Single Minute Exchange of Dies(S.M.ED)

22
Single Minute Single Minute Exchange of Exchange of Dies Dies Group no. : 11 Name: Anchal Singh Roll no.: 7554

description

This is a presentation made by me for Production & quality management subject in SYBMS. This presentation will explains you the SMED concept, origin, Steps to apply the concept, some examples & the most Important & unique relation Of SMED & F1 racing. I have related the smed with the pit stop of F1 car & how the pit stop is possible in 15 seconds.Hope you like it.Thank you.

Transcript of Single Minute Exchange of Dies(S.M.ED)

Page 1: Single Minute Exchange of Dies(S.M.ED)

Single Minute Single Minute Exchange of Exchange of DiesDies

Group no. : 11Name: Anchal SinghRoll no.: 7554

Page 2: Single Minute Exchange of Dies(S.M.ED)

What is SMED?What is SMED?Single Minute Exchange of Dies is

process changeover in 9 minutes or less.

The process was developedby Shigeo Shingo at Mazda,Mitsubishi and Toyota in the 1950’s and 1960’s.

Page 3: Single Minute Exchange of Dies(S.M.ED)

The SMED ProcessThe SMED Process

Preliminary Stage – Observe and record.

Stage 1 – Separate internal and external activities.

Stage 2 – Convert internal activities to external activities. Stage 3 – Streamline all activities.all activities.

Page 4: Single Minute Exchange of Dies(S.M.ED)

Preliminary StagePreliminary StageRecorder

Overall duration (from last product to first good product).

Describe the change (from what to what?).

Timers Time each step

Page 5: Single Minute Exchange of Dies(S.M.ED)
Page 6: Single Minute Exchange of Dies(S.M.ED)

Stage 1Stage 1

Separate internal and external activities. Study each internal step and ask if it

could be external.

Common issues:• Dies in remote storage racks.• Spanners not available.

Page 7: Single Minute Exchange of Dies(S.M.ED)

Stage 2Stage 2

Convert internal to external. Ask why the remaining internal steps

can’t be external. Re-examine the true function of each

step. Common issues:• Cold dies – using material to heat the dies. • No record of settings.

Page 8: Single Minute Exchange of Dies(S.M.ED)

Stage 3Stage 3

Streamline all activities. Analyze the elements (facts), and

discuss all possible ways of improving the step.

Study the external activities as well as the internal activities.

Common issues: • Fastenings – Are bolts needed? If so

remember that only the last turn tightens a nut or bolt.

• Standardize die heights.

Page 9: Single Minute Exchange of Dies(S.M.ED)
Page 10: Single Minute Exchange of Dies(S.M.ED)

Routing Diagram Routing Diagram (before)(before)

Page 11: Single Minute Exchange of Dies(S.M.ED)

Routing Diagram Routing Diagram (after)(after)

Page 12: Single Minute Exchange of Dies(S.M.ED)
Page 13: Single Minute Exchange of Dies(S.M.ED)
Page 14: Single Minute Exchange of Dies(S.M.ED)
Page 15: Single Minute Exchange of Dies(S.M.ED)

Step 0Step 0

Page 16: Single Minute Exchange of Dies(S.M.ED)

Step 1Step 1

Page 17: Single Minute Exchange of Dies(S.M.ED)

Step 2Step 2

Page 18: Single Minute Exchange of Dies(S.M.ED)

Step 3Step 3

Page 19: Single Minute Exchange of Dies(S.M.ED)

Step 4Step 4

Page 20: Single Minute Exchange of Dies(S.M.ED)

Step 5Step 5

Page 21: Single Minute Exchange of Dies(S.M.ED)

Step 6Step 6

Page 22: Single Minute Exchange of Dies(S.M.ED)

Thank Thank youyou