SMART TUNNEL (Stormwater Management And Road Tunnel) PRESENTED BY :AJMAL AFZAL

Transcript of Smart tunnel

Page 1: Smart  tunnel

SMART TUNNEL(Stormwater Management And Road Tunnel)

PRESENTED BY :AJMAL AFZAL

Page 2: Smart  tunnel

SMART TUNNEL

Page 3: Smart  tunnel

SMART TUNNEL• The "Storm water Management And Road Tunnel" or "SMART

Tunnel", is a storm drainage and road structure in Kuala Lumpur, Malaysia, and a major national project in the country.

• The 9.7 km (6.0 mi) tunnel is the longest storm water tunnel in South East Asia and second longest in Asia. . It is the longest multi-purpose tunnel in the world

• The main objective of this tunnel is to solve the problem of flash floods in Kuala Lumpur and also to reduce traffic jams during rush hour.

• There are two components of this tunnel, the storm water tunnel and motorway tunnel.

Page 4: Smart  tunnel

ROUTE

It begins at Kampung Berembang lake near Klang River at Ampang and ends at Taman Desa lake near Kerayong River at Salak South.

Page 5: Smart  tunnel

HISTORY• In 2001 the Government sought proposals for a solution that would

allow a typical flood of three to six hours’ duration to occur without flooding the city center. A tunnel that would allow floods to bypass the center was one way of achieving this, providing it was coupled with temporary storage facilities to keep flows downstream of Kuala Lumpur within the capacity of the river channel.

• A group led by Gamuda engaged SSP, a large Malaysian consultant engineering firm, and Mott MacDonald UK to develop proposals for a tunnel with holding ponds at upstream and downstream ends of the tunnel.

• Construction of the tunnel began in 25 November 2003.

Page 6: Smart  tunnel

CONSTRUCTIONOF SMART TUNNEL

Page 7: Smart  tunnel

CONSTRUCTION• Two Tunnel Boring Machines (TBM) from Germany manufactured by

Herrenknecht were used, including "Tuah" on north side and "Gemilang" on south side.

• Gusztáv Klados was the senior project manager of the project.

• The motorway sections on the SMART system was officially opened at 3:00PM, 14 May 2007.

• Meanwhile, the storm water sections on the SMART system began operations at the end of January 2007.

• As of 18 July 2010 the SMART system has prevented seven potentially disastrous flash floods in the city center.

Page 8: Smart  tunnel

How the SMART Tunnel works?

Page 9: Smart  tunnel

•The first mode, under normal conditions where there is no storm, no flood water will be diverted into the system.

Mode 1: No storm,

low rainfall

Page 10: Smart  tunnel

•When the second mode is activated, flood water is diverted into the bypass tunnel underneath the motorway tunnel. The motorway section is still open to traffic at this stage

Mode 2: Moderate storm

Page 11: Smart  tunnel

•When the third mode is in operation, the motorway will be closed to all traffic. After making sure all vehicles have exited the motorway, automated water-tight gates will be opened to allow flood waters to pass through. The motorway will be reopened to traffic within 48 hours of closure.

Mode 3: Major storm

Page 12: Smart  tunnel

TECHNICAL SPECIFICATIONS OF SMART TUNNEL

The north bound entrance of SMART Tunnel on the Kuala Lumpur-Seremban Expressway.

Page 13: Smart  tunnel

Stormwater tunnel

• Construction cost: US$ 514.6 million

• Stormwater tunnel length: 9.7 km (6.0 mi)

• Diameter: 13.2 m (43.3 ft.) (outer diameter)

• Tunneling method: Tunnel Boring Machine (TBM)

• TBM type: Slurry shield

Page 14: Smart  tunnel

Slurry Shield TBM• Slurry shields are TBM fitted with a full

face cutter head which provides face support by pressurizing boring fluid inside the cutter head chamber.

• These machines are most suited for tunnels through unstable material subjected to high groundwater pressure or water inflow that must be stopped by supporting the face with a boring fluid subjected to pressure.

Page 15: Smart  tunnel

Motorway tunnel

• Motorway tunnel length: 4 km (2.5 mi)

• Structure type: Double Deck

• Ingress and egress: 1.5 km (0.93 mi) at Jalan Sultan Ismail and Jalan Imbi

• Length: 1.4 km (0.87 mi) at Jalan Tun Razak

• Links: 1.6 km (0.99 mi) at Kuala Lumpur-Seremban Expressway Links: City Centre near Kg. Pandan Roundabout KL-Seremban Expressway near Sungai Besi Airport

Page 16: Smart  tunnel

FEATURES OF SMART TUNNEL

• Longest tunnel in Malaysia.

• 9.7 km (6.03 miles) stormwater by-pass tunnel.

• 4 km (2.49 miles) double-deck motorway within stormwater tunnel.

• The motorway tunnel is suitable for light vehicles only. Motorcycles and heavy vehicles are not allowed.

• Ingress and egress connections to the motorway tunnel linking the southern gateway to the city center.

Page 17: Smart  tunnel

FEATURES OF SMART TUNNEL (cont.)• Holding basin complete with diversion and tunnel intake structures.

• Storage reservoir and a twin-box culvert to release flood discharge.

• State-of-the-art operations control room equipped with the latest systems in operations management, surveillance and maintenance of the SMART system.

• Custom-made fire engine units consisting of two modified Toyota Hiluxes, parked at two different locations for quick access to the tunnel in case of fire on both carriageways.

Page 18: Smart  tunnel

CCTV monitoring of SMART Tunnel

Page 19: Smart  tunnel

TOLLS

CLASS TYPE OF VEHICLES Rate(in Malaysian ringgit (RM))

1 Private cars RM 3.00

2 Taxis RM 3.00

SMART Tunnel toll plaza has now fully Electronic Toll Collections (ETC)

As part of an initiative to facilitate faster transaction at the SMART Tunnel Toll Plaza, all toll transactions at this toll plaza on the SMART Tunnel has now conducted electronically via Touch 'n Go cards or SmartTAGs starting 9 September 2015.

Page 20: Smart  tunnel

FM Radio channels available in the tunnel

Radio Frequencies

Nasional FM 87.7 MHz

KL FM 97.2 MHz

Radio Klasik FM 95.3 MHz

Hot FM 97.6 MHz

Fly FM 95.8 MHz

hitz.fm 92.9 MHz

Traxx FM 90.3 MHz

BFM 89.9 89.9 MHz