SMART DMU Engine Replacement Procedure
for Crankshaft Replacement
DPM/Engine Replacement
Due to the engine crankshaft issue, all of engines need to be replaced to the engine which uses updated crankshaft in SMART. When engine/transmission set is uninstalled from the carbody, carbody need to be lifted by carjacks and need the caster Jig and engine Jig. Therefore this document shows how to lift the carbody and swing the engine.
DPM Jig & Caster Jig Picture
Caster jig DPM jig
Engine jig
DPM sit on DPM jig
Caster Jig & Engine Jig Picture
Caster jig
Engine jig
Engine/transmission sit on Engine jig/caster jig
Engine Exchange Procedure
Procedure of Engine & Transmission Installation/Uninstallaion
(1) Move car to pit. Drain engine coolant. Disconnect cardan shaft, auxiliary coupling, Engine & transmission connectors, battery cable and coolant hoses.
DPM
Cardan Shaft Auxiliary Shaft
DPM a
Caster Jig (2) Move car to flat place. Place engine jig on Caster jig, and set those aside the car
Top View
Side View
Engine Jig
Car
Transmission
Engine
Caster Jig (blue)
Engine Jig (orange)
Procedure of Engine & Transmission Installation/Uninstallaion
DPM a
(3) Use carjacks to lift the car, and slide the jigs into underneath the engine. Lower the car until contacting the engine jig to engine bracket. Uninstall the engine and transmission.
Engine
Caster Jig (blue)
Engine Jig (orange)
Procedure of Engine & Transmission Installation/Uninstallaion
(4) Fix the engine to the engine jig. Then, Lift the car and support truck frame by tripods as well as car jacks for the safety. Slide the engine and jigs out of the car.
DPM a Engine
Caster Jig (blue)
Engine Jig (orange)
Procedure of Engine & Transmission Installation/Uninstallaion
Car lifted and engine is located side of the car on the engine/caster jig
Tripod
(5) Exchange engine transmission set to new set with engine jig.
Engine
Procedure of Engine & Transmission Installation/Uninstallaion
Mod. Engine
New engine & transmission set with engine jig delivered from Cummins. (if the engine brackets, rubber mounts, oil/coolant/fuel filters, hoses are already attached to new set, the preparation work on site can be so reduced)
(6) Lift the car. Slide the new engine and jigs underneath the car.
Procedure of Engine & Transmission Installation/Uninstallaion
DPM a Mod. Engine
Caster Jig (blue)
Engine Jig (orange)
(7) lower car until contacting engine bracket to DPM frame. Install engine and transmission. Lift the car and slide jigs to side of the car.
Procedure of Engine & Transmission Installation/Uninstallaion
DPM a New Engine
Caster Jig (blue)
Engine Jig (orange)
Procedure of Engine & Transmission Installation/Uninstallaion
(8) Move car to pit. Connect cardan shaft, auxiliary coupling, engine & transmission connectors, battery cable and engine coolant hoses. Align the auxiliary shaft. Refill engine coolant. Keep engine high idle more than 10 minutes and top off the coolant.
DPM
Cardan Shaft Auxiliary Shaft
(9) Ship 2 engine/ transmission sets to Cummins to replace the crankshaft and oil gaskets. Test by dyno and couple engine and transmission. Cummins ship back the engine to SMART.
Ship engine to Cummins (w/ engine jig)
Procedure of Engine & Transmission Installation/Uninstallaion
Engine Transmission
Engine Uncoupling
Modify engine (crankshaft, gaskets)
Mod. Engine Dyno test
Mod. Engine Coupling
Mod. Engine
Ship engine to SMART (w/ engine jig)
Cummins
SMART
Engine jig
There are 2 spare transmission and 4 sets of diaphragms at NPower.
There is 1 engine jig at SMART and Npower is estimating 3 engine jig sets now.
Problem
Diaphragms (ZF)