Improvements to the intersection of Sheldon Road and Bradshaw Road are planned because threshold values for increased traffic have been met, per the process outlined in the Rural Road Improvement Policy and Standards. Based on community input and City Council direction, two options are being considered for the intersection: a signal or a roundabout. All proposed designs, currently 35% complete, take into consideration design preferences expressed in the Rural Road Improvement Policy and Standards.

Transcript of Sheldon & Bradshaw Intersection

Page 1: Sheldon & Bradshaw Intersection

WELCOME! OPEN HOUSE SHELDON & BRADSHAW INTERSECTION

The 30 minute presentat ion

will begin at 6:30pm. Unt il

t hen, please enjoy the

refreshments and feel free to

view the exhibit s around the

room.

Thank you.

Page 2: Sheldon & Bradshaw Intersection

INTRODUCTIONS

Presenters:

Tom Metcalf – Project Manager

Amberly Morgan – Environmental

Mat t Braughton – Traff ic

Page 3: Sheldon & Bradshaw Intersection

PURPOSE OF TONIGHT’S WORKSHOP

• Bring everyone up to speed on the project (past part icipants and new part icipants)

• Present the signalizat ion alternat ive and the roundabout alternat ive

• Discuss benefit s and challenges of both alternat ives

• With your “ st icky dot ” , show your preference for the alternat ive you prefer – Data to be shared with Cit y Council

• Allow t ime for sharing feedback with the Cit y at the posters

Page 4: Sheldon & Bradshaw Intersection

TONIGHT’S AGENDA

• Presentat ion (30 minutes) – Please hold all

quest ions/ comments

• Poster Exhibit s (Remainder of the evening)

Page 5: Sheldon & Bradshaw Intersection

EXISTING INTERSECTION

Sheldon

Bra

dsha

w

N

• Four way stop • Sheldon =

7,000 ADT • Bradshaw =

11,000 ADT

• No turn lanes o Signif icant

delays in the peak hour

Page 6: Sheldon & Bradshaw Intersection

EXISTING INTERSECTION

Sheldon

Bra

dsha

w

N

• Four way stop • Sheldon =

7,000 ADT • Bradshaw =

11,000 ADT

• No turn lanes o Signif icant

delays in the peak hour

• Creek

Page 7: Sheldon & Bradshaw Intersection

EXISTING INTERSECTION

Sheldon

Bra

dsha

w

N

• Four way stop • Sheldon =

7,000 ADT • Bradshaw =

11,000 ADT

• No turn lanes o Signif icant

delays in the peak hour

• Creek

• 80’ long by 32’ wide two-span bridge at a 45 degree skew

Page 8: Sheldon & Bradshaw Intersection

EXISTING INTERSECTION

Sheldon

Bra

dsha

w

N

• Four way stop • Sheldon =

7,000 ADT • Bradshaw =

11,000 ADT

• No turn lanes o Signif icant

delays in t he peak hour

• Creek

• 80 ’ long by 32’ wide two-span bridge at a 45 degree skew

• 100 year FEMA Floodplain

Page 9: Sheldon & Bradshaw Intersection

PROJECT NEED

1. Intersect ion Level of Service a) Exist ing Intersect ion = LOS F

(172 to 224 seconds of delay)

b) EG Policy CI-13: All intersect ions to operate at a minimum of Level of Service “ D” at all t imes

Page 10: Sheldon & Bradshaw Intersection

PROJECT NEED

1. Intersect ion Level of Service (cont inued)

c) Rural Roads Policy – Invest igate Traffic Signal Cont rol as well as a Roundabout

Page 11: Sheldon & Bradshaw Intersection

PROJECT NEED

2. Hydraulics a) Eliminates

overtopping of the bridge and roadway during the 100 Year Flood Event

• Benefit t o emergency service access and evacuat ions if necessary

Page 12: Sheldon & Bradshaw Intersection

RECENT PROJECT MILESTONES

• November 30, 2011 – Open House with the ent ire Rural Roads area invited to provide input on the project

• June 13, 2012 - Cit y Council directed to proceed with a signal and a roundabout design

• November 2015 – Design advanced to the 30% level – Environmental f ield studies completed – Environmental technical reports approved by Calt rans (federal funding requirement )

• December 2015 – Environmental document (IS/ MND) completed and circulated for public review/ comment – Comments due today (1/ 14)

• Here we are t oday!

Page 13: Sheldon & Bradshaw Intersection

PROJECT SCHEDULE

Jan 2016 Open House

Jan 27, 2016 Council Mtg – Intersect ion alternat ive selected

Summer 2016 – Federal Environmental Document approved by Calt rans and FHWA

Summer 2017 – Right Of Way Acquisit ion Completed

Fall 2017 – Advert ise for Const ruct ion

Late 2017 to Late 2018 – Const ruct ion

Summer 2017 – Final Design Completed

Early 2017 Open House

Page 14: Sheldon & Bradshaw Intersection

GRANTS RECEIVED

• Highway Bridge Program – $1.3M for Design – $2.6M for Const ruct ion

• Sacramento Area Council of Governments – $1.3M for Const ruct ion

• Total of Grants Received = $5.2M

Page 15: Sheldon & Bradshaw Intersection

Signal Alternat ive

• Add signal and left turn lanes

• LOS C and 34 second delay in 2018

Sheldon

N

Bra

dsha

w

Page 16: Sheldon & Bradshaw Intersection

Signal Alternat ive • Add signal

and left turn lanes

• LOS C and 34 second delay in 2018

• 600’ of work

• Standard shoulders / bike lanes

Sheldon

N

Bra

dsha

w

Page 17: Sheldon & Bradshaw Intersection

Signal Alternat ive • Add signal

and left turn lanes

• LOS C and 34 second delay in 2018

• 600’ of work

• Standard shoulders / bike lanes

• Pedest rian paths at intersect ion per ADA

Sheldon

N

Bra

dsha

w

Page 18: Sheldon & Bradshaw Intersection

Signal Alternat ive • Replace

exist ing bridge

N

Sheldon

Bra

dsha

w

Page 19: Sheldon & Bradshaw Intersection

Signal Alt ernat ive • Replace

exist ing bridge

• Const ruct 165’ long t r iple box culvert

N

Sheldon

Bra

dsha

w

Page 20: Sheldon & Bradshaw Intersection

Signal Alt ernat ive • Replace

exist ing bridge

• Const ruct 165’ long t r iple box culvert

• Raise intersect ion almost 2 feet

• Realign channel upst ream and downst ream

N

Sheldon

Bra

dsha

w

Page 21: Sheldon & Bradshaw Intersection

Signal Alt ernat ive • Replace

exist ing bridge

• Const ruct 165’ long t r iple box culvert

• Raise intersect ion almost 2 feet

• Realign channel upst ream and downst ream

• $6.1M Total Project Cost

– $5.2M Federal funds

– $900K Cit y funds

N

Sheldon

Bra

dsha

w

Page 22: Sheldon & Bradshaw Intersection

Roundabout Alternat ive

• LOS C and 16 second delay in 2018

Sheldon

N

Bra

dsha

w

Page 23: Sheldon & Bradshaw Intersection

Roundabout Alternat ive

• LOS C and 16 second delay in 2018

• 700’ of roadway work

• Standard shoulders/ bike lanes for full length of roadway work

Sheldon

N

Bra

dsha

w

Page 24: Sheldon & Bradshaw Intersection

Roundabout Alternat ive • LOS C and 16

second delay in 2018

• 700’ of roadway work

• Standard shoulders/ bike lanes for full length of roadway work

• Pedest rian and Bike Bypass paths at intersect ion

Sheldon

N

Bra

dsha

w

Page 25: Sheldon & Bradshaw Intersection

Roundabout Alternat ive • Replace

exist ing bridge

N

Sheldon

Bra

dsha

w

Page 26: Sheldon & Bradshaw Intersection

Roundabout Alternat ive • Replace

exist ing bridge

• Const ruct 280’ long t r iple box culvert

N

Sheldon

Bra

dsha

w

Page 27: Sheldon & Bradshaw Intersection

Roundabout Alt ernat ive • Replace exist ing

bridge

• Const ruct 280’ long t r iple box culvert

• Raise intersect ion almost 2 feet

• Realign channel upst ream and downst ream

N

Sheldon

Bra

dsha

w

Page 28: Sheldon & Bradshaw Intersection

Roundabout Alt ernat ive • Replace exist ing

bridge

• Const ruct 280’ long t r iple box culvert

• Raise intersect ion almost 2 feet

• Realign channel upst ream and downst ream

• $7.9M Total Project Cost

– $5.2M Federal funds

– $2.7M City funds

N

Sheldon

Bra

dsha

w

Page 29: Sheldon & Bradshaw Intersection

Both Alternat ives • Tree impact s

– 14 t o 17 prot ect ed t rees removed

• Mit igat ion

ENVIRONMENTAL REVIEW

Page 30: Sheldon & Bradshaw Intersection

Both Alternat ives

• Tree impact s – 14 t o 17 prot ect ed

t rees removed • Mit igat ion

• St ream re locat ion – No prot ect ed

species – Permit t ing

ENVIRONMENTAL REVIEW

Page 31: Sheldon & Bradshaw Intersection

Both Alternat ives

• Tree impact s – 14 t o 17 prot ect ed

t rees removed • Mit igat ion

• St ream re locat ion – No prot ect ed

species – Permit t ing

• Traffic

• Air qualit y

ENVIRONMENTAL REVIEW

Page 32: Sheldon & Bradshaw Intersection

TRAFFIC/ AIR QUALITY IMPROVEMENTS

React ive Organic Gases (ROG)

Nit rogen Oxide (NOX)

Carbon Monoxide (CO)

Coarse Part iculate Mat ter (PM10)

Fine Part iculate Mat ter (PM2.5)

2015 Condit ion lbs/ day

54.6 153.1 342.5 3.0 1.5

2017 Signal Condit ions lbs/ day

7.9 22.5 48.5 0.2 0.2

2017 Roundabout lbs/ day

3.8 10.9 23.6 0.1 0.1

2037 Signal Lbs/ day

9.7 20.2 50.1 0.1 0.1

2035 Roundabout Lbs/ day

6.9 14.4 35.8 0.1 0.1

7x reduct ion

Page 33: Sheldon & Bradshaw Intersection

TRAFFIC/ AIR QUALITY IMPROVEMENTS

React ive Organic Gases (ROG)

Nit rogen Oxide (NOX)

Carbon Monoxide (CO)

Coarse Part iculate Mat ter (PM10)

Fine Part iculate Mat ter (PM2.5)

2015 Condit ion lbs/ day

54.6 153.1 342.5 3.0 1.5

2017 Signal Condit ions lbs/ day

7.9 22.5 48.5 0.2 0.2

2017 Roundabout lbs/ day

3.8 10.9 23.6 0.1 0.1

2037 Signal Lbs/ day

9.7 20.2 50.1 0.1 0.1

2035 Roundabout Lbs/ day

6.9 14.4 35.8 0.1 0.1

14x reduct ion

Page 34: Sheldon & Bradshaw Intersection

ROUNDABOUT SUMMARY

• We all drive through signals every day and are quite familiar with them

• Roundabouts are less common • Let ’s take a moment to learn more

about roundabouts

Page 35: Sheldon & Bradshaw Intersection

ROUNDABOUT - TYPICAL FEATURES

Page 36: Sheldon & Bradshaw Intersection

PRINCIPLES OF GOOD ROUNDABOUT DESIGN

NCHRP Report 672 Roundabouts: An Informat ion Guide

• Slow ent ry speeds and consistent speeds • Adequate capacit y and number of lanes • Smooth channelizat ion • Accommodat ing design vehicles • Providing sight distance, visibilit y, and light ing

• Integrat ing pedest rian and bicycle features

Page 37: Sheldon & Bradshaw Intersection

BENEFITS OF ROUNDABOUT

• Improved Overall Safety – 36% to 60% fewer total crashes than a

signal – Reduct ion in crash severit y in general – Nearly 100% reduct ion in fatal Crashes

• Reduced Delay – No stopping if no opposing t raff ic

• Reduced Noise • Aesthet ically Pleasing

– Adaptable to Local Context

Page 38: Sheldon & Bradshaw Intersection

ROUNDABOUT - BICYCLE AND PEDESTRIAN FEATURES

Pedest rian refuge

Pedest rian and bike bypass shared use path

Crosswalk and two-stage crossing

Presenter
Presentation Notes
Pedestrians ADA requirements Cyclists Accident studies
Page 39: Sheldon & Bradshaw Intersection

ROUNDABOUT - “ RURAL” AESTHETICS

Page 40: Sheldon & Bradshaw Intersection

ROUNDABOUT “ RURAL” AESTHETICS Cent ral Island Public Art

Tan Colored Surface to Blend with Rural Surroundings

Use of Decomposed Granite with Cobble and Accent Boulders along with zones of non-irr igated nat ive grass and wild f lowers

Page 41: Sheldon & Bradshaw Intersection

ROUNDABOUT - “ RURAL” AESTHETICS

Page 42: Sheldon & Bradshaw Intersection

ALTERNATIVE COMPARISON

Sheldon and Bradshaw Intersect ion Feature Signal Roundabout

Ant icipated vehicular delay in 2018 after const ruct ion

Fewer number and lower severit y of crashes

Increased t raff ic calming effect

Abilit y to bet ter incorporate rural aesthet ics

Reduct ion in vehicle emissions

Lower long term maintenance and operat ion costs

Eliminates overtopping of the 100 year storm event

St ream relocat ion impacts

Least amount of r ight -of-way needed

Overall Project cost

Port ion of project cost paid by the Cit y

34 Seconds 16 Seconds

X

X

X

X

X

X X

X X

X

$6.1 M $7.9 M

$0.9 M $2.7 M

Page 43: Sheldon & Bradshaw Intersection

CONNECTION TO OTHER RURAL AREA PROJECTS

Bond/ Bader Signal Project Const ruct ion in Early 2016

Sheldon and Waterman Roundabout Project Const ruct ion in Late 2016

Waterman Road Rehabilitat ion and Bike Lane Project Const ruct ion in 2017? (Env & ROW)

This Project Const ruct ion in Late 2017? (ROW)

Page 44: Sheldon & Bradshaw Intersection

INTERSECTION CONSTRUCTION STAGING

Page 45: Sheldon & Bradshaw Intersection

INTERSECTION CONSTRUCTION STAGING

Page 46: Sheldon & Bradshaw Intersection

INTERSECTION CONSTRUCTION– STAGED CONSTRUCTION

Page 47: Sheldon & Bradshaw Intersection

INTERSECTION CONSTRUCTION– STAGED CONSTRUCTION

Page 48: Sheldon & Bradshaw Intersection

INTERSECTION CONSTRUCTION– STAGED CONSTRUCTION

Page 49: Sheldon & Bradshaw Intersection

INTERSECTION CONSTRUCTION– STAGED CONSTRUCTION

Page 50: Sheldon & Bradshaw Intersection

INTERSECTION CONSTRUCTION– STAGED CONSTRUCTION

Page 51: Sheldon & Bradshaw Intersection

INTERSECTION CONSTRUCTION– FULL CLOSURE

Page 52: Sheldon & Bradshaw Intersection

INTERSECTION CONSTRUCTION STAGING OPTIONS

Opt ion 1 Maintain t raff ic with 4 months of staged const ruct ion • Const ruct ion will last

addit ional months

Requires temporary detour and more ROW Opt ion 2 Full 6 week closure • Const ruct ion will last

addit ional months Impacts others outside the Sheldon area In the summer Primary detour route Secondary detour route Saves $400K to $600K

Page 53: Sheldon & Bradshaw Intersection

POSTER EXHIBIT INSTRUCTIONS

• Visit as many poster exhibit s as you would like

• Order does not mat ter

• Use st icky dots to inform us your intersect ion preference

• Add new ideas to the easel pads – Have had some new ideas come up through

recent discussions with property owners

• Facilit ators at each stat ion to help

Page 54: Sheldon & Bradshaw Intersection

NEXT STEPS

• Community input from tonight will be collected and provided to the Cit y Council on 1/ 27

• 1/ 27 Cit y Council Meet ing – Will include environmental document approval and the Council decision on a signal or a roundabout

• Design will be advanced

• Next Open House in Early 2017 – Be sure to sign-in to receive email updates

• Const ruct ion in 2017/ 2018?

Page 55: Sheldon & Bradshaw Intersection

THANK YOU FOR YOUR PARTICIPATION!

Contact Informat ion: Tom Metcalf tmetcalf@elkgrovecit y.org 916-532-8169