Shore Station UPS Requirements for the

NEPTUNE Power System

Tim McGinnis

UW/APL

Page 2: Shore Station UPS Requirements for the NEPTUNE Power System Tim McGinnis UW/APL.

Background

• 2 Shore Stations – each able to individually power to the network, although with possible reduced capability

• West Coast of Vancouver Island– Planned visitor center at Victoria– Existing cable stations at Port Alberni,

Bamfield

• Oregon Coast– Existing cable stations at Nedonna Beach,

Rockaway, Pacific City, Bandon

Page 3: Shore Station UPS Requirements for the NEPTUNE Power System Tim McGinnis UW/APL.

Local Utility Power Reliability

• 2 Substations, each located about 8 miles away

• Station currently served by 1, possibility of connecting to both substations with a switch

• Several outages of 30-60 minutes per year can be expected – mostly from trees/branches

Page 4: Shore Station UPS Requirements for the NEPTUNE Power System Tim McGinnis UW/APL.

Cable Station

Public UtilitySub-StationLocations

Nedonna Beach

5 mi

Page 5: Shore Station UPS Requirements for the NEPTUNE Power System Tim McGinnis UW/APL.

UPS Alternatives

• DC System– Typical for Telecom Systems– Most equipment requires 48 VDC – AC-DC rectifiers supply power to batteries

and equipment – If utility power fails, batteries are always on-

line– 3-8 hour battery life typical, generator optional– DC-AC inverter for critical AC loads (minimal)

Page 6: Shore Station UPS Requirements for the NEPTUNE Power System Tim McGinnis UW/APL.

Traditional Telecom Power Feed Equipment (PFE)

DieselGenerator480 VAC

DC/DCConverter

48VDC:10kVDC

Ground Bed

480VACControl andSwitching

Step DownTransformer480VAC:240/

120VAC

Utility480VAC

Rectifier/BatteryCharger

48VDCBattery Bank

BackboneCable

DC/DC Convertersand

DC/AC Inverters

Non-Essential

Loads

EssentialLoads

Page 7: Shore Station UPS Requirements for the NEPTUNE Power System Tim McGinnis UW/APL.

UPS Alternatives

• AC System– Typical for Information Technology, Network,

Hospital, Commercial and similar facilities– Most equipment requires 120VAC– If utility fails, run on battery until generator

starts– 10 minute battery life, typical– One or more generators for AC backup

Page 8: Shore Station UPS Requirements for the NEPTUNE Power System Tim McGinnis UW/APL.

Typical IT UPS System with a backup generator

DieselGenerator480 VAC

AC/DCConverter

480VAC:10kVDC

Ground Bed

Power Module480VAC

Control andSwitching

Step DownTransformer480VAC:240/

120VAC

Battery Bank

Utility480VAC

BackboneCable

Other Loads

Page 9: Shore Station UPS Requirements for the NEPTUNE Power System Tim McGinnis UW/APL.

Selection Criteria

• Reliability

• Load Voltage and Power Requirements

• Cost

Page 10: Shore Station UPS Requirements for the NEPTUNE Power System Tim McGinnis UW/APL.

Reliability - DC

dc system 1

commercialac power

enginegenerator

switchrectifier

N+1

battery3 hours

boostconverter

N+1

commercialac power

rectifierN+1

battery8 hours

dc system 2

W = 9 x 10-10

W = 3.45 x 10-7

Page 11: Shore Station UPS Requirements for the NEPTUNE Power System Tim McGinnis UW/APL.

Reliability - AC

commercialac power

enginegenerator

transferswitch

ac/dc

battery10 min

ac system

commercialac power

enginegenerator

transferswitch

bypassswitch

dc/ac

W = 3.5 x 10-10

Page 12: Shore Station UPS Requirements for the NEPTUNE Power System Tim McGinnis UW/APL.

Load Power Requirements

• Expected NEPTUNE Shore Station Load is mostly AC equipment

• Power Estimate – 120 kW total– 100 kW seafloor cable load– 20 kW terrestrial load

• Current Estimates– 48 VDC → 2500 A– 480 VAC, 3Ф → 144 A

Page 13: Shore Station UPS Requirements for the NEPTUNE Power System Tim McGinnis UW/APL.

Cost

• For Loads < 25 kW– Batteries cost less– Batteries have smaller footprint

• For Loads > 25 kW– Generator costs less– Generator has smaller footprint

Page 14: Shore Station UPS Requirements for the NEPTUNE Power System Tim McGinnis UW/APL.

Item AC DC

Simplicity X

Reliability X X

Majority of Load Voltage - 120AC X

Load Power Requirement – 200 kW

X

Foot Print Size X

Cost X

Criteria for selecting a UPS System

Page 15: Shore Station UPS Requirements for the NEPTUNE Power System Tim McGinnis UW/APL.

Conclusions

• Need to learn more about Shore Station power requirements

• Need to confirm reliability/availability data

• Need to learn more about similar installations