  • TITLE II SERVICES

    ISSUE FOR BIDDING

    SPECIFICATIONS

    SMOKE BOMB HILL

    DUNKIN DONUTS

    GFF PROJECT NUMBER 11174

    AAFES PROJECT NUMBER 0530-11-000017

    May 6, 2016

  • Smoke Bomb Hill Mini Mall/Express Fort Bragg, North Carolina Issue for Bidding May 6, 2016

    Table of Contents

    Table of Contents

    DIVISION 0 BIDDING REQUIREMENTS, CONTRACT FORMS, AND CONDITIONS OF THE

    CONTRACT

    00 04 04 Substitutions 00 23 00 Existing Conditions

    DIVISION 1 GENERAL REQUIREMENTS

    01 10 00 Summary 01 10 42 Construction Phasing 01 10 60 Safety Policies and Procedures 01 13 00 Safety Regulations and Codes 01 13 00.1 Fort Bragg Waste Disposal 01 14 50 Cutting and Patching 01 25 00 Substitution Procedures 01 31 00 Project Management and Coordination 01 32 00 Construction Progress Schedules 01 33 00 Submittal Procedures 01 35 43 Environmental Protection 01 40 00 Quality Requirements 01 51 00 Temporary Utilities 01 55 00 Temporary Facilities, Barriers and Controls 01 59 00 Field Offices and Sheds 01 71 00 Cleaning 01 74 19 Construction Waste Management and Disposal 01 77 00 Project Closeout 01 78 39 Project Record Documents DIVISION 2 EXISTING CONDITIONS NOT USED

    DIVISION 3 CONCRETE

    03 20 00 Concrete Reinforcement 03 30 00 Cast-in-Place Concrete

    DIVISION 4 MASONRY NOT USED

    DIVISION 5 METALS NOT USED

    DIVISION 6 WOOD, PLASTICS AND COMPOSITES NOT USED

    DIVISION 7 THERMAL AND MOISTURE PROTECTION NOT USED

    DIVISION 8 OPENINGS NOT USED

    DIVISION 9 FINISHES NOT USED

    DIVISION 10 SPECIALTIES NOT USED

    DIVISION 11 EQUIPMENT NOT USED

  • Smoke Bomb Hill Mini Mall/Express Fort Bragg, North Carolina Issue for Bidding May 6, 2016

    Table of Contents

    DIVISION 12 FURNISHINGS NOT USED

    DIVISION 13 SPECIAL CONSTRUCTION NOT USED

    DIVISION 14 CONVEYING EQUIPMENT NOT USED

    DIVISION 21 FIRE SUPPRESSION NOT USED

    DIVISION 22 - PLUMBING

    22 00 00 Plumbing General Provisions 22 05 00 Common Work Results For Plumbing 22 05 23 Plumbing Piping Valves and Accessories 22 05 53 Identification for Plumbing Piping and Equipment 22 11 16 Domestic Water Piping 22 11 19 Domestic Water Piping Specialties 22 13 19 Sanitary Waste Piping Specialties 22 40 00 Plumbing Fixtures DIVISION 23 MECHANICAL NOT USED DIVISION 26 ELECTRICAL NOT USED

    DIVISION 28 ELECTRONIC SAFETY AND SECURITY NOT USED DIVISION 31 EARTHWORK NOT USED DIVISION 32 EXTERIOR IMPROVEMENTS NOT USED DIVISION 33 UTILITIES NOT USED END OF TABLE OF CONTENTS

  • Smoke Bomb Hill Mini Mall/Express Fort Bragg, North Carolina Issue for Bidding May 6, 2016

    00 04 04 - 1

    SECTION 00 04 04

    SUBSTITUTIONS

    PART 1 - GENERAL 1.1 CONTRACTING OFFICERS APPROVAL

    A. The contract is based on materials and methods described in the contract document. B. The Contracting Officer will consider proposals for substitution of materials, equipment and methods

    only when such proposals are accompanied by full and complete technical data and all other information required by the Contracting Officer to evaluate the proposed substitution.

    C. Do not substitute materials or equipment, unless such substitution has been specifically approved

    for this Work by the Contracting Officer. D. All substitution requests submitted during solicitation (bid phase) must be received by the

    Contracting Officer no later than 10 days prior to solicitation due date. 1.2 OR EQUAL

    A. Where the phrase or equal or or equal as approved in advance by the Contracting Officer occurs in the Contract Documents, do not assume that material and equipment will be approved as equal by the Contracting Officer unless the item has been specifically approved for this work by the Contracting Officer.

    B. The decision of the Contracting Officer shall be final.

    1.3 AVAILABILITY OF SPECIFIED ITEMS

    A. Verify prior to bidding that all specified items will be available in time for installation during orderly and timely progress of the Work.

    B. In the event specified item or items will not be so available, notify the Contracting Officer prior to

    receipt of bids. C. Costs of delays because of non-availability of specified items, when such delays could have been

    avoided by the Contractor, will be back-charged as necessary and shall not be borne by EXCHANGE.

    1.4 SUBSTITUTIONS FOLLOWING AWARD OF CONTRACT

    A. Substitutions for Cause: Not later than 15 days prior to time required for preparation and review of submittals.

    B. Substitutions for Convenience: Not allowed.

    PART 2 PRODUCTS (NOT USED)

    PART 3 EXECUTION (NOT USED)

    END OF SECTION 00 04 04

  • Smoke Bomb Hill Mini Mall/Express Fort Bragg, North Carolina Issue for Bidding May 6, 2016

    00 04 04 - 2

  • Smoke Bomb Hill Mini Mall/Express Fort Bragg, North Carolina Issue for Bidding May 6, 2016

    Existing Conditions

    00 23 00-1

    SECTION 00 23 00

    EXISTING CONDITIONS

    PART 1 GENERAL

    1.1 DESCRIPTION

    A. The existing building is located on the northeast corner of Gruber and Reilly Roads. The project consists of new underfloor plumbing, and a new concrete floor slab in the area designated for Dunkin Donuts. The demising walls are in place around the Dunkin Donuts space, and an existing door is provided for access. Fire alarms and fire sprinklers have been installed and are operational, and should be left in place. No lighting has been installed.

    1.2 DESCRIPTION OF SITE

    A. The site, comprising approximately 7.2 acres, bounded on 3 sides by streets, Gruber Road, Reilly Road and Kedenburg Road. The sites topography slopes from Gruber Road to Kedenburg Street ranging from elevations 300 to 270 ft. MSL (NAVD 88). The parking lot, curbs, gutters, sidewalks, service drive and all other site work have been installed by others.

    1.3 DESCRIPTION OF EXISTING BUILDINGS

    A. There is a newly constructed building of approximately 34,000 square feet, consisting of an Express on the south end, a food court in the middle, and concession spaces on the north end of the building. The Dunkin Donuts space is in a space just north of the food court seating area.

    END OF SECTION 00230

  • Smoke Bomb Hill Mini Mall/Express Fort Bragg, North Carolina Issue for Bidding May 6, 2016

    Summary 01 10 00 - 1

    SECTION 01 10 00

    SUMMARY

    1.1 PROJECT INFORMATION

    A. Project Identification: Smoke Bomb Hill Dunkin Donuts

    1. Project Location: Fort Bragg, North Carolina

    B. Owner: EXCHANGE.

    1. EXCHANGE Contracting Office: Nikisha Knowlton, Army & Air Force Exchange Service; 3911 S. Walton Walker; Dallas, TX 75236; (214) 312-4570.

    C. Architect: Tammy Chambless; Good, Fulton & Farrell Architects; 2808 Fairmount, Suite 300; Dallas, TX 75201; (214) 303-1500.

    D. Architect's Consultants: The Architect has retained the following design professionals who have prepared designated portions of the Contract Documents:

    1. Structural Engineer: Brandon Fick; Hunt & Joiner, Inc.; 1825 Market Center Blvd, Suite 620; Dallas, TX 75207; (214) 760-7000

    2. MEP Engineer: Stacy Carr; Bury.; 5310 Harvest Hill Road, Ste. 100, Dallas, TX 75230; (972) 295-9140

    3. Fire Protection Engineer: Carissa Platter; Reed Fire Protection Engineering; 4144 N. Central Expressway, Suite 510; Dallas, TX 75204; (214) 638-7599

    4. Civil Engineer: Tamara Carter Murphy; McKim and Creed; 243 North Front Street; Wilmington NC 28401; (910) 520-7754

    E. Exchange Project Manager: Dennis Stephens; Army & Air Force Exchange Service; 3911 S. Walton Walker; Dallas, TX 75236; (214) 312-6101

    F. Project Web Site: Administered by the Exchange.

    1.2 STATEMENT OF WORK

    A. Scope: The work covered by these specifications consists of furnishing all plant, supervision, labor, equipment, and materials as necessary to perform all operations required to complete construction of the underfloor plumbing work and construction of a concrete floor slab with the Dunkin Donuts vendor space. The work is to be performed in accordance with the specifica-tions and the applicable drawings, and subject to the terms and conditions of the contract.

    B. Location: The work to be performed is located at Fort Bragg, North Carolina. The site is locat-

    ed to the east of Reilly Street, to the north of Gruber Road and south of Kedenburg.

  • Smoke Bomb Hill Mini Mall/Express Fort Bragg, North Carolina Issue for Bidding May 6, 2016

    Summary 01 10 00 - 2

    D. General Provisions: The Contractor is advised to take note of the following General Provisions

    of the Contract: Cleaning up; Material and Workmanship; Accident Prevention; Protection of Existing Vegetation, Structures, Utilities and Improvements; Operation and Storage Areas; Site Investigation; Permits and Responsibilities. Copies of the General Provisions may be obtained from the Contracting Officer.

    E. Type of Contract: Single prime contract. F. Bid Alternates: Refer to Section 01 23 00 Bid Alternates.

    1.3 SPECIAL BASE REQUIREMENT

    A. General working hours on Base are from 7:00 A.M. to 7:00 P.M. B. No streets will be blocked without Base headquarters approval. C. Contractor shall immediately clean up any debris tracked on to the Base streets resul