Seven Borealis fieldtrip
July 6, 2012
Simon Crowe
![Page 2: Seven Borealis fieldtrip - Subsea 7 · 2020-04-08 · Seven Borealis a vessel for every subsea occasion •Length 182m x breadth 46m •600t tension S-Lay for up to 46-inch pipe diameter](https://reader034.fdocuments.in/reader034/viewer/2022050309/5f71b758d599a67bb51e6e8c/html5/thumbnails/2.jpg)
2 Page 8-Jul-12
Seven Borealis is part of our fleet enhancement programme
• Investment focused on core assets, with high technical specifications
• Focused on achieving the optimal deployment of the optimal fleet
• Over 40 vessels - continue to enhance our fleet to drive profitable growth
*Oleg Strashnov delivered to the SHL JV
Divest / Release Life-of-Field SURF Conventional
JVs
![Page 3: Seven Borealis fieldtrip - Subsea 7 · 2020-04-08 · Seven Borealis a vessel for every subsea occasion •Length 182m x breadth 46m •600t tension S-Lay for up to 46-inch pipe diameter](https://reader034.fdocuments.in/reader034/viewer/2022050309/5f71b758d599a67bb51e6e8c/html5/thumbnails/3.jpg)
3 Page 8-Jul-12
BARRIER SCALE
Access to Capital Low or High
Fixed Assets Low
Management Systems Low
Technology Medium
Market Positioning High
Competence & Track Record High
Knowhow - People High
The barriers today are more on the softer assets than ever before in our industry
Competitive advantage is multi-faceted
![Page 4: Seven Borealis fieldtrip - Subsea 7 · 2020-04-08 · Seven Borealis a vessel for every subsea occasion •Length 182m x breadth 46m •600t tension S-Lay for up to 46-inch pipe diameter](https://reader034.fdocuments.in/reader034/viewer/2022050309/5f71b758d599a67bb51e6e8c/html5/thumbnails/4.jpg)
4 Page 8-Jul-12
Sapura Crest
Allseas
Global EPIC players
Joint Venture or
niche positions
Small threats –
niche positions
Local content and
low cost
Market positioning
Subsea 7 Technip
(with Global) Saipem
EMAS-AMC McDermott Heerema
Ocean Install
er
Mer
maid Fugro
Ocean eering
Trico Helix GE DOF COOEC Swiber
Local Players
![Page 5: Seven Borealis fieldtrip - Subsea 7 · 2020-04-08 · Seven Borealis a vessel for every subsea occasion •Length 182m x breadth 46m •600t tension S-Lay for up to 46-inch pipe diameter](https://reader034.fdocuments.in/reader034/viewer/2022050309/5f71b758d599a67bb51e6e8c/html5/thumbnails/5.jpg)
5 Page 8-Jul-12
Competence and track record lead to partnership
The ability to forge and sustain effective strategic partnerships with our global client base remains the backbone of our business
![Page 6: Seven Borealis fieldtrip - Subsea 7 · 2020-04-08 · Seven Borealis a vessel for every subsea occasion •Length 182m x breadth 46m •600t tension S-Lay for up to 46-inch pipe diameter](https://reader034.fdocuments.in/reader034/viewer/2022050309/5f71b758d599a67bb51e6e8c/html5/thumbnails/6.jpg)
6 Page 8-Jul-12
A global leader
![Page 7: Seven Borealis fieldtrip - Subsea 7 · 2020-04-08 · Seven Borealis a vessel for every subsea occasion •Length 182m x breadth 46m •600t tension S-Lay for up to 46-inch pipe diameter](https://reader034.fdocuments.in/reader034/viewer/2022050309/5f71b758d599a67bb51e6e8c/html5/thumbnails/7.jpg)
7 Page 8-Jul-12
We are focused on the sweet spot
Market
Competitors
Customer needs
Our Capabilities
Find the Sweet spot “Differentiation”
![Page 8: Seven Borealis fieldtrip - Subsea 7 · 2020-04-08 · Seven Borealis a vessel for every subsea occasion •Length 182m x breadth 46m •600t tension S-Lay for up to 46-inch pipe diameter](https://reader034.fdocuments.in/reader034/viewer/2022050309/5f71b758d599a67bb51e6e8c/html5/thumbnails/8.jpg)
8 Page 8-Jul-12
World energy consumption by source
Sources: International Energy Outlook 2011, September 2011, US Energy Information Administration
39% 33%
29%
21%
22%
23%
25%
29%
27%
6%
5%
7%
9%
11%
14%
0
100
200
300
400
500
600
700
800
900
1990 1995 2000 2005 2010 2015 2020 2025 2030 2035
Qu
ad
rillio
n B
tu
Renewables
Nuclear
Coal
Natural gas
Oil
![Page 9: Seven Borealis fieldtrip - Subsea 7 · 2020-04-08 · Seven Borealis a vessel for every subsea occasion •Length 182m x breadth 46m •600t tension S-Lay for up to 46-inch pipe diameter](https://reader034.fdocuments.in/reader034/viewer/2022050309/5f71b758d599a67bb51e6e8c/html5/thumbnails/9.jpg)
9 Page 8-Jul-12
Global demand - going ever deeper
![Page 10: Seven Borealis fieldtrip - Subsea 7 · 2020-04-08 · Seven Borealis a vessel for every subsea occasion •Length 182m x breadth 46m •600t tension S-Lay for up to 46-inch pipe diameter](https://reader034.fdocuments.in/reader034/viewer/2022050309/5f71b758d599a67bb51e6e8c/html5/thumbnails/10.jpg)
10 Page 8-Jul-12
Market scale
• A galaxy of industry sectors
• Often unconnected
• Different market dynamics
• Many different technologies
• Opportunities everywhere
$600Bn
$20-30Bn
$5-6Bn
E&P SURF Subsea 7
Management order of magnitude estimates Not drawn to scale
![Page 11: Seven Borealis fieldtrip - Subsea 7 · 2020-04-08 · Seven Borealis a vessel for every subsea occasion •Length 182m x breadth 46m •600t tension S-Lay for up to 46-inch pipe diameter](https://reader034.fdocuments.in/reader034/viewer/2022050309/5f71b758d599a67bb51e6e8c/html5/thumbnails/11.jpg)
11 Page 8-Jul-12
Subsea 7’s focus market growth (excluding renewables)
Index (
real)
40
60
80
100
120
140
160
180
200
2011 2012F 2013F 2014F 2015F 2016F 2017F
![Page 12: Seven Borealis fieldtrip - Subsea 7 · 2020-04-08 · Seven Borealis a vessel for every subsea occasion •Length 182m x breadth 46m •600t tension S-Lay for up to 46-inch pipe diameter](https://reader034.fdocuments.in/reader034/viewer/2022050309/5f71b758d599a67bb51e6e8c/html5/thumbnails/12.jpg)
12 Page 8-Jul-12
Today’s industry challenges … are Subsea 7’s opportunities
Large engineering & project
management capabilities
Proven expertise and
execution track record
Cultural diversification and
tailored local content Local content requirements
Shortage of resources in a growing
global market
Deeper waters and more challenging
environments
Growing size and complexity
of large EPIC contracts
Risk management and reliability
paramount
Processes and knowledge
management
Fleet size & flexibility
Effective Management of
worldwide resources
![Page 13: Seven Borealis fieldtrip - Subsea 7 · 2020-04-08 · Seven Borealis a vessel for every subsea occasion •Length 182m x breadth 46m •600t tension S-Lay for up to 46-inch pipe diameter](https://reader034.fdocuments.in/reader034/viewer/2022050309/5f71b758d599a67bb51e6e8c/html5/thumbnails/13.jpg)
10.01.11 13 Page
seabed-to-surface
www.subsea7.com
![Page 14: Seven Borealis fieldtrip - Subsea 7 · 2020-04-08 · Seven Borealis a vessel for every subsea occasion •Length 182m x breadth 46m •600t tension S-Lay for up to 46-inch pipe diameter](https://reader034.fdocuments.in/reader034/viewer/2022050309/5f71b758d599a67bb51e6e8c/html5/thumbnails/14.jpg)
The Seven Borealis
A Star is Born
6th July 2012
Tom Welsh
Project Director
![Page 15: Seven Borealis fieldtrip - Subsea 7 · 2020-04-08 · Seven Borealis a vessel for every subsea occasion •Length 182m x breadth 46m •600t tension S-Lay for up to 46-inch pipe diameter](https://reader034.fdocuments.in/reader034/viewer/2022050309/5f71b758d599a67bb51e6e8c/html5/thumbnails/15.jpg)
2 Page 8-Jul-12 2 Page 8-Jul-12
Agenda
Our changing fleet
Story of the Seven Borealis
From China to the Netherlands via Singapore
A flagship vessel
![Page 16: Seven Borealis fieldtrip - Subsea 7 · 2020-04-08 · Seven Borealis a vessel for every subsea occasion •Length 182m x breadth 46m •600t tension S-Lay for up to 46-inch pipe diameter](https://reader034.fdocuments.in/reader034/viewer/2022050309/5f71b758d599a67bb51e6e8c/html5/thumbnails/16.jpg)
3 Page 8-Jul-12
Seven Borealis is part of our fleet enhancement programme
• Investment focused on core assets, with high technical specifications
• Focused on achieving the optimal deployment of the optimal fleet
• Over 40 vessels - continue to enhance our fleet to drive profitable growth
*Oleg Strashnov delivered to the SHL JV
Divest / Release Life-of-Field SURF Conventional
JVs
![Page 17: Seven Borealis fieldtrip - Subsea 7 · 2020-04-08 · Seven Borealis a vessel for every subsea occasion •Length 182m x breadth 46m •600t tension S-Lay for up to 46-inch pipe diameter](https://reader034.fdocuments.in/reader034/viewer/2022050309/5f71b758d599a67bb51e6e8c/html5/thumbnails/17.jpg)
4 Page 8-Jul-12
Subsea 7 Fleet – Seven Borealis, a global enabler
20%
9 vessels
23%
10 vessels
14%
6 vessels
23%
10 vessels
18%
8 vessels
2%
1 vessel
Construction/Vertical Flexlay
Dive Support
Other
Construction/Horizontal Flexlay
Rigid Pipelay/Heavy Lift
Life of Field/Light Construction
![Page 18: Seven Borealis fieldtrip - Subsea 7 · 2020-04-08 · Seven Borealis a vessel for every subsea occasion •Length 182m x breadth 46m •600t tension S-Lay for up to 46-inch pipe diameter](https://reader034.fdocuments.in/reader034/viewer/2022050309/5f71b758d599a67bb51e6e8c/html5/thumbnails/18.jpg)
5 Page 8-Jul-12
Seven Borealis – A star is born
• Subsea 7’s flagship strategic enabler
• A deepwater pipelay, heavy-lift vessel
• Joins fleet H2 2012
• 1st project – Angola CLOV development
![Page 19: Seven Borealis fieldtrip - Subsea 7 · 2020-04-08 · Seven Borealis a vessel for every subsea occasion •Length 182m x breadth 46m •600t tension S-Lay for up to 46-inch pipe diameter](https://reader034.fdocuments.in/reader034/viewer/2022050309/5f71b758d599a67bb51e6e8c/html5/thumbnails/19.jpg)
6 Page 8-Jul-12
The Seven Borealis provides “unprecedented flexibility and capability which, together with our engineering and management expertise will enable us to meet our clients’ strategic needs, particularly in deepwater and harsh environment acreage.”
Jean Cahuzac
Chief Executive, Subsea 7
16th December 2009
![Page 20: Seven Borealis fieldtrip - Subsea 7 · 2020-04-08 · Seven Borealis a vessel for every subsea occasion •Length 182m x breadth 46m •600t tension S-Lay for up to 46-inch pipe diameter](https://reader034.fdocuments.in/reader034/viewer/2022050309/5f71b758d599a67bb51e6e8c/html5/thumbnails/20.jpg)
7 Page 8-Jul-12
The story begins
• Nordic Heavy Lift with Sembawang shipyard announce new build – 28th May 2007
• Designed according to a SOC 5000 series – Ulstein Sea of Solutions
• Keel laid Nantong Yahua Shipbuilding, China
• Hull launched 19th October 2009
![Page 21: Seven Borealis fieldtrip - Subsea 7 · 2020-04-08 · Seven Borealis a vessel for every subsea occasion •Length 182m x breadth 46m •600t tension S-Lay for up to 46-inch pipe diameter](https://reader034.fdocuments.in/reader034/viewer/2022050309/5f71b758d599a67bb51e6e8c/html5/thumbnails/21.jpg)
8 Page 8-Jul-12
Subsea 7 acquires Seven Borealis
• Subsea 7 announces acquisition of vessel 16th December 2009
• Redesigned - 5,000t heavy lift to be complemented by
– 937t J-Lay system
– 600t S-Lay system
• Funded entirely from the Company’s existing cash resources
![Page 22: Seven Borealis fieldtrip - Subsea 7 · 2020-04-08 · Seven Borealis a vessel for every subsea occasion •Length 182m x breadth 46m •600t tension S-Lay for up to 46-inch pipe diameter](https://reader034.fdocuments.in/reader034/viewer/2022050309/5f71b758d599a67bb51e6e8c/html5/thumbnails/22.jpg)
9 Page 8-Jul-12
Seven Borealis a vessel for every subsea occasion
• Length 182m x breadth 46m
• 600t tension S-Lay for up to 46-inch pipe diameter
• 937t top tension J-Lay system for up to 24-inch pipe diameter
• 2,800t onboard pipe storage
• Mast crane: capacity main hoist 5,000t; 1,200t heave compensated aux hoist
• Accommodation for 399 persons
• 2 x work class 3,000m rated ROVs
![Page 23: Seven Borealis fieldtrip - Subsea 7 · 2020-04-08 · Seven Borealis a vessel for every subsea occasion •Length 182m x breadth 46m •600t tension S-Lay for up to 46-inch pipe diameter](https://reader034.fdocuments.in/reader034/viewer/2022050309/5f71b758d599a67bb51e6e8c/html5/thumbnails/23.jpg)
10 Page 8-Jul-12
The Seven Borealis in Singapore
• Towed to Singapore
• Equipped and load tested with world’s largest offshore mast crane
• Crane installation was a four day operation
• Naming ceremony 7th January 2012
![Page 24: Seven Borealis fieldtrip - Subsea 7 · 2020-04-08 · Seven Borealis a vessel for every subsea occasion •Length 182m x breadth 46m •600t tension S-Lay for up to 46-inch pipe diameter](https://reader034.fdocuments.in/reader034/viewer/2022050309/5f71b758d599a67bb51e6e8c/html5/thumbnails/24.jpg)
11 Page 8-Jul-12
Final installations – on to the Netherlands
• J-Lay system – installed in Vlissingen
– Max Tension: 937t
– Pipe Range: 4-inch min 24-inch max
• S-Lay system – installed in Schiedam
– Max Tension: 600t
– Tensioners: 3 x Huisman BV two track tensioners
– Pipe Range: 4.5 - 46 inches
![Page 25: Seven Borealis fieldtrip - Subsea 7 · 2020-04-08 · Seven Borealis a vessel for every subsea occasion •Length 182m x breadth 46m •600t tension S-Lay for up to 46-inch pipe diameter](https://reader034.fdocuments.in/reader034/viewer/2022050309/5f71b758d599a67bb51e6e8c/html5/thumbnails/25.jpg)
12 Page 8-Jul-12
A flagship vessel
• CLEAN-DESIGN notation – commitment to minimise environmental impact
• Main Engines/Generators:
– 6 Rolls-Royce B32:40 V12A 720 rpm diesel engines each generating 5,760kW
• Thrusters for Propulsion and DP:
– 2 x azimuth thrusters
– Rolls-Royce UUC 455 FP, underwater demountable
– Power 5,500kW each
• Thrusters for DP:
– 4 x azimuth thrusters, vertically retractable
– Rolls-Royce UL 305 FP
– Power 3,200kW
• Service speed: 12 knots
![Page 26: Seven Borealis fieldtrip - Subsea 7 · 2020-04-08 · Seven Borealis a vessel for every subsea occasion •Length 182m x breadth 46m •600t tension S-Lay for up to 46-inch pipe diameter](https://reader034.fdocuments.in/reader034/viewer/2022050309/5f71b758d599a67bb51e6e8c/html5/thumbnails/26.jpg)
13 Page 8-Jul-12
Seven Borealis – A global strategic enabler
• Global reach
– all deepwater areas
• Full range of pipelines
– Shallow to deepwater
– Pipe-in-pipe
• Heavy pile/manifold capabilities
• Add 500t flex-lay tower (optional)
• Available for conventional heavy lift
![Page 27: Seven Borealis fieldtrip - Subsea 7 · 2020-04-08 · Seven Borealis a vessel for every subsea occasion •Length 182m x breadth 46m •600t tension S-Lay for up to 46-inch pipe diameter](https://reader034.fdocuments.in/reader034/viewer/2022050309/5f71b758d599a67bb51e6e8c/html5/thumbnails/27.jpg)
14 Page 8-Jul-12 10.01.11 14 Page
seabed-to-surface
www.subsea7.com