    CE SpecsPage 8-3

    CE11/S8.DOCSal(010611)DPD

    8.1 TESTING OF MATERIAL (CONT'D)

    SCHEDULE OF MATERIAL TESTS (CE WORKS)

    S/NTYPE OF

    MATERIALTO BE TESTED

    TYPE OF TEST TO BECARRIED OUT

    FREQUENCY OF TESTFOR EACH TYPE OF TEST

    NO. OFSAMPLESPER TEST

    1. Timber piles ) a) Moisture content)) b) Green/dry stresses) (stress grading))) c) Preservative) penetration)) d) Dry salt retention

    )) 1) 1 test for up to 3000 metre) run.)) 2) Subsequent test at each) interval of 3000 metre run) subject to a minimum of) 2 test.)

    2. Concrete -concrete cube

    Compressive strength 1 test for every 20 cubic metreor part thereof of each grade forevery concreting day.

    2 cubes for testat 7 days and 2cubes for test at28 days.

    3. Precast concretedrain channels,kerbs, roadchannels(gutters),dividers, etc

    Absorption test 0.5% of total quantities requiredfor the Works subject to aminimum of 3 numbers.

    3

    a) Water absorption test a) 0.5% of total quantitiesrequired for the Workssubject to a minimum of 3slabs.

    4. Precast aerationslabs

    b) Transverse strengthtest

    b) Minimum of 3 slabs forevery 1,000 pieces of theWorks.

    }}}} 3}}}

    5. Precast BGslabs

    a) Water absorption a) 3 tests for every 1,000pieces subject to a minimumof 3 tests.

    b) Transverse strength

    test

    b) 3 tests for every 1,000

    pieces subject to a minimumof 3 tests.

    }}} 3}}}

    6. Interlockingconcrete pavingblocks

    a) Compressive strength a) 1 test for each 550 m2

    ofinterlocking concretepavement.

    16

    b) Surface LayerThickness

    b) 5 tests, comprising 1 sampleper test, for each 550 m

    2of

    interlocking concretepavement.

    1

  • 8/12/2019 Sengkang Test Schedule

    2/2

    CE SpecsPage 8-4

    CE11/S8.DOCSal(010611)DPD

    8.1 TESTING OF MATERIAL (CONT'D)

    SCHEDULE OF MATERIAL TESTS (CE WORKS)

    S/N

    TYPE OF

    MATERIALTO BE TESTED

    TYPE OF TEST TO BE

    CARRIED OUT

    FREQUENCY OF TEST

    FOR EACH TYPE OF TEST

    NO. OF

    SAMPLESPER TEST

    a) Mean TransverseBreaking Load Test

    a) 1 test for each 200 m2of

    clay pavers pavement.107. Clay pavers for

    flexible pavement(Type PB)

    b) Mean Wet SkidResistance

    b) 1 test for each 200 m2of

    clay pavers pavement.5

    8. Hot dippedgalvanisedgrating

    Zinc Mass Coating Test 2% of total number of gratingssubject to a minimum of 3numbers of gratings.

    9 Soil testing for

    sidetables.

    Soil classification 1 test for every 200 m of

    sidetable subject to a minimumof 2 tests.

    10. Final testing ofkerbs.

    Water absorption test 1 test for every 120 m lengthsubject to a minimum of2 tests.

    11. Final testing ofpremix.

    Grading analysis,thickness and bitumencontent

    1 test for every 550 m2of

    carpark and 1 test for every 450m

    2of service road/driveway

    subject to a minimum of 2 tests.

    12. Final testing ofprecast footpathslabs.

    Water absorption test 1 sample for every 350 m2

    subject to a minimum of 2 tests.

    a) Compaction test(Dry Density/MoistureContent Relation)

    a) 1 test for each classof material to be compacted

    13. Compaction ofroad formation.

    b) In Situ Field DensityTest

    b) 1 test for every 300m2of

    surface of each compactedlayer.

    14. Compaction ofsubgrade.

    CBR test. 1 test for every 50m ofcarriageway subject to aminimum of 3 tests.

    15. Plant soil. Soil classifications. 3 tests.

    16. Road Works LTA Road TestingRequirements

    As specified in theSpecifications.

    a) Tranverse StrengthTest

    a) Minimum of 3 slabs forevery 1,000 pieces.

    b) Water Absorption Test b) Minimum of 5 slabls forevery 1,000 pieces.

    17. PerforatedInterlockingParing Slabs

    c) Surface Layerthickness

    b) 5 tests comprising 1 sampleper test, for each 550 m

    2of

    interlocking concretepavement.