SHORT TERM OPEN ACCESS CASE STUDIES
description
Transcript of SHORT TERM OPEN ACCESS CASE STUDIES
SHORT TERM OPEN ACCESSSHORT TERM OPEN ACCESS
CASE STUDIES CASE STUDIES
24-06-09
InternalizationInternalization As Declared in the ApplicationAs Declared in the Application
Buyer/Seller is said to be internalised : Buyer/Seller is said to be internalised : If they are Directly connected to CTU (ex. SEBs, CGS etc.) If they are Directly connected to CTU (ex. SEBs, CGS etc.) In case of an Embedded Customer where The Connected In case of an Embedded Customer where The Connected
STU is not yet unbundled STU is not yet unbundled In case of organizations where full commercial separation In case of organizations where full commercial separation
is not in placeis not in place When STU charges and losses are not published When STU charges and losses are not published If the power purchase rate includes the Tr. Ch. And Losses If the power purchase rate includes the Tr. Ch. And Losses
Implications if internalised : Implications if internalised :
• No Transmission charges No Transmission charges • No Scheduling/ operating chargesNo Scheduling/ operating charges• No Normative LossesNo Normative Losses
Non-InternalizationNon-Internalization As Declared in the ApplicationAs Declared in the Application
Buyer/Seller is said to be Not Internalised Buyer/Seller is said to be Not Internalised If Buyer/Seller is embedded customer (CPP, IPP, If Buyer/Seller is embedded customer (CPP, IPP,
HT consumer etc.)HT consumer etc.)• in a not-yet unbundled SEB in a not-yet unbundled SEB • In an unbundled state setup case In an unbundled state setup case
If Buyer/Seller is a Power purchase centre, If Buyer/Seller is a Power purchase centre, Discom in an unbundled setupDiscom in an unbundled setup
Implications if Not internalised : Implications if Not internalised : • Transmission charges to be paidTransmission charges to be paid• Scheduling/ operating charges to be borneScheduling/ operating charges to be borne• Normative Losses applicableNormative Losses applicable
Normative Losses for Scheduling STOANormative Losses for Scheduling STOA AP: 4.2% AP: 4.2% KPTCL: 4.06%KPTCL: 4.06% DVC: 2.82% DVC: 2.82% WB: 3.9%WB: 3.9% DTL: 1.5% DTL: 1.5% CSEB:4.03%CSEB:4.03% MP: 4.9%MP: 4.9% Maharashtra: 4.85%Maharashtra: 4.85% OPTCL:4.5%OPTCL:4.5% Rajasthan: 4.4%Rajasthan: 4.4%
only for Embeddedonly for Embedded KSEB: 0.75% KSEB: 0.75% TNEB: 1.75%TNEB: 1.75%
STOA OF KSEB(KYCPP) - TNEB 0000 HRS – 2400 HRSSTOA OF KSEB(KYCPP) - TNEB 0000 HRS – 2400 HRS150MW AT KYCPP EXBUS POINT for 31 days150MW AT KYCPP EXBUS POINT for 31 days
TAMILNADU
KE
RA
LA
INJECTING UTILITY : KYCPP, (KSEB)
(Not Internalised)
TRADER: -
KAYAMKULAM CCGT(NTPC)
DRAWEE UTILITY TNEB
(Internalised)
CAPACITY APPROVED 150 MW
DAILY PERIOD 0000-2400 HRS
DATE OF COMMENCEMENT 01-10-10
DATE OF EXPIRY 31-10-10
CUSTOMER: TNEB
STOA OF KSEB(KYCPP) - TNEB 0000 HRS – 2400 HRSSTOA OF KSEB(KYCPP) - TNEB 0000 HRS – 2400 HRS150MW AT KYCPP EXBUS POINT for 31 days150MW AT KYCPP EXBUS POINT for 31 days
FROM 01-10-07 TO 31-10-07, THROUGHOUT THE DAYFROM 01-10-07 TO 31-10-07, THROUGHOUT THE DAY
TAMILNADU
KE
RA
LA
APPLICATION PROCESSING FEE
Rs 5000 PER TRANSACTION
KAYAMKULAM CCGT(NTPC)MORE DETAILS
TRANSMISSION CHARGES PER MW PER DAY
1. Rs 30/ MWh FOR CTU-SR
2. Rs 30/ MWh FOR KERALA
TOTAL TRANSMISSION CHARGE
PER UNIT 6.12/. Ps
SCHEDULING CHARGES PER DAY
1. Rs 2000 FOR SRLDC
2. Rs 2000 FOR KSEB
STOA OF WBSEB - PCKL (0000 – 1700 & 2300 – 2400 HRSSTOA OF WBSEB - PCKL (0000 – 1700 & 2300 – 2400 HRS) ) 50 50 MW AT INJECTION POINT FOR 21.11.10 MW AT INJECTION POINT FOR 21.11.10
KAR
WB
SR
CTU
HVDC BACK TO BACK AT GAZUWAKA IN SR
ER
INJECTING UTILITY WBSEB
(Not Internalised)
CUSTOMER: NVVN
DRAWEE UTILITY PCKL
(Not Internalised)
CAPACITY APPROVED 50 MW
DAILY PERIOD 0000-1700 & 2300-2400 HRS
DATE OF COMMENCEMENT 21-11-10
DATE OF EXPIRY 21-11-10
INTERVENING REGIONAL LINK ER-SR
TRADER: NVVN
KAR
WB
SR
CTU
HVDC BACK TO BACK AT GAZUWAKA IN SR
ER
EXPORT AT WB 50 MW
AT KPTCL PERIPHERY 44.85 MW
LOSSES IN ER 3%
LOSSES IN SR 3.67%
TOTAL LOSSES FOR TRANSACTION 2.77 MW
PCKL RECEIVES 43.23 MW
STOA OF WBSEB - PCKL (0000 – 1700 & 2300 – 2400 HRSSTOA OF WBSEB - PCKL (0000 – 1700 & 2300 – 2400 HRS) ) 50 50 MW AT INJECTION POINT FOR 21.11.10 MW AT INJECTION POINT FOR 21.11.10
LOSSES IN WB 4%
AT ER- WB PERIPHERY 48 MW
AT ER-SR PERIPHERY 46.56 MW
LOSSES IN KPTCL 4.06%
KAR
WB
SR
CTU
HVDC BACK TO BACK AT GAZUWAKA IN SR
ER
APPLICATION PROCESSING FEE Rs 5000 PER TRANSACTION
TRANSMISSION CHARGES PER MWh PER DAY
1. Rs 80/MWh FOR WBTCL
2. Rs 80/MWh FOR CTU-ER
3. Rs 80/MWh FOR CTU-SR
4. Rs 32.833/MWh FOR KPTCL
SCHEDULING CHARGES PER DAY
1. Rs 2000 FOR WBLDC
2. Rs 2000 FOR ERLDC
3. Rs 2000 FOR SRLDC
4. Rs 2000 FOR Karnataka LDC
TOTAL TRANSMISSION CHARGE PER UNIT 12.2833 Ps/U
STOA OF WBSEB - PCKL (0000 – 1700 & 2300 – 2400 STOA OF WBSEB - PCKL (0000 – 1700 & 2300 – 2400 HRS) 50 MW AT INJECTION POINT FOR 21.11.10HRS) 50 MW AT INJECTION POINT FOR 21.11.10
MPTRADECO-APPCCB THROUGH LANCOMPTRADECO-APPCCB THROUGH LANCO(1200 HRS – 1800 HRS(1200 HRS – 1800 HRS) 100 ) 100 MW AT INJECTION POINT for MW AT INJECTION POINT for
26.10.10 26.10.10
INJECTING UTILITY MPTRADECO
(Not Internalised)
CUSTOMER: LANCO
DRAWEE UTILITY APPCC
(Not Internalised)
CAPACITY APPROVED 100 MW
DAILY PERIOD 1200-1800 HRS
DATE OF COMMENCEMENT 26-10-10
DATE OF EXPIRY 26-10-10
AP
WR GRID
MP
HVDC BACK TO BACK AT
BHADRWATHI IN WR
INTERVENING REGIONAL LINK
1. WR-SR
TRADER: LANCO
EXPORT AT MP 100 MW
AT MP PERIPHERY 96.0 MW
APPCC RECIEVES 84.42 MW
LOSSES IN MP 4%
LOSSES IN WR 4%
TOTAL LOSSES FOR
TRANSACTION 15.57 MW
AP
WR GRID
MP
HVDC BACK TO BACK AT
BHADRWATHI IN WR
CT
U
MPTRADECO-APPCCB THROUGH LANCOMPTRADECO-APPCCB THROUGH LANCO(1200 HRS – 1800 HRS) 100 MW AT INJECTION POINT for (1200 HRS – 1800 HRS) 100 MW AT INJECTION POINT for
26.10.1026.10.10
LOSSES IN SR 4.05%
AT WR-SR PERIPHERY 92.16 MW
AT SR-AP PERIPHERY 88.83 MW
LOSSES IN AP 4.53%
APPLICATION PROCESSING FEE
Rs 5000 PER TRANSACTION
TRANSMISSION CHARGES PER MW PER DAY
1. Rs. 80/MWh FOR MPTCL
2. Rs 80/MWh FOR WR CTU
3. Rs 80/MWh FOR SR CTU
4. Rs 53.3/MWH FOR APTRANSCO
TOTAL TRANSMISSION CHARGE PER UNIT
14.33 Ps/U.
SCHEDULING CHARGES PER DAY
1. Rs 2000 FOR MP SLDC
2. Rs 2000 FOR WRLDC
3. Rs 2000 FOR SRLDC
4. Rs 2000 FOR APLDC
AP
WR GRID
MP
HVDC BACK TO BACK AT
BHADRWATHI IN WR
MPTRADECO-APPCCB THROUGH LANCOMPTRADECO-APPCCB THROUGH LANCO(1200 HRS – 1800 HRS) 100 MW AT INJECTION POINT for (1200 HRS – 1800 HRS) 100 MW AT INJECTION POINT for
26.10.1026.10.10
STOA OF BANNARI AMMAN SUGARS -APPCC, STOA OF BANNARI AMMAN SUGARS -APPCC, 10 MW FROM 0000 HRS – 2400 HRS 10 MW FROM 0000 HRS – 2400 HRS
FROM 09-11-10 TO 12-11-10FROM 09-11-10 TO 12-11-10
INJECTING UTILITY BANNARI AMMAN SUGARS (KPTCL)
(Not Internalised)
TRADER: TATA
DRAWEE UTILITY APPCC
(Not Internalised)
INTERVENING REGION SR
CAPACITY APPROVED 10 MW
DAILY PERIOD 0000 HRS – 2400 HRS
DATE OF COMMENCEMENT 09-11-10
DATE OF EXPIRY 12-11-10
AP
KAR
CUSTOMER: TATA
EXPORT AT BANNARI 10 MW
AT KPTCL PERIPHERY 9.594 MW
LOSSES IN SR 3.45%
TOTAL LOSSES FOR TRANSACTION
11.56 MW
AP
KAR
STOA OF BANNARI AMMAN SUGARS -APPCC, 10 MW STOA OF BANNARI AMMAN SUGARS -APPCC, 10 MW FROM 0000 HRS – 2400 HRS FROM 0000 HRS – 2400 HRS FROM 09-11-10 TO 12-11-10FROM 09-11-10 TO 12-11-10
LOSSES IN KARNATAKA 4.06%
AT AP PERIPHERY 9.263 MW
AT AP PERIPHERY 9.263 MW
LOSSES IN AP 4.53%
APPLICATION PROCESSING FEE Rs 5000 PER TRANSACTION
TRANSMISSION CHARGES PER MW PER DAY
1. Rs. 32.833/ MWh FOR KPTCL
2. Rs 30 / MWH FOR CTU-SR
3. Rs 53.3 / MWH FOR APTRANSCO
TOTAL TRANSMISSION CHARGE PER UNIT 11.6133 Ps./U
SCHEDULING CHARGES PER DAY
1. Rs 2000 FOR KP LDC
2. Rs 2000 FOR SRLDC
3. Rs 2000 FOR AP LDC AP
KAR
STOA OF BANNARI AMMAN SUGARS -APPCC, 10 MW STOA OF BANNARI AMMAN SUGARS -APPCC, 10 MW FROM 0000 HRS – 2400 HRS FROM 0000 HRS – 2400 HRS FROM 09-11-10 TO 12-11-10FROM 09-11-10 TO 12-11-10
CALCULATION FOR THE SHORT TERM CUSTOMER FOR THE TRANSACTION OF KYCPP – TNEB OF NVVNL (150 MW)
S.NO Floor Rate Period Amount (Rs.)1 Transmission Charges Rs/MWh Days
CTU - SR 30 31 3348000STU - KSEB 30 31 3348000SUB TOTAL ( 1 ) 6696000
2 Scheduling and System Operation ChargesSLDC - KSEB 2000 31 62000RLDC - SRLDC 2000 31 62000SUB TOTAL ( 2 ) 124000
3 Application Processing Fee 50004 Total Payment ( 1+2+3+4 ) 6,825,000
ENERGY(MWh) 111600Rate (ps/u ) 6.12
BACK
DVC – Jaipur WHEEL THROUGH SR DVC – Jaipur WHEEL THROUGH SR (0000 HRS – 1700 HRS AND 2300-2400 HRS(0000 HRS – 1700 HRS AND 2300-2400 HRS) 50 ) 50 MWMW
FROM 01.01.10 to 31.01.10FROM 01.01.10 to 31.01.10
INJECTING UTILITY DVC
(Not Internalised)
CUSTOMER: TATA
DRAWEE UTILITY JAIPUR (DISCOM)
(Not Internalised)
INTERVENING REGION SR & WR
CAPACITY APPROVED 50 MW
DAILY PERIOD 0000-1700 & 2300-2400 hrs
DATE OF COMMENCEMENT 01-01-10DATE OF EXPIRY 31-01-10
INTERVENING REGIONAL LINK :
ER-SR SR-WR WR-NR
WB
SR
HVDC BACK TO BACK AT GAZUWAKA IN SR
ER
NR
WR
RAJASTHAN
JAIPUR
HVDC BACK TO BACK AT BHADRWATHI IN WR
HVDC BACK TO BACK AT VINDHYACHAL IN WR
TRADER: TATA
INTERVENING STATE TRANSMISSION UTILITY RRVPN
DVC
EXPORT AT DVC 50 MW
JAIPUR RECIEVES 40.07 MW
LOSSES IN ER 3%
LOSSES IN SR 4.0%
TOTAL LOSSES FOR TRANSACTION 9.93 MW
WB
SR
HVDC BACK TO BACK AT GAZUWAKA IN SR
ER
NR
WR
RAJASTHAN
AJMER
HVDC BACK TO BACK AT BHADRWATHI IN WR
AT SR-WR PERIPHERY 45.25 MW
AT WR-NR PERIPHERY 43.44 MW
AT NR-RAJ.PERIPHERY 41.92 MW
LOSSES IN WR 4%
LOSSES IN NR 3.5%
LOSSES IN RAJASTHAN 4.4%
VINDHYACHAL HVDC & Gwalior-Agra
DVC – Jaipur WHEEL THROUGH SR, WRDVC – Jaipur WHEEL THROUGH SR, WR(0000 HRS – 1700 HRS AND 2300-2400 HRS) 50 MW(0000 HRS – 1700 HRS AND 2300-2400 HRS) 50 MW
FROM 01.01.10 to 31.01.10FROM 01.01.10 to 31.01.10
LOSSES IN DVC 2.82%
AT ER-SR PERIPHERY 48.59 MW
AT ER-SR PERIPHERY 47.13 MW
DVC
APPLICATION PROCESSING FEE Rs 5000 PER TRANSACTION
SCHEDULING CHARGES PER DAY
1. Rs 2000 FOR ERLDC
2. Rs 2000 FOR SRLDC
3. Rs 3000 FOR WRLDC
4. Rs 2000 FOR NRLDC
5. Rs 2000 FOR RAJASTHAN
WB
SR HVDC BACK TO BACK AT GAZUWAKA IN SR
ER
NR
WR
RAJASTHAN
AJMER
HVDC BACK TO BACK AT BHADRWATHI IN WR
HVDC BACK TO BACK AT VINDHYACHAL IN WR
DVC – Jaipur WHEEL THROUGH SR (0000 HRS – 1700 HRS AND 2300-2400DVC – Jaipur WHEEL THROUGH SR (0000 HRS – 1700 HRS AND 2300-2400 HRS) 50 MW FROM 01.01.10 to 31.01.10 HRS) 50 MW FROM 01.01.10 to 31.01.10
DVC
TOTAL TRANSMISSION CHARGE PER UNIT 39.25 Ps/U
(AS PER PRESENT RATES 22.12Ps/U)
WB
SR HVDC BACK TO BACK AT GAZUWAKA IN SR
ER
NR
WR
RAJASTHAN
AJMER
HVDC BACK TO BACK AT BHADRWATHI IN WR
HVDC BACK TO BACK AT VINDHYACHAL IN WR
DVC – Jaipur WHEEL THROUGH SR (0000 HRS – 1700 HRS AND 2300-2400DVC – Jaipur WHEEL THROUGH SR (0000 HRS – 1700 HRS AND 2300-2400 HRS) 50 MW FROM 01.01.10 to 31.01.10 HRS) 50 MW FROM 01.01.10 to 31.01.10
DVC
WB
AP
HVDC BACK TO BACK AT GAZUWAKA IN SR
ER
DADRI
AJMER
Dadri URS Power– AP through ER (0000 HRS – 1700 HRSDadri URS Power– AP through ER (0000 HRS – 1700 HRS AND 2300-2400 HRS) 50 MW AND 2300-2400 HRS) 50 MW
on 21.11.10 on 21.11.10
NR
INJECTING UTILITY DADRI
(Internalised)
CUSTOMER: NVVN
INTERVENING REGION ER
CAPACITY APPROVED 50 MW
DATE OF COMMENCEMENT 21-11-10
DATE OF EXPIRY 21-11-10
TRADER: NVVN
INTERVENING STATE TRANSMISSION UTILITYAPTRANSCO
DRAWEE UTILITY APPCC
(Not Internalised)
EXPORT AT Dadri 50 MW
LOSSES IN ER 3.4%
LOSSES IN SR 3.67%
TOTAL LOSSES FOR TRANSACTION 7.43 MW
WB
AP
HVDC BACK TO BACK AT GAZUWAKA IN SR
ER
DADRI
AJMER
AT CTU-AP PERIPHERY 44.43 MW
AT AP DISCOMS RECIEVE 42.57 MW
LOSSES IN AP 4.2%
Dadri URS Power– AP through ER (0000 HRS – 1700 HRSDadri URS Power– AP through ER (0000 HRS – 1700 HRS AND 2300-2400 HRS) 50 MW AND 2300-2400 HRS) 50 MW
on 21.11.10 on 21.11.10
LOSSES IN NR 4.5 %
AT NR-ER PERIPHERY 47.75 MW
AT ER-SR PERIPHERY 46.12 MW
NR
WB
AP
HVDC BACK TO BACK AT GAZUWAKA IN SR
ER
DADRI
AJMER
Dadri URS Power– AP through ER (0000 HRS – 1700 HRSDadri URS Power– AP through ER (0000 HRS – 1700 HRS AND 2300-2400 HRS) 50 MW AND 2300-2400 HRS) 50 MW
on 21.11.10 on 21.11.10
NR
WB
ER
APPLICATION PROCESSING FEE
Rs 5000 PER TRANSACTION
TRANSMISSION CHARGES PER MWh PER DAY
1. Rs 80/MWh FOR CTU-NR
2. Rs 80/MWh FOR CTU-ER
3. Rs 80/MWh FOR CTU-SR
4. Rs 53.3/MWh FOR APTRANSCO
SCHEDULING CHARGES PER DAY
1. Rs 2000 FOR NBLDC
2. Rs 2000 FOR ERLDC
3. Rs 2000 FOR SRLDC
4. Rs 2000 FOR AP LDC
TOTAL TRANSMISSION CHARGE PER UNIT
14.33 Ps/U BACK