Slide: 1 EUM/PPS/08/VWG/0124 - 22 October 2008
Programme Preparation
2nd Post-EPS User Consultation Workshop
Darmstadt, 3-4 February 2009
Lorenzo Sarlo
ONLY SELECTEDSLIDES FOR ASI
Slide: 2EUM/PPS/09/VWG/0013 3 February 2009
The Post-EPS Framework
08 10 15 20 25 30 35
EPS MetOp A, B, C (09:30 LTDN)
Post-EPS Sounding/Imaging (09:30 LTDN)
Post-EPS Additional Contribution (TBD)
NOAA-N, N’ (13:30 LTAN)
NPP (13:30 LTAN)
NPOESS C1, C3 (13:30 LTAN)
NPOESS C2, C4 (05:30 LTDN)
NPOESS follow-on programme
Jason 1, 2 Jason 2 follow-on / SWOT
Sentinel-3 (±10:30 LTDN)
Readiness /
Slide: 3EUM/PPS/09/VWG/0013 3 February 2009
The Post-EPS Framework
The Post-EPS Programme Preparation includes the Phases 0 and A
• The Phase 0 is currently running and will last until Q4 2009
• The Phase 0 will be closed with the planned MDR (Mission Definition Review)
• The Phase A includes a PCR (Preliminary Concept Review) and will close with a PRR (Preliminary Requirements Review) at system level
EUMETSAT conducts the overall Mission, System and Ground Segment Engineering
ESA conducts Industrial Studies at Pre-feasibility and feasibility level
ESA also ensures coordination at Space Segment Level for the GMES Sentinel 5Post-EPS Programme Preparation process based on the logic deployed for the successful
preparation of the MTG Programme.
MTG entered Phase B in January 2009
Slide: 4EUM/PPS/09/VWG/0013 3 February 2009
User Needs
Phase 0Studies
Phase AStudies
(2009-2011)
Phase ACloseout
1st Post-EPS UC Workshop, 2006
2nd Post-EPS UC Workshop, 2009
3rd Post-EPS UC Workshop
Application Expert Group (AEG)
Position Papers
Candidate Missions
Post-EPS MRD, PARD Space Segment
Configuration to be Selected by
CouncilDraft EURD
Payload Complement to be Selected by
Council
2005
2011
Key milestones of the User Consultation Process are these Workshops, providing the forum for users and experts to follow and steer the results of the process. PHASE
B
Post-EPSUser Consultation Process
PRR
MDR
Slide: 5EUM/PPS/09/VWG/0013 3 February 2009
User Consultation > 150 User Representatives involved
2 Workshops conducted since 2006
The 1st UC Workshop (DA, 2006) provided very relevant recommendations for the elaboration of mission requirements
This 2nd Workshop will help to discuss on candidate missions to support further consolidation of requirements and concepts
Further Workshops will be organised in the future to keep users informed on progress of Post-EPS during Phase A
The Post-EPS Mission Expert Team 7 meetings already done
Support to Mission Requirements definition and consolidation
Consulted for all relevant requirements descoping necessary to eliminate hard design drivers
Will be maintained during Phase A
Post-EPSUser Consultation Process
Slide: 6EUM/PPS/09/VWG/0013 3 February 2009
Post-EPS Status & RoadmapPlanningElements
Phase 0 Mission Analysis 2005 – 2009
Phase A Feasibility 2009 – 2011
Phase B Preliminary Definition 2011 – 2013
Phase C/D Detailed Definition, Production 2014 – 2019
Phase E Utilisation from 2018/2020
Slide: 7EUM/PPS/09/VWG/0013 3 February 2009
Post-EPS Status & Roadmap
Phase BPhase 0 Phase A
IR and MW SoundingVIS/IR Imaging
missions
2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020
Phase C/D
Other missions
Prep. Programme
Development and Operation ProgrammeEUMETSATApproval Processes
ESA Programme
ESA Min. Conf.go ahead for phase B/C/D
Operations
2nd User Cons. Workshop
MDR
PlanningElements
Slide: 8EUM/PPS/09/VWG/0013 3 February 2009
ESA Phase 0 Studies
2007 2008 2009 2010 2011
ESA CMin-11go-ahead for Phase B/C/D
Ph.0 Studies Ph. A Studies
PAR MTR FR + MDR
2nd User ConsultationWorkshop
> EUMETSAT
Preparatory Programme
2012
PAR held in June June 2008
planned
extension
Industrial Studiesconducted
… Detailed Presentations planned at this workshop …
MTRs completed in January 2009
Slide: 9EUM/PPS/09/VWG/0013 3 February 2009
2nd User Consultation Workshop ObjectivesCooperation Framework
NPOESS
PostNPOESS
… otherOperators /Agencies …
JPS
Slide: 10EUM/PPS/09/VWG/0013 3 February 2009
Other potential areas for cooperation3MI and RO
The User Consultation Process is a Pillar of the EUMETSAT Programme Preparation process
The Post-EPS Mission Experts Team (PMET) effective work highly recognised and appreciated
Next Steps aim to prepare for important decisions of the EUMETSAT and ESA Councils for the Post-EPS
Programme to endorse MRD and agree on the cooperation schemes
… Dialogue with Users continues…