Shepard Energy Centre
description
Transcript of Shepard Energy Centre
![Page 1: Shepard Energy Centre](https://reader036.fdocuments.in/reader036/viewer/2022081503/56815d04550346895dcb0509/html5/thumbnails/1.jpg)
Shepard Energy Centre
![Page 2: Shepard Energy Centre](https://reader036.fdocuments.in/reader036/viewer/2022081503/56815d04550346895dcb0509/html5/thumbnails/2.jpg)
Environmental Stewardship
![Page 3: Shepard Energy Centre](https://reader036.fdocuments.in/reader036/viewer/2022081503/56815d04550346895dcb0509/html5/thumbnails/3.jpg)
Overview
Nominal 800 MW Natural Gas Combined CycleEarly 2011 Received Regulatory Approval (Alberta Utilities Commission and Alberta Environment and Sustainable Resource Development) Cost: Approximately 1.35 BillionJoint Venture with Capital PowerCurrently under construction COD: Early 2015
![Page 4: Shepard Energy Centre](https://reader036.fdocuments.in/reader036/viewer/2022081503/56815d04550346895dcb0509/html5/thumbnails/4.jpg)
4
TechnologyVideoNatural Gas Combined Cycle2 on 1 Mitsubishi 501G gas turbine
![Page 5: Shepard Energy Centre](https://reader036.fdocuments.in/reader036/viewer/2022081503/56815d04550346895dcb0509/html5/thumbnails/5.jpg)
Environmental Attributes - Low Air Emissions
GHG – Less that 0.4 tonnes/MWh (less than half of the emissions from Coal)SOx – Virtually noneNOx – Shepard will only emit between 3 ppm and 6 ppmPM – virtually noneMercury – No mercury emissionsWe did extensive air dispersion modeling and Shepard has minimal impact on air quality in the region.
![Page 6: Shepard Energy Centre](https://reader036.fdocuments.in/reader036/viewer/2022081503/56815d04550346895dcb0509/html5/thumbnails/6.jpg)
Environmental Attributes - Water Consumption
Plant MW ML/y ML/MW Comment
Keephills 766 16000 20.9 Inefficient
Battle River 663 6019 9.1 More efficient
Shepard 800 3796 4.7 Very efficient due to plant design and uses reclaimed water
![Page 7: Shepard Energy Centre](https://reader036.fdocuments.in/reader036/viewer/2022081503/56815d04550346895dcb0509/html5/thumbnails/7.jpg)
Shepard Site Photos – April 2013
Aerial View Looking South
![Page 8: Shepard Energy Centre](https://reader036.fdocuments.in/reader036/viewer/2022081503/56815d04550346895dcb0509/html5/thumbnails/8.jpg)
Shepard Site Photos – April 2013
Fiberglass Cooling Tower Showing End Wall And Louver Installation
![Page 9: Shepard Energy Centre](https://reader036.fdocuments.in/reader036/viewer/2022081503/56815d04550346895dcb0509/html5/thumbnails/9.jpg)
Shepard Site Photos – April 2013
HRSG #2 Finger Rack Area
![Page 10: Shepard Energy Centre](https://reader036.fdocuments.in/reader036/viewer/2022081503/56815d04550346895dcb0509/html5/thumbnails/10.jpg)
Shepard Site Photos – April 2013
Combustion Turbine #1
![Page 11: Shepard Energy Centre](https://reader036.fdocuments.in/reader036/viewer/2022081503/56815d04550346895dcb0509/html5/thumbnails/11.jpg)
Shepard Site Photos – April 2013
Low Pressure Steam Turbine Rotor Insertion