Smart Metering
for
Automatic Demand Response
Sanjeev K Rana TATA Power Delhi Distribution Limited METERING BILLING/CRM BANGKOK 08-May-2012
Agenda
• Company Overview
• Challenges in Indian Power Sector
• Need and implementation of Automatic Demand Response
• Need and implementation of Smart Metering for Automatic Demand
Response
• Metering scenario in TPDDL
• TPDDL AMI & ADR Project
• Way Forward …..
5/10/2012 2
TPDDL Profile
• Joint Venture of Tata Power Company and Govt. of NCT of Delhi (51: 49)
Licensed for distribution of power in North and North
West Delhi
3 5/10/2012
• The Tata Power Company Ltd. and
Govt. of Delhi JV (51:49)
• License Area : N. Delhi- 510 sq. km
• Consumer Base : 1.25 Mln ; serving
population of 5 Mln
• Peak Load Served : ~ 1400 MW
•Tata Power Delhi Distribution : ISO 9001,
14001, 27001 ; SA 8000 Certified
TPDDL’s journey so far ….
At the time of inception
• AT&C Losses at a level of 53%
• Unreliable Power Situation - transformer failure rate of 11%, only 48% streetlights functional, power cuts of 8-10 hrs/day with 10-12 hrs in summer
• No Concept of Consumer Service
• Erroneous consumer and asset database
• Lack of Performance orientation
• No Computerization / Automation / Tracking and Monitoring
Current Scenario
• AT&C Loss level : 13.5% -- unprecedented reduction of 75% from opening loss levels
• Power Reliability improved manifolds – transformer failure rate 1%, 99% streetlights functional, power cuts negligent despite continuous load growth
• One Stop solution for consumers- State of Art Call Center and Consumer Care
• GIS implemented – 100% Assets and consumers mapped
• Performance Orientation through • Change Management • & Balanced Scorecard Approach
• Integrated CRM introduced, Automation roadmap implemented (SCADA, OMS, DMS, DA implemented)
4 5/10/2012
2
00
4
2
00
5 &
2
00
6
2
00
7
2
00
8 &
2
00
9
20
03 PARIVARTAN (Change Management) Focus on Employee development and consumer orientation. Amalgamation of culture post privatization.
Institutionalization of Training and development.
Elimination of Electricity Theft Conversion of Network to Theft proof technologies such as HVDS, LT ABC etc., Mass Meter
Replacement. Electronic Meter, AMR Technologies;
Performance Consolidation Institutionalization of Score card, Adaptation of advance technology/applications
e.g. SAMBANDH, GIS, SCADA , SAP, SANCHAY etc.
Performance Assurance Process Mapping; Technology upgradation, Network Augmentation
Maturity & Self Sustenance Long Term PPA’s, BD Group, Consultancy/Training to
other utilities; Generation Plant.
Turn
aro
un
d
Ind
ust
ry E
min
en
ce
Emer
gin
g Le
ade
r
20
10
-12
Sustainability Long Term PPA, Own Generation, Green Power, SAP-
ISU integrated with R3/GIS, Latest Technology
(OMS,DMS,DA), Workforce Competency Building, Smart
Grid initiatives Assessment
Steps to Pride…
Challenges in Power Sector
5/10/2012 6
India Market DR Potential
Demand Response - Market Potential P
eak
Dem
and
GW
Business-as-Usual (No DR)
Maximum
Achievable
(Achievable) 5% Reduction in peak demand through DR
(Achievable) 10% Reduction in peak
demand through DR
In 2011-12
• Peak Demand - 152.746 GW
• 5% reduction - 8 GW
• 10% reduction - 16 GW
5/10/2012 7
Demand Response (DR)
Demand Response (DR) is Peak Electrical Load Reduction, an historical perspective and business model for load control
Demand Response explicitly refers to all those activities that involve utility action in the marketplace to modify the consumer's load profile through Consumer participation. Demand Response is a potent tool to address the peak energy and power deficit in India which stands at 12.1% and 10.6% respectively.
5/10/2012 8
Why Demand Response??
A. Gap between Demand side and supply side may be met by:- 1. Increasing the Generation Growth 2. Reducing the Load Demand
B. Time, Resource and Capital Requirement issue can be addressed easily- crucial for Developing nations.
C. Operational Concern addressed – Virtual Peaking Generator D. Aligned with the Climate Concern
5/10/2012 9
Automatic Demand Response (ADR) is an integrated system with energy management control systems to initiate customer approved actions to curtail loads automatically during requirement of Grid. An Auto-DR event can be triggered by either real-time prices or system reliability triggers. The communication is based on open standards like Internet protocols – Open ADR protocol.
5/10/2012 10
Utility
Facilities
Facilities Aggregator
Automatic Demand Response (ADR)
Infrastructure Model
• Utility will have direct customer relationship, contract and pay incentives
• Utility will design, develop, market and program manage the DR program
• Utility will engage DR infrastructure provider to provide multiple services like Auto DR infrastructure, Facility Commissioning and Shed strategy, BMS programming and management, customer training and problem resolution
DR Aggregator Model
• Utility will not have direct customer relationship
• Utility will engage service provider to provide Turnkey DR services like Auto DR infrastructure, BMS programming and management, customer training and problem resolution, design and development of DR program, incentive payment, DR program marketing and management, customer web portal, delivery of peak demand reduction
5/10/2012 11
Demand Response (DR)
5/10/2012 12
Smart Metering is one of the cornerstones of Smart Grid Vision as it:
Allows customers to make informed decisions by providing highly detailed information
Provides customers with greater control over their electricity use when coupled with time-based rates, potentially saving money on their monthly electric bill.
Allows for faster outage detection and restoration of service , reduce call centre cost
Increases privacy because electricity usage information can be relayed automatically to the utility for billing purposes without on-site visits
Smart Metering for ADR
Current Metering Scenario at TPDDL
Consumer Segment
Profile Sanctioned
Load % of TPDDL
Consumer(Nos) Meter Type Reading Type
Xpress Consumer
DJB , DMRC, Malls etc.
> 499 KW 208
(0.02%) HT Meter AMR
Key Consumer
LIP , Hospitals, Institution
> 99 KW 1649
(0.14%) HT Meter AMR
HRB Consumer
SIP ,Towers , Street light etc.
11 KW to 99 KW
34087 (2.88%)
CT Meter AMR
HCB Consumer
Household , Shops &
Agriculture
1 KW to 10 KW
1018545 (85.98%)
Single Phase HHD
G & I Consumer
Government & Institutional Consumers
All Load 9361
(0.79 %)
HT/CT/Prepaid Meters
AMR HHD (Prepaid only)
SCG Consumer
JJ Clusters 2 KW 120779 (10.20%)
Single Phase Group Meter
Spot Billing
5/10/2012 14
Automatic Meter Reading at TPDDL
Existing set up:
•48000 meters are on AMR which serves 3% of the total consumers
generating 60 % of total revenue
•GSM based CSD technology
Challenges:
•Communication reliability
•Scalability (Capex, Opex, technical)
•Real time monitoring
•1 way communication system
15 5/10/2012
AMI
Meter Operation • Real time meter reading • Remote meter reading • Remote connect & disconnect • Interval metering • Automated & timely billing • Data storage • Pre-payment metering • Load Management/Outage
handling
Customer Information for utility • Comprehensive life sheet of • consumer consumption • Faster complaint redressal • Remote notification &
escalation • Timely bill & payment alerts
Information for utility/customer
• Overall power‐usage information (meter reads)
• Power‐usage pattern information
•Granular information about power usage by
devices inside the home
• Meter consumption reports
• Load profiling & history of usage
• Dynamic pricing peak/non-peak
Meter Maintenance • Remote meter health
check • Tamper proof • Remote firmware
upgrade
•Smart‐meters along with AMI Modems or the Meters having capability to
communicate data over a media
•A Communication media that carries Data from Smart‐meter to
designated Server (or a Data Centre) and
•An Enterprise Application Suite (like Data Acquisition Software, Meter
Data Acquisition, SAP FICO /MM etc.) that helps process the data for
billing /invoicing and other organization control & integration process
Smart metering solution framework
TPDDL AMI & ADR Project
Project Objective:
a) Peak Shaving by about 34 MW based on large C&I Customers
identified by TPDDL and respective customer’s potential and their
agreement with TPDDL.
b) Demonstrate the key features of AMI for C&I and Residential
customers,
c) Demonstrate the key features of Demand Response
5/10/2012 18
TPDDL AMI & ADR Project
Triggers for DR:
a) Price Trigger
b) Reliability Trigger
Scenarios identified by TPDDL:
a) Shortage of Generation known in advance and the gap is not met
through Short Term Trading.
b) Freq <49.7 TPDDL within schedule and known that freq is likely to be
there for more than 1.5 hrs.
5/10/2012 19
TPDDL AMI & ADR Project Benefits:
a)Facilitate the Customers for better Energy Management
b) Potential Reduction of Expensive Power Purchases
c) Achieve Grid Reliability
5/10/2012 20
TPDDL AMI & ADR Project
Where:
250 large customers (Approx.150 MW contracted load)
How:
a)DR scenarios approved by Regulator
b) MOU between Consumers and Utility
c) Value added services to the customers
d) Automatic Customer Load Curtailment
5/10/2012 21
Service Level Agreement with Customer
Customer’s Home Area Network
GPRS / PLC Communication Network
Meter Data Management System
Meter Data Collection System
Service Level Agreement with Communication
Network Provider
Demand Response Automation Server
Network Operations Centre (NOC)
Demand Load Control (DLC) through Open
ADR
Custom Applications Customer Portal
Customer Smart Meter
BMS
TPDDL –Metering Integration
Enterprise Business Analytics
HISTORIAN CBM
ATO
Enterprise Service Bus
SCADA / EMS / DMS DA GIS
DER Operations
Substation Automation
OMS AMR / AMI
SAP
MDMS / TOD DR Consumer HAN
Network Planning
Design Asset Management
ICC
P
5/10/2012 23
SCADA : Supervisory Control & Data Acquisition EMS : Energy Management System DMS : Distribution Management System DA : Distribution Automation OMS : Outage Management System GIS : Geographical Information System SAP : System Application & Products CBM : Condition Based Maintenance ATO : Advanced Transmission Operations AMR : Automated Meter Reading AMI : Advanced Metering Infrastructure DR : Demand Response MDMS : Meter Data Management System TOD : Time of Day HAN : Home Area Network DER : Distributed Energy Resources ICCP : Inter Control Centre Protocol
Way forward –Technology Integration