SEPTA and spares follow-upJ. Borburgh for SEpta section
![Page 2: SEPTA and spares follow-up](https://reader036.fdocuments.in/reader036/viewer/2022081507/56816243550346895dd27d73/html5/thumbnails/2.jpg)
What is and should be traced in general
• Magnetic septaComplete septa (installed, operational spares, second choice spares)Operational history (# pulses, failures)CoilsHigh current feedthroughsLifting jigs (certification)
• Electrostatic septaComplete septa (installed, operational spares, second choice spares)Operational history (failures)HV cablesSF6 safety valves for HV generatorsLifting jigs (certification)CathodesHV deflectorsHV feedthroughs
• Protection elementsComplete devices (installed, spares)
![Page 3: SEPTA and spares follow-up](https://reader036.fdocuments.in/reader036/viewer/2022081507/56816243550346895dd27d73/html5/thumbnails/3.jpg)
What is not traced
• Magnetic septaStriplines (consumable)
• Electrostatic septa Feedhtroughs
• Protection elementsAbsorbing blocks
![Page 4: SEPTA and spares follow-up](https://reader036.fdocuments.in/reader036/viewer/2022081507/56816243550346895dd27d73/html5/thumbnails/4.jpg)
How and where is it followed-up
Depends on operational responsible.Different per accelerator.Different per equipment type (different needs).
Mostly documented in Excel files on dfs.Some history on Web pages:
AB pagesMTF for LHC equipment.
![Page 5: SEPTA and spares follow-up](https://reader036.fdocuments.in/reader036/viewer/2022081507/56816243550346895dd27d73/html5/thumbnails/5.jpg)
PS complex magnetic elements
Operational responsible for LHC back bone: T. Masson• General dfs directory:
Operational history per magnetPulse history and preventive exchange planningWDPCoil inventoryFeedthrough inventoryLifting equipment
CTF3 and AD equipment less actively followed up
![Page 6: SEPTA and spares follow-up](https://reader036.fdocuments.in/reader036/viewer/2022081507/56816243550346895dd27d73/html5/thumbnails/6.jpg)
PS complex electrostatic elementsOperational responsible A. Prost• Some history on Web pages:
AB pages (obsolete)Remainder on dfs:
Complete septa (installed, operational spares, second choice spares)Operational history (failures)HV cables (not up to date)SF6 safety valvesLifting equipmentCathodes inventory SEH23Cathodes inventory SEH31Anode foil inventory SEH23Anode foil inventory SEH31HV deflectorsHV feedthroughs
![Page 7: SEPTA and spares follow-up](https://reader036.fdocuments.in/reader036/viewer/2022081507/56816243550346895dd27d73/html5/thumbnails/7.jpg)
PS extraction protection elements
• TPS15 dummy septum– Operational responsible to be determined– Installed in 2014, spare being validated– No follow up as yet
![Page 8: SEPTA and spares follow-up](https://reader036.fdocuments.in/reader036/viewer/2022081507/56816243550346895dd27d73/html5/thumbnails/8.jpg)
SPS magnetic elements
• Operational responsible: C. Baud• General dfs directory:
Magnet inventoryWater filtersPotentiometer inventoryComplete assemblies, including MS, MPCoils
![Page 9: SEPTA and spares follow-up](https://reader036.fdocuments.in/reader036/viewer/2022081507/56816243550346895dd27d73/html5/thumbnails/9.jpg)
SPS electrostatic elements
• Operational responsible: B. Balhan• General dfs directory:
ZS inventoryPart inventory (HV component, wires, pot…)Operational history (Sparks/Failures)HV cables Pumping Module with BDI equipmentIntervention, WDP
![Page 10: SEPTA and spares follow-up](https://reader036.fdocuments.in/reader036/viewer/2022081507/56816243550346895dd27d73/html5/thumbnails/10.jpg)
SPS extraction protection elements
Operational responsible B. Pinget• TPST TPSG4 TPSG6– Global inventory– Spare parts (CC, CFC, Inconel,…)– History
![Page 11: SEPTA and spares follow-up](https://reader036.fdocuments.in/reader036/viewer/2022081507/56816243550346895dd27d73/html5/thumbnails/11.jpg)
LHC extraction protection elements• Operational responsible: C. Boucly• TCDQ, TCDS, TCDQM, TCLIM ….• Hardware being followed up in MTF
![Page 12: SEPTA and spares follow-up](https://reader036.fdocuments.in/reader036/viewer/2022081507/56816243550346895dd27d73/html5/thumbnails/12.jpg)
SummaryMain items are already followed upPresently a very non-homogenous approach
For the future tool(s), principal requirements:– ‘Unit’ inventory – History (failure, # pulses, failure history….)– Spare parts inventory (coils, cathodes, yokes, …)– Preventive exchange planning– Safety related items inventory and validation dates
(SF6 valves, lifting equipment).