SESEC VII
Small Hydro Power PlantsSmall Hydro Power PlantsSmall Hydro Power PlantsSmall Hydro Power PlantsSmall Hydro Power PlantsSmall Hydro Power PlantsSmall Hydro Power PlantsSmall Hydro Power Plants
A key actor of green power generationA key actor of green power generationA key actor of green power generationA key actor of green power generationA key actor of green power generationA key actor of green power generationA key actor of green power generationA key actor of green power generation
Vincent DenisVincent Denis
Ing. EPFIng. EPF--SIASIA
MHyLabMHyLab1354 Montcherand1354 Montcherand
-
7/28/2019 Sesec7 Denis
2/21
213/11/2008
SESEC VII
Electricity generationElectricity generation -- Current SituationCurrent Situation
Electricity needs are increasing all over the World Climate change is a challenge
Large projects are much debated from a socio-economic standpointwhile some of them are also burdened by financial and profitability
problems
Electrification needs of remotes or peripheral areas in countries witha low density distribution network
Hydropower is a competitive technology
Hydro Potential heavily exploited in industrialised countries
Hydroelectric market is increasingly focusing on small and medium-sized power plants
-
7/28/2019 Sesec7 Denis
3/21
313/11/2008
SESEC VII
Small hydropower ?Small hydropower ?
Seujet Power plant (Geneva) 3 bulb turbines
Power : 3 x 2900 kW
Flow : 3 x 135 m3/s
Erection took 8 years
La Douve II Power plant (Alps) 1 Pelton turbine
Power : 75 kW
Flow : 0.1 m3/s
Erection took 4 months at workshop
and 23 minutes at site
-
7/28/2019 Sesec7 Denis
4/21
413/11/2008
SESEC VII
Small hydro power plant definitionSmall hydro power plant definition
The power criterion is not sufficient
=>
A small hydropower plant is a plant which, fortechnical and economic considerations,
must not be the geometrical reductionof a large one
-
7/28/2019 Sesec7 Denis
5/21
513/11/2008
SESEC VII
Success criteria: key wordsSuccess criteria: key words
Simple manufacturing to ensure technical
and economic feasibility for SMEs
High energy efficiency
Maximum reliability and easy maintenance
-
7/28/2019 Sesec7 Denis
6/21
613/11/2008
SESEC VII
MHyLabMHyLab
A foundation dedicated to small hydroA foundation dedicated to small hydro
The aim is to propose the technology for thedevelopment of SHP conforming to the previousrequirements
MHyLab is a technical support to everybody who isinvolved in small-hydro development.
MHyLab is a supplier of small hydro up to datetechnology
-
7/28/2019 Sesec7 Denis
7/21
713/11/2008
SESEC VIIPelton, high heads :Pelton, high heads :
6060600 m600 m
10.00
Diagonale
MHyLab - Domaine de recherche sur les mini-turbines
1.0
10.0
100.0
1000.0
0.01 0.10 1.00 Q (m3/s)
H(m)
Pelton
Axiale
PicoTBCh
Pico + TBCh
5.0
50.0
500.0
0.05 0.50 5.00
Axial turbines,Axial turbines,low headslow heads
: 5: 5 --30 m30 m
DiagonalsDiagonals,,
medium heads : 25medium heads : 25 --100 m100 m
VeryVery--low headlow head
:1.5:1.5 5 m5 m
Ultra low heads
0,5 1,7 m
De=1
,5
Niveau min
Niveau max
Niveau min
Pico turbines :Pico turbines :
1.51.5 5 m5 mNiveauamontconstant
Niveauminimum
DZ=2,0 m
PICO-TURBINEDe = 300 mm
-
7/28/2019 Sesec7 Denis
8/21
813/11/2008
SESEC VII
The MHyLabThe MHyLab systemisationsystemisation methodmethod
Entire parameterisation of aturbine's hydraulics.
Laboratory Test of its behaviourand performances as a function of
the evolution of these parameters.
Custom design of each turbinefunction of the exactcharacteristics of the site to beequipped.
Meeting of the fundamental criteriaof simplicity, reliability and high &
guaranteed performances.
Modified blade 7
-
7/28/2019 Sesec7 Denis
9/21
913/11/2008
SESEC VII
-
7/28/2019 Sesec7 Denis
10/21
1013/11/2008
SESEC VII
Val d'Illiez small hydropower plantVal d'Illiez small hydropower plant
(CH)(CH)
1 Pelton, vertical axis
4 nozzles
Commissioning : 2006
Net head: 277 mMax. discharge: 370 l/s
Rotation speed: 1000 rpm
Max. electrical output: 870 kW
Production: 2'600 MWh/year
Technical design: MHyLab
Turbine supplier: Gasa Sa (CH)
-
7/28/2019 Sesec7 Denis
11/21
1113/11/2008
SESEC VII
Val small hydropower plant (France)Val small hydropower plant (France)
1 Pelton, vertical axis
3 nozzles
Commissioning : 2007-2008
Net head: 240 mMax. discharge: 600 l/s
Rotation speed: 1000 rpm
Max. electrical output: 1165 kW
Technical design: MHyLab
Turbine supplier: Desgranges Sarl(France)
-
7/28/2019 Sesec7 Denis
12/21
1213/11/2008
SESEC VII
Use of drinking waterUse of drinking water
La Zour SHP (SaviLa Zour SHP (Savise, Valais, CH)se, Valais, CH)
1 Pelton, vertical axis,
3 nozzles
Commissioning : 2004
Head: 217 m
Max. discharge: 300 l/s
Max. electrical output: 465 kW
Annual production: 1'800 MWh/year
Technical design: MHyLab
Turbine supplier: GASA SA (CH)
-
7/28/2019 Sesec7 Denis
13/21
1313/11/2008
SESEC VII
Use of irrigation waterUse of irrigation water-- L'ArmaryL'Armary -- AubonneAubonne
Armary
Source at
Monther
od
Small hydropower
plant at 437 m
Penstock : 1800
m
Water intake
at
542 m
Outlet in the
Armary
Leman
lake
Armary small hydropower
plant Irrigation water
-
7/28/2019 Sesec7 Denis
14/21
1413/11/2008
SESEC VII
Armary power plantArmary power plant -- AubonneAubonne
Start up: 2006 Pelton, 2 nozzles Difference in altitude: 105 m
Nominal discharge: 90 l/s Electrical output: 68 kW Electrical production: 454'000 kWh/year
(the consumption of 100 households) Hydraulic design: MHyLab
Manufacturer: Gasa SA (Lausanne) Operator: le Groupe Arrosage (Aubonne)
Investment: 650'000 CHF Cost price: 10 cts CHF/kWh
-
7/28/2019 Sesec7 Denis
15/21
1513/11/2008
SESEC VII
Use of wastewaterUse of wastewater-- Chble SHP onChble SHP on
RehabilitationRehabilitation -- 20082008
1 Pelton, vertical axis
2 nozzles
Difference in levels: 449 m
Max. discharge: 100 l/s
Electrical output: 350 kW
Design: MHyLabTurbine supplier: Gasa SA
-
7/28/2019 Sesec7 Denis
16/21
1613/11/2008
SESEC VII
The Amman city and neighborhoodsThe Amman city and neighborhoods
sewage systemsewage system
New (2005) DN
1500 penstock
Old lagoon WWTP
Duleil Wadi
New As Samra WWTP
Amman City
Ain Ghazal pretreatment plant
-
7/28/2019 Sesec7 Denis
17/21
1713/11/2008
SESEC VII
The inlet turbinesThe inlet turbines
2 five-nozzle Pelton
Z = 104 m
Qn
= 2 x 1.25 m3/s
Hn = 79.3 m @ Qn
N = 428.57 rpm
Pe = 830 kW
E = 12.5 GWh/year Commissioning : April 2007
Supplyer : Andritz VA Tech
-
7/28/2019 Sesec7 Denis
18/21
1813/11/2008
SESEC VII
The outlet turbinesThe outlet turbines
2 horizontal Francis turbines
Z = 42.1 m
Qmax = 2 x 2.3 m3/s
Qn = 2 x 2.0 m3/s
Hn @ Qmax = 41.6 m @ Qmax N = 1'000 rpm
Pe = 807 kW E = 8.6 GWh/year
Supplyer : Andritz VA Tech
-
7/28/2019 Sesec7 Denis
19/21
1913/11/2008
SESEC VII
Use of existing weir and channelsUse of existing weir and channels
SiphonSiphonSiphonSiphonSiphonSiphonSiphonSiphon
turbinesturbinesturbinesturbinesturbinesturbinesturbinesturbines
0.50.50.50.50.50.50.50.53.0 m3.0 m3.0 m3.0 m3.0 m3.0 m3.0 m3.0 m
-
7/28/2019 Sesec7 Denis
20/21
2013/11/2008
SESEC VII
Small hydroSmall hydroA perfect solution forA perfect solution for
emerging and developping countriesemerging and developping countries
Indigenous &
renewable energy
Long life cycle
High energy output
-
7/28/2019 Sesec7 Denis
21/21
2113/11/2008
SESEC VII
ConclusionsConclusions
There is still an untapped potential for small hydroprojects.
This field needs specific knowledge which is not thesame as for large hydro.
Small hydro brings an answer to a sustainableelectricity production.
R&D results are now available and a simple, efficientand reliable technology is ready for the market.