Session #7 - Pedestrian & Bicycle Counting Tips - Schneider

59
Sweat the Details! Tips for Pedestrian and Bicycle Counting Bob Schneider, UC Berkeley Safe Transportation Research & Education Center ProWalk/ProBike Conference 2010 0.0 5.0 10.0 15.0 20.0 25.0 30.0 35.0 40.0 45.0 50.0 55.0 12 AM 4 AM 8AM 12 PM 4 PM 8 PM 12 AM 4 AM 8 AM 12 PM 4 PM 8 PM 12 AM 4AM 8 AM 12 PM 4 PM 8PM 12AM 4 AM 8 AM 12 PM 4 PM 8 PM 12 AM 4 AM 8 AM 12 PM 4PM 8 PM 12 AM 4 AM 8AM 12 PM 4 PM 8 PM 12 AM 4 AM 8 AM 12 PM 4 PM 8 PM Bicyclesperhourcountedby bicycleloop in southbound bicyclelane Telegraph Ave. Southbound Bicycle Loop Counts--Typical W eek (M ar., Jun., Sep. 2009) M arch June Septem ber M T W Th F Sa Su

description

 

Transcript of Session #7 - Pedestrian & Bicycle Counting Tips - Schneider

Page 1: Session #7 - Pedestrian & Bicycle Counting Tips - Schneider

Sweat the Details!Tips for Pedestrian and Bicycle Counting

Bob Schneider, UC Berkeley Safe Transportation Research & Education Center ProWalk/ProBike Conference 2010

0.0

5.0

10.0

15.0

20.0

25.0

30.0

35.0

40.0

45.0

50.0

55.0

12 A

M4

AM

8 A

M12

PM

4 PM

8 PM

12 A

M4

AM

8 A

M12

PM

4 PM

8 PM

12 A

M4

AM

8 A

M12

PM

4 PM

8 PM

12 A

M4

AM

8 A

M12

PM

4 PM

8 PM

12 A

M4

AM

8 A

M12

PM

4 PM

8 PM

12 A

M4

AM

8 A

M12

PM

4 PM

8 PM

12 A

M4

AM

8 A

M12

PM

4 PM

8 PM

Bicy

cles

per

hou

r co

unte

d by

bic

ycle

loop

in s

outh

boun

d bi

cycl

e la

ne

Telegraph Ave. Southbound Bicycle Loop Counts--Typical Week (Mar., Jun., Sep. 2009)

March

June

September

M T W Th F Sa Su

Page 2: Session #7 - Pedestrian & Bicycle Counting Tips - Schneider

Pedestrian and Bicycle Counting Tips

• Manual counts• Automated counts• Pedestrian and bicycle count applications

Page 3: Session #7 - Pedestrian & Bicycle Counting Tips - Schneider

Overall advice: Count with a purpose

• Identify possible uses of count data before starting• Possible purposes:

– Track trends in walking & bicycling over time– Evaluate crash risk at specific locations– Show the effect of specific projects/programs on use or

safety (before and after studies)– Demonstrate that there are many people walking and

bicycling– Develop pedestrian or bicycle volume models

Page 4: Session #7 - Pedestrian & Bicycle Counting Tips - Schneider

Manual Counts

Page 5: Session #7 - Pedestrian & Bicycle Counting Tips - Schneider

Tip 1: Train the Data Collectors

Page 6: Session #7 - Pedestrian & Bicycle Counting Tips - Schneider

“Why do we need training?

...It’s just counting people walking and bicycling!”

Page 7: Session #7 - Pedestrian & Bicycle Counting Tips - Schneider

We Need Consistent, Reliable Counts

• Accuracy is most important• Counts will be used by transportation & planning

agencies, advocates, researchers• Counting is easy. • Counting accurately & consistently is the

challenge.• Data collectors get better with experience.

Page 8: Session #7 - Pedestrian & Bicycle Counting Tips - Schneider

Several Different Ways to Count

• “Intersection” − Where two roadways cross

• “Screenline” or “Segment”− Along sidewalk/roadway segment− National Documentation Project

• “Mid-block”− Crossing in the middle of the block, away from the intersection

Page 9: Session #7 - Pedestrian & Bicycle Counting Tips - Schneider

Google Earth—Tele Atlas 2008

Example

Page 10: Session #7 - Pedestrian & Bicycle Counting Tips - Schneider

Google Earth—Tele Atlas 2008

Pedestrian Midblock Crossing Counts

Example

Page 11: Session #7 - Pedestrian & Bicycle Counting Tips - Schneider

Google Earth—Tele Atlas 2008

Pedestrian Segment/Screenline Counts

Example

Page 12: Session #7 - Pedestrian & Bicycle Counting Tips - Schneider

Example

Google Earth—Tele Atlas 2008

Pedestrian Intersection Crossing Counts

Page 13: Session #7 - Pedestrian & Bicycle Counting Tips - Schneider

Example

Google Earth—Tele Atlas 2008

Pedestrian Intersection Crossing Counts

Page 14: Session #7 - Pedestrian & Bicycle Counting Tips - Schneider

Google Earth—Tele Atlas 2008

Right

Straight

Left

Bicyclist Intersection Turning Counts

Example

Page 15: Session #7 - Pedestrian & Bicycle Counting Tips - Schneider

Google Earth—Tele Atlas 2008

Right

Straight

Left

Bicyclist Intersection Turning Counts

Example

Page 16: Session #7 - Pedestrian & Bicycle Counting Tips - Schneider

Questions in Data Collectors’ MindsEliminate them.

• Who is a pedestrian?– Baby in Dad’s arms? Skateboarder? Person walking a

bike?

• Who is a bicyclist?– Moped rider? Person walking a bike?

• When does a pedestrian get counted?– Jaywalking? Turning right around the corner?

• When does a bicyclist get counted?– Riding on sidewalk? Turning right around the corner?

Page 17: Session #7 - Pedestrian & Bicycle Counting Tips - Schneider

Tip 2: Choose a Good Count Form(or recording device)

Page 18: Session #7 - Pedestrian & Bicycle Counting Tips - Schneider

National Documentation Project Screenline Count Form

Page 19: Session #7 - Pedestrian & Bicycle Counting Tips - Schneider

Pedestrian Intersection Count Form

Page 20: Session #7 - Pedestrian & Bicycle Counting Tips - Schneider

Pedestrian Intersection Count Form (“Maddox”)

Page 21: Session #7 - Pedestrian & Bicycle Counting Tips - Schneider

Informal Experiment

Group Using Original Group Using “Maddox”

Page 22: Session #7 - Pedestrian & Bicycle Counting Tips - Schneider

Bicycle Intersection Count Form

Page 23: Session #7 - Pedestrian & Bicycle Counting Tips - Schneider

Google Earth—Tele Atlas 2008

Right

Straight

Left

Bicyclist Intersection Turning Counts

Bicycle Turning Counts (Complex)

Page 24: Session #7 - Pedestrian & Bicycle Counting Tips - Schneider

Google Earth—Tele Atlas 2008

Approaching from Leg C

Bicyclist Intersection Counts

Bicycle Approach Counts (Simple)

Page 25: Session #7 - Pedestrian & Bicycle Counting Tips - Schneider

Google Earth—Tele Atlas 2008

Approaching from Leg C

Bicyclist Intersection Counts

Approaching from Leg A

Approaching from Leg D

Approaching from Leg B

Bicycle Approach Counts (Simple)

Page 26: Session #7 - Pedestrian & Bicycle Counting Tips - Schneider

Tip 3: Identify locations that need more than one data collector in advance

Page 27: Session #7 - Pedestrian & Bicycle Counting Tips - Schneider

When do you need more than one data collector?

• Rule of thumb: 400-500 pedestrians per hour is upper limit of single data collector for intersections

• Greater mix of pedestrians & bicyclists requires more attention/more data collectors

Page 28: Session #7 - Pedestrian & Bicycle Counting Tips - Schneider

Tip 4: Prioritize data items so that most important information is collected

Essential

Important

Optional

Page 29: Session #7 - Pedestrian & Bicycle Counting Tips - Schneider

Possible Data Priority Ranking

1) Count of pedestrians2) Count of bicyclists3) Gender4) Helmet Use5) Pedestrian Crossing Direction6) Bicyclist Turning Movement

Page 30: Session #7 - Pedestrian & Bicycle Counting Tips - Schneider

Automated Counts

0

100

200

300

400

500

600

Bicy

cles

per

day

cou

nted

by

bicy

cle

loop

in so

uthb

ound

bic

ycle

lane

Telegraph Ave. Southbound Bicycle Loop Counts , Feb. to Nov. 2009

February March April May June July August September October Nov

Page 31: Session #7 - Pedestrian & Bicycle Counting Tips - Schneider

Tip 1: Understand the type of data that the automated counter will provide

Page 32: Session #7 - Pedestrian & Bicycle Counting Tips - Schneider

0.00%

0.20%

0.40%

0.60%

0.80%

1.00%

1.20%

1.40%12

AM

4 A

M8

AM

12 P

M4

PM8

PM12

AM

4 A

M8

AM

12 P

M4

PM8

PM12

AM

4 A

M8

AM

12 P

M4

PM8

PM12

AM

4 A

M8

AM

12 P

M4

PM8

PM12

AM

4 A

M8

AM

12 P

M4

PM8

PM12

AM

4 A

M8

AM

12 P

M4

PM8

PM12

AM

4 A

M8

AM

12 P

M4

PM8

PM

Perc

ent o

f Wee

kly

Pede

stri

an V

olum

e pe

r H

our

M T W Th F Sa Su

“Typical” Alameda County Pedestrian Activity Pattern (13 sites)

Page 33: Session #7 - Pedestrian & Bicycle Counting Tips - Schneider

In-Pavement Loop Detectors

Page 34: Session #7 - Pedestrian & Bicycle Counting Tips - Schneider

0

100

200

300

400

500

600

Bicy

cles

per

day

cou

nted

by

bicy

cle

loop

in s

outh

boun

d bi

cycl

e la

ne

Telegraph Ave. Southbound Bicycle Loop Counts , Feb. to Nov. 2009

February March April May June July August September October Nov

UC-Berkeley Summer Break

Rain

Rain

Bike To Work Day

Bicycle Lane Volume Pattern (Alameda County Site)

Page 35: Session #7 - Pedestrian & Bicycle Counting Tips - Schneider

Tip 2: Review raw data and correct anomalies

Page 36: Session #7 - Pedestrian & Bicycle Counting Tips - Schneider
Page 37: Session #7 - Pedestrian & Bicycle Counting Tips - Schneider

Tip 3: Understand and correct for undercounting

Page 38: Session #7 - Pedestrian & Bicycle Counting Tips - Schneider

0

100

200

300

400

500

600

700

800

0 100 200 300 400 500 600 700 800

Man

ual C

ount

(15

-min

ute

peri

od)

Automated Count (15-minute period)

Automated Counts vs. Manual Counts (15-minute periods)

Manual = Automated

LineValidation counts taken in Alameda County and San Francisco, CA. Included locations with different sidewalk widths, temperature, precipitation.

Page 39: Session #7 - Pedestrian & Bicycle Counting Tips - Schneider

y = 0.393x1.2672

0

100

200

300

400

500

600

700

800

0 100 200 300 400 500 600 700 800

Man

ual C

ount

(15

-min

ute

peri

od)

Automated Count (15-minute period)

Automated Count to Manual Count Conversion Function

For Automated Counts > 49:

ConversionFunction

Manual = Automated

Line

For Automated Counts < 49:y = 1.1x

Undercounting is likely to depend on the width and design of the sidewalk in addition to the volume of pedestrians. However, this is an early attempt to develop a general conversion function.

Page 40: Session #7 - Pedestrian & Bicycle Counting Tips - Schneider

Tip 4: Use data to develop adjustment(extrapolation) factors

• Time of day, day of week, season of year

• Land use• Weather

Page 41: Session #7 - Pedestrian & Bicycle Counting Tips - Schneider

0.00%

0.20%

0.40%

0.60%

0.80%

1.00%

1.20%

1.40%12

AM

4 A

M8

AM

12 P

M4

PM8

PM12

AM

4 A

M8

AM

12 P

M4

PM8

PM12

AM

4 A

M8

AM

12 P

M4

PM8

PM12

AM

4 A

M8

AM

12 P

M4

PM8

PM12

AM

4 A

M8

AM

12 P

M4

PM8

PM12

AM

4 A

M8

AM

12 P

M4

PM8

PM12

AM

4 A

M8

AM

12 P

M4

PM8

PM

Perc

ent o

f Wee

kly

Pede

stri

an V

olum

e pe

r H

our

M T W Th F Sa Su

“Typical” Alameda County Pedestrian Activity Pattern (13 sites)

Page 42: Session #7 - Pedestrian & Bicycle Counting Tips - Schneider

0.00%

0.20%

0.40%

0.60%

0.80%

1.00%

1.20%

1.40%12

AM

4 A

M8

AM

12 P

M4

PM8

PM12

AM

4 A

M8

AM

12 P

M4

PM8

PM12

AM

4 A

M8

AM

12 P

M4

PM8

PM12

AM

4 A

M8

AM

12 P

M4

PM8

PM12

AM

4 A

M8

AM

12 P

M4

PM8

PM12

AM

4 A

M8

AM

12 P

M4

PM8

PM12

AM

4 A

M8

AM

12 P

M4

PM8

PM

Perc

ent o

f Wee

kly

Pede

stri

an V

olum

e pe

r H

our

M T W Th F Sa Su

“Typical” Alameda County Pedestrian Activity Pattern (13 sites)

2-hour count period

Page 43: Session #7 - Pedestrian & Bicycle Counting Tips - Schneider

0.00%

0.20%

0.40%

0.60%

0.80%

1.00%

1.20%

1.40%12

AM

4 A

M8

AM

12 P

M4

PM8

PM12

AM

4 A

M8

AM

12 P

M4

PM8

PM12

AM

4 A

M8

AM

12 P

M4

PM8

PM12

AM

4 A

M8

AM

12 P

M4

PM8

PM12

AM

4 A

M8

AM

12 P

M4

PM8

PM12

AM

4 A

M8

AM

12 P

M4

PM8

PM12

AM

4 A

M8

AM

12 P

M4

PM8

PM

Perc

ent o

f Wee

kly

Pede

stri

an V

olum

e pe

r H

our

M T W Th F Sa Su

“Typical” Pedestrian Activity Pattern vs. Employment Centers

Page 44: Session #7 - Pedestrian & Bicycle Counting Tips - Schneider

“Typical” Pedestrian Activity Pattern vs. Employment Centers

0.00%

0.20%

0.40%

0.60%

0.80%

1.00%

1.20%

1.40%12

AM

4 A

M8

AM

12 P

M4

PM8

PM12

AM

4 A

M8

AM

12 P

M4

PM8

PM12

AM

4 A

M8

AM

12 P

M4

PM8

PM12

AM

4 A

M8

AM

12 P

M4

PM8

PM12

AM

4 A

M8

AM

12 P

M4

PM8

PM12

AM

4 A

M8

AM

12 P

M4

PM8

PM12

AM

4 A

M8

AM

12 P

M4

PM8

PM

Perc

ent o

f Wee

kly

Vol

ume

per H

our

M T W Th F Sa Su

Page 45: Session #7 - Pedestrian & Bicycle Counting Tips - Schneider

0.00%

0.20%

0.40%

0.60%

0.80%

1.00%

1.20%

1.40%12

AM

4 A

M8

AM

12 P

M4

PM8

PM12

AM

4 A

M8

AM

12 P

M4

PM8

PM12

AM

4 A

M8

AM

12 P

M4

PM8

PM12

AM

4 A

M8

AM

12 P

M4

PM8

PM12

AM

4 A

M8

AM

12 P

M4

PM8

PM12

AM

4 A

M8

AM

12 P

M4

PM8

PM12

AM

4 A

M8

AM

12 P

M4

PM8

PM

Perc

ent o

f Wee

kly

Vol

ume

per H

our

M T W Th F Sa Su

Composite of 13 Locations12 to 2 p.m., Wednesday=

2.16% of total weekly volume

Employment Centers12 to 2 p.m., Wednesday =

2.63% of total weekly volume

“Typical” Pedestrian Activity Pattern vs. Employment Centers

Page 46: Session #7 - Pedestrian & Bicycle Counting Tips - Schneider

Land Use Adjustment Factors

Land Use Category DefinitionWeekday12-2 p.m.

Weekday2-4 p.m.

Weekday3-5 p.m.

Weekday4-6 p.m.

Saturday9-11 a.m.

Saturday12-2 p.m.

Saturday3-5 p.m.

Employment Center >=2,000 jobs within 0.25 miles (402 m)4 0.83 0.97 0.99 0.99 1.16 1.00 1.07

Residential Area>=500 jobs within 0.25 miles (402 m)4 & no

commercial retail properties within 0.1 miles (161 m)5 1.37 0.96 0.90 0.98 0.86 1.14 1.12

Neighborhood Commercial Area

>=10 commercial retail properties within 0.1 miles

(161 m)5 0.92 1.00 1.00 0.97 1.04 0.77 0.78

Near Multi-Use Trail

>=0.5 centerline miles of multi-use trails within 0.25

miles (402 m)6 1.63 0.79 0.72 0.91 0.69 1.31 1.07

Near School>=1 elementary, middle, or high school within 0.25

miles (402 m)5 0.94 0.77 0.82 1.07 1.20 1.23 1.37

Count Times when Adjustment Factors were Applied

Counts taken at locations with specific types of land uses were multiplied by these factors to match counts taken at “typical” Alameda County Locations

(Example: Alameda County, CA)

Page 47: Session #7 - Pedestrian & Bicycle Counting Tips - Schneider

Weather Adjustment Factors

Counts taken under certain weather conditions were multiplied by these factors to match counts taken during “typical” Alameda County weather conditions

Weather Condition Definition

Warm>=80 degrees Fahrenheit (27 degrees Celsius) during

first count hour7

Cool<=50 degrees Fahrenheit (10 degrees Celsius) during

first count hour7

Cloudy<= 0.6 of the expected solar radiation (Langleys per

day) during first count hour7,8

Rain>=0.01 inch (0.254 mm) of precipitation during either

count hour7

Saturday9 a.m.-5 p.m.

Count Times when Adjustment Factors were Applied

1.07

Weekday12-6 p.m.

1.10

1.11

1.27

1.12

1.06

1.11

1.34

(Example: Alameda County, CA)

Page 48: Session #7 - Pedestrian & Bicycle Counting Tips - Schneider

Seasonal Adjustment Factors

Counts taken during the spring were multiplied by these factors to match counts taken in Alameda County during a typical time of the year

Land Use Category Definition

Employment Center >=2,000 jobs within 0.25 miles (402 m)4

Residential Area>=500 jobs within 0.25 miles (402 m)4 & no

commercial retail properties within 0.1 miles (161 m)5

Neighborhood Commercial Area

>=10 commercial retail properties within 0.1 miles

(161 m)5

Near Multi-Use Trail

>=0.5 centerline miles of multi-use trails within 0.25

miles (402 m)6

Near School>=1 elementary, middle, or high school within 0.25

miles (402 m)5 0.93

Count Times when Adjustment Factors were Applied

All Time Periods

0.98

0.97

0.98

0.91

(Example: Alameda County, CA)

Page 49: Session #7 - Pedestrian & Bicycle Counting Tips - Schneider

Seasonal Adjustment Factors

Each month has a different proportion of the total annual pedestrian or bicycle volume

(Example: National Documentation Project)

Page 50: Session #7 - Pedestrian & Bicycle Counting Tips - Schneider

Applications of Count Data

• Analyze crash risk– Prioritize locations for safety treatments– Improve roadway designs & CRFs

• Develop predictive volume models• Track progress over time

Page 51: Session #7 - Pedestrian & Bicycle Counting Tips - Schneider

Analyze Crash Risk

Page 52: Session #7 - Pedestrian & Bicycle Counting Tips - Schneider

Alameda County Pedestrian Crash Analysis

Mainline Roadway

Intersecting Roadway

Reported Pedestrian

Crashes (1996-2005)

Mission Boulevard

Torrano Avenue 5

Davis Street Pierce Avenue 4Foothill Boulevard D Street 1Mission Boulevard

Jefferson Street 5

University Avenue Bonar Street 7International Boulevard 107th Avenue 2San Pablo Avenue Harrison Street 2East 14th Street

Hasperian Boulevard 1

International Boulevard 46th Avenue 3

Solano AvenueMasonic Avenue 2

Broadway 12th Street 5

Page 53: Session #7 - Pedestrian & Bicycle Counting Tips - Schneider

Mainline Roadway

Intersecting Roadway

Estimated Total Weekly

Pedestrian Crossings

Annual Pedestrian

Volume Estimate

Ten-Year Pedestrian

Volume Estimate

Reported Pedestrian

Crashes (1996-2005)

Pedestrian Risk (Crashes

per 10,000,000 crossings)

Mission Boulevard

Torrano Avenue 1,169 60,796 607,964 5 82.24

Davis Street Pierce Avenue 1,570 81,619 816,187 4 49.01Foothill Boulevard D Street 632 32,862 328,624 1 30.43Mission Boulevard

Jefferson Street 5,236 272,246 2,722,464 5 18.37

University Avenue Bonar Street 11,175 581,113 5,811,127 7 12.05International Boulevard 107th Avenue 3,985 207,243 2,072,429 2 9.65San Pablo Avenue Harrison Street 4,930 256,357 2,563,572 2 7.80East 14th Street

Hasperian Boulevard 3,777 196,410 1,964,102 1 5.09

International Boulevard 46th Avenue 12,303 639,752 6,397,522 3 4.69

Solano AvenueMasonic Avenue 22,203 1,154,559 11,545,589 2 1.73

Broadway 12th Street 112,896 5,870,590 58,705,898 5 0.85

Alameda County Pedestrian Risk Analysis

Page 54: Session #7 - Pedestrian & Bicycle Counting Tips - Schneider

Alameda County Pedestrian Volume ModelEstimated Weekly Pedestrian Crossings =

0.987 * Total population within 0.5-miles of the intersection

+ 2.19 * Total employment within 0.25-miles of the intersection

+ 71.1 * Number of commercial properties within 0.25-miles of the intersection

+49,300 * Number of regional transit stations within 0.10-miles of the intersection

- 4850 (Constant)

Adjusted R2 = 0.900Root Mean Squared Error = 5310Independent variables significant at 93% confidence interval

Page 55: Session #7 - Pedestrian & Bicycle Counting Tips - Schneider

Pilot Pedestrian Volume Model Application

Page 56: Session #7 - Pedestrian & Bicycle Counting Tips - Schneider

Source: New York City DOT, 2010

New York City Bicycle Counts (1980-2009)

Page 57: Session #7 - Pedestrian & Bicycle Counting Tips - Schneider

Source: City of Seattle

Seattle Bicycle Counts

Page 58: Session #7 - Pedestrian & Bicycle Counting Tips - Schneider

Source:

Community withPedestrian Counts?

?

Page 59: Session #7 - Pedestrian & Bicycle Counting Tips - Schneider

Questions & Answers