1986:
Mr. Haluk Arican (GM) founded the company Inka Fixing Systems in Istanbul with about 200 employees , production of metal parts
1990:
In need of improved product quality of construction sector, Inka began the production of fixing systems
1995:
Re-organisation of Inka, to adapt to increasing market competition and start sales to int. Markets
2005:
Distributor of St. Gobain cast iron products - PAM - in Turkey
2006:
Relocation to our 11.000 sqm new factory
First production of mounting systems for Solar industry
-
3
2009:
First production of exhaust clamps for automotive industry, the exhaust clamp was improved by INKA
Product range expansion with the MSS pipe supporting systems
2010:
Product range expansion with firefighting systems & couplings
Investments, to cover up the expectations of the solar business
2011
Investments to cover up the expectations of the growing MSS business
-
4 4
2000 ISO 9001 Quality Assurance certification 2008 GOST approval for INKA branded items 2009 FM approval for MSS pipe supporting products 2011 ISO 14001:2004 Environment certification OHSAS 18001 occupational health and safety MPA certification for CV couplings 2012 MPA certification for RAPID couplings Planned for 2015 ISO 16949
-
5 5
FINANCE &
ACCOUNTING
DEPARTMENT
HR
DEPARTMENT
QUALITY
ASSURANCE
DEPARTMENT
SALES &
MARKETING
DEPARTMENT
BUSINESS &
SOURCE
DEPARTMENT
ENGINEERING
DEPARTMENT
PRODUCTION
DEPARTMENT
GENERAL MANAGER
Project Enginer
R&D Engineer
Mould Design Engineer
Assembly Machine Designer
ERP Data Responsible
Production Document Responsible
PURCHASING
DEPARTMENT
TECHNICAL
DEPARTMENT
-
6
AutoCAD
SOLIDWORKS
NASTRAN
CANIAS IAS-Industrial Application
Software
3D CAD design software
FEA Analysis
2D CAD drawing software
other Over 10 sets of Excel
Programs for Supplementary
Design
6
-
7 7
INKA is able to make the design and production of the mould.
-
8 8
INKA is able to make assembly machine design and the production.
-
INKA is able to make stress analysis studies for the new supports design.
9
-
10
PROJECT INPUTS Technical Specifications / Customer T.Drawings
PROJECT OUTPUTS Serial production
INKAs SCOPE Make the specification study
Make the mould and production machine design
Prepare t.drawings and get the customer approval
If needed, prepare the prototypes and get the customer approval
10
-
PROFILE PROJECT INPUTS
CODE requirements
Design requirements pipeline stress analysis reports
Piping lay-out plans & T.drawings
INKAs SCOPE
Concept design study
Stress analysis for the loads on the support concept design
Stress analysis for the displacements of the support concept design
Review the analysis until allowable safety factor
Get the customer approvement with the t.drawings and analysis report of the supports
PROJECT OUTPUTS
Production of the supports & delivery on time
11
-
12 12
-
13 13
-
Production with the different customers brands from EUROPE Inka delivers for different Brands,
Production of pipeclamps, Sales are for domestic and foreign and other special parts markets for the construction industry as INKA Brand Production of MSS Products Research & Development is at Inka national & international consultants & specialists supports Inka. Sales with INKA and also other Brands Production of clamps and special designed Sales are for the German & domestic parts for the automotive market industry NEW PRODUCTION Sales to European markets SML Products (CV-Rapid Clamps)
14
OUR PRODUCTION & SALES DIVISIONS
-
15
-
16
-
17
TOTAL EMPLOYEES : 210
PRODUCTION AREA (sqm) : 11.000 sqm
WAREHOUSE AREA : 3.500 pallets
PRODUCTION CAPACITY : approx. 4 mio clamp/month
EXPORT SHARE : 70%
-
18
Milling Machine 3 pcs
CNC Milling Machine 2 pcs
Lathe 1 pcs
CNC Wire Machine 1 pcs
Surface Grinding Machine 1 pcs
Electro-Erosion 1 pcs
-
19
Eccentric, Bending, Cutting Presses 37 pcs
Arc Welding Robot 3 pcs
Electro Galvanizing Line (250 tons/month) 2 pcs
3 Roll Bending machine 2 pcs
Projection Welding Machine (120-220 kVA) 7 pcs
Automatic Assembly Lines 18 pcs
-
20
Tensile Test Device 2 pcs
Hardness Test Device 1 pcs
Webster Hardness Test Device 1 pcs
Shore Hardness Test Device 1 pcs
Optical Profile Projector 1 pcs
Microscope 1 pcs
-
21
MAIN FOCUS AREAS
Heating & Cooling Systems Supports
HOUSING AND MALL PROJECTS AIRPORT & TERMINALS
PIPE CLAMPS
HANGING EQUIPMENS
ANCHORS
-
22
MAIN FOCUS AREAS
HOUSING AND MALL PROJECTS AIRPORT & TERMINALS
Heating & Cooling Systems Supports
-
23
MAIN FOCUS AREAS
HOUSING AND MALL PROJECTS AIRPORT & TERMINALS
MSS PRODUCTS
Heating & Cooling Systems Supports
-
24
MAIN FOCUS AREAS
Exhaust clamp pipe line clamps..
-
25
MAIN FOCUS AREAS
Solar Park connection clamps, roof hooks
-
TRAININGS AND EDUCATIONS
We will support our employees further with trainings and educations internally and externally
ENVIRONMENT
We want to increase the environmental awerness of our employees
CERTIFICATION
ISO 16949 is planned
NEW PRODUCT GROUPS AND SALES
to introduce the CV & Rapid clamps succesfully in markets
to grow in the automotive industry with new customers and projects
to increase our Inkas market share of the MSS products and fire suppression systems.
INVESTMENT
Inka will invest more in automation to be more competitive
26
-
QUALITY
high quality understanding
low employee turnover (2,8%)
continiously investments in research and development
own design & production of toolings and equipments
ISO 9001 & ISO 14001 certification
FLEXIBILITY
flexible production
just in time shipments
from INKA educated suppliers with longterm partership and flexibility
automation as far the product properties and the quantities allow the automation
ERP System
LOGISTICS
logistical advantages and custom benefits (Turkey is in EU customs union)
TRUST
Inka is a strategical partner you can trust
27
-
28
4.474
6.130 7.467
10.034
12.939
16.577 17.944
25.179
17.622
23.826
31.423
22.274 23.659
25.000
-
5.000
10.000
15.000
20.000
25.000
30.000
35.000
2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014
-
29
-
30
-
31
-
32
-
33
-
34
-
35
-