SHEET PILE BARRIER AND BANK STABILIZATION · 2017. 3. 28. · HWL HIGH WATER LEVEL MIN. MINIMUM N...

4

Transcript of SHEET PILE BARRIER AND BANK STABILIZATION · 2017. 3. 28. · HWL HIGH WATER LEVEL MIN. MINIMUM N...

Page 1: SHEET PILE BARRIER AND BANK STABILIZATION · 2017. 3. 28. · HWL HIGH WATER LEVEL MIN. MINIMUM N NORTH NO. NUMBER PVC POLYVINYL CHLORIDE R RANGE T TOWNSHIP ... BARRIER WALL AND RIPRAP
Page 2: SHEET PILE BARRIER AND BANK STABILIZATION · 2017. 3. 28. · HWL HIGH WATER LEVEL MIN. MINIMUM N NORTH NO. NUMBER PVC POLYVINYL CHLORIDE R RANGE T TOWNSHIP ... BARRIER WALL AND RIPRAP

PR

OJE

CT

LO

CA

TIO

N, IN

DE

X O

F S

HE

ET

S

AN

D P

LA

N S

ET

AB

BR

EV

IAT

ION

S

SH

EE

T P

ILE

BA

RR

IER

AN

D R

IVE

R B

AN

K

ST

AB

ILIZ

AT

ION

P

RO

JE

CT

CH

EV

RO

N C

INC

INN

AT

I F

AC

ILIT

Y, O

HIO

RE

V:

FIL

E:

CH

EC

KE

D B

Y:

SC

ALE

:

DR

AW

N B

Y:

DA

TE

RE

VIS

ION

S

DE

SC

RIP

TIO

NC

HK

'DB

YR

EV

.

DA

TE

:

IF T

HIS

BA

R D

OE

S N

OT

ME

AS

UR

E 1

" IN

LE

NG

TH

TH

EN

DR

AW

ING

IS

NO

TA

T I

NT

EN

DE

D S

CA

LE

WA

RN

ING

CO

VE

R S

HE

ET

1

1 O

F 8

A

RE

P JG

P

12

/28/0

7

AS

SH

OW

N

500

TIT

LE

CO

VE

R_S

1

00

7/1

7/2

007

PE

ER

AS

SIS

TS

VJG

P

CERTIFICATE OF ENGINEER

STATE OF OHIO )

) SS:

COUNTY OF HAMILTON )

THIS CERTIFIES THAT THE HYDRAULIC MODELING AND

FLOOD-TOLERANT VEGETATION DESIGN, DRAWINGS, AND DETAILS HAVE

BEEN PREPARED BY ME OR UNDER MY DIRECT SUPERVISION.

SHEET NO. TITLE REV.

1PROJECT LOCATION, INDEX OF SHEETS

AND PLAN SET ABBREVIATIONSA

2 GENERAL REMEDY PLAN A

3 CROSS SECTION LOCATIONS AND CROSS SECTION A-A' A

4 CROSS SECTION B-B' AND CROSS SECTION C-C' A

5 SHEET PILE BARRIER PLAN, PROFILE, AND DETAILS A

6 FLOOD-TOLERANT VEGETATION PLAN AND DETAILS A

7HOOVEN DITCH REALIGNMENT PLAN, PROFILE

AND TYPICAL CROSS SECTIONA

8 HORIZONTAL AIR SPARGE PIPING AND COFFER DAM LAYOUT A

SITE

SHEET PILE BARRIER AND BANK STABILIZATION

ALONG THE GREAT MIAMI RIVERCHEVRON CINCINNATI FACILITY

HOOVEN, OHIO

DECEMBER 28, 2007

DIA. DIAMETER

EL. ELEVATION

FT AMSL FEET ABOVE MEAN SEA LEVEL

HWL HIGH WATER LEVEL

MIN. MINIMUM

N NORTH

NO. NUMBER

PVC POLYVINYL CHLORIDE

R RANGE

T TOWNSHIP

TYP. TYPICAL

2 OHIO STATE MAP

SCALE 1" = ~30 MILES

1 SITE VICINITY MAP

SCALE 1" = 500'

R3ER2E

T34N

T2ST

2S

T34N

R98W

SET NO.

CERTIFICATE OF ENGINEER

STATE OF OHIO )

) SS:

COUNTY OF HAMILTON )

THIS CERTIFIES THAT THE DESIGN, DRAWINGS, AND DETAILS FOR THE

AIR SPARGE SYSTEM, AND GENERAL SITE WORK HAVE BEEN PREPARED

BY ME OR UNDER MY DIRECT SUPERVISION.

CERTIFICATE OF ENGINEER

STATE OF OHIO )

) SS:

COUNTY OF HAMILTON )

THIS CERTIFIES THAT THE STRUCTURAL DESIGN CALCULATIONS,

DRAWINGS, AND DETAILS PERTAINING TO THE STEEL SHEET PILE

BARRIER WALL AND RIPRAP REVETMENT SYSTEM HAVE BEEN

PREPARED BY ME OR UNDER MY DIRECT SUPERVISION.

0 500' 1,000'

PROJECT LOCATION

0 ~30 MILES ~60 MILES

4 INDEX OF SHEETS 3

PLAN SET ABBREVIATIONS

A1

1/2

8/2

007

WO

RK

PL

AN

SU

BM

ITT

AL

TO

EP

AR

EP

JG

P

Page 3: SHEET PILE BARRIER AND BANK STABILIZATION · 2017. 3. 28. · HWL HIGH WATER LEVEL MIN. MINIMUM N NORTH NO. NUMBER PVC POLYVINYL CHLORIDE R RANGE T TOWNSHIP ... BARRIER WALL AND RIPRAP

GENERAL REMEDY PLAN

REV: FILE:

CHECKED BY:

SCALE:

DRAWN BY:

DATE

REVISIONS

DESCRIPTION CHK'DBYREV.

DATE:

IF THIS BAR DOES NOTMEASURE 1" IN LENGTHTHEN DRAWING IS NOT

AT INTENDED SCALE

WARNINGSHEET

2

2 OF 8

A

SV

JGP

7/17/07

1" = 200'

500REMEDYPLAN_S2

02

00

'4

00

'

SHEET PILE BARRIER AND RIVER BANK

STABILIZATION PROJECT

CHEVRON CINCINNATI FACILITY, OHIO

0 07/17/2007 PEER ASSIST SV JGP

A 12/28/2007 WORK PLAN SUBMITTAL TO EPA REP JGP

EX

PL

AN

AT

ION

PR

OP

OS

ED

GR

OU

ND

SU

RF

AC

E

(INT

ER

VA

L: 2

FT

, EL

: FT

AM

SL)

FE

ET

AB

OV

E M

EA

N S

EA

LE

VE

LF

T A

MS

L

EX

IST

ING

GR

OU

ND

SU

RF

AC

E

(INT

ER

VA

L: 2

FT

, EL

: FT

AM

SL)

Page 4: SHEET PILE BARRIER AND BANK STABILIZATION · 2017. 3. 28. · HWL HIGH WATER LEVEL MIN. MINIMUM N NORTH NO. NUMBER PVC POLYVINYL CHLORIDE R RANGE T TOWNSHIP ... BARRIER WALL AND RIPRAP

CROSS SECTION LOCATIONS

AND CROSS SECTION A-A'

REV: FILE:

CHECKED BY:

SCALE:

DRAWN BY:

DATE

REVISIONS

DESCRIPTION CHK'DBYREV.

DATE:

IF THIS BAR DOES NOTMEASURE 1" IN LENGTHTHEN DRAWING IS NOT

AT INTENDED SCALE

WARNINGSHEET

3

3 OF 8

A

REP

JGP

12/28/07

AS SHOWN

500GMRTYPSECTIONS_S3-4

A C

RO

SS

SE

CT

ION

A - A

' S

CA

LE

H: 1

" = 2

0' V

: 1" =

10'

1 C

RO

SS

SE

CT

ION

LO

CA

TIO

NS

S

CA

LE

: 1" =

80'

08

0'

16

0'

SHEET PILE BARRIER AND RIVER BANK

STABILIZATION PROJECT

CHEVRON CINCINNATI FACILITY, OHIO

0 07/17/2007 PEER ASSIST SV JGP

A4

A'4

B5

C'

5

B'

5

C5

BE

DR

OC

K A

T 6

0-8

0 F

T-B

GS

NO

TE

:

WA

TE

R S

UR

FA

CE

ELE

VA

TIO

N

EX

PL

AN

AT

ION

PR

OP

OS

ED

GR

OU

ND

SU

RF

AC

E

(INT

ER

VA

L: 2

FT

, EL

: FT

AM

SL)

FE

ET

AB

OV

E M

EA

N S

EA

LE

VE

LF

T A

MS

L

A 12/28/2007 WORK PLAN SUBMITTAL TO EPA REP JGP

WA

TE

R S

UR

FA

CE

ELE

VA

TIO

NW

SE

L

EX

IST

ING

GR

OU

ND

SU

RF

AC

E

(INT

ER

VA

L: 2

FT

, EL

: FT

AM

SL)