Session3 wouter blaas ihc holland

6
4 augustus 2007 1 2010 1 What would you choose ? October 10, 2011 Wouter Blaas Director standard hoppers 2010 2

Transcript of Session3 wouter blaas ihc holland

Page 1: Session3 wouter blaas  ihc holland

4 augustus 2007

1

2010

1What would you choose ?

October 10, 2011

Wouter Blaas

Director standard hoppers

2010

2

Page 2: Session3 wouter blaas  ihc holland

4 augustus 2007

2

2010

3

Continuous improvement and innovation

•Hull shape optimised for dredging circumstances

• Lower fuel consumption and emissions per m3

• Less waves with higher speed

•Wild dragon draghead

• High efficiency in hard packed sand

•Increased pump efficiency

• Shorter cycle, lower fuel consumption

• Less wear in the pump

2010

4

What would you choose?

BMW X5

Price: 100%

Landwind X6

Price: 19%

Sales volume 12 million USDSales volume 12 million USDSales volume 9000 million USDSales volume 9000 million USD

Page 3: Session3 wouter blaas  ihc holland

4 augustus 2007

3

2010

5

Cost per m3 calculation:

0%

20%

40%

60%

80%

100%

120%

140%

160%

Investment Production Utilization Fuel Maintenance Lifetime

TSHD 1

TSHD 2

Life cycle costs

Cost per m3 are 50%-75%

2010

6

Low investment or high returns ?

What would you choose?

Page 4: Session3 wouter blaas  ihc holland

4 augustus 2007

4

2010

7

Standard Beagle Hopper Dredgers

New development:

Standardized components and systems, fit for purpose design

2010

8

The Beagle Series

Beagle 2

Beagle 4

Beagle 8

Page 5: Session3 wouter blaas  ihc holland

4 augustus 2007

5

2010

9

Starting points:

- Work area: Port & Waterways

- Dredging depth 15 m

- Dredged material: Silt (hopper density 1250 kg/m3)

- Unloading by Dumping

- Workability 40 weeks/year – 24/7

- Sailing distance, varying from 4 – 10 miles

Production – Maintenance work

Resulting Production:

Beagle 2: approx. 4.6 – 2.7 mio m3/yr

Beagle 4: approx. 7.6 – 6.3 mio m3/yr

Beagle 8: approx. 18.0 – 11.7 mio m3/yr

2010

10

Starting points:

- Work area: Dredging within 15 nm from shore or within

20 nm from port

- Dredging depth 20 m

- Dredged material: Medium Fine Sand

- Unloading by Shore pumping

- Workability 40 weeks/year – 24/7

- Sailing distance, varying from 4 – 10 miles

Production – Multi purpose

Resulting Production:

Beagle 2: approx. 3.0 – 2.2 mio m3/yr

Beagle 4: approx. 5.3 – 4.1 mio m3/yr

Beagle 8: approx. 12.7 – 9.6 mio m3/yr

Page 6: Session3 wouter blaas  ihc holland

4 augustus 2007

6

2010

11

Thank you for your attention!