Kwun Tong Line Extension Contract No. 1001
Yau Ma Tei to Whampoa Tunnels and Ho Man Tin Station
Project Presentation
25 October 2014
![Page 2: Site visit presentation: Kwun Tong line extension](https://reader034.fdocuments.in/reader034/viewer/2022052122/559a89441a28ab684d8b4598/html5/thumbnails/2.jpg)
• KTE 1001: Engineer’s Design (Station-Caverns-HOM to WHA Tunnel)
• Main Contractor: Nishimatsu Construction Co. Ltd.
• Contractor’s Designer: Jacobs China Ltd. (YMT to HOM Tunnel)
• ICE: AECOM
• Project Duration: June 2011 to May 2015
The KTE will extend the full Kwun Tong Line (KTL) service from YMT to WHA
via HOM, adding approximately 2.6km underground route length to KTL.
Project
![Page 3: Site visit presentation: Kwun Tong line extension](https://reader034.fdocuments.in/reader034/viewer/2022052122/559a89441a28ab684d8b4598/html5/thumbnails/3.jpg)
Project
• HOM Interchange Station including both KTE & SCL
• Running tunnels between YMT and WHA including conversion of the existing YMT overrun tunnels, refuge sidings and cable tunnels into the KTE running tunnels
• Modifications to existing YMT, existing cable tunnel and GAR including provisions for cable diversions from YMT and HOM
• WAB comprising emergency access and egress provision and future ventilation provisions
• Upgrading and new formed slope works
• Tree felling, off site tree compensation, transplanting works and landscape works
• Provisions for designated and interfacing contracts
• Backfill and demolition of the Air Raid Precaution Tunnels for construction of HOM
• Essential Public Infrastructural Works
• A temporary explosive magazine at TKO
• A barging facility at HUH Finger Terminal
• Demolition of existing Kerosene Store and Refuse Collection Point at Chung Hau Street, existing driving test centreat Chung Yee Street, existing LCSD sheds at Wuhu Street, Temporary Playground at Ho Man Tin East Services Reservoir Playground
• Reinstatement and re-provision of affected LCSD and Government playgrounds, gardens, open spaces, etc.
• Enabling works for property development at HOM
![Page 4: Site visit presentation: Kwun Tong line extension](https://reader034.fdocuments.in/reader034/viewer/2022052122/559a89441a28ab684d8b4598/html5/thumbnails/4.jpg)
Project Organization
TUNNEL TEAM
ADMIN.
TEAM
COST
CONTROL
TEAM
COMMERCIAL
/ QS TEAM
SAFETY &
ENVIR.
TEAM
QUALITY
ASSURANCE
TEAM
ENGINEERING/
DESIGN/
GEOTECHNICAL
TEAM
EPIW/ UU/
TTMS TEAM
HOM STATION
& BLDG TEAM
SAFETY
MANAGER
LEO WONG
QA MANAGER
OZCAN AKSOY
DEPUTY PROJECT
MANAGER
TONY SHIELD
PROJECT
MANAGER
COLIN BIRKBY
ADMIN.
MANAGER
PORTIA LI
COMMERCIAL
MANAGER
GOOCH JASON
CHARLES
![Page 5: Site visit presentation: Kwun Tong line extension](https://reader034.fdocuments.in/reader034/viewer/2022052122/559a89441a28ab684d8b4598/html5/thumbnails/5.jpg)
WAB FKP
Shape 17.2m x 12.6m Oval Shape
De
pth
Soil Excavation approx. 15m approx. 10m
Rock Excavation approx. 30m approx. 25m
Pipe Pile Wall610mm Dia.
12mm THK @ 1200
610mm Dia.
10mm THK @ 1200
RC Ring Beam4 layer of
B350mm x H1000m
2 layer of
B350mm x H1000m
GroutingGrout Curtain &
Toe GroutToe Grout
required access opening
12.0m x 4.0m
Drilling jumbo installation
12.0m x 3.5m
WAB Shaft Structure
10.6m x 8.2m
WAB ShaftFKP Shaft
Shaft Excavation
![Page 6: Site visit presentation: Kwun Tong line extension](https://reader034.fdocuments.in/reader034/viewer/2022052122/559a89441a28ab684d8b4598/html5/thumbnails/6.jpg)
Methods• Soft Ground Excavation to Rockhead
• Mechanical Excavation for 5m Non-Blasting Zone
• Drill-and-Blast method for remaining rock excavation
WAB ShaftFKP Shaft
Shaft Excavation
FKP 4th Blast 20120706.wmv
![Page 7: Site visit presentation: Kwun Tong line extension](https://reader034.fdocuments.in/reader034/viewer/2022052122/559a89441a28ab684d8b4598/html5/thumbnails/7.jpg)
Stage 1 - Adit Construction
Stage 2 - Junction Construction
Shaft Excavation
![Page 8: Site visit presentation: Kwun Tong line extension](https://reader034.fdocuments.in/reader034/viewer/2022052122/559a89441a28ab684d8b4598/html5/thumbnails/8.jpg)
Tunneling Excavation
Tunnel Excavation1. Drill-and-Blast method to be applied along whole length of tunnels.
2. Full Face method – For Single Track Tunnel
3. Benching method – For Bifurcation & Caverns
4. Mini Bench method – For Twin Track Tunnel
![Page 9: Site visit presentation: Kwun Tong line extension](https://reader034.fdocuments.in/reader034/viewer/2022052122/559a89441a28ab684d8b4598/html5/thumbnails/9.jpg)
Excavation Sequence
YMT to HOM Tunnels• From WAB Shaft towards YMT end and Western Cavern
HOM to HWA Tunnels
• From FKP Shaft towards Eastern Cavern and WHA end
![Page 10: Site visit presentation: Kwun Tong line extension](https://reader034.fdocuments.in/reader034/viewer/2022052122/559a89441a28ab684d8b4598/html5/thumbnails/10.jpg)
1.Controlled by Blasting Sensitive
Receivers
2.Varies from 1.0m to 4.5m
3.Monthly Progress from 29m to
109m
Pullout Length
![Page 11: Site visit presentation: Kwun Tong line extension](https://reader034.fdocuments.in/reader034/viewer/2022052122/559a89441a28ab684d8b4598/html5/thumbnails/11.jpg)
Site Layout at FKP
![Page 12: Site visit presentation: Kwun Tong line extension](https://reader034.fdocuments.in/reader034/viewer/2022052122/559a89441a28ab684d8b4598/html5/thumbnails/12.jpg)
Site Layout at WAB
![Page 13: Site visit presentation: Kwun Tong line extension](https://reader034.fdocuments.in/reader034/viewer/2022052122/559a89441a28ab684d8b4598/html5/thumbnails/13.jpg)
Site Layout at GAR
![Page 14: Site visit presentation: Kwun Tong line extension](https://reader034.fdocuments.in/reader034/viewer/2022052122/559a89441a28ab684d8b4598/html5/thumbnails/14.jpg)
![Page 15: Site visit presentation: Kwun Tong line extension](https://reader034.fdocuments.in/reader034/viewer/2022052122/559a89441a28ab684d8b4598/html5/thumbnails/15.jpg)
![Page 16: Site visit presentation: Kwun Tong line extension](https://reader034.fdocuments.in/reader034/viewer/2022052122/559a89441a28ab684d8b4598/html5/thumbnails/16.jpg)
Tunnel change from Bifurcation to Single Tracks –
Excavation Stage (Direction from HOM towards YMT)
![Page 17: Site visit presentation: Kwun Tong line extension](https://reader034.fdocuments.in/reader034/viewer/2022052122/559a89441a28ab684d8b4598/html5/thumbnails/17.jpg)
Tunnel change from Bifurcation to Single Tracks – After Concreting
(Direction from HOM towards YMT)
![Page 18: Site visit presentation: Kwun Tong line extension](https://reader034.fdocuments.in/reader034/viewer/2022052122/559a89441a28ab684d8b4598/html5/thumbnails/18.jpg)
Tunnel change from Twin Track to Single Track – Excavation Stage
(Direction from HOM towards WHA)
![Page 19: Site visit presentation: Kwun Tong line extension](https://reader034.fdocuments.in/reader034/viewer/2022052122/559a89441a28ab684d8b4598/html5/thumbnails/19.jpg)
Tunnel change from Twin Track to Single Track – Construction Stage
(Direction from HOM towards WHA)
![Page 20: Site visit presentation: Kwun Tong line extension](https://reader034.fdocuments.in/reader034/viewer/2022052122/559a89441a28ab684d8b4598/html5/thumbnails/20.jpg)
Lining & Civil Works
Twin Track Tunnels Single Track Tunnels
![Page 21: Site visit presentation: Kwun Tong line extension](https://reader034.fdocuments.in/reader034/viewer/2022052122/559a89441a28ab684d8b4598/html5/thumbnails/21.jpg)
Lining & Civil Works
![Page 22: Site visit presentation: Kwun Tong line extension](https://reader034.fdocuments.in/reader034/viewer/2022052122/559a89441a28ab684d8b4598/html5/thumbnails/22.jpg)
Lining & Civil Works
![Page 23: Site visit presentation: Kwun Tong line extension](https://reader034.fdocuments.in/reader034/viewer/2022052122/559a89441a28ab684d8b4598/html5/thumbnails/23.jpg)
Casting Directions
![Page 24: Site visit presentation: Kwun Tong line extension](https://reader034.fdocuments.in/reader034/viewer/2022052122/559a89441a28ab684d8b4598/html5/thumbnails/24.jpg)
Lining & Civil Works
Lining Concrete Completed in YMT to HOM Tunnel
![Page 25: Site visit presentation: Kwun Tong line extension](https://reader034.fdocuments.in/reader034/viewer/2022052122/559a89441a28ab684d8b4598/html5/thumbnails/25.jpg)
Rail Track Works (by Others) Commenced in Tunnel
![Page 26: Site visit presentation: Kwun Tong line extension](https://reader034.fdocuments.in/reader034/viewer/2022052122/559a89441a28ab684d8b4598/html5/thumbnails/26.jpg)
Lining & Civil Works
Eastern Small Cavern of the HOM Station
![Page 27: Site visit presentation: Kwun Tong line extension](https://reader034.fdocuments.in/reader034/viewer/2022052122/559a89441a28ab684d8b4598/html5/thumbnails/27.jpg)
Kwun Tong Line Extension Contract No. 1001
Yau Ma Tei to Whampoa Tunnels and Ho Man Tin Station
Site Formation at HOM
![Page 28: Site visit presentation: Kwun Tong line extension](https://reader034.fdocuments.in/reader034/viewer/2022052122/559a89441a28ab684d8b4598/html5/thumbnails/28.jpg)
Kwun Tong Line Extension Contract No. 1001
Yau Ma Tei to Whampoa Tunnels and Ho Man Tin Station
Sectional View of HOM
![Page 29: Site visit presentation: Kwun Tong line extension](https://reader034.fdocuments.in/reader034/viewer/2022052122/559a89441a28ab684d8b4598/html5/thumbnails/29.jpg)
Sectional View of HOM
![Page 30: Site visit presentation: Kwun Tong line extension](https://reader034.fdocuments.in/reader034/viewer/2022052122/559a89441a28ab684d8b4598/html5/thumbnails/30.jpg)
Surface Blasting at HOM
![Page 31: Site visit presentation: Kwun Tong line extension](https://reader034.fdocuments.in/reader034/viewer/2022052122/559a89441a28ab684d8b4598/html5/thumbnails/31.jpg)
HOM Station towards the Southern Side (Year 2013)
![Page 32: Site visit presentation: Kwun Tong line extension](https://reader034.fdocuments.in/reader034/viewer/2022052122/559a89441a28ab684d8b4598/html5/thumbnails/32.jpg)
HOM Station towards the Southern Side (Early 2014)
![Page 33: Site visit presentation: Kwun Tong line extension](https://reader034.fdocuments.in/reader034/viewer/2022052122/559a89441a28ab684d8b4598/html5/thumbnails/33.jpg)
HOM Station towards the Southern Side (Sept-2014)
![Page 34: Site visit presentation: Kwun Tong line extension](https://reader034.fdocuments.in/reader034/viewer/2022052122/559a89441a28ab684d8b4598/html5/thumbnails/34.jpg)
HOM Station Construction at North Side
![Page 35: Site visit presentation: Kwun Tong line extension](https://reader034.fdocuments.in/reader034/viewer/2022052122/559a89441a28ab684d8b4598/html5/thumbnails/35.jpg)
HOM Station Construction at KTE Level (Zone B)
![Page 36: Site visit presentation: Kwun Tong line extension](https://reader034.fdocuments.in/reader034/viewer/2022052122/559a89441a28ab684d8b4598/html5/thumbnails/36.jpg)
Site
Entrance
Tower
Crane
Station Construction
![Page 37: Site visit presentation: Kwun Tong line extension](https://reader034.fdocuments.in/reader034/viewer/2022052122/559a89441a28ab684d8b4598/html5/thumbnails/37.jpg)
(1) Chatham
Road North
Footbridge
(3) Chung Hau
Street
Subway
(4) Chung Hau
Street PTF
(2) Fat Kwong
Street
Subway
(5) Common
Footbridge
(6) Oi Man Estate
Connection
(7) Ho Man Tin
Estate
Connection
EPIW Layout Plan
![Page 38: Site visit presentation: Kwun Tong line extension](https://reader034.fdocuments.in/reader034/viewer/2022052122/559a89441a28ab684d8b4598/html5/thumbnails/38.jpg)
EPIW Worksites
Chatham Road North Footbridge
![Page 39: Site visit presentation: Kwun Tong line extension](https://reader034.fdocuments.in/reader034/viewer/2022052122/559a89441a28ab684d8b4598/html5/thumbnails/39.jpg)
EPIW Worksites
Oil Man Estate Connection
![Page 40: Site visit presentation: Kwun Tong line extension](https://reader034.fdocuments.in/reader034/viewer/2022052122/559a89441a28ab684d8b4598/html5/thumbnails/40.jpg)
EPIW Worksites
Chung Hau Street Public Transfer Facilitates
and the 2 Water Mains Works
![Page 41: Site visit presentation: Kwun Tong line extension](https://reader034.fdocuments.in/reader034/viewer/2022052122/559a89441a28ab684d8b4598/html5/thumbnails/41.jpg)
EPIW Worksites
Fat Kwong Street Subway
![Page 42: Site visit presentation: Kwun Tong line extension](https://reader034.fdocuments.in/reader034/viewer/2022052122/559a89441a28ab684d8b4598/html5/thumbnails/42.jpg)
Project Safety
Management System
DOCUMENTATION HIERACHY
HKBO SQE Policy
Site Safety Policy/Alcohol & Drug Free Charter
Company Management Manual
Project Safety Plan
Crisis Management Plan
Emergency Action Plan
Lifting Plan
Company Safety Procedures
Specific Work Rules
Work Permit System
Method Statements
Task Method Statements
PROCESS
PLAN
DO
CHECK
ACT