Simulated Life Test System Team 8

15
Active8 Automation Simulated Life Test System Team 8 Team Members: Mike Hansen Katie Kinziger Shan Pin Koh Kurt Mitts Kevin Nelson Matt Snyder Our sponsor: Our Advisor: A.K.Kulkarni

description

Active. Automation. Simulated Life Test System Team 8. Team Members: Mike Hansen Katie Kinziger Shan Pin Koh Kurt Mitts Kevin Nelson Matt Snyder. Our sponsor:. Our Advisor: A.K.Kulkarni. Automation. Active. Automation. GDO Operation. Transmitter. Receiver. Active. - PowerPoint PPT Presentation

Transcript of Simulated Life Test System Team 8

Page 1: Simulated Life Test System    Team 8

Active8 Automation

Simulated Life Test System Team 8

Team Members:Mike HansenKatie KinzigerShan Pin KohKurt MittsKevin NelsonMatt Snyder

Our sponsor:

Our Advisor:

A.K.Kulkarni

Page 2: Simulated Life Test System    Team 8

Active8 Automation

GDO Operation

Page 3: Simulated Life Test System    Team 8

Active8 Automation

HomeLink Garage Door Opener

Page 4: Simulated Life Test System    Team 8

Active8 Automation

Problem Statement

Design a test system to operate and monitor

JCI Homelink Trainable Garage Door Opener (GDO) Transmitters under the conditions that would be characteristic of a product installed in a modern automobile. The test system should be capable of monitoring the operation of the system while exposed to a number of conditioned variables. If a discrepancy is found, the conditions at the time the error occurred should be automatically logged to a spreadsheet file.

Page 5: Simulated Life Test System    Team 8

Active8 Automation

Design Considerations

Setup Considerations

* Matrix configuration Turntable Stacked turntable Sliding rail array

Actuation Considerations

* Stepper Motor

Shape Memory Alloy (SMA)

Pneumatics

Solenoid

Page 6: Simulated Life Test System    Team 8

Active8 Automation

Single SMA Test Setup

Page 7: Simulated Life Test System    Team 8

Active8 Automation

Dual SMA Test Setup

Page 8: Simulated Life Test System    Team 8

Active8 Automation

Pneumatic Test Setup

Page 9: Simulated Life Test System    Team 8

Active8 Automation

Temperature Profile

6 26 38.5 48.5 55

-40

0

+25

+85

Temperature Cycle ProfileInside Temperature Chamber

Tem

pera

t ure

(°C

)

Time (minutes)

20 minutes

10 minutes

10 °C /m

inute

10 °

C /m

inut

e

10 °

C /m

inut

e

Page 10: Simulated Life Test System    Team 8

Active8 Automation

Temperature Chamber

Page 11: Simulated Life Test System    Team 8

Active8 Automation

GDO Variable Voltage Supply

+24V

DC

16V Regulator

14.5V Regulator

9V Regulator

Solid State Relay

GDOs

Solid State Relay

Solid State Relay

TTL Control Inputs

Page 12: Simulated Life Test System    Team 8

Active8 Automation

Supply Voltage Cycle

TV TV TV9 10

16

14.5

9

Supply Voltage Cycle

Vol

tage

(V

)

Time (s)

Page 13: Simulated Life Test System    Team 8

Active8 Automation

PC

Date,Time,Index

ErrorLogging

DAQ Card LabVIEW

Microsoft Excel

SpreadsheetFile

Signal Reception

Stepper Motor Control

Select Supply Voltage

Signal Reception

GDO Current Draw

Supply Voltage

Pressure Sensor

Temperature

Motor Position

Test Control

Page 14: Simulated Life Test System    Team 8

Active8 Automation

Design Challenges

Actuator operation between -40oC to +85o C Consistency/Repeatability Speed Converting rotational to linear motion (stepper

motor) Control Force of actuation at hot and cold Size constraints of 24 unit configuration Error logging Computer Control and Operation

Page 15: Simulated Life Test System    Team 8

Active8 Automation

Summary

Past Actuation

Considerations Stepper motor SMA Solenoid Setup Considerations Turntable Sliding rail array Matrix configuration

Present Testing stepper

motor and actuationApparatus

LabVIEWProgramming

Future Investigate turntable

configuration Try different stepper

motors (ie linearstepper motors)