Smart Metering

for

Automatic Demand Response

Sanjeev K Rana TATA Power Delhi Distribution Limited METERING BILLING/CRM BANGKOK 08-May-2012

Page 2: Smart Metering for Automatic Demand Response Rana...• Need and implementation of Smart Metering for Automatic Demand Response • Metering scenario in TPDDL • TPDDL AMI & ADR Project

Agenda

• Company Overview

• Challenges in Indian Power Sector

• Need and implementation of Automatic Demand Response

• Need and implementation of Smart Metering for Automatic Demand

Response

• Metering scenario in TPDDL

• TPDDL AMI & ADR Project

• Way Forward …..

5/10/2012 2

Page 3: Smart Metering for Automatic Demand Response Rana...• Need and implementation of Smart Metering for Automatic Demand Response • Metering scenario in TPDDL • TPDDL AMI & ADR Project

TPDDL Profile

• Joint Venture of Tata Power Company and Govt. of NCT of Delhi (51: 49)

Licensed for distribution of power in North and North

West Delhi

3 5/10/2012

• The Tata Power Company Ltd. and

Govt. of Delhi JV (51:49)

• License Area : N. Delhi- 510 sq. km

• Consumer Base : 1.25 Mln ; serving

population of 5 Mln

• Peak Load Served : ~ 1400 MW

•Tata Power Delhi Distribution : ISO 9001,

14001, 27001 ; SA 8000 Certified

Page 4: Smart Metering for Automatic Demand Response Rana...• Need and implementation of Smart Metering for Automatic Demand Response • Metering scenario in TPDDL • TPDDL AMI & ADR Project

TPDDL’s journey so far ….

At the time of inception

• AT&C Losses at a level of 53%

• Unreliable Power Situation - transformer failure rate of 11%, only 48% streetlights functional, power cuts of 8-10 hrs/day with 10-12 hrs in summer

• No Concept of Consumer Service

• Erroneous consumer and asset database

• Lack of Performance orientation

• No Computerization / Automation / Tracking and Monitoring

Current Scenario

• AT&C Loss level : 13.5% -- unprecedented reduction of 75% from opening loss levels

• Power Reliability improved manifolds – transformer failure rate 1%, 99% streetlights functional, power cuts negligent despite continuous load growth

• One Stop solution for consumers- State of Art Call Center and Consumer Care

• GIS implemented – 100% Assets and consumers mapped

• Performance Orientation through • Change Management • & Balanced Scorecard Approach

• Integrated CRM introduced, Automation roadmap implemented (SCADA, OMS, DMS, DA implemented)

4 5/10/2012

Page 5: Smart Metering for Automatic Demand Response Rana...• Need and implementation of Smart Metering for Automatic Demand Response • Metering scenario in TPDDL • TPDDL AMI & ADR Project

2

00

4

2

00

5 &

2

00

6

2

00

7

2

00

8 &

2

00

9

20

03 PARIVARTAN (Change Management) Focus on Employee development and consumer orientation. Amalgamation of culture post privatization.

Institutionalization of Training and development.

Elimination of Electricity Theft Conversion of Network to Theft proof technologies such as HVDS, LT ABC etc., Mass Meter

Replacement. Electronic Meter, AMR Technologies;

Performance Consolidation Institutionalization of Score card, Adaptation of advance technology/applications

e.g. SAMBANDH, GIS, SCADA , SAP, SANCHAY etc.

Performance Assurance Process Mapping; Technology upgradation, Network Augmentation

Maturity & Self Sustenance Long Term PPA’s, BD Group, Consultancy/Training to

other utilities; Generation Plant.

Turn

aro

un

d

Ind

ust

ry E

min

en

ce

Emer

gin

g Le

ade

r

20

10

-12

Sustainability Long Term PPA, Own Generation, Green Power, SAP-

ISU integrated with R3/GIS, Latest Technology

(OMS,DMS,DA), Workforce Competency Building, Smart

Grid initiatives Assessment

Steps to Pride…

Page 6: Smart Metering for Automatic Demand Response Rana...• Need and implementation of Smart Metering for Automatic Demand Response • Metering scenario in TPDDL • TPDDL AMI & ADR Project

Challenges in Power Sector

5/10/2012 6

Page 7: Smart Metering for Automatic Demand Response Rana...• Need and implementation of Smart Metering for Automatic Demand Response • Metering scenario in TPDDL • TPDDL AMI & ADR Project

India Market DR Potential

Demand Response - Market Potential P

eak

Dem

and

GW

Business-as-Usual (No DR)

Maximum

Achievable

(Achievable) 5% Reduction in peak demand through DR

(Achievable) 10% Reduction in peak

demand through DR

In 2011-12

• Peak Demand - 152.746 GW

• 5% reduction - 8 GW

• 10% reduction - 16 GW

5/10/2012 7

Page 8: Smart Metering for Automatic Demand Response Rana...• Need and implementation of Smart Metering for Automatic Demand Response • Metering scenario in TPDDL • TPDDL AMI & ADR Project

Demand Response (DR)

Demand Response (DR) is Peak Electrical Load Reduction, an historical perspective and business model for load control

Demand Response explicitly refers to all those activities that involve utility action in the marketplace to modify the consumer's load profile through Consumer participation. Demand Response is a potent tool to address the peak energy and power deficit in India which stands at 12.1% and 10.6% respectively.

5/10/2012 8

Page 9: Smart Metering for Automatic Demand Response Rana...• Need and implementation of Smart Metering for Automatic Demand Response • Metering scenario in TPDDL • TPDDL AMI & ADR Project

Why Demand Response??

A. Gap between Demand side and supply side may be met by:- 1. Increasing the Generation Growth 2. Reducing the Load Demand

B. Time, Resource and Capital Requirement issue can be addressed easily- crucial for Developing nations.

C. Operational Concern addressed – Virtual Peaking Generator D. Aligned with the Climate Concern

5/10/2012 9

Page 10: Smart Metering for Automatic Demand Response Rana...• Need and implementation of Smart Metering for Automatic Demand Response • Metering scenario in TPDDL • TPDDL AMI & ADR Project

Automatic Demand Response (ADR) is an integrated system with energy management control systems to initiate customer approved actions to curtail loads automatically during requirement of Grid. An Auto-DR event can be triggered by either real-time prices or system reliability triggers. The communication is based on open standards like Internet protocols – Open ADR protocol.

5/10/2012 10

Utility

Facilities

Facilities Aggregator

Automatic Demand Response (ADR)

Page 11: Smart Metering for Automatic Demand Response Rana...• Need and implementation of Smart Metering for Automatic Demand Response • Metering scenario in TPDDL • TPDDL AMI & ADR Project

Infrastructure Model

• Utility will have direct customer relationship, contract and pay incentives

• Utility will design, develop, market and program manage the DR program

• Utility will engage DR infrastructure provider to provide multiple services like Auto DR infrastructure, Facility Commissioning and Shed strategy, BMS programming and management, customer training and problem resolution

DR Aggregator Model

• Utility will not have direct customer relationship

• Utility will engage service provider to provide Turnkey DR services like Auto DR infrastructure, BMS programming and management, customer training and problem resolution, design and development of DR program, incentive payment, DR program marketing and management, customer web portal, delivery of peak demand reduction

5/10/2012 11

Demand Response (DR)

Page 12: Smart Metering for Automatic Demand Response Rana...• Need and implementation of Smart Metering for Automatic Demand Response • Metering scenario in TPDDL • TPDDL AMI & ADR Project

5/10/2012 12

Page 13: Smart Metering for Automatic Demand Response Rana...• Need and implementation of Smart Metering for Automatic Demand Response • Metering scenario in TPDDL • TPDDL AMI & ADR Project

Smart Metering is one of the cornerstones of Smart Grid Vision as it:

Allows customers to make informed decisions by providing highly detailed information

Provides customers with greater control over their electricity use when coupled with time-based rates, potentially saving money on their monthly electric bill.

Allows for faster outage detection and restoration of service , reduce call centre cost

Increases privacy because electricity usage information can be relayed automatically to the utility for billing purposes without on-site visits

Smart Metering for ADR

Page 14: Smart Metering for Automatic Demand Response Rana...• Need and implementation of Smart Metering for Automatic Demand Response • Metering scenario in TPDDL • TPDDL AMI & ADR Project

Current Metering Scenario at TPDDL

Consumer Segment

Profile Sanctioned

Load % of TPDDL

Consumer(Nos) Meter Type Reading Type

Xpress Consumer

DJB , DMRC, Malls etc.

> 499 KW 208

(0.02%) HT Meter AMR

Key Consumer

LIP , Hospitals, Institution

> 99 KW 1649

(0.14%) HT Meter AMR

HRB Consumer

SIP ,Towers , Street light etc.

11 KW to 99 KW

34087 (2.88%)

CT Meter AMR

HCB Consumer

Household , Shops &

Agriculture

1 KW to 10 KW

1018545 (85.98%)

Single Phase HHD

G & I Consumer

Government & Institutional Consumers

All Load 9361

(0.79 %)

HT/CT/Prepaid Meters

AMR HHD (Prepaid only)

SCG Consumer

JJ Clusters 2 KW 120779 (10.20%)

Single Phase Group Meter

Spot Billing

5/10/2012 14

Page 15: Smart Metering for Automatic Demand Response Rana...• Need and implementation of Smart Metering for Automatic Demand Response • Metering scenario in TPDDL • TPDDL AMI & ADR Project

Automatic Meter Reading at TPDDL

Existing set up:

•48000 meters are on AMR which serves 3% of the total consumers

generating 60 % of total revenue

•GSM based CSD technology

Challenges:

•Communication reliability

•Scalability (Capex, Opex, technical)

•Real time monitoring

•1 way communication system

15 5/10/2012

Page 16: Smart Metering for Automatic Demand Response Rana...• Need and implementation of Smart Metering for Automatic Demand Response • Metering scenario in TPDDL • TPDDL AMI & ADR Project

AMI

Meter Operation • Real time meter reading • Remote meter reading • Remote connect & disconnect • Interval metering • Automated & timely billing • Data storage • Pre-payment metering • Load Management/Outage

handling

Customer Information for utility • Comprehensive life sheet of • consumer consumption • Faster complaint redressal • Remote notification &

escalation • Timely bill & payment alerts

Information for utility/customer

• Overall power‐usage information (meter reads)

• Power‐usage pattern information

•Granular information about power usage by

devices inside the home

• Meter consumption reports

• Load profiling & history of usage

• Dynamic pricing peak/non-peak

Meter Maintenance • Remote meter health

check • Tamper proof • Remote firmware

upgrade

Page 17: Smart Metering for Automatic Demand Response Rana...• Need and implementation of Smart Metering for Automatic Demand Response • Metering scenario in TPDDL • TPDDL AMI & ADR Project

•Smart‐meters along with AMI Modems or the Meters having capability to

communicate data over a media

•A Communication media that carries Data from Smart‐meter to

designated Server (or a Data Centre) and

•An Enterprise Application Suite (like Data Acquisition Software, Meter

Data Acquisition, SAP FICO /MM etc.) that helps process the data for

billing /invoicing and other organization control & integration process

Smart metering solution framework

Page 18: Smart Metering for Automatic Demand Response Rana...• Need and implementation of Smart Metering for Automatic Demand Response • Metering scenario in TPDDL • TPDDL AMI & ADR Project

TPDDL AMI & ADR Project

Project Objective:

a) Peak Shaving by about 34 MW based on large C&I Customers

identified by TPDDL and respective customer’s potential and their

agreement with TPDDL.

b) Demonstrate the key features of AMI for C&I and Residential

customers,

c) Demonstrate the key features of Demand Response

5/10/2012 18

Page 19: Smart Metering for Automatic Demand Response Rana...• Need and implementation of Smart Metering for Automatic Demand Response • Metering scenario in TPDDL • TPDDL AMI & ADR Project

TPDDL AMI & ADR Project

Triggers for DR:

a) Price Trigger

b) Reliability Trigger

Scenarios identified by TPDDL:

a) Shortage of Generation known in advance and the gap is not met

through Short Term Trading.

b) Freq <49.7 TPDDL within schedule and known that freq is likely to be

there for more than 1.5 hrs.

5/10/2012 19

Page 20: Smart Metering for Automatic Demand Response Rana...• Need and implementation of Smart Metering for Automatic Demand Response • Metering scenario in TPDDL • TPDDL AMI & ADR Project

TPDDL AMI & ADR Project Benefits:

a)Facilitate the Customers for better Energy Management

b) Potential Reduction of Expensive Power Purchases

c) Achieve Grid Reliability

5/10/2012 20

Page 21: Smart Metering for Automatic Demand Response Rana...• Need and implementation of Smart Metering for Automatic Demand Response • Metering scenario in TPDDL • TPDDL AMI & ADR Project

TPDDL AMI & ADR Project

Where:

250 large customers (Approx.150 MW contracted load)

How:

a)DR scenarios approved by Regulator

b) MOU between Consumers and Utility

c) Value added services to the customers

d) Automatic Customer Load Curtailment

5/10/2012 21

Page 22: Smart Metering for Automatic Demand Response Rana...• Need and implementation of Smart Metering for Automatic Demand Response • Metering scenario in TPDDL • TPDDL AMI & ADR Project

Service Level Agreement with Customer

Customer’s Home Area Network

GPRS / PLC Communication Network

Meter Data Management System

Meter Data Collection System

Service Level Agreement with Communication

Network Provider

Demand Response Automation Server

Network Operations Centre (NOC)

Demand Load Control (DLC) through Open

ADR

Custom Applications Customer Portal

Customer Smart Meter

BMS

TPDDL –Metering Integration

Page 23: Smart Metering for Automatic Demand Response Rana...• Need and implementation of Smart Metering for Automatic Demand Response • Metering scenario in TPDDL • TPDDL AMI & ADR Project

Enterprise Business Analytics

HISTORIAN CBM

ATO

Enterprise Service Bus

SCADA / EMS / DMS DA GIS

DER Operations

Substation Automation

OMS AMR / AMI

SAP

MDMS / TOD DR Consumer HAN

Network Planning

Design Asset Management

ICC

P

5/10/2012 23

SCADA : Supervisory Control & Data Acquisition EMS : Energy Management System DMS : Distribution Management System DA : Distribution Automation OMS : Outage Management System GIS : Geographical Information System SAP : System Application & Products CBM : Condition Based Maintenance ATO : Advanced Transmission Operations AMR : Automated Meter Reading AMI : Advanced Metering Infrastructure DR : Demand Response MDMS : Meter Data Management System TOD : Time of Day HAN : Home Area Network DER : Distributed Energy Resources ICCP : Inter Control Centre Protocol

Way forward –Technology Integration