sem 6 ppt
-
Upload
rakesh-kushwaha -
Category
Documents
-
view
217 -
download
0
Transcript of sem 6 ppt
8/3/2019 sem 6 ppt
http://slidepdf.com/reader/full/sem-6-ppt 1/27
8/3/2019 sem 6 ppt
http://slidepdf.com/reader/full/sem-6-ppt 2/27
(Industrial PROJECT-602)
SEM-Vl
Group No:- A6
Formation of group:-
Incharge Sign. Student Sign.
Sr. No Name Roll No
1 Tripathi Manisha 81
2 Parmar Dhara 18
3 parjapati Uddhav 68
8/3/2019 sem 6 ppt
http://slidepdf.com/reader/full/sem-6-ppt 3/27
We need secure data.
Easy to generate the bill and receipt also.
We need that the system to be automatically. Easy to store the product.
Time saving process.
Easy to use the internet for information about the system.
8/3/2019 sem 6 ppt
http://slidepdf.com/reader/full/sem-6-ppt 4/27
RDBMS
Multimedia
8/3/2019 sem 6 ppt
http://slidepdf.com/reader/full/sem-6-ppt 5/27
Name : ASIAN GRANITO INDIA LTD.
Logo :
Slogan : Asian me ghar saja h,Asian aashiyaan h har kadampr Asian h.
Asian feels the perfection.
Distribution : In India,China,London,USA,Japan
etc
Department : Private Ltd.
Products : Glaze Tiles,Acquatic Marbles & Marbles
with design etc
Owner Name : Mr.Mukesh Patel.
8/3/2019 sem 6 ppt
http://slidepdf.com/reader/full/sem-6-ppt 6/27
Existing system is totally Computerized.
We provide best services to our customer.
In existing system data search is easy.
Row material comes from Rajasthan, China,USA etc and after processing as per requirement.
For example:- design wise, polishing wise
8/3/2019 sem 6 ppt
http://slidepdf.com/reader/full/sem-6-ppt 7/27
The firing is of two different types, they are single firing anddouble firing.
Single firing for vitrified tiles and double firing for wall tiles.
For creating the vitrified tiles, we use first firing than policing tothe tiles. And for creating the tiles, they have same process .
If some tiles are broken during preparation, then they will throwthe waste and pack the good product and stored in thewarehouse.
Product has been stored in the warehouse then they will dispatchthe product.
8/3/2019 sem 6 ppt
http://slidepdf.com/reader/full/sem-6-ppt 8/27
Data search is easy.
Easy to maintain our daily record in existing system.
Data entry is so easy.
No counting problem in existing system.
Easy to maintain all machine, create the tiles.
8/3/2019 sem 6 ppt
http://slidepdf.com/reader/full/sem-6-ppt 9/27
Existing system is so costly process.
It is very long process.
In the existing system used more than power.
8/3/2019 sem 6 ppt
http://slidepdf.com/reader/full/sem-6-ppt 10/27
Managing Director
Purchase Director
Financial Director
Chief Director
Manager
(office)
Manager
(plant)
Accountant Compute Clerk IT General
.MWorks SecureDepart .M
Marble tile
division Wall tile
division Buttery fide
tiles division
8/3/2019 sem 6 ppt
http://slidepdf.com/reader/full/sem-6-ppt 11/27
Sale
Management
Accounting
Management
Stock
Management
Profit loss
Management
Cashing
Management
Advertising
Management
Available
Product
Counting
Material
Row
Material Paying
Material
Salary
Management
Purchase
Management
Customer
bill
8/3/2019 sem 6 ppt
http://slidepdf.com/reader/full/sem-6-ppt 12/27
Easy to maintain daily record.
Purpose system is so costly but easy to maintain all record and timesaving process.
Easy management system.
Provide of workers medical insurance.
Easy to maintain all dispatch product.
8/3/2019 sem 6 ppt
http://slidepdf.com/reader/full/sem-6-ppt 13/27
The company to a very more number of customers, so doing thingsmanually result in too much consumption of time & manpower hencea computerized system would be extremely beneficial and wouldminimize Errors too.
The continuous turn over in the product servicing system requireshandling of more information which is only possible by improvingprocessing procedures this resulted in inception of new idea for doing things in a better, efficient, and faster way.
When request for the new system is made, the preliminaryinvestigation is begins. The purpose of it is to evaluate systemrequirements.
8/3/2019 sem 6 ppt
http://slidepdf.com/reader/full/sem-6-ppt 14/27
Technical feasibility refers to the technical resources needed todevelop, purchase, install or operate the system.
At this time companies working totally manually. So, they haveto purchase all the required software and hardware.
The management is ready to accept the proposed system. In
proposed system company have to use and embedded system.
8/3/2019 sem 6 ppt
http://slidepdf.com/reader/full/sem-6-ppt 15/27
Schedule feasibility means that a project can beimplemented in an acceptable time frame.
The company or its team control the factors because thenew system will be implemented then use to thecompany.
Control the entire factor or any difficulty and affect theschedule feasibility.
8/3/2019 sem 6 ppt
http://slidepdf.com/reader/full/sem-6-ppt 16/27
Mission:-
Without disturbing the nature to make the best tiles andmanufacture in the world.
Vision:-
Do not disturb the Nature.
Information:-
It was started in 2000.In 2000 when it was started and growthwas 0.8 carores.In 2009 its growth is 352 carores.
There are five factories in Gujarat:-
I Ceramic Floor tiles .Idar
II Vitrified wall tiles ,Himmatnagar
8/3/2019 sem 6 ppt
http://slidepdf.com/reader/full/sem-6-ppt 17/27
III Ceramic wall tiles,Himmatnagar IV Wall tiles,Dholka
Composite Marbles stone,Himmatnagar
In this more than 1600 employees, 4000Dealers and Sub dealers&18Depots.
16 Asian world show rooms like Chandigarh, New Delhi, andJaypur etc
Neon technology also used in Machine.
8/3/2019 sem 6 ppt
http://slidepdf.com/reader/full/sem-6-ppt 18/27
Hardware Requirement:-Min. 512 MB RAM
Pentiums and AMD processor
HDD 50 GB
Printer
2.4GHs Processor
Tools /Software Requirement:-
Windows2007
VB.NET2010
Mysql server
SoundDriver:-
Realtek or any other software.
8/3/2019 sem 6 ppt
http://slidepdf.com/reader/full/sem-6-ppt 19/27
8/3/2019 sem 6 ppt
http://slidepdf.com/reader/full/sem-6-ppt 20/27
Economic feasibility means that the projected benefit of
the proposed system outweigh the estimated costs ofusually considered the total cost of ownership.
We will give the software to the company at free cost. So,there is not any burden of buying system.
The organization does not having same system so it iscertainly required for purchase new hardware andsoftware for proposed system and company iseconomically able for it.
8/3/2019 sem 6 ppt
http://slidepdf.com/reader/full/sem-6-ppt 21/27
Operational feasibility that a proposed system will be used
effectively after it has been developed.
The management supports that project because our system is very useful to the company.
There is no risk because we think to company benefit thenwill be starting the new system and do not bed image to
the company.
8/3/2019 sem 6 ppt
http://slidepdf.com/reader/full/sem-6-ppt 22/27
Technical feasibility refers to the technical resources needed todevelop, purchase, install or operate the system.
At this time companies working totally manually. So, they haveto purchase all the required software and hardware.
The management is ready to accept the proposed system. Inproposed system company have to use and embedded system.
8/3/2019 sem 6 ppt
http://slidepdf.com/reader/full/sem-6-ppt 23/27
Schedule feasibility means that a project can be implementedin an acceptable time frame.
The company or its team control the factors because the newsystem will be implemented then use to the company.
Control the entire factor or any difficulty and affect theschedule feasibility.
8/3/2019 sem 6 ppt
http://slidepdf.com/reader/full/sem-6-ppt 24/27
8/3/2019 sem 6 ppt
http://slidepdf.com/reader/full/sem-6-ppt 25/27
8/3/2019 sem 6 ppt
http://slidepdf.com/reader/full/sem-6-ppt 26/27
8/3/2019 sem 6 ppt
http://slidepdf.com/reader/full/sem-6-ppt 27/27
M
1
1
M
1
1 M M
M
M
1