Single Track French Immersion: A Pathway For The Future. School District No. 72 Campbell River...

40
Single Track French Single Track French Immersion: Immersion: A Pathway A Pathway For The For The Future. Future. School District No. 72 Campbell River School District No. 72 Campbell River January 30, 2007 January 30, 2007

Transcript of Single Track French Immersion: A Pathway For The Future. School District No. 72 Campbell River...

Page 1: Single Track French Immersion: A Pathway For The Future. School District No. 72 Campbell River January 30, 2007 Single Track French Immersion: A Pathway.

Single Track French Immersion:Single Track French Immersion:

A PathwayA PathwayFor TheFor The

Future.Future.

School District No. 72 Campbell RiverSchool District No. 72 Campbell River

January 30, 2007January 30, 2007

Page 2: Single Track French Immersion: A Pathway For The Future. School District No. 72 Campbell River January 30, 2007 Single Track French Immersion: A Pathway.

The Process To This Point:The Process To This Point:

February 2006 – Public Board Meeting February 2006 – Public Board Meeting concerning enrolment of French Immersion concerning enrolment of French Immersion Kindergarten at Georgia Park.Kindergarten at Georgia Park.

March – May Developed the concept of a March – May Developed the concept of a “Pathway” for French Immersion.“Pathway” for French Immersion.

Several consultants approached by Several consultants approached by Superintendent and Dr. Ron Rubadeau Superintendent and Dr. Ron Rubadeau was contracted.was contracted.

Page 3: Single Track French Immersion: A Pathway For The Future. School District No. 72 Campbell River January 30, 2007 Single Track French Immersion: A Pathway.

Review By R. RubadeauReview By R. Rubadeau

Purpose: Purpose: to provide the Boardto provide the Boardwith a clear pathwaywith a clear pathwayin which to makein which to makefuture decisionsfuture decisionsconcerningconcerningplacement & supportplacement & supportfor FI programsfor FI programswithin the District.within the District.

Outline of Review:Outline of Review:

a)a) A history of FIA history of FI

b)b) Comprehensive Comprehensive review of data with review of data with respect to:respect to:a)a) Graduation ratesGraduation rates

b)b) Drop-out rates over Drop-out rates over timetime

c)c) Parameters on best Parameters on best location of programslocation of programs

d)d) Summary of what Summary of what could be a pathway.could be a pathway.

Page 4: Single Track French Immersion: A Pathway For The Future. School District No. 72 Campbell River January 30, 2007 Single Track French Immersion: A Pathway.

Groups Involved in Review:Groups Involved in Review:

District Parent District Parent Advisory Council Advisory Council (DPAC)(DPAC)

Canadian Parents for Canadian Parents for French (CPF)French (CPF)

Campbell River & Campbell River & District Teachers District Teachers Association (CRDTA)Association (CRDTA)

Campbell River Campbell River Principal & Vice Principal & Vice Principals (CRPVPA)Principals (CRPVPA)

Canadian Union of Canadian Union of Public Employees Public Employees (CUPE)(CUPE)

District StaffDistrict Staff ParentsParents Community MembersCommunity Members

Page 5: Single Track French Immersion: A Pathway For The Future. School District No. 72 Campbell River January 30, 2007 Single Track French Immersion: A Pathway.

Rubadeau’s Report:Rubadeau’s Report:

Pages 19 – 21 ObservationsPages 19 – 21 Observations Pages 22 –24 Six OptionsPages 22 –24 Six Options Recognized the issue is declining Recognized the issue is declining

enrolmentenrolment French Immersion is well supported French Immersion is well supported

in the Districtin the District Need to consider: educational issues; Need to consider: educational issues;

staffing issues; economic issues; and staffing issues; economic issues; and facility utilization issues. facility utilization issues.

Page 6: Single Track French Immersion: A Pathway For The Future. School District No. 72 Campbell River January 30, 2007 Single Track French Immersion: A Pathway.

Further Studies:Further Studies:

Trillium Business Trillium Business Strategies Inc.Strategies Inc.– Provided an initial Provided an initial

analysis on the analysis on the utilization of utilization of facilities in SD72.facilities in SD72.

– Final Report:Final Report:

Facility ArrangementsFacility Arrangements

Single Track French Single Track French Immersion. Immersion. (01.29.2007)(01.29.2007)

T. Beachy, T. Beachy, ConsultantConsultant– Assisted in Assisted in

clarifying Board’s clarifying Board’s core values core values

– Assisted in Assisted in clarifying Board’s clarifying Board’s process for process for developing developing sustainability for sustainability for the future. the future.

Page 7: Single Track French Immersion: A Pathway For The Future. School District No. 72 Campbell River January 30, 2007 Single Track French Immersion: A Pathway.

January 9January 9thth 2007 Board 2007 Board Meeting:Meeting:

There was an unanimous decision by There was an unanimous decision by the Board of Trustees to continue the Board of Trustees to continue with Single Track programming for with Single Track programming for Elementary French Immersion in Elementary French Immersion in School District No. 72.School District No. 72.

Page 8: Single Track French Immersion: A Pathway For The Future. School District No. 72 Campbell River January 30, 2007 Single Track French Immersion: A Pathway.

Decisions To Be Discussed:Decisions To Be Discussed:

The number of elementary school(s) The number of elementary school(s) offering the single track program.offering the single track program.

The location(s) of program.The location(s) of program. The timing of the implementation.The timing of the implementation. Entry time (This was not reviewed at Entry time (This was not reviewed at

the present time as per Board’s the present time as per Board’s direction).direction).

Page 9: Single Track French Immersion: A Pathway For The Future. School District No. 72 Campbell River January 30, 2007 Single Track French Immersion: A Pathway.

Facility ArrangementsFacility ArrangementsSingle Track French ImmersionSingle Track French Immersion

TRILLIUM TRILLIUM Business Strategies Inc.Business Strategies Inc.(Doug Hibbins)(Doug Hibbins)

&&

Keta Consulting Inc.Keta Consulting Inc.(Ken Hunt)(Ken Hunt)

Page 10: Single Track French Immersion: A Pathway For The Future. School District No. 72 Campbell River January 30, 2007 Single Track French Immersion: A Pathway.

POPULATION FORECAST

20,000

25,000

30,000

35,000

40,000

45,000

50,000

55,000

1998

1999

2000

2001

2002

2003

2004

2005

2006

2007

2008

2009

2010

2011

2012

2013

2014

2015

2016

2017

2018

2019

2020

2021

2022

2023

2024

2025

2026

2027

2028

2029

2030

2031

Page 11: Single Track French Immersion: A Pathway For The Future. School District No. 72 Campbell River January 30, 2007 Single Track French Immersion: A Pathway.

SCHOOL AGE POPULATION FORECAST

0

1,000

2,000

3,000

4,000

5,000

6,000

7,000

8,000

9,000

1998

1999

2000

2001

2002

2003

2004

2005

2006

2007

2008

2009

2010

2011

2012

2013

2014

2015

2016

2017

2018

2019

2020

2021

2022

2023

2024

2025

2026

2027

2028

2029

2030

2031

Page 12: Single Track French Immersion: A Pathway For The Future. School District No. 72 Campbell River January 30, 2007 Single Track French Immersion: A Pathway.

ENROLMENT - HISTORICAL & FORECAST

0

1,000

2,000

3,000

4,000

5,000

6,000

7,000

2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016

Grades K to 6 Grades 7 to 9 Grades 10 to 12 All Grades

Page 13: Single Track French Immersion: A Pathway For The Future. School District No. 72 Campbell River January 30, 2007 Single Track French Immersion: A Pathway.

GRADES K-6 ENROLMENT - FRENCH IMMERSION vs.DISTRICT

0

500

1,000

1,500

2,000

2,500

3,000

3,500

2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016

French Immersion District

Page 14: Single Track French Immersion: A Pathway For The Future. School District No. 72 Campbell River January 30, 2007 Single Track French Immersion: A Pathway.

Ecole des Deux Mondes

Page 15: Single Track French Immersion: A Pathway For The Future. School District No. 72 Campbell River January 30, 2007 Single Track French Immersion: A Pathway.

Ecole Willow Point

Page 16: Single Track French Immersion: A Pathway For The Future. School District No. 72 Campbell River January 30, 2007 Single Track French Immersion: A Pathway.

Ecole Georgia Park

Page 17: Single Track French Immersion: A Pathway For The Future. School District No. 72 Campbell River January 30, 2007 Single Track French Immersion: A Pathway.

School Kindergarten

Headcount September 2006

Grades 1 – 6 Headcount

September 2006

École des Deux Mondes 19 145

École Willow Point 25 138

École Georgia Park 19 130

Totals 63 413

Page 18: Single Track French Immersion: A Pathway For The Future. School District No. 72 Campbell River January 30, 2007 Single Track French Immersion: A Pathway.

SchoolOperating

Capacity

École des Deux Mondes 38K/184E

Robron Centre 76K/414E

Rockland 38K/253E

Willow Point 38K/161E

Georgia Park 38K/368E

Page 19: Single Track French Immersion: A Pathway For The Future. School District No. 72 Campbell River January 30, 2007 Single Track French Immersion: A Pathway.

Preliminary Screening Preliminary Screening ConclusionsConclusions

The consultants concluded that there The consultants concluded that there are three facilities that are suitable are three facilities that are suitable for the delivery of single track K-6 for the delivery of single track K-6 French Immersion. The three French Immersion. The three facilities are:facilities are:

ÉcoleÉcole des Deux Mondes des Deux Mondes Robron CentreRobron Centre Willow PointWillow Point

Page 20: Single Track French Immersion: A Pathway For The Future. School District No. 72 Campbell River January 30, 2007 Single Track French Immersion: A Pathway.

The consultants concluded that the following arrangements warranted detailed assessment:

single school model convert Robron Centre to accommodate all the K-6 French Immersion enrolment close EDM, close Willow Point

two school models convert Robron to accommodate some K-6 French Immersion, accommodate the remainder at EDM, close Willow Point

convert Robron to accommodate some K-6 French Immersion, accommodate the remainder at Willow Point, close EDM

retain Robron as a District Learning Centre, accommodate some K-6 French Immersion at EDM, accommodate the remainder at Willow Point

Page 21: Single Track French Immersion: A Pathway For The Future. School District No. 72 Campbell River January 30, 2007 Single Track French Immersion: A Pathway.

Designate Robron Centre as the onlySingle Track K-6 French Immersion School

Features of this model are as follows:

• Robron Centre would be converted into a 76K/414E capacity elementary school

• All K-6 French Immersion students, teachers and resources would be centralized in Robron Centre

• Students enrolled in the regular program at Willow Point would be transferred to Georgia Park.

• Willow Point Elementary and École des Deux Mondes would be closed.

• All or at least most of the programs offered in Robron Centre would need to be relocated to other District-owned facilities or leased space (the resulting operating budget impacts have not been estimated).

•Bussing to Robron would be provided in accordance with the student transportation policy.

Page 22: Single Track French Immersion: A Pathway For The Future. School District No. 72 Campbell River January 30, 2007 Single Track French Immersion: A Pathway.

Conversion CostsLocal Capital

Annual Facility Grant

Robron Education Centre

minor renovations $1,207,500

sports field rehabilitation $300,000

TOTAL $1,507,500

Page 23: Single Track French Immersion: A Pathway For The Future. School District No. 72 Campbell River January 30, 2007 Single Track French Immersion: A Pathway.

Avoided Capital Costs Capital PlanAnnual Facility

Grant

Robron

minor renovations (incl. in conversion) $240,000

EDM

seismic upgrading $2,576,000

minor renovations $431,500

Willow Point

seismic upgrading $1,502,110

Minor renovations $2,500

TOTAL $4,078,110 $674,000

Page 24: Single Track French Immersion: A Pathway For The Future. School District No. 72 Campbell River January 30, 2007 Single Track French Immersion: A Pathway.

Increase/(decrease) in Operating Costs

One-Time Annual

school staffing ($187,653)

operations & maintenance ( $9,920)

moving & mothballing $30,000

TOTAL $30,000 ($197,573)

Page 25: Single Track French Immersion: A Pathway For The Future. School District No. 72 Campbell River January 30, 2007 Single Track French Immersion: A Pathway.

Designate Robron Centre and EDMas Single Track K-6 French Immersion Schools

Features of this model are as follows:

•A portion of Robron Centre would be converted into a 38K/230E elementary school

•K-6 French Immersion would be offered at Robron Centre and EDM

•French Immersion students enrolled at Willow Point and Georgia Park would be transferred to Robron.

•Students enrolled in the regular program at Willow Point would be transferred to Georgia Park.

•Willow Point Elementary would be closed.

•Some of the programs offered in Robron Centre would need to be relocated to other District-owned facilities or leased space (the resulting operating budget impacts have not been estimated).

•Bussing to Robron and EDM would be provided in accordance with the student transportation policy.

Page 26: Single Track French Immersion: A Pathway For The Future. School District No. 72 Campbell River January 30, 2007 Single Track French Immersion: A Pathway.

Conversion Costs Local CapitalAnnual Facility Grant

Robron Education Centre

minor renovations $815,500

sports field rehabilitation $150,000

TOTAL $965,500

Page 27: Single Track French Immersion: A Pathway For The Future. School District No. 72 Campbell River January 30, 2007 Single Track French Immersion: A Pathway.

Avoided Capital Costs Capital PlanAnnual Facility Grant

Robron

minor renovations (incl. in conversion)

$240,000

Willow Point

seismic upgrading $1,502,110

minor renovations $2,500

TOTAL $1,502,110 $242,500

Page 28: Single Track French Immersion: A Pathway For The Future. School District No. 72 Campbell River January 30, 2007 Single Track French Immersion: A Pathway.

Increase/(decrease) in Operating Costs

One-Time Annual

school staffing ($117,057)

operations & maintenance $35,990

Moving & mothballing $25,000

TOTAL $25,000 ($81,067)

Page 29: Single Track French Immersion: A Pathway For The Future. School District No. 72 Campbell River January 30, 2007 Single Track French Immersion: A Pathway.

Designate Robron Centre and Willow Pointas Single Track K-6 French Immersion Schools

Features of this model are as follows:

•A portion of Robron Centre would be converted into a 38K/253E elementary school

•K-6 French Immersion would be offered at Robron Centre and Willow Point

•French Immersion students enrolled at EDM and Georgia Park would be transferred to Robron Centre and Willow Point.

•Students enrolled in the regular program at Willow Point would be transferred to Georgia Park.

•École des Deux Mondes would be closed.

•Some of the programs offered in Robron Centre would need to be relocated to other District-owned facilities or leased space (the resulting operating budget impacts have not been estimated).

•Bussing to Robron and Willow Point would be provided in accordance with the student transportation policy.

Page 30: Single Track French Immersion: A Pathway For The Future. School District No. 72 Campbell River January 30, 2007 Single Track French Immersion: A Pathway.

Conversion CostsLocal Capital

Annual Facility Grant

Robron Education Centre

minor renovations $887,250

sports field rehabilitation $150,000

TOTAL $1,037,250

Page 31: Single Track French Immersion: A Pathway For The Future. School District No. 72 Campbell River January 30, 2007 Single Track French Immersion: A Pathway.

Avoided Capital Costs Capital PlanAnnual Facility Grant

Robron

minor renovations (incl. in conversion)

$240,000

EDM

seismic upgrading $2,576,000

minor renovations $431,500

TOTAL $2,576,000 $671,500

Page 32: Single Track French Immersion: A Pathway For The Future. School District No. 72 Campbell River January 30, 2007 Single Track French Immersion: A Pathway.

Increase/(decrease) in Operating Costs

One-Time Annual

school staffing ($117,057)

operations & maintenance $23,530

moving & mothballing $25,000

TOTAL $25,000 ($93,527)

Page 33: Single Track French Immersion: A Pathway For The Future. School District No. 72 Campbell River January 30, 2007 Single Track French Immersion: A Pathway.

Designate EDM and Willow Pointas Single Track K-6 French Immersion Schools

Features of this model are as follows:• Capacity of Willow Point would be increased to 38K/230E as follows:

•3 new classrooms (currently has 6 portable classrooms in use)•new multi-purpose room•expanded gym

• K-6 French Immersion would be offered at EDM and Willow Point

• French Immersion students enrolled at Georgia Park would be transferred to EDM and Willow Point.

• Students enrolled in the regular program at Willow Point would be transferred to Georgia Park.

• Bussing to EDM and Willow Point would be provided in accordance with the student transportation policy.

Page 34: Single Track French Immersion: A Pathway For The Future. School District No. 72 Campbell River January 30, 2007 Single Track French Immersion: A Pathway.

Conversion Costs Local CapitalAnnual Facility Grant

Willow Point

school addition $2,500,000

TOTAL $2,500,000

Page 35: Single Track French Immersion: A Pathway For The Future. School District No. 72 Campbell River January 30, 2007 Single Track French Immersion: A Pathway.

Avoided Capital Costs Capital PlanAnnual Facility Grant

Willow Point

Minor renovations (incl. in conversion)

$2,500

TOTAL $2,500

Page 36: Single Track French Immersion: A Pathway For The Future. School District No. 72 Campbell River January 30, 2007 Single Track French Immersion: A Pathway.

Increase/(decrease) in Operating Costs

One-Time Annual

school staffing ($117,057)

operations & maintenance ($4,726)

moving & mothballing $15,000

TOTAL $15,000 ($121,783)

Page 37: Single Track French Immersion: A Pathway For The Future. School District No. 72 Campbell River January 30, 2007 Single Track French Immersion: A Pathway.

The consultants suggest that the preferred model be the one which, in the opinion of the Board of School Trustees, achieves the best balance among

the following objectives:

•maintaining convenient access to K-6 French Immersion

•minimizing capital costs associated with the change

•maximizing operating savings through reductions in the number of open schools

•providing flexibility for future growth

Page 38: Single Track French Immersion: A Pathway For The Future. School District No. 72 Campbell River January 30, 2007 Single Track French Immersion: A Pathway.
Page 39: Single Track French Immersion: A Pathway For The Future. School District No. 72 Campbell River January 30, 2007 Single Track French Immersion: A Pathway.

PATHWAY:PATHWAY:

Declining Enrolment will force decisions as Declining Enrolment will force decisions as it continues into the future.it continues into the future.

Decisions now can take us there all at Decisions now can take us there all at once or in a step-like process.once or in a step-like process.

One school option includes the closure of One school option includes the closure of schools and will require a longer time schools and will require a longer time frame to implement.frame to implement.

Parent, student, & staff input will be Parent, student, & staff input will be requested for transition planning. requested for transition planning.

Page 40: Single Track French Immersion: A Pathway For The Future. School District No. 72 Campbell River January 30, 2007 Single Track French Immersion: A Pathway.

Any Questions?Any Questions?

Discussion & Deliberation. Discussion & Deliberation.