Sligo County Council in Sligo County Council in Partnership with the Partnership with the
Federation of Group Water Federation of Group Water Supply Schemes.Supply Schemes.
‘ ‘ Progress on the construction of Progress on the construction of the group water supply bundles the group water supply bundles in Sligo’in Sligo’
Pat Doyle ,Project Pat Doyle ,Project Engineer.Engineer.
8 June 068 June 06
Sligo d.b.o. bundlesSligo d.b.o. bundlesNORTH BUNDLE NORTH BUNDLE COST €2,545,749COST €2,545,7491Ballintrillick gwss. 1Ballintrillick gwss. 2 Benbulbin gwss10m/3/h .2 Benbulbin gwss10m/3/h .3Castletown gwss.8m/3/h3Castletown gwss.8m/3/h4 Drum east gwss 20m/3/h.4 Drum east gwss 20m/3/h.5Beltra gwss.10m/3/h5Beltra gwss.10m/3/h6 Kellogoboy gwss 12m/3/h6 Kellogoboy gwss 12m/3/hSOUTH BUNDLE SOUTH BUNDLE COST €2.936,588 COST €2.936,588 7Castlebalwin gwss.35m/3/h7Castlebalwin gwss.35m/3/h 8Corrick gwss.10m/3/h8Corrick gwss.10m/3/h 9 Culfadda gwss.9 Culfadda gwss.10 Geevagh Highwood gwss.52m/3/h10 Geevagh Highwood gwss.52m/3/h11 Keash gwss 12m/3/h11 Keash gwss 12m/3/h
CONTRACT SIGNED ON APRIL 11 2005CONTRACT SIGNED ON APRIL 11 2005 CONTRACT PERIOD 12 MONTHSCONTRACT PERIOD 12 MONTHSThe contractor will maintain these plants for 20years.The contractor will maintain these plants for 20years.
CONTRACTOR --TREATMENT SYSTEMS LTD. KilkennyCONTRACTOR --TREATMENT SYSTEMS LTD. Kilkenny
Easkey
Lough Easkey
Lough Talt
Lough GillSligo
Grange
Lough Na Labe
6
1
5
42
3
North West Group1. Drum East (250 Houses)2. Benbulben (53 Houses)3. Ballintrillick (112 Houses)4. Castletown (58 Houses)5. Keelogyboy (92 Houses)6. Beltra (81 Houses)
BallymoteLough BoLough Arrow
12
79
11 10
8South East Group7. Geevagh Highwood (388 Houses)8. Castlebaldwin (280 Houses)9. Carrownadorgny (25 Houses)10. Keash (130 Houses)11.11. CulfaddaCulfadda (162 Houses)12. Corrick / Ballinafad (86 Houses)
BALLINTRILLICKBALLINTRILLICKBALLINTRILLICK
Construction processConstruction process Once the contractor was appointed ,they ware Once the contractor was appointed ,they ware
allowed a specific period to prepare the allowed a specific period to prepare the design.This design was then submitted to the design.This design was then submitted to the clients rep. for consideration and approval. clients rep. for consideration and approval. (CONSTRUCTION DOCUMENT REVIEW)(CONSTRUCTION DOCUMENT REVIEW)
Drawings were made available for part 8 Drawings were made available for part 8 planning to co. co.planning to co. co.
Once the process of design was Once the process of design was agreed ,drawings were issued to the project agreed ,drawings were issued to the project engineer for recording and comment as work engineer for recording and comment as work progressed.progressed.
PROGRESSPROGRESS DESIGN COMMENCED IN NOVEMBER DESIGN COMMENCED IN NOVEMBER
2004 2004 PART 8 PLANNINGPART 8 PLANNING CONTRACT SIGNED ON APRIL 11 2005CONTRACT SIGNED ON APRIL 11 2005 PROJECT PROGRAMME PROJECT PROGRAMME PAYMENT PROFILE SUBMITTEDPAYMENT PROFILE SUBMITTED CIVIL CONSTRUCTION COMMENCED IN CIVIL CONSTRUCTION COMMENCED IN
AUGUST 2005AUGUST 2005 MECHANICAL CONSTRUCTION BEGAN MECHANICAL CONSTRUCTION BEGAN
IN DECEMBER2005IN DECEMBER2005 PROCESS PROVING MAY/JUNE 2006PROCESS PROVING MAY/JUNE 2006
BENBULBIN T.PLANTBENBULBIN T.PLANT
Replacement of existing reservoir at Ballintrillick GWSReplacement of existing reservoir at Ballintrillick GWSN. SligoN. Sligo
Newly replaced reservoir and treatment plantNewly replaced reservoir and treatment plant Ballintrillick GWS N. Sligo Ballintrillick GWS N. Sligo
Design demandDesign demand Design year = 2005.Design year = 2005. Design period = 20years.Design period = 20years. Per Capita Consumption (PCC) = 180 litres Per Capita Consumption (PCC) = 180 litres
per person per day consistent with the per person per day consistent with the Department of Environment Department of Environment
and Local Government guideline figures for and Local Government guideline figures for GWSsGWSs
Agricultural Demand = 814 litres per Agricultural Demand = 814 litres per connection, based upon W.S Atkins National connection, based upon W.S Atkins National
Water Study Report, 2000.Water Study Report, 2000. Other connections = 1000 litres per Other connections = 1000 litres per
connection assumed.connection assumed.
PRESSURE VESSEL AND INSTRUMENT PANELPRESSURE VESSEL AND INSTRUMENT PANEL
BENBULBINBENBULBIN
Project management-Project management-constructionconstruction
Project inceptionProject inception
Project Review
Design and Planning
ProcurementDevelopmentDelivery
ProjectManagement
ContractManagement
ESB JOB TRACKER FOR SLIGO COUNTY COUNCIL WATER SCHEMES 2005/06
Job ID Location Contractor Payment MIC Stage Comments
Cert in.
127847 Ballintrillick Yes €26,000.00 25 Connected Completed 11/01/06 Yes
127413 Keelogyboy Yes €46,989 25 Designing Design to be handed to Contractor ws 23/01 for build February No
127410 Benbulben Yes €7,519 25 Construction Line outages in progress ws 23/01 for completion end Jan 06.power team on site No
127408 Castletown Yes €15,296 15 Construction As per Benbulben above power team to mobilize next week No
127412 Drum East Yes €6,302 25 Construction As per Benbulben & Castletown {ducting S Campbell} No
124494 Beltra No €3,536 25 Construction Alteration and Linework Done 8/12/05 can be connected when cert in. No
127535 Corrick Yes €8,480 15 Construction Contractor finished linework 23rd Dec. Can be connected when cert in. No
127551 Keash No €19,470 15 Designing Duchas approval rec'd with conditions (Area of Conservation). Line is No
now being designed on site with Duchas representative input & to
minimise risk of damage ESB Crews will do construction rather than
Contractors. Probably construct in March subject to agreements.
127552 Keash No €4,110 20 Designing As per above (Shared line) esb to meet Duchas again this week on site No
E.S.B. crews at work at Castletown GWS ,BenbulbinE.S.B. crews at work at Castletown GWS ,BenbulbinN.SligoN.Sligo
CASTLETOWNCASTLETOWN
BELTRABELTRA
BELTRABELTRA
Castlebaldwin intakeCastlebaldwin intake
CASTLEBALWIN INTAKE
CASTLEBALWIN INTAKE CASTLEBALWIN INTAKE ON LOUGH ARROWON LOUGH ARROW
ADSORPTION CLARIFIERADSORPTION CLARIFIER
CORRICK BEFORE CORRICK BEFORE CONSTRUCTIONCONSTRUCTION
CORRICK TREATMENT CORRICK TREATMENT WORKS OVERLOOKING WORKS OVERLOOKING
LOUGH ARROWLOUGH ARROW
KEASHKEASH
KEASH, BRICKLIEVEKEASH, BRICKLIEVE
Projects construction Projects construction management Water management Water Services,Sligo co.co.Services,Sligo co.co.
Personnel: 1no.Project Engineer,Personnel: 1no.Project Engineer,
2no. SRE,2no. SRE,
2no.RE, 2no.RE,
2no. A/RE, 2no. A/RE,
1no G1 technician1no G1 technician
Working closely with the employers Working closely with the employers representative and main line staff to representative and main line staff to help deliver projects.help deliver projects.
Employers requirementsEmployers requirements
To Provide for the Construction of a To Provide for the Construction of a new Water Treatment Works in new Water Treatment Works in Accordance with the EU (Drinking Accordance with the EU (Drinking Water) Regulations, 2000 S.I. No439Water) Regulations, 2000 S.I. No439
To ensure compliance with the To ensure compliance with the maximum admissible concentrations maximum admissible concentrations (MAC) for colour, manganese and iron (MAC) for colour, manganese and iron and to eliminate the threat from and to eliminate the threat from concentrations of trihalomethanes concentrations of trihalomethanes (THMs) (THMs)
Table 3.3.4:- Estimated Unaccounted For Water (UFW) - 2005
GWSTheor.
DomesticTheor.Agric.
Theor.Other
2005 Total Theor.Demands
2005 ExistingConsumption
Estimated 2005UFW
Estimated 2005
UFW
Unit m3/day m3/day m3/day m3/day m3/day m3/day %
Geevagh/High. 280 383 11 674 1,023 349 52
Keash 78 92 0 170 227 57 34
Culfadda 108 81 2 192 273 81 42
Corrick 70 20 2 93 70 0 0
Castlebaldwin 184 125 22 331 450 119 36
Doongeela 12 11 3 26 12 0 0
SUMMARY OF DUTIESSUMMARY OF DUTIES circularlL7/04circularlL7/04
1.1 To supervise the construction, completion 1.1 To supervise the construction, completion and maintenance of the contract works on the and maintenance of the contract works on the scheme to ensure that they are executed fully scheme to ensure that they are executed fully in accordance with the Contract Documents. in accordance with the Contract Documents.
1.2 To ensure that all materials used in the 1.2 To ensure that all materials used in the works are in accordance with the works are in accordance with the Specification. Specification.
1.3 To execute or supervise tests carried out 1.3 To execute or supervise tests carried out on site and to inspect materials and on site and to inspect materials and manufacture at source other than that which manufacture at source other than that which may be carried out by the Consulting may be carried out by the Consulting Engineer's Head Office Staff. Engineer's Head Office Staff.
Duties continued. Duties continued. To record and check the progress of the work To record and check the progress of the work
against the programme including regular monthly against the programme including regular monthly updating of the programme and of the cash flow updating of the programme and of the cash flow statementsstatements . .
To keep a comprehensive diary constituting a To keep a comprehensive diary constituting a detailed history of the work of construction and of detailed history of the work of construction and of significant happenings at the site and submit significant happenings at the site and submit regular progress reports to the Consulting regular progress reports to the Consulting Engineer. Engineer.
To record with particular detail information To record with particular detail information relating to delays, adverse physical conditions, relating to delays, adverse physical conditions, disputes with landowners, and all Contractor's disputes with landowners, and all Contractor's plant and labour and all Sub-Contractors' plant and plant and labour and all Sub-Contractors' plant and labour . labour .
To measure in agreement with the Contractor's To measure in agreement with the Contractor's staff on a monthly basis.staff on a monthly basis.
To check all interim valuations and submit report To check all interim valuations and submit report to employers representative with to employers representative with recommendation.recommendation.
attend regular measurement meetings with attend regular measurement meetings with Consulting Engineer where any difficulties with Consulting Engineer where any difficulties with interim measurement are to be discussed. interim measurement are to be discussed.
examine in detail any claims submitted by the examine in detail any claims submitted by the Contractor and to make written reports on same. Contractor and to make written reports on same.
Ensure compliance with Safety , Health and Ensure compliance with Safety , Health and Welfare at Work .Welfare at Work .
for regular photographic records of the progress for regular photographic records of the progress of the works of the works
To carry out inspections at regular intervals To carry out inspections at regular intervals to ensure that the Contractors are meeting to ensure that the Contractors are meeting their obligations with regard to the payment their obligations with regard to the payment of P .A. Y .E., P .R.S.I., and Pension of P .A. Y .E., P .R.S.I., and Pension Fund/Sick Pay Contributions on behalf of their Fund/Sick Pay Contributions on behalf of their employees.employees.
Surveillance of testing and commissioning Surveillance of testing and commissioning during process proving period.during process proving period.
To assist in the preparation of all Final To assist in the preparation of all Final AccountsAccounts
Assist with reporting on the PMSAssist with reporting on the PMS
Acrobat Document
Benbulbin GWS new reservoir and treatment plant,Benbulbin GWS new reservoir and treatment plant, N. Sligo N. Sligo
KEELOGOBOYKEELOGOBOY
DRUM EASTDRUM EAST
ADSORPTION CLARIFIERADSORPTION CLARIFIER