SiD and the Next Steps for ILC Detectors SLAC DOE Program Review June 12, 2007 John Jaros.

35
SiD and the Next Steps for ILC Detectors SLAC DOE Program Review June 12,
  • date post

    20-Dec-2015
  • Category

    Documents

  • view

    214
  • download

    0

Transcript of SiD and the Next Steps for ILC Detectors SLAC DOE Program Review June 12, 2007 John Jaros.

Page 1: SiD and the Next Steps for ILC Detectors SLAC DOE Program Review June 12, 2007 John Jaros.

SiD and the Next Steps for ILC Detectors

SLAC DOE Program Review June 12, 2007 John Jaros

Page 2: SiD and the Next Steps for ILC Detectors SLAC DOE Program Review June 12, 2007 John Jaros.

A Lot is Happening in the ILC Detector World

• Real Progress on the Machine: Reference Design Report (RDR) and Cost were unveiled in February.

• Pressure on the detectors: International Linear Collider Steering Committee charged the Detector Community to Propose a Detector Roadmap, to put ILC Detectors on the same timeline as the Machine.

• Preparing the ILC Case: A draft Detector Concept Report (DCR), the companion document to the RDR which makes the case for ILC physics and detectors, was released in May. The RDR and DCR justify moving to the next step, engineering designs for machine and detector.

• Next Steps: Plans for the Machine Engineering Design Report and first steps for the Detector Roadmap were announced at the LCWS last week.

Page 3: SiD and the Next Steps for ILC Detectors SLAC DOE Program Review June 12, 2007 John Jaros.

DCR: The Case for ILC Physics and Detectors

http://www.linearcollider.org/wiki/doku.php?id=dcrdet:dcrdet_home

Page 4: SiD and the Next Steps for ILC Detectors SLAC DOE Program Review June 12, 2007 John Jaros.

Global Design Effort

GDE Machine Roadmap

2005 2006 2007 2008 2009 2010

Global Design Effort Project

Baseline configuration

Reference Design

ILC R&D Program

Engineering Design

Expression of Interest to Host

International Mgmt

LHCPhysics

Page 5: SiD and the Next Steps for ILC Detectors SLAC DOE Program Review June 12, 2007 John Jaros.

Shin-ichi Kurokawa, ILCSC Chair

Albrecht Wagner, ICFA Chair Subject: Letter to WWS Co-Chairs

• 26 February 2007• To: Co-Chairs of the WWS International Organizing Committee• From: ILCSC

• The realization of the International Linear Collider has taken major steps forward in recent years. This could not have happened without the leadership taken coherently by the particle physics community, within the framework of ICFA. Unprecedented collaborative steps have been necessary, and the community has adapted successfully to what, in some regions, required major redirections of traditional accelerator R&D effort.

• Two major milestones, the selection of the main-linac RF technology and the GDE’s announcement of the RDR budget and associated design choices, keep the GDE on pace to complete a construction-ready engineering design for the ILC accelerator-complex by 2010.

• Maintaining this momentum requires also that the equivalent strategic decisions and the level of technical maturity for the two ILC detector proposals keep pace with the accelerator schedule. Major progress in this regard is ongoing under the auspices of WWS. In addition, a definite plan together with milestones is needed to have detector designs of a maturity similar to that of the accelerator by 2010. This needs an enhanced effort by the community. ILCSC will support the formation of an International Detector Advisory Group to assist this effort. ICFA looks forward to receiving such a plan from WWS at the June 1, 2007 ILCSC meeting at DESY.

Page 6: SiD and the Next Steps for ILC Detectors SLAC DOE Program Review June 12, 2007 John Jaros.

The Roadmap, as proposed by WWS The key elements of the roadmap proposal are:• A call for LOIs by ILCSC this summer, due summer 2008• These LOIs will provide a description of the proposed detector and its

performance, and will note the intent of those planning to collaborate on developing the EDR.

• LOIs will be reviewed by the IDAG, an International Detector Advisory Group of experts chosen by ILCSC.

• IDAG will facilitate the definition of two, complementary and contrasting detector designs, and report the result to ILCSC.

• The result of this process should be two proto-collaborations operating by the beginning of 2009 to produce EDR documents by end 2010.

…and begun by the ILCSC• Issue Call for Detector LOIs summer 2007.• Search for, and appoint a Research Director, to oversee the

experimental program for the ILC, coordinate reviews of the LOIs, facilitate the selection of two, complementary detector designs, help generate support for the two detector EDRs, and monitor EDR development.

Page 7: SiD and the Next Steps for ILC Detectors SLAC DOE Program Review June 12, 2007 John Jaros.

Calling for LOIs signals a Phase Change for the Detector Concepts. Detector “Design Studies” are becoming “Detector Collaborations.”

Calling for LOIs also sends signals to the ILC Detector R&D Community. Now’s the time to align with a detector concept, participate in the optimization process, and contribute to the LOIs.

Four goes to Two.The four ILC detector concepts, plus any that emerge within the next year, must eventually contract to two, suitable for full engineering design. Spontaneous Coalescence (e.g., LDC and GLD) Induced Coalescence? Shotgun Marriage?

Roadmap Implications

Page 8: SiD and the Next Steps for ILC Detectors SLAC DOE Program Review June 12, 2007 John Jaros.

ILC Detector Concepts

SiD LDC GLD

•Solenoid Designs B=5,4,3 Tesla•Si vs TPC Tracking•“Particle Flow” Calorimeters

4th

•Dual Solenoid•Compensating Cal•TPC Tracking

Page 9: SiD and the Next Steps for ILC Detectors SLAC DOE Program Review June 12, 2007 John Jaros.

SLAC’s Role in ILC Detector Development •Co-Leads the SiD Design Study

•Provides Computing-Simulation- Analysis infrastructure for the US ILC Detector Effort

•Optimizes SiD Design and Benchmarks SiD performance

•Pursues detector R&D, especially Si/W Calorimetry, Readout electronics, and Si Tracking

•Designs and studies the Machine- Detector interface and IP Instrumentation

.

Page 10: SiD and the Next Steps for ILC Detectors SLAC DOE Program Review June 12, 2007 John Jaros.

Silicon Detector Design Study

Goals: Design an ILC detector, aggressive in performance, constrained in cost, identify and develop needed detector R&D, and engage an international community of physicists interested in the ILC

.

Page 11: SiD and the Next Steps for ILC Detectors SLAC DOE Program Review June 12, 2007 John Jaros.

SiD Collaborators• Design Study Leadership is International

Fermilab, Argonne, Brookhaven, SLAC, Annecy, U Tokyo,U Oregon, U T Arlington, NIU, Brown, U Wisconsin, Oxford, KEK

• Design Study Participants from many InstitutionsU Washington, RAL, LLNL, IHEP Beijing, Kyungpook U, Princeton, MIT, UCSC, UC Davis, U Iowa, U Colorado,Kansas State, U Chicago, U Michigan, Notre Dame, Yale,U New Mexico, Purdue

• Close R&D Collaborations with several InstitutionsFermilab, U Oregon, UC Davis, Brown, Oxford, UCSC,NIU, Argonne,…

130 Authors for SiD DOD

Page 12: SiD and the Next Steps for ILC Detectors SLAC DOE Program Review June 12, 2007 John Jaros.

• Collaboration Workshops SiD Workshop at SLAC October 26-28, 2006 http://www-sid.slac.stanford.edu/SLAC-06-workshop/Workshop06.asp SiD Workshop at Fermilab April 9-11, 2007 http://ilc.fnal.gov/detector/rd/sid/sid07.htm

• R&D Reviews Microstrip Sensor Design Review (SLAC) Dec 14, 2006 WWS Tracking Review (Beijing) Feb 5-8, 2007

WWS Calorimeter Review (DESY) May 31-Jun 4, 2007• Weekly Meetings

Benchmarking, Reconstruction, Calorimetry, Tracking/Vertexing see SiD Webpage: http://www-sid.slac.stanford.edu/default.asp

• SiD Documents Detector Outline Document http://hep.uchicago.edu/~oreglia/siddod.pdf SiD Tracking R&D Report http://www-sid.slac.stanford.edu/Documents/Tracking_review.pdf

SiD Calorimetry R&D Report http://www-hep.uta.edu/~white/SiD_Cal_Review07/SiD_Calorimeter_RD_Review_Report_Final.doc

SiD Activities

Page 13: SiD and the Next Steps for ILC Detectors SLAC DOE Program Review June 12, 2007 John Jaros.

• Jet energy resolution goal is E/E=3-4% to distinguish hadronic decays of W’s and Z’s. Particle Flow Calorimetry requires a dense, highly segmented, SiW Ecal and Hcal.

• Constrain the cost of calorimeters and solenoid by limiting the radius; boost B to maintain BR2. B = 5 Tesla

• Si strip tracker exploits high B and gives excellent momentum resolution and robust performance. pt/pt

2 ≤ 5 x 10-5 GeV-1

• VX Tracker exploits high B to sit at minimum possible radius with max Ω = 5 10/psin3/2 m

SiD Design Rationale

Page 14: SiD and the Next Steps for ILC Detectors SLAC DOE Program Review June 12, 2007 John Jaros.

SiD Starting Point

Vertex detector: Vertex detector: 5 barrels, 4 disks; R5 barrels, 4 disks; Rinin= 1.4 cm= 1.4 cm

Si tracking: 5 layers; RSi tracking: 5 layers; Rinin= 20 cm= 20 cm

HCAL Fe: 34 layers; RHCAL Fe: 34 layers; Rinin= 138 cm= 138 cm

Solenoid: 5 T; RSolenoid: 5 T; Rinin= 250 cm= 250 cm

EMCAL Si/W: 30 layers REMCAL Si/W: 30 layers Rinin= 125 cm= 125 cm

Flux return/muonFlux return/muonRRinin= 333 cm= 333 cmRRoutout= 645 cm= 645 cm

Page 15: SiD and the Next Steps for ILC Detectors SLAC DOE Program Review June 12, 2007 John Jaros.

SiD @ SLAC: Simulation/Reconstruction

• Provides full detector simulation in Geant4. Runtime detector description in XML, making it easy to study design variations.

• Provides Java-based reconstruction & analysis framework• Developing Tracking and Calorimeter reconstruction code • Supports SiD, ALCPG, and international simulation effort with Tutorials,

Workshops, WWS Working Groups• Provides physics simulation and data samples for physics analysis

e.g. 1 ab-1 sample of all SM Processes at 500 GeV http://www.lcsim.org/datasets/ftp.html

SLAC Sim/Recon Group Ron Cassel Norman Graf* Tony Johnson Jeremy McCormick

See Norman’s Talkin Breakout Sessions

Page 16: SiD and the Next Steps for ILC Detectors SLAC DOE Program Review June 12, 2007 John Jaros.

• Understanding Physics Requirements on CalorimetryNeed clean identification of W’s, Z’s, H’s, tops, so dijet mass resolution few GeV.

• How Important is Jet Energy Resolution? e.g. Triple Higgs Coupling

Optimization and Benchmarking

( )12212

12 cos12 θ−≈ EEM

⎥⎦

⎤⎢⎣

⎡⊕⊕≈ K

2

2

1

1

12

12

2

1

E

dE

E

dE

M

dM

Requiring dM/M Z/MZ = 2.5/92 = 2.7 %, sets dEjet/Ejet ~ 3-4%

15002000sGeVLfb−==

E/E60%30%equiv to 1.4 Lumi=→×

hhhhhhgg

E/ETim Barklow

SLAC GroupTim BarklowRon CassellNorman GrafJohn Jaros

Page 17: SiD and the Next Steps for ILC Detectors SLAC DOE Program Review June 12, 2007 John Jaros.

Particle Flow CalorimetryPromises Improved Dijet Mass Resolution

1

Measure the energy of every particle, not the energy deposited in calorimeter modules. Tracker measures charged particles, ECal measures photons, Hcal measures neutral hadrons.

High transverse and longitudinal segmentation is needed to distinguish individual particles and avoidconfusion.

Page 18: SiD and the Next Steps for ILC Detectors SLAC DOE Program Review June 12, 2007 John Jaros.

Silicon Tungsten Ecal

13 mm2 pixels

Readout 1k pixelsper si sensor (KPiX)

Low Power Passive Cooling

SLAC EffortBreidenbachFreytagGrafHerbstHallerNelson+ BNL, U Oregon,UC Davis

Page 19: SiD and the Next Steps for ILC Detectors SLAC DOE Program Review June 12, 2007 John Jaros.

Integrated Electronics Preserves RMoliere

Kapton Cables (UC Davis)

Pixel Sensor with KPiX (U Oregon)

1 mm readout gap 13 mm effective Moliere radius. Very compact showers.

Mechanical Design (SLAC/Oregon/Annecy)

Page 20: SiD and the Next Steps for ILC Detectors SLAC DOE Program Review June 12, 2007 John Jaros.

KPiX Readout ChipOne cell. Dual range, time measuring, 13 bit, quad buffered

2 x 32 Prototype #4 now being tested at SLAC. #5 is on the way. Full chip in the fall.

Use for ecal and µstrips; adapt for hcal.

Noise in KPiX-4

Demonstrated Performance

•Single MIP tagging (S/N = 8)

• Dynamic range 0.1 –2500 MIPs

•Low power <20 mW per wafer with power pulsing

• 4 deep buffer for bunch train

Page 21: SiD and the Next Steps for ILC Detectors SLAC DOE Program Review June 12, 2007 John Jaros.

SiD Integrated Tracking

• Silicon Tracker is fast (1 BX only)

• Silicon is robust(No HV trips)

• Tracking System VXD Si Main Tracker Ecal

Page 22: SiD and the Next Steps for ILC Detectors SLAC DOE Program Review June 12, 2007 John Jaros.

Pixel Vertex Tracker VXTFNAL Mech DesignFNAL Mech Design

SLAC GroupMarty BreidenbachSu DongNick Sinev (Oregon)

Marty’s Idea: Short Column CCD

Challenges:Readout Speed, Current Supply,Material Budget, Backgrounds

Yale/Oregon

Page 23: SiD and the Next Steps for ILC Detectors SLAC DOE Program Review June 12, 2007 John Jaros.

Si Tracking• Physics Premium on Superb

Momentum Resolution• Challenges

Low Material BudgetRobust Pattern Recognition

p/p2 ~ 2 x 10-5

0.5%

SLAC GroupN. GrafJ. JarosT. NelsonR. Partridge

See Tim Nelson’s Talk in the Breakout Sessions

Page 24: SiD and the Next Steps for ILC Detectors SLAC DOE Program Review June 12, 2007 John Jaros.

Si Microstrip DevelopmentKPiX Compatible Sensor Designed 92 x 92 mm2

1840 sense lines < 5 m resolutionSubmitting to HPK

Double Metal TracesConnect Strips to KPiX

Kapton Cable Design (UNM/SLAC)

Page 25: SiD and the Next Steps for ILC Detectors SLAC DOE Program Review June 12, 2007 John Jaros.

Si Sensor Module/Mechanics• Sensor Module Tiles Tracker

Cylinders, Endcaps• Kapton cables route signals

and power to endcap modules• Next steps: FEA and Prototyping

Tracker Design FNAL/SLAC

Page 26: SiD and the Next Steps for ILC Detectors SLAC DOE Program Review June 12, 2007 John Jaros.

Machine-Detector InterfaceMachine-Detector Interface

Machine-Detector Interface at the ILC• (L,E,P) measurements: Luminosity, Energy, Polarization• Forward Region Detectors• Collimation and Backgrounds• IR Design and Detector Assembly• EMI (electro-magnetic interference) in IR

MDI-related Experiments at SLAC’s End Station A• Collimator Wakefield Studies (T-480)• Energy spectrometer prototypes (T-474/491 and T-

475)• IR background studies for IP BPMs (T-488)• EMI studies

Beam Instrumentation Experiments in ESA• Rf BPM prototypes for ILC Linac (part of T-474)• Bunch length diagnostics for ILC and LCLS (includes T-487)

See Mike Woods’ talkin the Breakout Sessions

Page 27: SiD and the Next Steps for ILC Detectors SLAC DOE Program Review June 12, 2007 John Jaros.

ILC Test Beams in ESA50 Participants at SLAC in 2006 for this program

18 from SLAC + 32 users

18 Institutions participated in 2006 beam tests and measurements Birmingham U., Cambridge U., Daresbury, DESY, Dubna, Fermilab, KEK, Lancaster U., Leland H.S., LLNL, Manchester U., Notre Dame U.,

Oxford U., Royal Holloway U., SLAC, UC Berkeley, UC London, U. Oregon

Runs in 2006, 2007, and 2008 (planned)

Precision Energy Spectrometers Needed to Measure Energy to 200ppm

Page 28: SiD and the Next Steps for ILC Detectors SLAC DOE Program Review June 12, 2007 John Jaros.

MDI Activities

-0.5

-0.4

-0.3

-0.2

-0.1

0

0.1

0.2

0.3

0.4

0.5

0 2 4 6 8 10 12 14 16

IR Design Pair Backgrounds

Surface Assembly SLAC MDI Group Tom Markiewicz (ILC)Takashi MaruyamaKen MoffeitMike Woods

Page 29: SiD and the Next Steps for ILC Detectors SLAC DOE Program Review June 12, 2007 John Jaros.

SiD’s Next StepsOptimize SiD Design, Grow the Collaboration,

Write an LOI

• Simulation/Reconstruction Code Make PFA into a design tool, Complete detailed tracker simulation, Perfect Forward Pattern Recognition

• Benchmarking/Analysis/Design Optimization Optimize Global Parameter, Optimize Subsystem Parameteres, Develop Full MC Benchmark Analyses.

• Ecal Fab and Test full KPiX Prototype, Evaluate new Si Sensors, Begin Mechanical Design ,Build Ecal Prototype Tower, Beam Test

• Main Tracker Fab and Test Tracker Si Sensor, Prototype Sensor Modules, Establish Si Lab, Beam test

• Vertex Tracker Evaluate Performance, Continue with Mechanical Design (with FNAL), Study Power Distribution

Page 30: SiD and the Next Steps for ILC Detectors SLAC DOE Program Review June 12, 2007 John Jaros.

Expanding Effort on SiD

We have a good start on optimizing the SiD design. There’s progress with the addition of a new SiD Mechanical Engineer (due~Oct. 1), plans underway for a Si Lab for sensor testing and development, growing involvement from SLAC Users and the International Community, and progress on detector R&D.

But the present program must grow if we and our International colleagues are to prepare the SiD LOI, and the Engineering Design which follows, on the WWS timetable.

SLAC is a natural site to lead ILC detector development with our user community, sister laboratories, and international partners.

We have much of the needed engineering, construction facilities, large detector experience, computing and simulation infrastructure, and test beams, and can serve as a center for design and analysis activity.

Page 31: SiD and the Next Steps for ILC Detectors SLAC DOE Program Review June 12, 2007 John Jaros.

Backup Slides

Page 32: SiD and the Next Steps for ILC Detectors SLAC DOE Program Review June 12, 2007 John Jaros.

SiD @ SLAC: Physics Benchmarking• Evaluating Detector Performance Requirements• Full MC Physics Analyses

ZHqqbb ZHX

Page 33: SiD and the Next Steps for ILC Detectors SLAC DOE Program Review June 12, 2007 John Jaros.

SiD@SLAC: PeopleSiD Department Marty Breidenbach

John JarosSiD Sim/Recon Norman Graf

Ron Cassell Tony Johnson Jeremy McCormick

SiD Ecal Electronics Gunther Haller Dieter Freytag

Ryan HerbstSiD Tracking Tim Nelson

Rich PartridgeSiD MDI/Polarization Tom Markiewicz Mike Woods

Ken Moffeit Takashi MaruyamaSiD Benchmarking Tim BarklowSiD Vertex Detector Su Dong

Page 34: SiD and the Next Steps for ILC Detectors SLAC DOE Program Review June 12, 2007 John Jaros.

More Information and MeetingSchedules are on SiD Webpage:http://www-sid.slac.stanford.edu/

Page 35: SiD and the Next Steps for ILC Detectors SLAC DOE Program Review June 12, 2007 John Jaros.

Guide to ILC SpeakILCSC International Linear Collider Steering Committee, chartered by ICFA to realize the ILC. ILCSC chose the technology, established the GDE, hired the Director, facilitates getting support, and provides oversight.GDE Global Design Effort. Under Barry Barish’s direction, the GDE is the international team designing, developing, and now engineering the ILC. Next step, Machine EDR.WWS World Wide Study (of Physics and Detectors for the Linear Collider). Grass Roots organization of the detector and physics communities, led by Brau, Richard, and Yamamoto. WWS organizes detector R&D and detector concept studies, and has developed a detector roadmap.RDR/DCR The Reference Design Report, outlining the machine baseline design and costs and the Detector Concept Report, making the case for ILC physics and detectors.EDRs Engineering Design Reports for the machine and detector, due 2010, which will serve as the proposal to World Governments to construct the ILC and its Detectors.