux Electriques de Distribution Ouverts aux Renouvelables

Project partners

5

Sunday 30 June 13

Funded by

Started in January 2013

Page 6: Snapshot of achieved work within the GREDOR project.

Sunday 30 June 13

GREDOR - Gestion des Réseaux Electriques de Distribution Ouverts aux Renouvelables

General process

6

Prequalification

Global Capacity ANnouncement

Investment

Flexibility procurement

Flexibility notification

Flexibility Activation

Operational planning

Real-time control

Settlement

Long term

Short term

Very short term

ex post

DSO & TSO All stakeholders

Page 7: Snapshot of achieved work within the GREDOR project.

Sunday 30 June 13

GREDOR - Gestion des Réseaux Electriques de Distribution Ouverts aux Renouvelables

Global Capacity Announcement

7

Prequalification

Global Capacity ANnouncement

Investment

Flexibility procurement

Long term

DSO & TSO All stakeholders

Questions •What to publish, who to?•is base case actual system or with foreseen investment?

Goals:•estimate & communicate capacity of network through a set of indicators•incentivise connections in good locations from network’s perspective•incentivise flexibility service in good locations

Page 8: Snapshot of achieved work within the GREDOR project.

Sunday 30 June 13

GREDOR - Gestion des Réseaux Electriques de Distribution Ouverts aux RenouvelablesGREDOR - Gestion des Réseaux Electriques de Distribution Ouverts aux Renouvelables

GCAN example: generation connection

8

New  connections

Page 9: Snapshot of achieved work within the GREDOR project.

Sunday 30 June 13

GREDOR - Gestion des Réseaux Electriques de Distribution Ouverts aux Renouvelables

GCAN computation results

9

Active Network Management aspect not considered:

Flexible connectionFirm connection

Page 10: Snapshot of achieved work within the GREDOR project.

Sunday 30 June 13

GREDOR - Gestion des Réseaux Electriques de Distribution Ouverts aux Renouvelables

Operational planning

10

Prequalification

Flexibility notification

Operational planning

Real-time control

Short term

Very short term

Long term

Available controls:•reconfiguration•flexibility contracts•storage•regulation devices

Goals:•take preventive actions to have the system in a

secure state in real time, •with sufficient controls to maintain it there in RT• Trade off preventive versus corrective actions.

Page 11: Snapshot of achieved work within the GREDOR project.

Sunday 30 June 13

GREDOR - Gestion des Réseaux Electriques de Distribution Ouverts aux Renouvelables

Operational planning example

11

Voltage magnitude

Power injection

Power off take

Curtailed

Modulated

Now24h ahead

Current magnitude

Instantaneous cost

Now24h ahead

Page 12: Snapshot of achieved work within the GREDOR project.

Sunday 30 June 13

GREDOR - Gestion des Réseaux Electriques de Distribution Ouverts aux Renouvelables

Operational planning = Active Network Management

12

31/10/14 17:42Active Network Management Benchmark

Page 1 of 4http://www.montefiore.ulg.ac.be/~anm/

ANM Benchmark.In order to promote the development of computational techniques

for Active Network Management (ANM), we propose a test

instance of a generic ANM problem. It can be used as a test bed for

comparing existing computational techniques, as well as for

developing new ones.

3

Intro Material Team

http://www.montefiore.ulg.ac.be/~anm/

Page 13: Snapshot of achieved work within the GREDOR project.

Sunday 30 June 13

GREDOR - Gestion des Réseaux Electriques de Distribution Ouverts aux Renouvelables

X

GREDOR - Distribution Network SimulatorGREDOR - Distribution Network SimulatorEngine for the Quantitative Analysis of Regulatory Frameworks in Distribution Networks

Instance Server

Parameters

Simulate

Additional parameters

58f44b10 - day 167

Date Tue, 21 Oct 2014 15:30:40 GMT

Title Day 167

Network bus75

Production 25 MW mean

50 MW max

100 % of flexibility

-55 €/MWh cost

Consumption 5 MW mean

9.2 MW max

20 % of flexibility

60.5 €/MWh benefits

Energy prices 47.45 €/MWh mean

82.3 €/MWh max

Day 167 to 167

.

. . . . . . . .

.

.

.

.

.

.

.

. .

.

.

. .

.

. .

. .

.

.

.

. .

.

. .

. .

.

.

.

. .

.

. .

. .

.

. .

.

.

.

. .

.

. .

. .

.

. .

.

. .

.

. .

. .

.

. .

.

.

1000

1100

1101

1102

1103

1104

1105

1106

1107

1108

1109

1110

1111

1112 1113

1114

1115

1116

1117

1118

1119

1120

1121

1122

1123

1124

1125

1126

1127

1128

1129

1130

1131

1132

1133

1134

1135

1136

1137

1138

1139

1140

1141

1142

1143

1144

1145

1146

1147

1148

1149

1150

1151

1152

1153

1154

1155

1156

1157

1158

1159

1160

1161

1162

1163

1164

1165

1166

1167

1168

1169

1170

1171

1172

1173

1174

1175

~ ~ ~

~

~

~

~

~

~

~

~

~

~

~

~

~

~

~

~

~

~

~

Quantitative analysis

13

Page 14: Snapshot of achieved work within the GREDOR project.

Sunday 30 June 13

GREDOR - Gestion des Réseaux Electriques de Distribution Ouverts aux Renouvelables

Simulation process (just an overview)

14

Sunday 30 June 13

Figure: General view of the future implementation. 5/5

Page 15: Snapshot of achieved work within the GREDOR project.

Sunday 30 June 13

GREDOR - Gestion des Réseaux Electriques de Distribution Ouverts aux Renouvelables

Example of results

15

Model 0 Model 1 Model 2 Model 3

min mean max min mean max min mean max min mean max

Welfare Euro -6697 30400 67922 5697 31462 67922 5697 31438 67922 5697 31559 67974

Shedding costs Euro 0 1108 32524 0 132 9702 0 151 9702 0 12 2532

DSO costs Euro 0 0 0 0 59 3218 -52 159 8613 -0 202 8541

TSO surplus Euro 573 2284 4129 573 2284 4129 573 2284 4129 387 2266 4129

Producers surplus

Euro -10935 27521 67497 -10929 27664 67497 -10906 27760 10906 -10906 27803 67459

Retailers surplus Euro -3081 1704 15579 -3081 1704 15579 -3081 1704 15579 -3081 1704 15579

Total shed quantity

MWh 0,0 11,1 325,2 0,0 1,3 97,0 0,0 1,5 97,0 0,0 0,1 25,3

Max. imbalance MW -0,8 -3,6 -16,6 -0,8 -3,0 -15,0 -0,8 -3,2 -15,0 -0,8 -3,0 -11,0

Total imbalance MWh 5,8 36,3 348,8 5,3 30,8 194,6 5,3 31,5 194,6 5,3 30,6 196,0

Total flexibility usage

MWh 0,0 0,8 207,0 0,0 5,2 207,5 0,0 5,6 207,5 0,0 6,2 207,5

Page 16: Snapshot of achieved work within the GREDOR project.

Sunday 30 June 13

GREDOR - Gestion des Réseaux Electriques de Distribution Ouverts aux Renouvelables

And many more activities

16

Investment planning☞ Tractebel engineering

Real time control☞ ULg, Pr. T. Vancutsem

Statistical models☞ UMons, Pr. J. Lobry

System data collection☞ RESAInteraction models and

qualitative analysis ☞ORES