    Small Hydro Power PlantsSmall Hydro Power PlantsSmall Hydro Power PlantsSmall Hydro Power PlantsSmall Hydro Power PlantsSmall Hydro Power PlantsSmall Hydro Power PlantsSmall Hydro Power Plants

    A key actor of green power generationA key actor of green power generationA key actor of green power generationA key actor of green power generationA key actor of green power generationA key actor of green power generationA key actor of green power generationA key actor of green power generation

    Vincent DenisVincent Denis

    Ing. EPFIng. EPF--SIASIA

    MHyLabMHyLab1354 Montcherand1354 Montcherand

  • 7/28/2019 Sesec7 Denis

    2/21

    213/11/2008

    SESEC VII

    Electricity generationElectricity generation -- Current SituationCurrent Situation

    Electricity needs are increasing all over the World Climate change is a challenge

    Large projects are much debated from a socio-economic standpointwhile some of them are also burdened by financial and profitability

    problems

    Electrification needs of remotes or peripheral areas in countries witha low density distribution network

    Hydropower is a competitive technology

    Hydro Potential heavily exploited in industrialised countries

    Hydroelectric market is increasingly focusing on small and medium-sized power plants

  • 7/28/2019 Sesec7 Denis

    3/21

    313/11/2008

    SESEC VII

    Small hydropower ?Small hydropower ?

    Seujet Power plant (Geneva) 3 bulb turbines

    Power : 3 x 2900 kW

    Flow : 3 x 135 m3/s

    Erection took 8 years

    La Douve II Power plant (Alps) 1 Pelton turbine

    Power : 75 kW

    Flow : 0.1 m3/s

    Erection took 4 months at workshop

    and 23 minutes at site

  • 7/28/2019 Sesec7 Denis

    4/21

    413/11/2008

    SESEC VII

    Small hydro power plant definitionSmall hydro power plant definition

    The power criterion is not sufficient

    =>

    A small hydropower plant is a plant which, fortechnical and economic considerations,

    must not be the geometrical reductionof a large one

  • 7/28/2019 Sesec7 Denis

    5/21

    513/11/2008

    SESEC VII

    Success criteria: key wordsSuccess criteria: key words

    Simple manufacturing to ensure technical

    and economic feasibility for SMEs

    High energy efficiency

    Maximum reliability and easy maintenance

  • 7/28/2019 Sesec7 Denis

    6/21

    613/11/2008

    SESEC VII

    MHyLabMHyLab

    A foundation dedicated to small hydroA foundation dedicated to small hydro

    The aim is to propose the technology for thedevelopment of SHP conforming to the previousrequirements

    MHyLab is a technical support to everybody who isinvolved in small-hydro development.

    MHyLab is a supplier of small hydro up to datetechnology

  • 7/28/2019 Sesec7 Denis

    7/21

    713/11/2008

    SESEC VIIPelton, high heads :Pelton, high heads :

    6060600 m600 m

    10.00

    Diagonale

    MHyLab - Domaine de recherche sur les mini-turbines

    1.0

    10.0

    100.0

    1000.0

    0.01 0.10 1.00 Q (m3/s)

    H(m)

    Pelton

    Axiale

    PicoTBCh

    Pico + TBCh

    5.0

    50.0

    500.0

    0.05 0.50 5.00

    Axial turbines,Axial turbines,low headslow heads

    : 5: 5 --30 m30 m

    DiagonalsDiagonals,,

    medium heads : 25medium heads : 25 --100 m100 m

    VeryVery--low headlow head

    :1.5:1.5 5 m5 m

    Ultra low heads

    0,5 1,7 m

    De=1

    ,5

    Niveau min

    Niveau max

    Niveau min

    Pico turbines :Pico turbines :

    1.51.5 5 m5 mNiveauamontconstant

    Niveauminimum

    DZ=2,0 m

    PICO-TURBINEDe = 300 mm

  • 7/28/2019 Sesec7 Denis

    8/21

    813/11/2008

    SESEC VII

    The MHyLabThe MHyLab systemisationsystemisation methodmethod

    Entire parameterisation of aturbine's hydraulics.

    Laboratory Test of its behaviourand performances as a function of

    the evolution of these parameters.

    Custom design of each turbinefunction of the exactcharacteristics of the site to beequipped.

    Meeting of the fundamental criteriaof simplicity, reliability and high &

    guaranteed performances.

    Modified blade 7

  • 7/28/2019 Sesec7 Denis

    9/21

    913/11/2008

    SESEC VII

  • 7/28/2019 Sesec7 Denis

    10/21

    1013/11/2008

    SESEC VII

    Val d'Illiez small hydropower plantVal d'Illiez small hydropower plant

    (CH)(CH)

    1 Pelton, vertical axis

    4 nozzles

    Commissioning : 2006

    Net head: 277 mMax. discharge: 370 l/s

    Rotation speed: 1000 rpm

    Max. electrical output: 870 kW

    Production: 2'600 MWh/year

    Technical design: MHyLab

    Turbine supplier: Gasa Sa (CH)

  • 7/28/2019 Sesec7 Denis

    11/21

    1113/11/2008

    SESEC VII

    Val small hydropower plant (France)Val small hydropower plant (France)

    1 Pelton, vertical axis

    3 nozzles

    Commissioning : 2007-2008

    Net head: 240 mMax. discharge: 600 l/s

    Rotation speed: 1000 rpm

    Max. electrical output: 1165 kW

    Technical design: MHyLab

    Turbine supplier: Desgranges Sarl(France)

  • 7/28/2019 Sesec7 Denis

    12/21

    1213/11/2008

    SESEC VII

    Use of drinking waterUse of drinking water

    La Zour SHP (SaviLa Zour SHP (Savise, Valais, CH)se, Valais, CH)

    1 Pelton, vertical axis,

    3 nozzles

    Commissioning : 2004

    Head: 217 m

    Max. discharge: 300 l/s

    Max. electrical output: 465 kW

    Annual production: 1'800 MWh/year

    Technical design: MHyLab

    Turbine supplier: GASA SA (CH)

  • 7/28/2019 Sesec7 Denis

    13/21

    1313/11/2008

    SESEC VII

    Use of irrigation waterUse of irrigation water-- L'ArmaryL'Armary -- AubonneAubonne

    Armary

    Source at

    Monther

    od

    Small hydropower

    plant at 437 m

    Penstock : 1800

    m

    Water intake

    at

    542 m

    Outlet in the

    Armary

    Leman

    lake

    Armary small hydropower

    plant Irrigation water

  • 7/28/2019 Sesec7 Denis

    14/21

    1413/11/2008

    SESEC VII

    Armary power plantArmary power plant -- AubonneAubonne

    Start up: 2006 Pelton, 2 nozzles Difference in altitude: 105 m

    Nominal discharge: 90 l/s Electrical output: 68 kW Electrical production: 454'000 kWh/year

    (the consumption of 100 households) Hydraulic design: MHyLab

    Manufacturer: Gasa SA (Lausanne) Operator: le Groupe Arrosage (Aubonne)

    Investment: 650'000 CHF Cost price: 10 cts CHF/kWh

  • 7/28/2019 Sesec7 Denis

    15/21

    1513/11/2008

    SESEC VII

    Use of wastewaterUse of wastewater-- Chble SHP onChble SHP on

    RehabilitationRehabilitation -- 20082008

    1 Pelton, vertical axis

    2 nozzles

    Difference in levels: 449 m

    Max. discharge: 100 l/s

    Electrical output: 350 kW

    Design: MHyLabTurbine supplier: Gasa SA

  • 7/28/2019 Sesec7 Denis

    16/21

    1613/11/2008

    SESEC VII

    The Amman city and neighborhoodsThe Amman city and neighborhoods

    sewage systemsewage system

    New (2005) DN

    1500 penstock

    Old lagoon WWTP

    Duleil Wadi

    New As Samra WWTP

    Amman City

    Ain Ghazal pretreatment plant

  • 7/28/2019 Sesec7 Denis

    17/21

    1713/11/2008

    SESEC VII

    The inlet turbinesThe inlet turbines

    2 five-nozzle Pelton

    Z = 104 m

    Qn

    = 2 x 1.25 m3/s

    Hn = 79.3 m @ Qn

    N = 428.57 rpm

    Pe = 830 kW

    E = 12.5 GWh/year Commissioning : April 2007

    Supplyer : Andritz VA Tech

  • 7/28/2019 Sesec7 Denis

    18/21

    1813/11/2008

    SESEC VII

    The outlet turbinesThe outlet turbines

    2 horizontal Francis turbines

    Z = 42.1 m

    Qmax = 2 x 2.3 m3/s

    Qn = 2 x 2.0 m3/s

    Hn @ Qmax = 41.6 m @ Qmax N = 1'000 rpm

    Pe = 807 kW E = 8.6 GWh/year

    Supplyer : Andritz VA Tech

  • 7/28/2019 Sesec7 Denis

    19/21

    1913/11/2008

    SESEC VII

    Use of existing weir and channelsUse of existing weir and channels

    SiphonSiphonSiphonSiphonSiphonSiphonSiphonSiphon

    turbinesturbinesturbinesturbinesturbinesturbinesturbinesturbines

    0.50.50.50.50.50.50.50.53.0 m3.0 m3.0 m3.0 m3.0 m3.0 m3.0 m3.0 m

  • 7/28/2019 Sesec7 Denis

    20/21

    2013/11/2008

    SESEC VII

    Small hydroSmall hydroA perfect solution forA perfect solution for

    emerging and developping countriesemerging and developping countries

    Indigenous &

    renewable energy

    Long life cycle

    High energy output

  • 7/28/2019 Sesec7 Denis

    21/21

    2113/11/2008

    SESEC VII

    ConclusionsConclusions

    There is still an untapped potential for small hydroprojects.

    This field needs specific knowledge which is not thesame as for large hydro.

    Small hydro brings an answer to a sustainableelectricity production.

    R&D results are now available and a simple, efficientand reliable technology is ready for the market.