Senior Management Handbook (3.64 MB)
Transcript of Senior Management Handbook (3.64 MB)
Standard Review PlanSenior Management Handbook
Capital and Major Construction Projects Critical Decision Review and Approval
January 2013
Performance Status & Verification
Our experiences with major nuclear design and construction projects continue to highlight the importance of a focused, technically rigorous, and standardized approach to project reviews performed at Critical Decision (CD) approval points. This approach is fundamental to a positive safety culture and effective nuclear safety management.
Capital and Major Construction ProjectsCritical Decision Review and Approval
Overview
Thomas P. D’AgostinoUnder Secretary for Nuclear Security
DOE O 413.3B, Program and Project Management for the Acquisition of Capital Assets, and DOE-STD-1189-2008, Integration of Safety into the Design Process, provide core DOE requirements and expectations to ensure that project activities are conducted correctly and timely. This is also to ensure that safety is fully integrated, early in the facility lifecycle phases and, ultimately, the entire project.
The Standard Review Plans (SRPs) are designed to be a practical tool for Headquarters and field senior management and the Federal Project Directors (FPDs). They provide detailed lines of inquiry (LOIs) consistent with existing DOE requirements, expectations, and real-life DOE project experience. The LOIs encompass broad disciplines of Project Management; Engineering and Design; Nuclear and Facility Safety; Worker Safety; Environment; Security; and Quality Assurance. Collectively, they provide DOE management and technical staff the tools to ensure that the issues and risks that may challenge the successful execution of nuclear projects are identified early as part of the CD review process and managed proactively throughout the project or facility lifecycle.
The development of the SRPs is a collaborative effort between the Office of Environmental Management (EM) and the Chief of Nuclear Safety (CNS). The National Nuclear Security Administration (NNSA) has developed a similar review tool, such as the Criteria and Review Approach Documents (CRADs). The NNSA CRADs are also designed to be CD- and project review-specific and based on DOE O 413.3B, DOE-STD-1189, other Federal and DOE requirements, and industry best business practices. NNSA works closely with the Chief of Defense Nuclear Safety (CDNS) to ensure that safety in design is built into each nuclear project. Both the EM SRPs and NNSA CRADs provide the technical framework to formalize our institutional processes and requirements associated with the in-depth review of nuclear projects and facilities.
This Handbook provides Headquarters and field senior management who are charged with review and approval of CD deliverables with a set of key questions to further strengthen technical soundness and performance accountability prior to CD approval. These high-level key questions are organized by CD phases and applicable disciplines. Included in this Handbook are also two tables that depict the prerequisite CD activities and the required documents that are subject to DOE review and approval. These tables also present the developmental process of the key documents as the project proceeds through the CD process.
I strongly encourage you to use this Handbook as a key institutional tool available to proactively enhance the successful execution of our projects.
Yes NoHas Pre-Conceptual Planning been performed to address project activities, including program strategic goals and objectives, safety, design, Rough Order of Magnitude cost range, and schedule estimates? (All Project Areas)
For a Major System Project (MSP) with Total Project Cost (TPC) ≥ $750M, has a Mission Validation Independent Review been performed for Program Secretarial Office (PSO) approval? (PM)
For a project with TPC ≥ $100M, has a Mission Need Statement Document been prepared for PSO approval? (PM)
Has the Office of Acquisition and Project Management (APM) conducted an Independent Cost Review for the MSP or for a project designated by the Secretarial Acquisition Executive (SAE)? (PM)
For a nuclear project (Hazard Category 1, 2, or 3), have the Safety-in-Design expectations been documented for approval by the Safety Basis Approval Authority (SBAA)? (ED, NFS, PM)
Has a project prepared a Program Requirements Document that defines the goals the project must meet (note: this applies only to NNSA projects)? (All Project Areas)
Have all the required CD-0 Documents been submitted to APM? (All Project Areas)
Has a Project Data Sheet (PDS) been developed for requesting Project Engineering and Design (PED) funds? (PM, ED)
Has a project (TPC ≥ $10M) initiated monthly Project Assessment and Reporting System (PARS II) reporting? (PM)
Has the project initiated Quarterly Project Reviews (QPRs) with the Acquisition Executive (AE) or designee? (PM)
Key Questions for Critical Decision Review and Approval 1
PM = Project Management, ED = Engineering and Design, NFS = Nuclear and Facility Safety,WS = Worker Safety, E = Environmental, S = Security, QA = Quality Assurance
1
Approval of Mission Need
Yes NoApproval of Mission Need
Yes NoFor an MSP, has an Acquisition Strategy been prepared, with endorsement from APM for PSO approval? (PM)
Has a preliminary Project Execution Plan (PEP) been prepared for SAE or AE approval? (PM)
If required, has a Tailoring Strategy been prepared for SAE or AE approval? (PM)
Has the SAE or AE appointed an FPD? Is the FPD certified at the correct level? (PM)
Has an Integrated Project Team (IPT) been chartered and organized? Is it functioning? (PM)
For a nuclear project, has a Risk and Opportunity Assessment been prepared to support the evaluation of the Safety-in-Design Strategy? (ED, NFS)
Does the project comply with the One-for-One Replacement legislation (excess space/offset requirement), as mandated in House Report 109-86? (PM)
For a project with a TPC ≥ $100M, has APM developed an Independent Cost Estimate or conducted an Independent Cost Review? (PM)
For a nuclear project, has the development of a Code of Record been initiated to support conceptual design? (ED, NFS)
Has DOE completed the conceptual design review and prepared a Conceptual Design Review Report? (ED)
Have the High-Performance Sustainable Building (HPSB) considerations been evaluated and documented in the Conceptual Design Report, Acquisition Strategy, or PEP? (E)
Has a Safety Design Strategy (SDS) been prepared for SBAA and FPD approval, with CNS concurrence, or reviewed by the CDNS? (ED, NFS)
Has a Conceptual Design Report been prepared? (ED)
Has a Risk Management Plan been prepared? Are all project risks identified, analyzed, and determined to be either avoidable or manageable? (All Project Areas)
Has the PDS been updated from CD-0? (PM)
Key Questions for Critical Decision Review and Approval
Approval of AlternativeSelection and Cost Range
Has the Project Team established a Corrective Action Tracking process and routine methods for addressing issues on the project that promote a strong Nuclear Safety Culture? (All Project Areas)
Yes No
Key Questions for Critical Decision Review and Approval
Approval of AlternativeSelection and Cost Range (Continued)
For a nuclear project, has the PSO requested an Independent Project Review (IPR) to ensure early integration of safety into the design process? (ED, NFS)
For a nuclear project, has the contractor prepared a Conceptual Safety Design Report (CSDR) for DOE approval? (NFS)
Has the DOE SBAA approved the CSDR and documented the findings in the Conceptual Safety Validation Report (CSVR), with concurrence from the FPD? (NFS)
For a non-nuclear project (i.e., below the Hazard Category 3 nuclear facility threshold as defined in 10 CFR Part 830, Subpart B), has the contractor prepared a Preliminary Hazard Analysis Report (PHAR)? Has the Field Organization approved the report? (FS, WS)
Has an Integrated Safety Management (ISM) Plan been developed and implemented? (NFS, WS)
Have Safeguards and Security requirements been identified? (S)
Has a National Environmental Policy Act (NEPA) Strategy been completed? Has a determination been issued? Has an Environmental Compliance Strategy been prepared? (E)
Has a Quality Assurance Program been established? For nuclear projects, are NQA-1 standards being implemented? (QA)
Have all the required CD-1 Documents been submitted to APM? (All Project Areas)
For a nuclear project, has a Checkout, Testing, and Commissioning Plan been initiated in preparation for the acceptance and turnover of the structures, systems, and components at CD-4? (PM, ED, NFS)
Has the project begun expenditure of the Project Engineering and Design (PED), Major Item of Equipment (MIE), or Operating Expense (OE) funds? (PM)
Has the project developed an Acquisition Plan, if applicable? (PM)
Has the project continued the monthly PARS II reports? (PM)
Has the project continued the QPRs with the AE or designee? (PM)
Yes NoApproval of Alternative Selection and Cost Range
Yes NoApproval of PerformanceBaseline
Has the project established a Performance Baseline (PB) for FPD approval? (PM)
Has the Acquisition Strategy been updated for PSO approval? (PM)
Has the PEP been updated and approved by the SAE or AE? (PM)
Have Long-Lead Item Procurements been established for SAE or AE approval? (PM)
Has a Project Definition Rating Index Analysis been prepared for FPD approval for projects with a TPC ≥ $100M? (PM)
Has DOE completed the preliminary design review? Has DOE prepared a Preliminary Design Review Report? (ED, NFS)
Have the HPSB considerations been evaluated and documented for the preliminary design? (E)
Has an SDS been updated for SBAA and FPD approval, with CNS concurrence, or reviewed by the CDNS? (ED, NFS)
For a nuclear project, has a Technical Independent Project Review (TIPR) been conducted for preliminary design and approved by the PSO? (ED, NFS)
For a nuclear project, has the Code of Record been placed under configuration control during preliminary design? (ED, NFS)
Has the PDS been updated from CD-1? (PM)
Has a Preliminary Design Report been prepared? (ED)
Has the contractor employed an Earned Value Management System (EVMS) in accordance with ANSI/EIA-748B, or as required by the contract? (PM)
For an MSP, has a Technology Readiness Assessment (TRA) been conducted? Has a Technology Maturation Plan (TMP) been developed, as appropriate? Are they approved by the FPD? (ED, NFS, WS)
Has a Project Management Plan been developed, if applicable? (PM)
Has a Funding Profile been prepared for SAE or AE approval? (PM)
Key Questions for Critical Decision Review and Approval
Yes NoApproval of PerformanceBaseline (Continued)
For a nuclear project, has the contractor prepared a Preliminary Safety Design Report (PSDR) for DOE SBAA approval? (NFS)
Has the DOE SBAA approved the PSDR and documented the findings in the Preliminary Safety Validation Report (PSVR)? (NFS)
Has the ISM Plan been updated and implemented? (NFS, WS)
Has the final Environmental Impact Statement (EIS) or Environmental Assessment (EA) been issued? (E)
Has a Preliminary Security Vulnerability Assessment been conducted, if applicable? (S)
Has a Quality Assurance Program been updated for preliminary design? (QA)
For projects with a TPC ≥ $100M, has APM conducted an EIR to validate the PB and issued a Performance Baseline Validation Letter to the PSO in accordance with DOE O 413.3B? (PM)
For projects with a TPC < $100M, has the Project Management Support Office conducted an IPR to validate the PB? (PM)
For projects with a TPC ≥ $100M, has APM developed an Independent Cost Estimate to validate the PB? (PM)
Have all the required CD-2 Documents been submitted to APM, including any Baseline Change Proposals (BCPs)? (All Project Areas)
Has the Budget Request for the TPC been submitted? (PM)
Has AE Endorsement been obtained on any changes to the approved funding profile? (PM)
Has an Annual Project Peer Review been initiated for project with TPC ≥ $100M? (PM)
Has the project continued the monthly PARS II reports? (PM)
Has the project continued the QPRs with the AE or designee? (PM)
For a non-nuclear project, has the contractor prepared a Hazard Analysis Report (HAR) based on new hazards and design information? Has the Field Organization approved the report? (FS, WS)
Yes NoApproval of Performance Baseline
Yes NoHas the SAE or AE approved the updated CD-2 Project Documentation that reflects major changes from final design, PEP, Performance Baseline, Acquisition Strategy, Project Data Sheet, and funding documents for MIE and OE funds? (PM)
Has the Final Design been completed and reviewed, and is the design sufficiently mature to start procurement or construction? (ED, NFS)
Has the FPD ensured that the Constructability Review was completed as part of final design? (PM, ED, NFS)
Have the HPSB considerations been evaluated and documented for the final design? (E)
Has the contractor employed a certified EVMS in accordance with ANSI/EIA-748B, or as required by the contract? (PM)
For a non-MSP, has the Project Management Support Office conducted an IPR? (All Project Areas)
Has APM developed an Independent Cost Estimate for the project with a TPC ≥ $100M? (PM)
For an MSP, has a PSO-approved TRA been conducted if there are significant technological modifications occurring after CD-2? (ED, NFS, WS)
Has an SDS been updated for SBAA and FPD approval, with CNS concurrence, or reviewed by the CDNS? (ED, NFS)
For a nuclear project, has the contractor prepared a Preliminary Documented Safety Analysis (PDSA) for DOE approval? (NFS)
Has the DOE SBAA approved the PDSA and documented the findings in the Safety Evaluation Report (SER)? (NFS)
Has a Quality Assurance Program been updated for final design, construction, and procurement activities? (QA)
For a non-nuclear project, has the contractor prepared an updated HAR based on new hazards and design information? Has the Field Organization approved the report? (FS, WS)
For an MSP, has APM conducted an EIR for construction or execution readiness? (All Project Areas)
Has the Code of Record been managed and controlled during final design and construction with a process for reviewing and evaluating new and revised requirements? (ED, NFS)
Approval of Start of Construction/Execution
Key Questions for Critical Decision Review and Approval
Yes No
Has a Construction Project Safety and Health Plan (CPSHP) been prepared prior to start of construction? Has it been kept current during construction? Has the Field Organization approved the CPSHP?(WS)
Have all the required CD-3 Documents been submitted to APM? (All Project Areas)
Has an Annual Project Peer Review been initiated for projects having a TPC ≥ $100M? (PM)
Have EVMS reviews been conducted to ensure compliance with ANSI/EIA-748B, or as required in the contract? (PM)
Has the project continued the monthly PARS II reports? (PM)
Has the PDS been updated? (PM)
Has the project continued the QPRs with the AE or designee? (PM)
Has a Lessons Learned Report regarding upfront project planning and design been submitted to the PSO and APM within 90 days of CD-3 approval? (All Project Areas)
Has the Security Vulnerability Assessment Report been finalized, if necessary? (S)
Approval of Start of Construction/Execution (Continued)
Yes NoApproval of Start of Construction/Execution
Key Questions for Critical Decision Review and Approval
Note: The Worker Safety and Health Programs under 10 CFR Part 851, which would include the Construction Project Safety and Health Plans, if applicable, must be developed and approved before any work, including construction work for DOE, is conducted on a DOE site. The Construction Project Safety and Health Plan can be a starting point for the development of a post-construction safety and health program.
Yes NoHas the FPD verified whether the Key Performance Parameters and Project Completion Criteria have been met and the mission requirements have been achieved? (All Project Areas)
Has the project prepared a Project Transition to Operations Plan? (All Project Areas)
For a non-nuclear project, has a Readiness to Operate Assessment been conducted? (All Project Areas)
For a nuclear project, has an Operational Readiness Review (ORR) or Readiness Assessment (RA) been conducted? (All Project Areas)
Has the DSA been finalized? Have the Technical Safety Requirements (TSRs) been established? (NFS)
Has the DOE SBAA reviewed and approved the DSA and TSRs and prepared an SER? (NFS)
For a non-nuclear project, has the HAR been finalized? Has the Field Organization approved the report? (FS, WS)
Has the Environmental Management System (EMS) been revised in accordance with DOE O 450.1A? (E)
Have Contractor Evaluation Documents been prepared and submitted to the AE, PSO, and APM? (All Project Areas)
Is the Code of Record included as part of the turnover documentation? (ED, NFS)
Approval of Start of Operations or Project Completion
Key Questions for Critical Decision Review and Approval
Have all the required CD-4 Documents been submitted to APM? (All Project Areas)
Has the PARS II reporting been finalized, including earned value data? (PM)
Has the Initial Project Closeout Report been prepared within 90 days? (All Project Areas)
Has a Lessons Learned Report been submitted to the PSO and APM within 90 days of CD-4 approval regarding project execution and facility startup? (All Project Areas)
Yes NoApproval of Start of Operations or Project Completion
Yes NoHas the final Project Closeout Report been prepared? (All Project Areas)
Have the Facility Sustainment goals been documented and verified by an independent third-party entity within one year of facility occupancy? (E)
Has the property record in the Facilities Information Management System been established and updated? (PM)
Has the site’s Ten-Year Site Plan been updated? (PM)
Key Questions for Critical Decision Review and Approval
(Prior to Operations)
Critical Decision Prerequisite Activitiesand
Key Documents
Tabl
e 1:
Cri
tica
l Dec
isio
n A
ppro
val P
rere
qu
isit
e A
cti
vit
ies
App
rova
l of
Mis
sion
Nee
dA
ppro
val o
f A
lter
nati
ve
Sele
ctio
n an
d C
ost
Ran
geA
ppro
val o
f P
erfo
rman
ce
Bas
elin
eA
ppro
val o
f S
tart
of
Con
stru
ctio
n/E
xecu
tion
App
rova
l of S
tart
of O
pera
tions
or
Pro
ject
Com
plet
ion
Prep
are
Mis
sion
Nee
d St
atem
ent
Perfo
rm p
re-c
once
ptua
l pla
nnin
g ac
tiviti
es
Perfo
rm a
Mis
sion
Val
idat
ion
Inde
pend
ent R
evie
w
Con
duct
Inde
pend
ent C
ost
Rev
iew
(by
APM
)
Doc
umen
t DO
E ex
pect
atio
ns fo
r Sa
fety
in D
esig
n
Prep
are
Prog
ram
Req
uire
men
ts
Doc
umen
t (N
NSA
onl
y)Im
plem
ent a
cer
tifie
d EV
MS
Perfo
rm a
n IP
R fo
r Non
-Maj
or
Syst
em P
roje
cts
(PSO
)
Perfo
rm a
n EI
R fo
r Con
stru
ctio
n or
Exe
cutio
n R
eadi
ness
(APM
)
Upd
ate
and
appr
ove
CD
-2 P
roje
ct
Doc
umen
ts
Perfo
rm a
Per
form
ance
Bas
elin
e Ex
tern
al In
depe
nden
t Rev
iew
(EIR
) or
Inde
pend
ent P
roje
ct R
evie
w (I
PR)
Upd
ate
and
appr
ove
PEP
Esta
blis
h a
Perfo
rman
ce B
asel
ine
Upd
ate
and
appr
ove
Acqu
isiti
on
Stra
tegy
Impl
emen
t an
Earn
ed V
alue
M
anag
emen
t Sys
tem
(EVM
S)
Prep
are
a Pr
ojec
t Man
agem
ent
Plan
(if a
pplic
able
)
Initi
ate
mon
thly
Pro
ject
As
sess
men
t and
Rep
ortin
g Sy
stem
(PAR
S II)
repo
rts
Initi
ate
Qua
rterly
Pro
ject
Rev
iew
s (Q
PRs)
Dev
elop
fund
ing
docu
men
ts fo
r M
ajor
Item
s of
Equ
ipm
ent (
MIE
) or
Ope
ratin
g Ex
pens
e (O
E) p
roje
cts
for t
he d
esig
n, a
nd O
MB
300s
Subm
it all C
D-0
Doc
umen
ts to
APM
Proc
eed
with
con
cept
ual p
lann
ing
and
desi
gn u
sing
ope
ratin
g fu
nds
Prep
are
and
appr
ove
an
Acqu
isiti
on S
trate
gy
Prep
are
a pr
elim
inar
y Pr
ojec
t Ex
ecut
ion
Plan
(PEP
)
Appr
ove
the
appo
intm
ent o
f the
Fe
dera
l Pro
ject
Dire
ctor
(FPD
)
Esta
blis
h an
d ch
arte
r an
Inte
grat
ed P
roje
ct T
eam
(IPT
)
Com
ply
with
One
-for-O
ne
Rep
lace
men
t leg
isla
tion
Prep
are
a Ta
ilorin
g St
rate
gy
Prep
are
a R
isk
Man
agem
ent P
lan
Deve
lop a
n In
depe
nden
t Cos
t Esti
mat
e an
d/or
Inde
pend
ent C
ost R
eview
for
proje
ct wi
th T
PC ≥
$10
0M (A
PM)
Begi
n ex
pend
iture
of P
roje
ct
Engi
neer
ing
and
Des
ign
(PED
), M
IE, o
r OE
fund
s
Con
tinue
QPR
s
Subm
it all C
D-1
Doc
umen
ts to
APM
Con
tinue
mon
thly
PAR
S II
repo
rts
Con
tinue
QPR
s
Obt
ain
AE e
ndor
sem
ent o
n ch
ange
s to
app
rove
d fu
ndin
g pr
ofile
Initi
ate
annu
al p
roje
ct p
eer r
evie
w
for p
roje
cts
with
TPC
≥ $
100M
Subm
it all C
D-2
Doc
umen
ts to
APM
Subm
it bu
dget
requ
est f
or th
e TP
C
Con
tinue
mon
thly
PAR
S II
repo
rting
Subm
it Le
sson
s Le
arne
d re
gard
ing
upfro
nt p
roje
ct p
lann
ing
and
desig
n to
PSO
and
APM
with
in 9
0 da
ys
Con
duct
EVM
S su
rvei
llanc
e
Con
tinue
QPR
s
Con
tinue
mon
thly
PAR
S II
repo
rts
Com
mit
all r
esou
rces
nec
essa
ry
to e
xecu
te p
roje
ct
Initi
ate
annu
al p
roje
ct p
eer r
evie
w
for p
roje
cts
with
TPC
≥ $
100M
Subm
it all C
D-3
Doc
umen
ts to
APM
Verif
y th
at k
ey p
erfo
rman
ce
para
met
ers
and
proj
ect c
ompl
etio
n cr
iteria
are
met
Prep
are
and
issu
e a
Proj
ect
Tran
sitio
n to
Ope
ratio
n Pl
an
Com
plet
e an
d su
bmit
Con
tract
or
Eval
uatio
n D
ocum
ents
(if a
pplic
able
)
Fina
lize
PAR
S re
porti
ng
Subm
it In
itial
Pro
ject
Clo
sure
R
epor
t with
in 9
0 da
ys
Subm
it Le
sson
s Le
arne
d re
gard
ing
proj
ect e
xecu
tion
and
faci
lity
star
tup
with
90
days
Subm
it all C
D-4
Doc
umen
ts to
APM
Esta
blis
h an
d up
date
pro
perty
re
cord
in th
e Fa
cilit
y In
form
atio
n M
anag
emen
t Sys
tem
Perfo
rm fi
nal a
dmin
istra
tive
and
finan
cial
clo
seou
t
Prep
are
final
Pro
ject
Clo
seou
t Rep
ort
Com
plete
and
doc
umen
t ach
ievem
ent
of F
acilit
y Sus
tainm
ent g
oals
Initi
ate
Nat
iona
l Env
ironm
enta
l Po
licy
Act (
NEP
A) s
trate
gy a
nd
anal
yses
Mai
ntai
n En
viro
nmen
tal
Man
agem
ent S
yste
m
Com
plet
e N
EPA
Stra
tegy
Inco
rpor
ate
Gui
ding
Prin
cipl
es fo
r Fe
dera
l Lea
ders
hip
in H
PSB
into
Fi
nal D
esig
n
Inco
rpor
ate
Sust
aina
ble
Envi
ronm
ent S
tew
ards
hip
cons
ider
atio
ns in
to F
inal
Des
ign
Doc
umen
t Sus
tain
able
En
viro
nmen
t Ste
war
dshi
p co
nsid
erat
ions
Docu
men
t High
-Per
form
ance
Su
staina
ble B
uildin
g (H
PSB)
pro
vision
s as
par
t of C
once
ptua
l Des
ign
Issu
e fin
al E
IS o
r EA
Inco
rpor
ate
Gui
ding
Prin
cipl
es fo
r Fe
dera
l Lea
ders
hip
in H
PSB
into
Pr
elim
inar
y D
esig
n
Inco
rpor
ate
Sust
aina
ble
Envir
onm
ent
Stew
ards
hip
cons
ider
atio
ns in
to
Prel
imin
ary
Des
ign
*
Pro
ject
M
anag
emen
t
Env
iron
men
t
Dev
elop
Pro
ject
Dat
a Sh
eet (
PDS)
Upd
ate
PDS
Com
plet
e C
once
ptua
l Des
ign
Prep
are
Con
cept
ual D
esig
n R
epor
t (C
DR
)
Initi
ate
Cod
e of
Rec
ord
for n
ucle
ar
proj
ects
Con
duct
Inde
pend
ent P
roje
ct
Rev
iew
Con
duct
a T
echn
ical
Inde
pend
ent
Proj
ect R
evie
w (T
IPR
) for
nuc
lear
pr
ojec
ts
Upd
ate
PDS
Com
plet
e Pr
elim
inar
y D
esig
n
Con
duct
a T
echn
olog
y R
eadi
ness
As
sess
men
t (TR
A)
Ensu
re th
at th
e C
ode
of R
ecor
d is
pa
rt of
turn
over
doc
umen
tatio
nPl
ace
the
Cod
e of
Rec
ord
unde
r co
nfig
urat
ion
cont
rol
Ensu
re th
at th
e C
ode
of R
ecor
d is
un
der c
onfig
urat
ion
cont
rol d
urin
g fin
al d
esig
n
Com
plet
e Fi
nal D
esig
n
Com
plet
e Fi
nal D
esig
n R
evie
w
Prep
are
Prel
imin
ary
Des
ign
Rep
ort (
PDR
)Pr
epar
e Fi
nal D
esig
n R
epor
t (FD
R)
Con
duct
an
Ope
ratio
nal R
eadi
ness
R
evie
w (O
RR
) or R
eadi
ness
R
evie
w (R
A) fo
r nuc
lear
pro
ject
s
Con
duct
a fo
rmal
ass
essm
ent o
n R
eadi
ness
to O
pera
te fo
r no
n-nu
clea
r pro
ject
s
Com
plet
e ch
ecko
ut, t
estin
g, a
nd
com
mis
sion
ing
revi
ew fo
r nuc
lear
pr
ojec
ts
Nuc
lear
and
Fa
cilit
y S
afet
y
Dev
elop
a C
heck
out,
Test
ing,
and
C
omm
issi
onin
g Pl
an
Con
duct
Tec
hnic
al In
depe
nden
t Pr
ojec
t Rev
iew
for N
ucle
ar P
roje
cts
Con
duct
Con
cept
ual D
esig
n R
evie
wC
ondu
ct P
relim
inar
y D
esig
n R
evie
w
Sec
urit
yN
one
at th
is C
D S
tage
Iden
tify
gene
ral S
afeg
uard
s an
d Se
curit
y re
quire
men
tsC
ondu
ct a
Pre
limin
ary
Secu
rity
Vuln
erab
ility
Asse
ssm
ent
Fina
lize
Secu
rity
Vuln
erab
ility
Asse
ssm
ent
Impl
emen
t Sec
urity
Vul
nera
bilit
y
Qua
lity
Ass
uran
ceN
one
at th
is C
D S
tage
Upd
ate
the
QAP
for c
onst
ruct
ion,
fie
ld d
esig
n ch
ange
s, a
nd
proc
urem
ent a
ctiv
ities
Initi
ate
chec
kout
, tes
ting,
and
co
mm
issi
onin
g re
view
for n
ucle
ar
proj
ects
Deve
lop a
Tech
nolog
y Mat
urat
ion P
lan
DO
E O
413
.3B
and
EM
Gui
danc
e
Det
erm
ine
maj
or p
oten
tial h
azar
ds
and
safe
ty/ri
sk im
plic
atio
ns
Doc
umen
t maj
or p
oten
tial h
azar
ds
and
safe
ty/ri
sk im
plic
atio
ns a
s pa
rt of
Mis
sion
Nee
d St
atem
ent
Prep
are
Safe
ty D
esig
n St
rate
gy
(SD
S) fo
r nuc
lear
pro
ject
sU
pdat
e th
e SD
SU
pdat
e th
e SD
S
Prep
are
the
Doc
umen
ted
Safe
ty
Anal
ysis
(DSA
) and
Tec
hnic
al
Safe
ty R
equi
rem
ents
(TSR
s) fo
r nu
clea
r pro
ject
s
Prep
are
Con
cept
ual S
afet
y Va
lidat
ion
Rep
ort (
CSV
R)
Prep
are
a Pr
elim
inar
y Sa
fety
Va
lidat
ion
Rep
ort f
or (P
SVR
) for
nu
clea
r pro
ject
s
Prep
are
a Sa
fety
Eva
luat
ion
Rep
ort (
SER
)
Prep
are
a H
AR fo
r non
-nuc
lear
pr
ojec
tsFi
naliz
e th
e H
AR fo
r non
-nuc
lear
pr
ojec
tsU
pdat
e th
e H
AR fo
r non
-nuc
lear
pr
ojec
tsPr
epar
e Pr
elim
inary
Haz
ard A
nalys
is Re
port (
PHAR
) for n
on-n
uclea
r pro
jects
Prep
are
a Pr
elim
inar
y Sa
fety
D
esig
n R
epor
t (PS
DR
)Pr
epar
e C
once
ptua
l Saf
ety
Des
ign
Rep
ort (
CSD
R) f
or n
ucle
ar p
roje
cts
Con
tinue
impl
emen
tatio
n of
ISM
Pla
n
Con
tinue
impl
emen
tatio
n of
the
QAP
Con
tinue
impl
emen
tatio
n of
ISM
Pla
nC
ontin
ue im
plem
enta
tion
of IS
M P
lan
Prep
are
an S
ER
Dev
elop
and
impl
emen
t an
Inte
grat
ed
Safe
ty M
anag
emen
t (IS
M) P
lan
Wor
ker
Saf
ety
Non
e at
this
CD
Sta
gePr
epar
e a
Con
stru
ctio
n Pr
ojec
t H
ealth
and
Saf
ety
Plan
Cont
inue
imple
men
tatio
n of
ISM
S (s
ame
unde
r Nuc
lear a
nd F
acilit
y Saf
ety)
Cont
inue
imple
men
tatio
n of
ISM
S (s
ame
unde
r Nuc
lear a
nd F
acilit
y Saf
ety)
Cont
inue
imple
men
tatio
n of
ISM
S (s
ame
unde
r Nuc
lear a
nd F
acilit
y Saf
ety)
Eng
inee
ring
an
d D
esig
n
*
Prep
are
the
Prel
imin
ary
Doc
umen
ted
Safe
ty A
nalys
is (P
DSA
)
Con
duct
a T
RA
Esta
blis
h Q
ualit
y As
sura
nce
Prog
ram
(QAP
)U
pdat
e th
e Q
AP fo
r ope
ratio
ns
To c
onse
rve
spac
e, a
cron
yms
are
spel
led
out e
arlie
r in
the
body
of t
he H
andb
ook
and
in D
OE
O 4
13.3
B o
r DO
E-S
TD-1
189-
2008
.
Dev
elop
and
impl
emen
t an
ISM
S
Syst
em (s
ame
unde
r Nuc
lear
and
Fa
cility
Saf
ety)
Tabl
e 2:
Key
Doc
umen
ts t
o S
uppo
rt C
riti
cal D
ecis
ion
App
rova
l
App
rova
l of
Mis
sion
Nee
dA
ppro
val o
f Alte
rnat
ive
Sele
ctio
n an
d C
ost R
ange
App
rova
l of
Per
form
ance
Bas
elin
eA
ppro
val o
f S
tart
of
Con
stru
ctio
n/E
xecu
tion
App
rova
l of S
tart
of O
pera
tions
or
Pro
ject
Com
plet
ion
Pro
ject
M
anag
emen
tM
issi
on N
eed
Stat
emen
tAc
quis
ition
Stra
tegy
Perfo
rman
ce B
asel
ine
Upd
ated
PEP
Upd
ated
Acq
uisi
tion
Stra
tegy
Upd
ated
Tai
lorin
g St
rate
gy
Upd
ated
Ris
k M
anag
emen
t Pla
n
Tailo
ring
Stra
tegy
Ris
k M
anag
emen
t Pla
n
Prel
imin
ary
Proj
ect E
xecu
tion
Plan
(PEP
)
Inte
grat
ed P
roje
ct T
eam
C
harte
r (IP
T)IE
R o
r IPR
Rep
ort o
n Pe
rform
ance
Bas
elin
e
Earn
ed V
alue
Man
agem
ent
Syst
em (E
VMS)
Proj
ect T
rans
ition
to O
pera
tion
Plan
Initi
al P
roje
ct C
losu
re R
epor
t (P
ost-C
D-4
)
Fina
l Pro
ject
Clo
sure
Rep
ort
(Prio
r to
Proj
ect C
lose
out)
Key
Perfo
rman
ce P
aram
eter
s an
d Pr
ojec
t Com
plet
ion
Crit
eria
Ve
rific
atio
n
Fina
l Adm
inis
trativ
e an
d Fi
nanc
ial C
lose
out (
Prio
r to
Proj
ect C
lose
out)
Inpu
t to
Faci
lity
Info
rmat
ion
Man
agem
ent S
yste
m (P
rior t
o Pr
ojec
t Clo
seou
t)Le
sson
s Le
arne
d R
epor
t on
Plan
ning
and
Des
ign
(Pos
t- C
D-3
)Le
sson
s Le
arne
d R
epor
t on
Proj
ect E
xecu
tion
and
Star
tup
(Pos
t-CD
-4)
Upd
ated
PEP
Cer
tifie
d EV
MS
Upd
ated
Acq
uisi
tion
Stra
tegy
Upd
ated
Tai
lorin
g St
rate
gy
Upd
ated
Ris
k M
anag
emen
t Pla
n
IER
or I
PR R
epor
t on
Con
stru
ctio
n or
Exe
cutio
n R
eadi
ness
Mod
ified
Per
form
ance
Bas
elin
e,
If ap
plic
able
Env
iron
men
tN
one
at th
is C
D S
tage
Fina
l EIS
or E
A
Envi
ronm
enta
l Man
agem
ent
Syst
em
Faci
lity
Sust
ainm
ent G
oals
Ac
hiev
emen
t Rep
ort
NEP
A St
rate
gy
Hig
h-Pe
rform
ance
Sus
tain
able
Bu
ildin
g (H
PSB)
Pro
visio
ns fo
r C
once
ptua
l Des
ign
Sust
aina
ble
Envi
ronm
ent
Stew
ards
hip
cons
ider
atio
n fo
r C
once
ptua
l Des
ign
HPS
B an
d Su
stai
nabl
e En
viro
nmen
t Ste
war
dshi
p re
ports
for p
relim
inar
y de
sign
HPS
B an
d Su
stai
nabl
e En
viron
men
t Ste
war
dshi
p re
ports
fo
r fin
al d
esig
n an
d co
nstru
ctio
n
*
Nuc
lear
and
Fa
cilit
y S
afet
y
Upd
ated
SD
SU
pdat
ed S
DS
Safe
ty E
valu
atio
n R
epor
t (SE
R)
Saf
ety
Eva
luat
ion
Rep
ort
Fina
l Haz
ard
Anal
ysis
Rep
ort
for n
on-n
ucle
ar p
roje
cts
Non
e at
this
CD
Sta
ge
Safe
ty D
esig
n St
rate
gy (S
DS)
Prel
imin
ary
Haz
ard
Anal
ysis
R
epor
t and
DO
E re
view
repo
rt on
non
-nuc
lear
pro
ject
s
Prel
imin
ary
Safe
ty V
alid
atio
n R
epor
t (PS
VR) f
or n
ucle
ar
proj
ects
Haz
ard
Anal
ysis
Rep
ort a
nd
DO
E re
view
repo
rt on
no
n-nu
clea
r pro
ject
s
Upd
ated
Haz
ard
Anal
ysis
R
epor
t and
DO
E re
view
repo
rt on
non
-nuc
lear
pro
ject
s
Con
cept
ual S
afet
y Va
lidat
ion
Rep
ort (
CSV
R)
Prel
imin
ary
Safe
ty D
esig
n R
epor
t (PS
DR
)Pr
elim
inar
y D
ocum
ente
d Sa
fety
An
alys
is (P
DSA
)
Doc
umen
ted
Safe
ty A
naly
sis
(DSA
) and
Tec
hnic
al S
afet
y R
equi
rem
ents
(TSR
s)C
once
ptua
l Saf
ety
Des
ign
Rep
ort
(CSD
R) f
or n
ucle
ar p
roje
cts
ISM
S Im
plem
enta
tion
ISM
S Im
plem
enta
tion
ISM
S Im
plem
enta
tion
Inte
grat
ed S
afet
y M
anag
emen
t (IS
M) P
lan
Eng
inee
ring
an
d D
esig
nN
one
at th
is C
D S
tage
Cod
e of
Rec
ord
TRA
Rep
ort
IPR
and
/or C
PR R
epor
ts
Upd
ated
PD
Ss
Cod
e of
Rec
ord
IPR
and
/or C
PR R
epor
ts
Proj
ect D
ata
Shee
ts (P
DSs
)
Appr
oved
Cod
e of
Rec
ord
Con
cept
ual D
esig
n an
d R
evie
w
Rep
orts
Prel
imin
ary
Des
ign
and
Rev
iew
R
epor
ts
Tech
nolo
gy R
eadi
ness
As
sess
men
t (TR
A) R
epor
t
Che
ckou
t, Te
stin
g, a
nd
Com
mis
sion
ing
Plan
Fina
l Des
ign
and
Rev
iew
R
epor
ts
Cod
e of
Rec
ord
as p
art o
f tu
rnov
er d
ocum
enta
tion
Che
ckou
t, Te
stin
g, a
nd
Com
mis
sion
ing
Rev
iew
Ope
ratio
nal R
eadi
ness
Rev
iew
(O
RR
) or R
eadi
ness
Rev
iew
(RA)
Form
al a
sses
smen
t on
Rea
dine
ss to
Ope
rate
for
non-
nucl
ear p
roje
cts
Inde
pend
ent P
roje
ct R
evie
w
(IPR
) and
Con
stru
ctio
n Pr
ojec
t R
evie
w (C
PR) R
epor
ts
Che
ckou
t, Te
stin
g, a
nd
Com
mis
sion
ing
Rev
iew
Qua
lity
Ass
uran
ceU
pdat
ed Q
AP a
nd Q
IP fo
r de
sign
Upd
ated
QAP
and
QIP
for
cons
truct
ion
and
proc
urem
ent
Upd
ated
QAP
and
QIP
for
oper
atio
nsN
one
at th
is C
D S
tage
Qua
lity
Assu
ranc
e Pl
an (Q
AP)
and
Qua
lity
Impl
emen
tatio
n Pl
an (Q
IP)
Sec
urit
yPr
elim
inar
y Se
curit
y Vu
lner
abilit
y As
sess
men
t Rep
ort
Fina
l Sec
urity
Vul
nera
bilit
y As
sess
men
t Rep
ort
Non
e at
this
CD
Sta
geId
entif
icat
ion
of S
afeg
uard
s an
d Se
curit
y re
quire
men
ts
Wor
ker
Saf
ety
Non
e at
this
CD
Sta
geIS
MS
Impl
emen
tatio
n IS
MS
Impl
emen
tatio
nIS
MS
Impl
emen
tatio
n
Con
stru
ctio
n Pr
ojec
t Hea
lth a
nd
Safe
ty P
lan
and
DO
E re
view
ISM
Pla
n (s
ame
unde
r Nuc
lear
an
d Fa
cilit
y Sa
fety
)
Thes
e ar
e th
e K
ey D
ocum
ents
requ
ired
by D
OE
O 4
13.3
B to
sup
port
Crit
ical
Dec
isio
n ap
prov
als
*
Points of ContactFor additional information or assistance please contact:
Chip LagdonChief of Nuclear Safety Office of the Under Secretary for Nuclear SecurityPhone: (202) [email protected]
Robert B. RainesAssociate Administrator for Acquisition and Project Management National Nuclear Security AdministrationPhone: (202) [email protected]
Matthew B. MouryDeputy Assistant Secretary for Safety, Security, and Quality ProgramsOffice of Environmental ManagementPhone: (202) [email protected]