SITE INFORMATION ASSESSMENT · 2017. 1. 26. · Shear vane tests were conducted at 500mm intervals...

49
Job No: 7569 April 2014 Ashby Consulting Engineering Ltd Structural, Civil & Geotechnical Engineering 3 Elizabeth Street, P O Box 124, Warkworth 0941 Ph 09 425 9422 Fax 09 425 9431 E-mail: [email protected] The Report has been prepared for the sole benefit of the client for the purposes as outlined in the introduction. Anyone using this report for any other purpose does so at his or her own risk. The report contained here-in remains the exclusive property and copyright of Ashby Consulting Engineering Ltd. SITE INFORMATION ASSESSMENT AND GEOTECHNICAL INVESTIGATION FOR LEN Mc.KEOWN FOR PROPOSED SUBDIVISION AT LOT 3 DP 452608 BLUE GUM DRIVE, WARKWORTH

Transcript of SITE INFORMATION ASSESSMENT · 2017. 1. 26. · Shear vane tests were conducted at 500mm intervals...

  • Job No: 7569 April 2014

    Ashby Consulting Engineering Ltd Structural, Civil & Geotechnical Engineering 3 Elizabeth Street, P O Box 124, Warkworth 0941

    Ph 09 425 9422 Fax 09 425 9431 E-mail: [email protected]

    The Report has been prepared for the sole benefit of the client for the

    purposes as outlined in the introduction. Anyone using this report for any other purpose does so at his or her own risk. The report contained here-in

    remains the exclusive property and copyright of Ashby Consulting

    Engineering Ltd.

    SITE INFORMATION ASSESSMENT

    AND

    GEOTECHNICAL INVESTIGATION

    FOR

    LEN Mc.KEOWN

    FOR

    PROPOSED SUBDIVISION

    AT

    LOT 3 DP 452608

    BLUE GUM DRIVE, WARKWORTH

  • Job No: 7569 April 2014

    CONTENTS

    Item Description Page

    1.0 Introduction 3

    2.0 Description 3

    3.0 Previous Geotechnical Report 4

    4.0 Site Information 4

    4.1 Wind Exposure 4

    4.2 Corrosion Zone 4

    4.3 Surface Water Assessment 4

    4.4 Ground Contamination Assessment 4

    5.0 Geology of the Area 4

    6.0 Investigation 5

    7.0 Topsoil and Unsuitable Material 5

    8.0 Groundwater 5

    9.0 Soil Parameters 5

    10.0 Findings 6

    11.0 Retaining Walls 10

    12.0 Earthworks 11

    13.0 Foundations 14

    14.0 Water supply and Sewage Disposal 15

    15.0 Stormwater Disposal and Stormwater Neutrality 16

    16.0 Access 16

    17.0 Historical & Cultural Issues 16

    18.0 Conclusion and Recommendations 16

    19.0 Applicability 18

    Appendix 19

    Ashby Consulting Engineering Ltd The Report has been prepared for the sole benefit of the client for the purposes as outlined in the introduction. Anyone using this report for any

    Structural, Civil & Geotechnical Engineering other purpose does so at his or her own risk. The report contained here-in 3 Elizabeth Street, P O Box 124, Warkworth 0941 remains the exclusive property and copyright of Ashby Consulting Ph 09 425 9422 Fax 09 425 9431 E-mail: [email protected] Engineering Ltd.

  • Ashby Consulting Engineering Ltd. - 7569

    3

    1.0 Introduction

    Ashby Consulting Engineering Ltd. has been requested by Len McKeown to carry out a geotechnical

    investigation for proposed subdivision located at Blue Gum Drive in Warkworth.

    The purpose of the investigation is to determine whether the proposed new building sites are stable

    and suitable to be built upon.

    2.0 Description

    The property is designated as Lot 3 DP 452608, and is located approximately 1.0km south of

    Warkworth town center on the southern end of Blue Gum Drive. The property has a total area of

    14,140m², and the topography can be typified as grassed pasture orientated to the west with moderate

    slopes of up to 12° or less and rolling into a stream below the western property boundary. Two

    existing houses are located above the north-eastern part of the section and the two access ways for the

    new subdivision will be shared with these two existing houses.

    An overland flow path is located near the western boundary orientated in north-south direction which

    collects the uphill runoff and discharges into the stream below the property which is a small tributary

    of the Mahurangi River.

    Discontinued effluent soakage trenches are located within the central part of the property which

    previously serviced one of the upper dwellings. We understand that this field was decommissioned

    and both the upper dwellings now pump wastewater into the public wastewater system. A small cut off

    drain which protected the effluent field is still within the proposed Lots.

    A public storm water manhole is also located within the central part of the property near the internal

    fence which collects water from the uphill properties which we assume discharges it into the stream

    but due to the overgrown nature of the stream banks we have not located the outfall structure.

    A visual inspection of the stream bed indicates that the upper clay and silt layers have been eroded

    down to the underlying rock layers that are thought to extend up under the property.

    Three horizontal drains are also installed within the proposed lots which plans indicated extend up to

    the building platform on 97 Blue Gum Drive (Lot 1 DP452608). A concrete chamber is installed just

    below proposed Lot 2 where these daylight.

    A previous geotechnical investigation for the dwelling located at 97 Blue Gum Drive done by Colin

    Ashby of this office in 1997 notes that the recommended counterfort drains that were originally

    suggested by the overlying subdivisional geotechnical report done by Harrision Grierson in 1991 are

    not required for this platform which is immediately above the proposed subdivision. It was also noted

    at the time that in the 18 months the three horizontal drains had been installed they had never been

    seen discharging any water.

    The proposal is to subdivide the property into 8 smaller lots with shared access ways with the two

    existing properties Lot 2 DP 452608 (89 Blue Gum Drive) and Lot 1, DP 452608.

    Earthworks will be required to develop level building platforms and the new access ways.

  • Ashby Consulting Engineering Ltd. - 7569

    4

    3.0 Previous Geotechnical Report

    Previous subdivision geotechnical report prepared by ‘Harrison Grierson Consultants Ltd’. ref no.

    43.5158.1 dated August 1991 and a previous geotechnical investigation by this office on 97 Blue Gum

    Drive in 1997 has been referred to whilst writing this report.

    4.0 Site Information

    4.1 Wind Exposure

    The basis of the building wind zone for bracing design is based on our visual assessment of the

    site having knowledge of the requirements of NZS 3604:2011. The site in our assessment

    would have very high wind exposure.

    4.2 Corrosion Zone

    The proposed building site is within the inland coastal areas with medium risk from the

    windblown sea-spray salt deposits. Therefore the site is within Zone C: Medium exposure in

    accordance with NZS 3604:2011.

    4.3 Surface Water Assessment

    We are satisfied that the building is unlikely to flood in the future, and that water from

    buildings or site works can be disposed of in a way that avoids the likelihood or damage or

    nuisance to the other property.

    From an event having a 2% probability of occurring annually (ie, 50 year return period storm)

    water is unlikely to enter buildings.

    4.4 Ground Contamination Assessment

    Although part of the proposed subdivision is currently covered in rows of old apple trees, a

    preliminary visual inspection has been carried out including the observation of flora and fauna

    as well as a critical appraisal of the physical land features. From this visual inspection, no

    unusual or non-conformity in the features of the site were apparent which would indicate past

    use or the presence of hazardous agents or contaminants.

    5.0 Geology of the Area

    The following geological map references have been referred to;

    1. NZ Geological Map Sheet 2A: at a scale of 1– 250,000. The map indicates that the site has the underlying soil type – Waitemata Group, “Dark grey sandstone and mudstone, non calcareous,

    often with intraformational slumping, slightly fossiliferous. Andesetic tuff and marine sandstone,

    with local plant beds.”

    2. The Institute of Geological and Nuclear Sciences map for Auckland defines the material as Waitemata Group, Warkworth subgroup, Pakiri formation, alternating thick-bedded volcanic rich

    graded sandstone and siltstone.

    3. Rodney District Council Expansive Soils Map Sheet number RDC 15549 indicates the area to be Category ‘B’ soils within the Alternative Solution 1 (AS1) to any foundation design. From the

    inspection carried out we are satisfied that this category is applicable to this site.

  • Ashby Consulting Engineering Ltd. - 7569

    5

    6.0 Investigation

    The site was visited on the 28th

    February, 3rd

    March and on 6th

    March 2014 and a geotechnical

    investigation was conducted. This consisted of an initial walkover of the sites and identifying the

    topography of the area. Hand drilled boreholes supplemented with shear vane readings and scala

    penetrometer soundings were undertaken to determine the bearing strength of the underlying soils and

    draw cross sections of the ground profile. The results of the field investigations are tabulated under

    soil parameters section.

    7.0 Topsoil and Unsuitable Material

    We would estimate that the proposed building platforms having average topsoil depth of 300mm based

    upon the borehole findings. Further unsuitable material has not been noted.

    We note however, that soils by their nature are varied and it is possible that once the topsoil is stripped

    pockets of unsuitable material not identified by this report may become apparent. Please contact us

    and discuss, should you have any concerns.

    8.0 Groundwater

    No groundwater was encountered during our investigations. Although damp to moist soil were

    encountered below 2.0m depth indicating possible winter ground water level to be at this level.

    The previous geotechnical investigations encountered ground water at 2m in one of the boreholes.

    9.0 Soil Parameters

    From inspection for general design purposes, we would assess soil parameters as the following;

    Upper 1.5m

    Apparent Cohesion (in terms of effective stress) c’ = 5kPa,

    Apparent Internal Angle of Friction (in terms of effective stress) ’ = 26°

    Bulk Density (weight density) = 18 kN/m³

    Between 1.5m -2.5m

    Apparent Cohesion (in terms of effective stress) c’ = 0kPa,

    Apparent Internal Angle of Friction (in terms of effective stress) ’ = 26°

    Bulk Density (weight density) = 18 kN/m³

    Between 2.5-3.5m

    Apparent Cohesion (in terms of effective stress) c’ = 0kPa,

    Apparent Internal Angle of Friction (in terms of effective stress) ’ = 20°

    Bulk Density (weight density) = 16 kN/m³

    Below 3.5m

    Apparent Cohesion (in terms of effective stress) c’ = 0kPa,

    Apparent Internal Angle of Friction (in terms of effective stress) ’ = 26°

    Bulk Density (weight density) = 18 kN/m³

  • Ashby Consulting Engineering Ltd. - 7569

    6

    Boreholes

    Soil Strengths kPa Bearing Capacities (kPa) Expansive

    Soil

    Category

    Shear

    (max)

    Remould

    r

    Ultimate

    (qu)

    Allowable

    (qa)

    BH1 123 16 300 100

    “B” or “M”

    BH2 104 16 300 100

    BH3 95 22 300 100

    BH4 101 25 300 100

    BH5 120 25 300 100

    BH6 123 25 300 100

    BH7 126 22 300 100

    10.0 Findings

    The proposed building sites are located on moderately sloping ground with slopes of up to 12°. The

    ground below the western boundary falls steeply into a small stream. There is a 25m wide paper road

    reserve between the western boundary of the property and these steeper stream banks.

    Boreholes (BH1 to BH7) were conducted within the site and supplemented with scala penetrometer

    soundings continued from the borehole base.

    BH1 was conducted within the proposed Lot 1 and was taken to a depth of 3800mm. This revealed an

    upper 250mm thick stratum of topsoil underlain by firm, dry, cohesive and plastic pale yellowish

    orange with mottled pink silty-clay till 1000mm depth. Thereafter becoming friable, damp to moist,

    light pinkish to pinkish red silt with traces of yellowish clay, light brown sand and black organics until

    the borehole was concluded.

    Shear vane tests were conducted at 500mm intervals throughout the borehole which revealed shear

    strength ranging from 123kPa to 221kPa. Remould shear strength ranges from 16kPa to 54kPa.

    SP1 was extended from the base of the borehole into the substrata and was taken to a total depth of

    4800mm. This revealed medium density soundings (2-8 blows per 100mm of penetration) to 4400mm

    depth, thereafter increasing to dense soundings (10-16 blows per 100mm of penetration).

    BH2 was conducted down slope near the boundary within the proposed Lot 1 and was taken to a depth

    of 4000mm. This revealed an upper 300mm thick stratum of topsoil underlain by firm, dry, cohesive

    and plastic pale yellowish brown with orange and light greyish silty-clay till 1500mm depth.

    Thereafter, becoming friable, damp to moist, light greyish white with yellow and orangey brown silty

    soil till 2400mm depth and then changing to orangey brown with pinkish red silty soil silt with traces

    of clay and black organics until the borehole was concluded.

    Shear vane tests were conducted at 500mm intervals throughout the borehole which revealed shear

    strength ranging from 104kPa to 221kPa. Remould shear strength ranges from 16kPa to 82kPa.

    SP2 was extended from the base of the borehole into the substrata and was taken to a total depth of

    5400mm. This revealed soft to medium density soundings (2-5 blows per 100mm of penetration) to

    5100mm depth, thereafter increasing to dense soundings (12-25 blows per 100mm of penetration) with

    hammer rebounding.

  • Ashby Consulting Engineering Ltd. - 7569

    7

    BH3 was conducted down slope near proposed Lot 3 boundary and was taken to a depth of 4000mm.

    This revealed an upper 300mm thick stratum of topsoil underlain by firm, dry, cohesive and plastic

    pale yellowish brown with orange and light greyish silty-clay till 1500mm depth. Thereafter,

    becoming friable, plastic, moist to wet, light greyish white with yellow silty soil with traces of clay

    until the borehole was concluded.

    Shear vane tests were conducted at 500mm intervals throughout the borehole which revealed shear

    strength ranging from 95kPa to 221kPa. Remould shear strength ranges from 22kPa to 73kPa.

    SP3 was extended from the base of the borehole into the substrata and was taken to a total depth of

    5200mm. This revealed medium to dense soundings (5-12 blows per 100mm of penetration) till

    4600mm depth with intermediate soft layer between 4600m to 4900mm with soundings (3.5-6 blows

    per 100mm of penetration). Thereafter increasing to dense soundings (13-30 blows per 100mm of

    penetration) with hammer rebounding.

    BH4 was conducted within proposed Lot 4 and was taken to a depth of 3000mm. This revealed an

    upper 300mm thick stratum of topsoil underlain by firm, dry, cohesive and plastic pale yellowish

    orange and light greyish white silty-clay till 1700mm depth. Thereafter, becoming friable, damp,

    pinkish red with light brown and black mottled clayey-silt until the borehole was concluded.

    Shear vane tests were conducted at 500mm intervals throughout the borehole which revealed shear

    strength ranging from 101kPa to 211kPa. Remould shear strength ranges from 25kPa to 69kPa.

    SP4 was extended from the base of the borehole into the substrata and was taken to a total depth of

    5100mm. This revealed medium density soundings (3-7 blows per 100mm of penetration) till 4100mm

    depth, thereafter increasing to dense soundings (8-24 blows per 100mm of penetration).

    BH5 was conducted within proposed Lot 6 and was taken to a depth of 3000mm. This revealed an

    upper 200mm thick stratum of topsoil underlain by firm, dry, cohesive and plastic pale yellowish

    orange with pink mottled silty-clay till 1500mm depth. Thereafter changing to friable, damp to moist,

    pinkish red with light brown and black mottled silty soil until the borehole was concluded.

    Shear vane tests were conducted at 500mm intervals throughout the borehole which revealed shear

    strength ranging from 120kPa to 221kPa. Remould shear strength ranges from 25kPa to 88kPa.

    SP5 was extended from the base of the borehole into the substrata and was taken to a total depth of

    5500mm. This revealed medium density soundings (3-7 blows per 100mm of penetration) till 4700mm

    depth, thereafter increasing to dense soundings (8-11 blows per 100mm of penetration).

    BH6 was conducted within proposed Lot 8 and was taken to a depth of 3000mm. This revealed an

    upper 200mm thick stratum of topsoil underlain by firm, dry, cohesive and plastic pale yellowish

    brown with orange with pink mottled silty-clay till 1500mm depth. Thereafter changing to friable,

    damp to moist, pinkish red with orange and black mottled clayey-silt until the borehole was

    concluded.

    Shear vane tests were conducted at 500mm intervals throughout the borehole which revealed shear

    strength ranging from 123kPa to 221kPa. Remould shear strength ranges from 25kPa to 76kPa.

  • Ashby Consulting Engineering Ltd. - 7569

    8

    SP6 was extended from the base of the borehole into the substrata and was taken to a total depth of

    5600mm. This revealed medium density soundings (3-7 blows per 100mm of penetration) till 4900mm

    depth, thereafter increasing to dense soundings (8-10 blows per 100mm of penetration).

    BH7 was conducted within proposed Lot 5 and was taken to a depth of 3000mm. This revealed an

    upper 200mm thick stratum of topsoil underlain by firm, dry, cohesive and plastic pale yellowish

    brown with orange silty clay till 700mm depth. Thereafter soil changes to friable, damp to moist,

    pinkish red with traces of light brown and mottled black silt until the borehole was concluded.

    Shear vane tests were conducted at 500mm intervals throughout the borehole which revealed shear

    strength ranging from 126kPa to 221kPa. Remould shear strength ranges from 22kPa to 57kPa.

    SP7 was extended from the base of the borehole into the substrata and was taken to a total depth of

    5500mm. This revealed medium density soundings (3-7 blows per 100mm of penetration) till 4100mm

    depth, thereafter increasing to dense soundings (8-12 blows per 100mm of penetration).

    A slightly weaker dilatant layer is encountered within boreholes 1 to 3 with shear strength decreasing

    slightly between 2.5m and 3.5m depth with reasonably high moisture content. We assume that this

    moisture is possibly due to the rising ground water level during winter seasons.

    From the acquired borehole data, 3 cross section profiles have been drawn.

    Cross section A-A

    Borehole BH1 and BH2 are considered in the profile. The ground slopes at 10° between BH1 and

    BH2. The underlying soil comprises of 1.5m of clay underlain by weathered Waitemata silt to 5.0m

    depth before reaching an inferred rock layer. We recommend locating the building site within the

    uphill part of the lot.

    Cross section B-B

    Borehole BH3 and BH4 are considered in the profile. The ground slopes at 9° between BH3 and BH4.

    The underlying soil comprises of plastic clay for 1.5m in depth underlain by weathered Waitemata silt

    to 5.2m depth before reaching the inferred rock layer.

    Cross section C-C

    Borehole BH5, BH6 & BH7 are considered for drawing the soil profile. The ground slopes with 7°

    between BH6 and BH7. The underlying soil comprises of plastic clay for 1.5m in depth with the

    exception of the 700mm in found in BH7. This clay layer is underlain by weathered Waitemata silts

    we estimate that the underlying rock layer to be below 6.0m.

    Note; It is important that shrub and tree species, such as willow and gum, etc, which have high

    groundwater demands during summer, be kept an appropriate distance from buildings, as their water

    demands can effect expansive soils significantly, leading to differential settlement of adjacent

    buildings. Therefore, it would be prudent to seek professional advice, before planting such tree

    species, in order to ensure that sufficient separation distances, from any buildings, are maintained. As

    a “rule of thumb” trees should be planted no closer to a building when their equivalent height at

    maturity.

  • Ashby Consulting Engineering Ltd. - 7569

    9

    Core Sampling and Laboratory Testing

    To confirm the soil strength and frictional angle parameters, undisturbed soil samples were retrieved

    from the ground on 21st March 2014, at three different locations as shown on the site plan. ‘Pro Drill

    NZ’ was engaged in extracting the sample using a drill rig and push tube sampling technique.

    The core logging confirmed our earlier borehole logs with the upper 1.5m depth of silty-clay underlain

    by light greyish silty soil with traces of clay. This is followed by a hard underlying layer of weathered

    orangey brown sandstone layer at varying depth of 2.5m to 3.5m depth.

    Push tube (PT1) sample was taken between 2.5-2.8m and consisted of upper greyish layer followed by

    weathered sandstone. Not enough light greyish material was retrieved in this tube to triaxial test.

    Push tubes (PT2 & PT3) sample were taken between 2.0m to 2.3m and 2.5m to 3.0m. These consist of

    light greyish silty material with traces of clay. PT3 had a slightly higher clay content.

    Push tube (PT4) sample consist more of pinkish to light orange silty sand.

    From site assessment of the core sampling and the shear strengths recorded during the borehole

    investigations we suspect the light greyish silty layer as having the lowest soil parameters and

    therefore Push tube (PT2) sample retrieved at 2.0m depth was sent to ‘Opus’ laboratory for triaxial

    testing. The laboratory results are attached in the Appendix.

    The frictional angle (Ø’) determined from lab testing is 20° and the cohesion (c’) was 28kPa.

    Fig.1: Push Tube sampling location 1 Fig.2: Push Tube sampling location 2

    Slope Stability Analysis

    A Slope stability analysis using Galena 5.02 was undertaken on cross sections A-A, B-B and C-C.

    All three cross sections were analysed with ground water at 1.5m maximum for long term conditions,

    and with groundwater levels at the surface for short term conditions. Given the proximity of the stream

    we believe these to be reasonable assumption.

  • Ashby Consulting Engineering Ltd. - 7569

    10

    For long term conditions a minimum factor of safety of 1.5 would be appropriate and for short term

    conditions which are unlikely but could occur during intense storm events a minimum factor of safety

    of 1.2 would seem appropriate.

    Soil strength parameters as modelled;

    Top Silty clay layer - c’=5, Ø’=26° (considered conservative values)

    Silt layer between 1.5-2.5m - c’=0, Ø’=26°

    Silt layer between 2.5-3.5m - c’=0, Ø’=20° (ignoring any cohesion)

    Lower weathered silt layers c’=0, Ø’=26° (considered conservative values)

    Soil strength parameters from lab test;

    Cohesion c’= 28kPa

    Angel of friction Ø’= 20°

    For cross section A-A the result shows a factor of safety of 1.22 with the groundwater level at the

    surface and 2.04 with ground water below 1.5m.

    For cross section B-B the result shows a factor of safety of 1.23 with the groundwater level at the

    surface and 2.08 with ground water below 1.5m.

    For cross section C-C the result shows a factor of safety of 1.58 with the groundwater level at the

    surface and 2.54 with ground water below 1.5m.

    Based on the stability analysis, the geotechnical investigation including triaxial testing and the gently

    sloping nature of the property we are satisfied that the building sites are stable and suitable to be built

    upon without the need for any additional stability measures like counterfort drains or horizontal drains.

    We are also of the opinion that the three existing horizontal drains that run through the property are

    redundant with the physical changes that have occurred within the upstream catchment areas as Blue

    Gum Drive has been developed over the past 20 years.

    The road reserve below the property boundary provides a suitable setback from the steeper areas of the

    stream banks so no additional setbacks requirements are necessary.

    11.0 Retaining Walls

    For retaining walls, design parameters shall be taken as above with the exception that cohesion shall

    be taken as zero, c’ = 0 kPa.

    For cantilever timber retaining walls up to 3m not supporting a building or driveway, some deflection

    of the wall and minor settlement of the ground supported may be acceptable, and the coefficient for

    “Active Earth Pressure” may be used (KA).

    For 3m or higher, or more critical walls supporting a rigid structure which has not been underpinned,

    the coefficient of “At Rest Pressure” shall be utilised (KO).

    For intermediate cases to be considered on their merits by a Chartered Engineer, a coefficient of back

    pressure of ½( KA + KO) would be acceptable.

  • Ashby Consulting Engineering Ltd. - 7569

    11

    Note: Where any retaining wall exceeds 1.0m in height a specific design may be required as certain

    safety features need to be taken into consideration in accordance with the requirements of the Building

    Act 2004. Ashby Consulting can provide a proposal for specific design on request.

    12.0 Earthworks

    Fills

    It is best to avoid the use of moderately and highly expansive fill materials beneath buildings because

    of long term likely settlement and consolidation. Any fill over 400mm deep (even if properly

    compacted in accordance with NZS 4431:1989) is of potential concern.

    For the reasons set out in the discussion below, we would recommend that with any filling work over

    400mm deep using expansive soils, the following methodologies be considered;

    1. Foundation to be piled through and taken into firm original ground, pre-drilling the pile hole

    through the fill so as to reduce the possibility of negative skin friction punching the pile down.

    Note: while the piling method can support the building, on deep fills adjacent to a high

    retaining wall, ground shrinkage of as much as 200mm has been observed leaving a 200mm

    gap which would be visually unacceptable and can play havoc with patio areas.

    2. Hydrated Lime stabilisation of the expansive fill material can be a solution particularly when

    soil conditions are too wet and the site too confined to permit windrowing. This method has

    been trialled on a house site and found to work well and to have been competitive with under-

    piling. However, trenching for drains and cables should be completed as soon as possible

    subsequently and the ground will become hardened to the point where it may become difficult

    to dig. If this method is to be used, a test needs to be carried out to ensure the soil is reactive.

    On slopes, benching will be required in the normal manner and the entire depth of fill will need

    to be placed, stabilized and compacted at 200mm thick layers.

    3. Where downhill retaining walls are in close proximity to the foot print of the house the use of

    compacted hard-fill such as GAP 65 would be recommended. With the approval of the

    engineer, 500mm back from the wall to allow for drainage, this GAP 65 backfill could be

    supplemented by first placing and compacting to engineering standard up to 400mm of clay fill

    so as to minimise cut to waste and also minimise the volume of imported hard fill required.

    --//--

    Discussion on Fills

    In terms of the Australian Standard for Residential Slabs and Footings Construction AS2870:

    1996; Refer to 2.4.6.

    From the above, for Controlled Shallow Fills up to 0.4m deep these may be treated as for the

    natural site prior to filling.

    For Uncontrolled Shallow Fills up to 0.4m deep, all edge beams, internal beams and load

    support thickenings are founded on natural soil through the fill”.

  • Ashby Consulting Engineering Ltd. - 7569

    12

    For Controlled Deep Fills, the assessment shall consider the movement of the fill and the

    underlying soils from the as-constructed condition to the long-term equilibrium moisture

    conditions. Allowance shall be made for construction variations of moisture conditions.

    Alternatively the movement may be estimated by reference to established knowledge of the

    behaviour of similar fills in similar areas.

    With respect to the “underlying soils”, generally fills are unlikely to exceed 3m in depth, and

    the underlying soils usually encountered are insitu residual Waitemata soils not likely to be a

    noticeable problem with respect to compressibility and can be ignored. However if present,

    the compressibility of softer underlying alluvium deposits particularly if deep will require

    consideration.

    The Australian Standard AS 2870; 1996 goes on to imply that long term moisture equilibrium

    is unlikely to be established within a fill within 5 years. In essence the fill will need to go

    through a number of summers and is likely to be subject to “post construction consolidation”

    during those periods due soil suction as the summer heat dries the ground out, or capillary

    action even if well compacted as an ‘Controlled’ fill at optimum moisture content (OMC),

    further consolidation will most probably occur.

    Obviously in most situations it is not a practical option to wait 5 years before building and so

    alternatives to supporting buildings on deep expansive soils fills need to be considered.

    “Controlled Deep Fills” require special attention.

    Consider an expansive soil from a laboratory measured shrinkage test, dried out from the

    liquid limit state the soil may shrink 20%.

    The same soil, even when properly compacted using appropriate compaction equipment at

    Optimum Moisture Content (OMC), will dry out under prolonged summer conditions and can

    be expected to shrink as much as 10%, at least near the surface.

    This problem can be exacerbated by the close proximity of high downhill retaining walls

    which can have a significant effect on the drying out and consolidation of the fill.

    The potential for disaster when working with expansive or reactive soils is very real. NZS

    4431:1989 the New Zealand Code of Practice for Earth Fill for Residential Development

    does not seem to fully comprehend the risks with reactive soils. Never the less, we would

    recommend that any fill placed under or within 3 m of the footprint of a building shall be

    properly constructed and compacted in general accordance with NZS 4431:1989 the New

    Zealand Code of Practice for Earth Fill for Residential Development. Such Engineered earth

    fill can end up denser and stronger than the original ground (but still consolidate). This fill

    shall be tested and a Producer Statement Construction Review provided by a Chartered

    Engineer familiar with this report.

    NZS 4431 Section 7.4.2.4 states “For many cohesive soils it is found that an acceptable

    minimum shear strength is 150kPa and the maximum air voids is 10%. For particular soil

    types, and for reserve areas or road subgrades, some variations from the above value may be

    appropriate”.

  • Ashby Consulting Engineering Ltd. - 7569

    13

    When considering residual silty clay it has been found locally that minimum shear strength of

    150kPa cannot be achieve unless the soils are lime stabilized. Given the above, target shear

    strength of 100kPa in the soil should be acceptable.

    Fill shall be compacted at optimum moisture content (or just dry of), and may be tested using

    a “Dynamic cone Penetrometer Test” (Scala Penetrometer) which shall achieve soundings of

    not less than 4 blows per 100mm of penetration for a depth of twice the footing width or 1.2m

    whichever is the deeper, below the bottom of the footing. No account shall be taken of

    readings where the top of the probe hole is less than 300mm above the tip of the

    penetrometer. Any testing by penetrometer may need to be augmented by an insitu hand held

    shear strength test, as if soils are dry of optimum penetrometer tests can give higher readings

    and hence inferred higher densities than are not actually the case.

    The tracks of a hydraulic digger were designed to walk across swamps, therefore anyone

    using the tracks of a hydraulic digger to compact fill will be required to re-excavate all fill

    material and re-compact it properly using appropriate compaction equipment. As a general

    rule reactive clay materials generally do not tend to make good fill as outlined above and its

    use under a building should preferably be limited or avoided, possibly by building in empathy

    to the land to limit fills, or by use of the methodologies outlined in this report.

    Further considerations are;

    i) On small sites if the fill material is too wet there is often insufficient space to

    spread it out to windrow it to dry so that compaction at OMC can be achieved.

    ii) Building tends to be an all year around process, and therefore earthworks for

    house sites are often attempted at times when ground conditions are really too

    wet to achieve OMC and the weather is too wet to adequately dry windrowed

    Materials. Providing the soils are reactive to hydrated lime and suitable, the

    use of hydrated lime stabilisation may prove a useful tool under such

    circumstances as it will dry the soil out and strengthen it reducing shrink –

    swell characteristics at the same time.

    ii) With varying fill depths, differential settlement is a larger concern than if fill

    were of uniform thickness across a site.

    --//--

    Cuts

    Cut batters up to 0.6m high in these soils, may stand at up to 1v to 0.176h (80°) without being

    retained. Any near vertical cuts over 0.6m high shall be retained.

    With the exception of cut batters up to 0.6m high, cut or fill batters should be constructed no steeper

    than 1v in 4.0h (14.03°) for no more than 3m in elevation unless otherwise approved by the engineer.

  • Ashby Consulting Engineering Ltd. - 7569

    14

    13.0 Foundations

    From our investigations, the soil has good insitu shear strength and a safe bearing capacity of 100kPa

    is likely to be achieved for foundations. The building may be constructed in general accordance with

    NZS 3604 - 2011, with due allowance for extra depth to allow for the seasonal shrinkage - swelling

    nature of the soils.

    The soil parameters and ground strengths should be confirmed on site at the time of construction.

    Rodney District Council’s Expansive Soils Category “B” equates to the Australian Standard “AS 2870

    – 1996 Residential Slabs and Footings – Construction” to be classification “M” sites. Under local very

    dry summer conditions, vertical surface shrinkage movement (ys) is of the order of 20mm to 40mm,

    with the active depth of shrinkage (Hs) anticipated to extend down to 1.5m in this case. AS 2870

    assumes that shrinkage decreases lineally with depth, however we consider that shrinkage will

    decrease rapidly with depth in parabolic fashion.

    Shrinkage under a concrete slab can theoretically extend back as much as 1.0m in category “B” or

    “M” soils, while the ground under the centre of a slab will have reached moisture equilibrium. The

    result can be that the ground falls away below the footing, leaving the footing to be supported by the

    cantilever action of the floor slab.

    The parts of the building that will be most affected by ground shrinkage are the external outer corners

    where the ground can dry out on ¾ of a circle around the corner point. This leads to greater differential

    settlement at the corners, which in turn can lead to cracking at the corners, potentially affecting the

    footing, slab and cladding.

    To mitigate this risk we recommend that if the building is on a concrete slab or waffle slab, and the

    building has heavy wall cladding or a tiled roof, or is two storeys, that the external walls and outer

    corners be underpinned.

    With respect to under-piling we would normally suggest under piling at external corners at

    approximately 2.0m centers under external foundations. The piles should be specifically design for all

    design loads with a minimum embedment depth of at least 1500mm taken into the original ground

    unless specified otherwise.

    In the case where piles are required through fill, a pilot hole shall be predrilled through the fill to

    reduce the risk of negative skin friction of consolidating fill dragging the pile down. The pile shall be

    secured firmly into the underlying ground.

    For all 8 Lots

    Foundation can be designed for safe bearing strength of 100kPa for category “B” or “M” expansive

    soil.

    Continuous reinforced concrete strip footings tied into a reinforced concrete slab, shall be taken to a

    minimum of 600mm depth below finished ground level and underpinned at external outer corners as

    outlined above if necessary. Slabs shall be at least 100mm thick with at least grade 500E super ductile

    mesh SE-62 or equivalent used as reinforcement laid on damp proof course, on sand blinding, on

    100mm of compacted hard fill, on the prepared subgrade.

  • Ashby Consulting Engineering Ltd. - 7569

    15

    Waffle Slabs may be laid directly on damp proof course, on sand blinding, on 100mm of compacted

    hard fill, on the prepared subgrade, with exterior foundation underpinned if necessary as outlined

    above. However, underpinning of the exterior foundation will not be required where a waffle slab is

    specifically designed to support super-imposed loads by cantilever action underground shrinkage

    conditions. Please note however that where fill depth using expansive soils are in excess of 400mm

    depth, it is intended under-piling will be required.

    Isolated Pile Foundations shall be taken to a minimum of 600mm depth below ground level. Where

    isolated piles are located in fill, these shall be founded through the fill into firm original ground, and

    shall be sleeved through the fill with PVC to prevent possible consolidation of the fill punching down

    the pile.

    Driven Timber Piles shall be in general accordance with NZS 3604 Section 6.6. except that founding

    depth shall be not less than 1.5m. Pilot holes shall first be predrilled through any fill to reduce the

    potential for negative skin friction.

    Bored & Poured Pile Foundations shall be taken to a minimum of 600mm depth below ground level.

    The bottom of any foundation bored hole shall have a minimum insitu shear strength in excess of 80

    kPa, shall be scrupulously clean and free of water, sponged out (as required with a sponge on the end

    of a stick). The use of an “Ezi-Yaka” precast concrete punch pad of largest practical size, dropped

    into the bottom of the hole is recommended if water ingress is likely to be a problem.

    If foundations are bored and poured, care needs to be taken to ensure that the boreholes are if possible

    bored and poured the same day to prevent ingress of water and softening of the soil. One trick is to

    pre-drill all but the last 0.5m of hole the day before, then on the day pump out as much water as

    possible and drill the last 0.5m to mop up any water.

    Alternatively driven piles should be drilled through the fill layer and driven either to refusal or to a

    shallower depth calculated on the depth of embedment required for the piles to resist lateral soil creep

    within the fill, and resist superimposed loads.

    Note: If placing a concrete slab on expansive soils, moisture content at time of construction is critical.

    Do not allow areas of the building platform under the building footprint to become over dry in summer

    or over wet during winter. Best controlled by placing compacted base course, PAP7 and/or sand

    binding immediately after platform cut, filled, compacted and trimmed. Also place DPC as soon as

    practicable. If excavated footings are used 25mm or more of concrete in base of trench is

    recommended.

    Where a specific foundation design is required, Ashby Consulting can provide a proposal for

    foundation design options based on this geotechnical report

    14.0 Water supply and Sewage Disposal

    Water supply connection is available at the end of Blue Gum Drive. We suggest either contacting

    Watercare for to enable the installation of new connections to the individual lots or alternatively, two

    25,000L rainwater tank could be installed on individual lots collecting the roof runoff. The overflows

    from any stormwater tanks should be connected into a piped reticulation system.

    The property is shown on councils web map as within Watercares reticulated service area and will

    require pressure wastewater collection systems to discharge into the public reticulated network.

  • Ashby Consulting Engineering Ltd. - 7569

    16

    Each dwelling will need an individual pump station to enable them to discharge into the public

    reticulation which is located on Blue Gum Drive.

    15.0 Stormwater Disposal and Stormwater Neutrality

    The proposed subdivision will create considerable impervious areas and all runoff from these

    impervious areas should be collected into a piped system. As part of the proposed subdivision it will

    be necessary to upgrade and modify the route of the existing public reticulated stormwater and install

    additional pipelines enabling a stormwater connection to be installed on each of the 8 lots and collect

    the existing upstream stormwater flows which currently drain into the existing pipeline.

    Appropriate storm water treatment devices should be installed to remove any sediments and heavy

    metals from discharges to protect the downstream environment.

    The existing public pipe line and outlet structure into the stream will most likely require upgrading as

    part of this subdivision.

    All stormwater surface flow should be kept well clear of the building platforms and directed to a point

    where it is unlikely to contribute to land instability or erosion.

    Council may require that a Stormwater Neutrality design with respect to this site be undertaken to

    ensure that the runoff after development is no greater than before development. Should a Stormwater

    Neutrality Design be required, such would need to be covered under separate report which Ashby

    Consulting Engineering Ltd if engaged to do so.

    16.0 Access

    Access to all building sites can be formed at gradients of less than 1 in 5. For Lot 1 to Lot 4, the

    proposed access is proposed by sharing the existing driveway with Lot 1 DP 452608. For Lots 5 to 8,

    the access way is proposed by sharing the driveway with Lot 2 DP 452608.

    17.0 Historical & Cultural Issues

    From our inspection of the site and from checking the NZAA digital site recording scheme database

    there were no apparent issues of a Historical or Cultural nature evident.

    However, if during construction, previously unrecorded historic sites are exposed, all work in the

    immediate vicinity will cease and the site will be investigated. If appropriate, an authority to continue

    operations will be obtained from the New Zealand Historic Places Trust, as prescribed in the Historic

    Places Act 1993.

    18.0 Conclusion and Recommendations

    It is the considered opinion of Ashby Consulting Engineering Ltd. that -

    1. The land on which the construction of the building is proposed is not subject to and is not likely to be subject to instability, erosion or inundation etc, subject to the recommendations as

    outlined in this report.

  • Ashby Consulting Engineering Ltd. - 7569

    17

    2. The building work itself is not likely to lead to instability, erosion or inundation etc, of the site itself or any other property, subject to the recommendations as outlined in this report.

    3. The proposed building is not likely to be exposed to any other geotechnical hazard.

    4. From the visual inspection, no unusual or non-conformity in the features of the site were apparent which would indicate past use or the presence of hazardous agents or contaminants.

    Soil testing can be very expensive and probably is not warranted.

    5. Soil Parameters for structural or retaining wall design may be adopted as outlined in this report.

    6. Retaining walls, earthworks and foundations may be constructed as outlined in this report.

    7. Foundations may be constructed as modified in this report. The Safe Bearing Pressure of the subsoils may be taken as at least 100kPa. The soils have been classified as category ‘B’ or ‘M’.

    8. The property is located within a pressure wastewater zoned area. A pump station will be needed to collect the sewage from the individual building sites to discharge it into the public

    sewage reticulation system.

    9. The short section of existing public stormwater system will require modification and upgrading as part of the proposed subdivision works.

    10. Council may require a Stormwater Neutrality report for this subdivision which would need to be covered under separate report.

    11. Access to the Building site can be formed at gradients of less than 1 in 5 and will formed by extending the two existing access ways.

    12. From our inspection of the site there were no apparent issues of a historical or a cultural nature evident.

    13. The site has been assessed as having very high wind exposure.

  • Ashby Consulting Engineering Ltd. - 7569

    19

    Appendix

    Borehole logs, Penetrometer sounding logs, Lab results, Slope Stability Results, Site Plan, Cross

    Section.

  • Client : Len McKeown.

    Location : Blue Gum Drive, Warkworth

    Job Number : 7569 Date : 03rd March 2014

    SOIL DESCRIPTION

    Auger Borehole No. 1

    Sheet 1 of 10

    Diameter 50 mm

    Samples -

    No.

    Type

    Depth

    Other

    Tests

    Remarks : LOGGED: I.C. CHECKED : A.H

    R.L. : m. TYPED BY : I.C.

    Topsoil

    Fill

    Clay

    Silt

    Sand

    Gravel

    Peat

    Rock

    0.5

    1.0

    2.25

    1.5

    2.0

    2.5

    2.75

    3.0

    Ashby Consulting Engineering Ltd 3 Elizabeth Street Warkworth Phone (09) 425 9422 Fax (09) 425 9431

    E-mail [email protected]

    1.75

    1.25

    0.75

    0.25

    Dep

    th

    (m

    )

    Leg

    en

    d

    Wa

    ter L

    evel

    Sh

    ea

    r V

    an

    e

    (

    kp

    a)

    R

    em

    ou

    ld

    Str

    en

    gth

    (k

    pa)

    0-250mm: Topsoil

    250-500mm: silty CLAY; light yellowish brown; firm; dry;

    cohesive; friable.

    500-1000mm: silty CLAY; pale yellowish orange with orangey

    mottled; dry; friable; firm; cohesive; with pink

    inclusions at 1000mm depth and increasing in

    silt.

    1000-1500mm: clayey SILT to SILT; pale yellowish orange

    with pink and traces of clay changing to light

    pink with yellowish orange; friable; silty; damp;

    dense underlying layer with resistance to shear

    vane penetration.

    1500-2000mm: SILTY; light pink and pinkish red with light

    brown mottled; friable; damp to moist; dilatant;

    resistance to vane penetration.

    2000-2500mm: SILTY; pinkish red with light yellowish and

    brown mottled; with traces of sand; friable;

    damp; dilatant; dense underlying layer.

    2500-3000mm: SILTY; pinkish red with charcoal organic

    black and bright yellowish clayey material;

    damp; dilatant; friable; with traces of sand.

    Continued on Sheet 2

    183

    151

    44

    44

    221

    221

    221

    221

    16

    25

    54

    32

    X X X — — — X X X — — —X X X — — — X X X — — —X X X — — — X X X — — —X X X — — —X X X — — — X X X — — — X X X — — — X X X — — — X X X — — — X X X — — — X X X — — — X X X — — —X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

    * * * * * * * * *

    * * * * * * * * *

  • Client : Len McKeown.

    Location : Blue Gum Drive, Warkworth

    Job Number : 7569 Date : 03rd March 2014

    SOIL DESCRIPTION

    Auger Borehole No. 1 contd.

    Sheet 2 of 10

    Diameter 50 mm

    Samples -

    No.

    Type

    Depth

    Other

    Tests

    Remarks : LOGGED: I.C. CHECKED : A.H

    R.L. : m. TYPED BY : I.C.

    Topsoil

    Fill

    Clay

    Silt

    Sand

    Gravel

    Peat

    Rock

    3.5

    4.0

    5.25

    4.5

    5.0

    5.5

    5.75

    6.0

    Ashby Consulting Engineering Ltd 3 Elizabeth Street Warkworth Phone (09) 425 9422 Fax (09) 425 9431

    E-mail [email protected]

    4.75

    4.25

    3.75

    3.25

    Dep

    th

    (m

    )

    Leg

    en

    d

    Wa

    ter L

    evel

    Sh

    ea

    r V

    an

    e

    (

    kp

    a)

    R

    em

    ou

    ld

    Str

    en

    gth

    (k

    pa)

    Continued from Sheet 1

    3000-3500mm: SILTY; pinkish red with charcoal organic

    black and bright yellowish clayey material;

    damp to moist; dilatant; friable; with traces of

    sand.

    3500-3800mm: SILTY; pinkish red with charcoal organic

    black and bright yellowish clayey material;

    damp to moist; dilatant; friable.

    3800mm: E.O.B.

    123

    221

    25

    38

    X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

    * * * * * * * * *

    * * * * * * * * *

  • Client : Len McKeown.

    Location : Blue Gum Drive, Warkworth

    Job Number : 7569 Date : 03rd March 2014

    SOIL DESCRIPTION

    Auger Borehole No. 2

    Sheet 3 of 10

    Diameter 50 mm

    Samples -

    No.

    Type

    Depth

    Other

    Tests

    Remarks : LOGGED: I.C. CHECKED : A.H

    R.L. : m. TYPED BY : I.C.

    Topsoil

    Fill

    Clay

    Silt

    Sand

    Gravel

    Peat

    Rock

    0.5

    1.0

    2.25

    1.5

    2.0

    2.5

    2.75

    3.0

    Ashby Consulting Engineering Ltd 3 Elizabeth Street Warkworth Phone (09) 425 9422 Fax (09) 425 9431

    E-mail [email protected]

    1.75

    1.25

    0.75

    0.25

    Dep

    th

    (m

    )

    Leg

    en

    d

    Wa

    ter L

    evel

    Sh

    ea

    r V

    an

    e

    (

    kp

    a)

    R

    em

    ou

    ld

    Str

    en

    gth

    (k

    pa)

    0-300mm: Topsoil

    300-500mm: silty CLAY with organic; dark brown with black;

    dry; friable; cohesive; mouldable.

    500-1000mm: silty CLAY; pale yellowish brown with orangey

    mottled; dry to damp; friable; firm; cohesive;

    mouldable.

    1000-1500mm: silty CLAY; pale yellowish orange with light

    grey; firm; cohesive; plastic; dry; increasing in

    silt.

    1500-2000mm: clayey SILT to SILT; light greyish with yellow

    and white; friable; damp; traces of clay;

    cohesive.

    2000-2500mm: SILTY; light greyish white with yellow;

    friable; dilatant; damp to moist; slightly

    cohesive; changing to orangey brown at

    2400mm depth; dense underlying layer.

    2500-3000mm: SILTY; orangey brown with pinkish mottled;

    friable; dense underlying layer; damp to moist;

    dilatant with traces of clay; slightly cohesive.

    Continued on Sheet 4

    139

    155

    57

    82

    158

    151

    192

    221

    76

    41

    16

    25

    X X X — — — X X X — — —X X X — — — X X X — — —X X X — — — X X X — — —X X X — — —X X X — — — X X X — — — X X X — — — X X X — — — X X X — — — X X X — — — X X X — — — X X X — — —X X X — — — X X X — — —X X X — — — X X X — — —X X X — — —X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

    * * * * * * * * *

    * * * * * * * * *

  • Client : Len McKeown.

    Location : Blue Gum Drive, Warkworth

    Job Number : 7569 Date : 03rd March 2014

    SOIL DESCRIPTION

    Auger Borehole No. 2 contd.

    Sheet 2 of 10

    Diameter 50 mm

    Samples -

    No.

    Type

    Depth

    Other

    Tests

    Remarks : LOGGED: I.C. CHECKED : A.H

    R.L. : m. TYPED BY : I.C.

    Topsoil

    Fill

    Clay

    Silt

    Sand

    Gravel

    Peat

    Rock

    3.5

    4.0

    5.25

    4.5

    5.0

    5.5

    5.75

    6.0

    Ashby Consulting Engineering Ltd 3 Elizabeth Street Warkworth Phone (09) 425 9422 Fax (09) 425 9431

    E-mail [email protected]

    4.75

    4.25

    3.75

    3.25

    Dep

    th

    (m

    )

    Leg

    en

    d

    Wa

    ter L

    evel

    Sh

    ea

    r V

    an

    e

    (

    kp

    a)

    R

    em

    ou

    ld

    Str

    en

    gth

    (k

    pa)

    Continued from Sheet 3

    3000-3500mm: SILTY; orangey brown with pink becoming

    pinkish red with orangey at 3400mm depth;

    friable; damp to moist; dilatant; traces of clay.

    3500-4000mm: SILTY; pinkish red with black mottled and

    traces of clay; moist; friable; silty soil with soft

    layer at 4000mm depth.

    4000mm: E.O.B.

    205

    104

    25

    32

    X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

    * * * * * * * * *

    * * * * * * * * *

  • Client : Len McKeown.

    Location : Blue Gum Drive, Warkworth

    Job Number : 7569 Date : 03rd March 2014

    SOIL DESCRIPTION

    Auger Borehole No. 3

    Sheet 5 of 10

    Diameter 50 mm

    Samples -

    No.

    Type

    Depth

    Other

    Tests

    Remarks : LOGGED: I.C. CHECKED : A.H

    R.L. : m. TYPED BY : I.C.

    Topsoil

    Fill

    Clay

    Silt

    Sand

    Gravel

    Peat

    Rock

    0.5

    1.0

    2.25

    1.5

    2.0

    2.5

    2.75

    3.0

    Ashby Consulting Engineering Ltd 3 Elizabeth Street Warkworth Phone (09) 425 9422 Fax (09) 425 9431

    E-mail [email protected]

    1.75

    1.25

    0.75

    0.25

    Dep

    th

    (m

    )

    Leg

    en

    d

    Wa

    ter L

    evel

    Sh

    ea

    r V

    an

    e

    (

    kp

    a)

    R

    em

    ou

    ld

    Str

    en

    gth

    (k

    pa)

    0-300mm: Topsoil

    300-500mm: silty CLAY; yellowish brown; firm; cohesive;

    dry; friable.

    500-1000mm: silty CLAY; pale yellowish brown with orange

    mottled; dry; friable; firm; cohesive; mouldable.

    1000-1500mm: silty CLAY; pale yellowish orange with light

    grey and orange; firm; cohesive; plastic; dry;

    mouldable.

    1500-2000mm: clayey SILT; light greyish with yellowish;

    with sandy silt inclusions; friable; damp to

    moist; cohesive; compressible.

    2000-2500mm: silty CLAY; light greyish white with mottled

    yellow; highly plastic clay; with yellowish

    sand; friable; cohesive; mouldable; damp.

    2500-3000mm: clayey SILT; light greyish with yellowish white

    damp; cohesive; with increasing in silt; friable.

    Continued on Sheet 6

    202

    145

    47

    73

    148

    139

    95

    101

    63

    54

    44

    35

    X X X — — — X X X — — —X X X — — — X X X — — —X X X — — — X X X — — —X X X — — —X X X — — — X X X — — — X X X — — — X X X — — — X X X — — — X X X — — — X X X — — — X X X — — —X X X — — — X X X — — —X X X — — — X X X — — —X X X — — —X X X — — — X X X — — — X X X — — — X X X — — — X X X — — — X X X — — — X X X — — — X X X — — —X X X — — — X X X — — —X X X — — — X X X — — —X X X — — —

    * * * * * * * * *

    * * * * * * * * *

  • Client : Len McKeown.

    Location : Blue Gum Drive, Warkworth

    Job Number : 7569 Date : 03rd March 2014

    SOIL DESCRIPTION

    Auger Borehole No. 3 contd.

    Sheet 6 of 10

    Diameter 50 mm

    Samples -

    No.

    Type

    Depth

    Other

    Tests

    Remarks : LOGGED: I.C. CHECKED : A.H

    R.L. : m. TYPED BY : I.C.

    Topsoil

    Fill

    Clay

    Silt

    Sand

    Gravel

    Peat

    Rock

    3.5

    4.0

    5.25

    4.5

    5.0

    5.5

    5.75

    6.0

    Ashby Consulting Engineering Ltd 3 Elizabeth Street Warkworth Phone (09) 425 9422 Fax (09) 425 9431

    E-mail [email protected]

    4.75

    4.25

    3.75

    3.25

    Dep

    th

    (m

    )

    Leg

    en

    d

    Wa

    ter L

    evel

    Sh

    ea

    r V

    an

    e

    (

    kp

    a)

    R

    em

    ou

    ld

    Str

    en

    gth

    (k

    pa)

    Continued from Sheet 5

    3000-3500mm: clayey SILT to SILT; light greyish white with

    yellow; very soft; moist to wet; silty; slightly

    cohesive; compressible.

    3500-4000mm: clayey SILT to SILT; light greyish white with

    yellow; soft; wet; dilatant; silty; slightly

    cohesive; compressible with hard layer at

    4000mm depth.

    4000mm: E.O.B.

    139

    221

    22

    25

    X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

    * * * * * * * * *

    * * * * * * * * *

  • Client : Len McKeown.

    Location : Blue Gum Drive, Warkworth

    Job Number : 7569 Date : 28th February 2014

    SOIL DESCRIPTION

    Auger Borehole No. 4

    Sheet 7 of 10

    Diameter 50 mm

    Samples -

    No.

    Type

    Depth

    Other

    Tests

    Remarks : LOGGED: I.C. CHECKED : A.H

    R.L. : m. TYPED BY : I.C.

    Topsoil

    Fill

    Clay

    Silt

    Sand

    Gravel

    Peat

    Rock

    0.5

    1.0

    2.25

    1.5

    2.0

    2.5

    2.75

    3.0

    Ashby Consulting Engineering Ltd 3 Elizabeth Street Warkworth Phone (09) 425 9422 Fax (09) 425 9431

    E-mail [email protected]

    1.75

    1.25

    0.75

    0.25

    Dep

    th

    (m

    )

    Leg

    en

    d

    Wa

    ter L

    evel

    Sh

    ea

    r V

    an

    e

    (

    kp

    a)

    R

    em

    ou

    ld

    Str

    en

    gth

    (k

    pa)

    0-350mm: Topsoil

    350-500mm: silty CLAY; yellowish brown with organics;

    firm; cohesive; dry; friable.

    500-1000mm: silty CLAY; pale yellowish orange with orangey

    mottled; firm; dry; cohesive; mouldable.

    1000-1500mm: silty CLAY; pale yellowish orange with orange

    and greyish mottled; firm; cohesive; plastic;

    dry; mouldable.

    1500-2000mm: clayey SILT; pale yellowish orange with

    orangey and greyish white changing to mix of

    pale yellow, pink, creamish and white at

    1700mm depth; increasing in silt; damp;

    cohesive; friable; compressible.

    2000-2500mm: clayey SILT; pinkish red with white and orange

    changing to pale yellowish orange at 2200mm

    depth; damp soft; friable; mouldable; cohesive.

    2500-3000mm: clayey SILT; pale orangey brown; soft; damp;

    cohesive; friable; changing to pinkish red with

    black and light brown at 2700mm depth;

    friable; damp; dilatant.

    3000mm: E.O.B

    211

    155

    50

    57

    126

    136

    155

    101

    69

    60

    54

    25

    X X X — — — X X X — — —X X X — — — X X X — — —X X X — — — X X X — — —X X X — — —X X X — — — X X X — — — X X X — — — X X X — — — X X X — — — X X X — — — X X X — — — X X X — — —X X X — — — X X X — — —X X X — — — X X X — — —X X X — — —X X X — — — X X X — — — X X X — — — X X X — — — X X X — — — X X X — — — X X X — — — X X X — — —X X X — — — X X X — — —X X X — — — X X X — — —X X X

    * * * * * * * * *

    * * * * * * * * *

  • Client : Len McKeown.

    Location : Blue Gum Drive, Warkworth

    Job Number : 7569 Date : 28th February 2014

    SOIL DESCRIPTION

    Auger Borehole No. 5

    Sheet 8 of 10

    Diameter 50 mm

    Samples -

    No.

    Type

    Depth

    Other

    Tests

    Remarks : LOGGED: I.C. CHECKED : A.H

    R.L. : m. TYPED BY : I.C.

    Topsoil

    Fill

    Clay

    Silt

    Sand

    Gravel

    Peat

    Rock

    0.5

    1.0

    2.25

    1.5

    2.0

    2.5

    2.75

    3.0

    Ashby Consulting Engineering Ltd 3 Elizabeth Street Warkworth Phone (09) 425 9422 Fax (09) 425 9431

    E-mail [email protected]

    1.75

    1.25

    0.75

    0.25

    Dep

    th

    (m

    )

    Leg

    en

    d

    Wa

    ter L

    evel

    Sh

    ea

    r V

    an

    e

    (

    kp

    a)

    R

    em

    ou

    ld

    Str

    en

    gth

    (k

    pa)

    0-200mm: Topsoil

    200-500mm: silty CLAY; yellowish brown with orange

    mottled; firm; cohesive; dry; friable.

    500-1000mm: silty CLAY; pale yellowish orange with orangey

    mottled; firm; dry; cohesive; friable.

    1000-1500mm: silty CLAY; pale yellowish orange pink

    mottled changing to pinkish red and yellowish

    orange at 1400mm depth; damp; cohesive;

    friable; with increasing in silt.

    1500-2000mm: clayey SILT; pinkish red to light pink mottled

    with charcoal black organic at 1700mm depth;

    damp; friable; slightly cohesive; silty.

    2000-2500mm: clayey SILT to SILT; pinkish red with light

    pink with mottled light brown and charcoal

    black; friable; silty; damp to moist.

    2500-3000mm: clayey SILT to SILT; pinkish red with light

    brown and black mottled; damp to moist;

    friable; silty; dilatant.

    3000mm: E.O.B

    221

    180

    35

    60

    192

    139

    132

    120

    88

    41

    25

    25

    X X X — — — X X X — — —X X X — — — X X X — — —X X X — — — X X X — — —X X X — — —X X X — — — X X X — — — X X X — — — X X X — — — X X X — — — X X X — — — X X X — — — X X X — — —X X X — — — X X X — — —X X X — — — X X X — — —X X X — — —X X X — — — X X X — — — X X X — — — X X X — — — X X X — — — X X X — — — X X X — — — X X X — — —X X X — — — X X X — — —X X X — — — X X X — — —X X X — — —X X X — — — X X X — — —

    * * * * * * * * *

    * * * * * * * * *

  • Client : Len McKeown.

    Location : Blue Gum Drive, Warkworth

    Job Number : 7569 Date : 28th February 2014

    SOIL DESCRIPTION

    Auger Borehole No. 6

    Sheet 9 of 10

    Diameter 50 mm

    Samples -

    No.

    Type

    Depth

    Other

    Tests

    Remarks : LOGGED: I.C. CHECKED : A.H

    R.L. : m. TYPED BY : I.C.

    Topsoil

    Fill

    Clay

    Silt

    Sand

    Gravel

    Peat

    Rock

    0.5

    1.0

    2.25

    1.5

    2.0

    2.5

    2.75

    3.0

    Ashby Consulting Engineering Ltd 3 Elizabeth Street Warkworth Phone (09) 425 9422 Fax (09) 425 9431

    E-mail [email protected]

    1.75

    1.25

    0.75

    0.25

    Dep

    th

    (m

    )

    Leg

    en

    d

    Wa

    ter L

    evel

    Sh

    ea

    r V

    an

    e

    (

    kp

    a)

    R

    em

    ou

    ld

    Str

    en

    gth

    (k

    pa)

    0-200mm: Topsoil

    200-500mm: silty CLAY; pale yellowish brown; firm;

    cohesive; dry; friable.

    500-1000mm: silty CLAY; pale yellowish brown with orange

    mottled; firm; dry; cohesive; friable.

    1000-1500mm: silty CLAY; pale yellowish brown mottled with

    orange changing to pale yellowish orange at

    1400mm depth; dry; cohesive; firm; mouldable.

    1500-2000mm: clayey SILT; pale yellowish orange changing to

    pinkish red with black mottled; dry to damp;

    friable; cohesive; increasing in silt.

    2000-2500mm: clayey SILT to SILT; pinkish red with orange

    and black mottled; friable; silty; damp; dilatant.

    2500-3000mm: clayey SILT; pinkish red with black mottled

    with traces of pale yellow, plastic and damp

    clay; friable; silty.

    3000mm: E.O.B

    199

    170

    47

    73

    221

    173

    164

    123

    76

    54

    44

    25

    X X X — — — X X X — — —X X X — — — X X X — — —X X X — — — X X X — — —X X X — — —X X X — — — X X X — — — X X X — — — X X X — — — X X X — — — X X X — — — X X X — — — X X X — — —X X X — — — X X X — — —X X X — — — X X X — — —X X X — — —X X X — — — X X X — — — X X X — — — X X X — — — X X X — — — X X X — — — X X X — — — X X X — — —X X X — — — X X X — — —X X X — — — X X X — — —X X X — — —X X X — — — X X X — — —

    * * * * * * * * *

    * * * * * * * * *

  • Client : Len McKeown.

    Location : Blue Gum Drive, Warkworth

    Job Number : 7569 Date : 06th March 2014

    SOIL DESCRIPTION

    Auger Borehole No. 7

    Sheet 10 of 10

    Diameter 50 mm

    Samples -

    No.

    Type

    Depth

    Other

    Tests

    Remarks : LOGGED: I.C. CHECKED : A.H

    R.L. : m. TYPED BY : I.C.

    Topsoil

    Fill

    Clay

    Silt

    Sand

    Gravel

    Peat

    Rock

    0.5

    1.0

    2.25

    1.5

    2.0

    2.5

    2.75

    3.0

    Ashby Consulting Engineering Ltd 3 Elizabeth Street Warkworth Phone (09) 425 9422 Fax (09) 425 9431

    E-mail [email protected]

    1.75

    1.25

    0.75

    0.25

    Dep

    th

    (m

    )

    Leg

    en

    d

    Wa

    ter L

    evel

    Sh

    ea

    r V

    an

    e

    (

    kp

    a)

    R

    em

    ou

    ld

    Str

    en

    gth

    (k

    pa)

    0-200mm: Topsoil

    200-500mm: silty CLAY; pale yellowish brown with orange;

    firm; cohesive; dry; friable.

    500-1000mm: clayey SILT; pale yellowish orange changing to

    pinkish red at 700mm; damp; friable; silty;

    compressible.

    1000-1500mm: clayey SILT to SILT; pinkish red with light

    brown sand and white mottled; damp to moist;

    friable; compressible.

    1500-2000mm: SILT; pinkish red with light brown and black

    mottled; friable; damp to moist; silty;

    compressible.

    2000-2500mm: SILT; pinkish red with light brown mottled;

    friable; damp to moist; silty; compressible.

    2500-3000mm: SILT; pinkish red with light brown mottled;

    friable; damp to moist; silty; compressible.

    3000mm: E.O.B

    221

    186

    57

    44

    126

    164

    129

    170

    22

    41

    25

    41

    X X X — — — X X X — — —X X X — — — X X X — — —X X X — — — X X X — — —X X X — — —X X X — — — X X X — — — X X X — — — X X X — — — X X X — — — X X X — — — X X X — — — X X X — — —X X X — — — X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

    * * * * * * * * *

    * * * * * * * * *

  • SITE

    START D. START D.

    50mm 2050 4050 8 50mm 2050 4050 4

    100 2100 4100 100 2100 4100

    150 2150 4150 6 150 2150 4150 3

    200 2200 4200 200 2200 4200

    250 2250 4250 8 250 2250 4250 3

    300 2300 4300 300 2300 4300

    350 2350 4350 4 350 2350 4350 2

    400 2400 4400 400 2400 4400

    450 2450 4450 10 450 2450 4450 2.5

    500 2500 4500 500 2500 4500

    550 2550 4550 12 550 2550 4550 2

    600 2600 4600 600 2600 4600

    650 2650 4650 10 650 2650 4650 2

    700 2700 4700 700 2700 4700

    750 2750 4750 16 750 2750 4750 1

    800 2800 4800 800 2800 4800

    850 2850 4850 850 2850 4850 3

    900 2900 4900 900 2900 4900

    950 2950 BH1 4950 950 2950 4950 4

    1000 3000 5000 1000 BH2 3000 BH2 5000

    1050 BH1 3050 5050 1050 3050 5050 5

    1100 3100 5100 1100 3100 5100

    1150 3150 5150 1150 3150 5150 12

    1200 3200 5200 1200 3200 5200

    1250 3250 5250 1250 3250 5250 25

    1300 3300 5300 1300 3300 5300

    1350 3350 5350 1350 3350 5350 25+

    1400 3400 5400 1400 3400 5400 rebound

    1450 3450 5450 1450 3450 5450

    1500 3500 5500 1500 3500 5500

    1550 3550 5550 1550 3550 5550

    1600 3600 5600 1600 3600 5600

    1650 3650 5650 1650 3650 5650

    1700 3700 5700 1700 3700 5700

    1750 3750 5750 1750 3750 5750

    1800 3800 5800 1800 3800 5800

    1850 3850 2 5850 1850 3850 5850

    1900 3900 5900 1900 3900 5900

    1950 3950 6 5950 1950 3950 5950

    2000 4000 6000 2000 4000 6000

    Dep. End Dep. End

    Job No.: Client:

    Site: Logged:

    Date: Weather:

    SCALA PENETROMETER TEST RESULTSTABLE OF BLOWS PER 50mm INCREMENT

    SP1 SP2

    Blue Gum Drive, Warkworth

    ASHBY CONSULTING ENGINEERING LTD

    CIVIL & STRUCTURAL ENGINEERING 7569

    Blue Gum Drive

    email: [email protected]

    Len McKeown

    IC

    Occasional Shower

    3 Elizabeth Street, P.O. Box 124, Warkworth

    Ph. (09) 425 9422, Fax. (09) 425 9431 3-Mar-14

  • SITE

    START D. START D.

    50mm 2050 4050 2 50mm 2050 4050 7

    100 2100 4100 100 2100 4100

    150 2150 4150 5 150 2150 4150 9

    200 2200 4200 200 2200 4200

    250 2250 4250 12 250 2250 4250 8

    300 2300 4300 300 2300 4300

    350 2350 4350 11 350 2350 4350 9

    400 2400 4400 400 2400 4400

    450 2450 4450 12 450 2450 4450 8

    500 2500 4500 500 2500 BH4 4500

    550 2550 4550 11 550 2550 4550 6

    600 2600 4600 600 2600 4600

    650 2650 4650 6 650 2650 4650 8

    700 2700 4700 700 2700 4700

    750 2750 4750 3.5 750 2750 4750 8

    800 2800 4800 800 2800 4800

    850 2850 4850 6 850 2850 4850 11

    900 2900 4900 900 2900 4900

    950 2950 4950 13 950 2950 4950 24

    1000 3000 5000 1000 BH4 3000 5000

    1050 BH3 3050 BH3 5050 20 1050 3050 1 5050 20

    1100 3100 5100 rebound 1100 3100 5100

    1150 3150 5150 30+ 1150 3150 1.5 5150

    1200 3200 5200 rebound 1200 3200 5200

    1250 3250 5250 1250 3250 1.5 5250

    1300 3300 5300 1300 3300 5300

    1350 3350 5350 1350 3350 3 5350

    1400 3400 5400 1400 3400 5400

    1450 3450 5450 1450 3450 2 5450

    1500 3500 5500 1500 3500 5500

    1550 3550 5550 1550 3550 3 5550

    1600 3600 5600 1600 3600 5600

    1650 3650 5650 1650 3650 4 5650

    1700 3700 5700 1700 3700 5700

    1750 3750 5750 1750 3750 5 5750

    1800 3800 5800 1800 3800 5800

    1850 3850 5850 1850 3850 6 5850

    1900 3900 5900 1900 3900 5900

    1950 3950 5950 1950 3950 7 5950

    2000 4000 6000 2000 4000 6000

    Dep. End Dep. End

    Job No.: Client:

    Site: Logged:

    Date: Weather:

    SCALA PENETROMETER TEST RESULTSTABLE OF BLOWS PER 50mm INCREMENT

    Blue Gum Drive, Warkworth

    SP3 SP4

    ASHBY CONSULTING ENGINEERING LTD

    CIVIL & STRUCTURAL ENGINEERING 7569 Len McKeown

    email: [email protected]

    3 Elizabeth Street, P.O. Box 124, Warkworth Blue Gum Drive IC

    Ph. (09) 425 9422, Fax. (09) 425 9431 3-Mar-14 Occasional Shower

  • SITE

    START D. START D.

    50mm 2050 4050 5 50mm 2050 4050 7

    100 2100 4100 100 2100 4100

    150 2150 4150 7 150 2150 4150 10

    200 2200 4200 200 2200 4200

    250 2250 4250 7 250 2250 4250 9

    300 2300 4300 300 2300 4300

    350 2350 4350 8 350 2350 4350 6

    400 2400 4400 400 2400 4400

    450 2450 4450 9 450 2450 4450 4

    500 2500 BH5 4500 500 2500 BH6 4500

    550 2550 4550 8 550 2550 4550 4

    600 2600 4600 600 2600 4600

    650 2650 4650 7 650 2650 4650 6

    700 2700 4700 700 2700 4700

    750 2750 4750 8 750 2750 4750 7

    800 2800 4800 800 2800 4800

    850 2850 4850 10 850 2850 4850 7

    900 2900 4900 900 2900 4900

    950 2950 4950 9 950 2950 4950 8

    1000 3000 5000 1000 BH6 3000 5000

    1050 BH5 3050 1 5050 11 1050 3050 1 5050 10

    1100 3100 5100 1100 3100 5100

    1150 3150 3 5150 9 1150 3150 3 5150 10

    1200 3200 5200 1200 3200 5200

    1250 3250 2 5250 9 1250 3250 4 5250 10

    1300 3300 5300 1300 3300 5300

    1350 3350 4 5350 10 1350 3350 3 5350 5

    1400 3400 5400 1400 3400 5400

    1450 3450 4 5450 10 1450 3450 4 5450 7

    1500 3500 5500 1500 3500 5500

    1550 3550 6 5550 1550 3550 3 5550 8

    1600 3600 5600 1600 3600 5600

    1650 3650 5 5650 1650 3650 4 5650

    1700 3700 5700 1700 3700 5700

    1750 3750 5 5750 1750 3750 8 5750

    1800 3800 5800 1800 3800 5800

    1850 3850 4 5850 1850 3850 5 5850

    1900 3900 5900 1900 3900 5900

    1950 3950 5 5950 1950 3950 5 5950

    2000 4000 6000 2000 4000 6000

    Dep. End Dep. End

    Job No.: Client:

    Site: Logged:

    Date: Weather:

    email: [email protected]

    3 Elizabeth Street, P.O. Box 124, Warkworth Blue Gum Drive IC

    Ph. (09) 425 9422, Fax. (09) 425 9431 28-Feb-14 Fine

    ASHBY CONSULTING ENGINEERING LTD

    CIVIL & STRUCTURAL ENGINEERING 7569 Len McKeown

    SCALA PENETROMETER TEST RESULTSTABLE OF BLOWS PER 50mm INCREMENT

    Blue Gum Drive, Warkworth

    SP5 SP6

  • SITE

    START D. START D.

    50mm 2050 4050 7 50mm 2050 4050

    100 2100 4100 100 2100 4100

    150 2150 4150 10 150 2150 4150

    200 2200 4200 200 2200 4200

    250 2250 4250 9 250 2250 4250

    300 2300 4300 300 2300 4300

    350 2350 4350 8 350 2350 4350

    400 2400 4400 400 2400 4400

    450 2450 4450 8 450 2450 4450

    500 2500 BH7 4500 500 2500 4500

    550 2550 4550 8 550 2550 4550

    600 2600 4600 600 2600 4600

    650 2650 4650 9 650 2650 4650

    700 2700 4700 700 2700 4700

    750 2750 4750 9 750 2750 4750

    800 2800 4800 800 2800 4800

    850 2850 4850 9 850 2850 4850

    900 2900 4900 900 2900 4900

    950 2950 4950 9 950 2950 4950

    1000 3000 5000 1000 3000 5000

    1050 BH7 3050 3 5050 9 1050 3050 5050

    1100 3100 5100 1100 3100 5100

    1150 3150 5 5150 9 1150 3150 5150

    1200 3200 5200 1200 3200 5200

    1250 3250 5 5250 11 1250 3250 5250

    1300 3300 5300 1300 3300 5300

    1350 3350 5 5350 12 1350 3350 5350

    1400 3400 5400 1400 3400 5400

    1450 3450 4 5450 12 1450 3450 5450

    1500 3500 5500 1500 3500 5500

    1550 3550 4 5550 1550 3550 5550

    1600 3600 5600 1600 3600 5600

    1650 3650 4 5650 1650 3650 5650

    1700 3700 5700 1700 3700 5700

    1750 3750 5 5750 1750 3750 5750

    1800 3800 5800 1800 3800 5800

    1850 3850 4 5850 1850 3850 5850

    1900 3900 5900 1900 3900 5900

    1950 3950 7 5950 1950 3950 5950

    2000 4000 6000 2000 4000 6000

    Dep. End Dep. End

    Job No.: Client:

    Site: Logged:

    Date: Weather:

    email: [email protected]

    3 Elizabeth Street, P.O. Box 124, Warkworth Blue Gum Drive IC

    Ph. (09) 425 9422, Fax. (09) 425 9431 6-Mar-14 Fine

    ASHBY CONSULTING ENGINEERING LTD

    CIVIL & STRUCTURAL ENGINEERING 7569 Len McKeown

    SCALA PENETROMETER TEST RESULTSTABLE OF BLOWS PER 50mm INCREMENT

    Blue Gum Drive, Warkworth

    SP7

  • /

    /

    /

    /

    /

    /

    /

    /

    /

    /

    /

    /

    /

    /

    /

    /

    /

    /

    /

    /

    /

    /

    /

    /

    /

    /

    /

    /

    /

    /

    /

    /

    /

    /

    /

    /

    /

    /

    /

    /

    /

    /

    /

    /

    /

    /

    /

    /

    /

    /

    /

    /

    /

    /

    /

    /

    /

    /

    /

    /

    /

    /

    /

    /

    /

    /

    /

    /

    /

    /

    /

    BH5/SP5

    BH1

    BH2

    BH3

    BH4

    BH6

    BH5

    BH4

    A

    A

    B

    B

    Lot 1

    Lot 3

    Lot 4

    Lot 8

    Lot 7

    Lot 6

    Lot 5

    Lot 1DP 452608

    ROW

    ROW

    N

    0 20 5010 30 40

    ExistingManhole

    Existing SW lineas per GIS

    Lot 2

    Discontinuedeffluent trenchs

    C

    C

    Lot 2DP 452608

    Building Sites

    Stream

    BH7

    Pt. Lot 11DP 1159860

    ROAD

    Legal,

    not fo

    rmed

    ROAD

    Legal, not formed

    concrete chamber

    Assumed alignment

    Horizontal drains

    Drain

    Note: The horizontal drains alignment shown on this drawing isassumed from visual inspection.The cross section slope is based on the levels shown on GIS map

    PT-1

    PT-2

    PT-3

    PT - Push tube soil samplelocation for Lab Testing

    CLIENT: PROJECT:

    LOCATION:

    DRAWING:

    SCALE: DRAWN: CHECKED:

    REV: SERIES OF:SHEET:

    NO. DATE: REVISION DESCRIPTION: JOB NO.:

    DATE:

    A

    B

    C

  • Infered rockLayer

    BH2BH1

    Bdy

    Silty Clay - up to 1.5m

    RL 20.0m

    Top soil - up to 300mm

    Weatherd Silt - between 1.5 to 5.4mWaitemata series

    Section A-A

    Section B-B

    Infered rockLayer

    BH3

    BH4Silty Clay - up to 1.5m

    Top soil - up to 300mm

    Clayey Silt ofWaitemata series

    RL 20.0m

    Subdivision boundary

    Assumed wintergroundwater level

    Assumed wintergroundwater level

    RL 20.0m

    Section C-C

    Infered rockLayer

    BH6

    BH5

    Silty Clay - up to 1.5m

    Top soil - up to 200mm

    Clayey Silt ofWaitemata series

    Assumed wintergroundwater level

    Subdivision boundary

    BH7

    CLIENT: PROJECT:

    LOCATION:

    DRAWING:

    SCALE: DRAWN: CHECKED:

    REV: SERIES OF:SHEET:

    NO. DATE: REVISION DESCRIPTION: JOB NO.:

    DATE:

    A

    B

    C