Selfsufficient Settlement

22
1 Self-sufficient residential area Integrated Environment Protection Concept www.muenchgroup.com www.ecologic-architecture.org/main

description

To serve the human, and to built up a cultural landscape in the global dynamic equilibrium.

Transcript of Selfsufficient Settlement

Page 1: Selfsufficient Settlement

1

Self-sufficient residential areaIntegrated Environment Protection Concept

www.muenchgroup.comwww.ecologic-architecture.org/main

Page 2: Selfsufficient Settlement

2

A building that

● for a long time and● without major changes● with low environmental impact● intense● economic and● is used with great advantages for all stakeholders,

is ecologically worthwhile.

All of our activities, we should ask again and again on this foundation, because otherwise we lose because of blindness about details the most important task of building:

To serve the human, and to built up a cultural landscape in the global dynamic equilibrium.

Page 3: Selfsufficient Settlement

3

The Concept Energetic self-sufficient Settlement: Renewable Energy and

Waste-to-Energy as sources combined covers demand of electricity, heating and cooling – in countries with more than 2.000 hours of sun per year a surplus of energy can be produced.

Waste Utilization: Recycling of raw materials, energetic utilization based on gasification and solarthermal wastewater evaporation

Prefabricated Houses: Optimized passive-house architecture combined with the advantages of pre-fabrication leads to high-quality and economically pricing

Urban Structure: Ultimately, the task of a city is to supply essential requirements such as housing, employment, food and recreation. A balanced planning process is necessary

Page 4: Selfsufficient Settlement

4

Self-sufficient energy supplyfrom solar thermal energy with combined and intergrated waste-to-energy concept for a residential allotment

There are four components in this operation:● Solarthermal production of heat for:

– production of electricity– evaporation of domestic sludge

● Production of electricity from heat of burning dried solid content of domestic sludge● Gasification of municipality waste and production of:

– electricity– process heat– light fuel– clean water– different raw materials

• Solar climatisation of residential buildings (solar heating/cooling)

All components are connected and synchronized to ensure the efficiency and uninterruptibility of the energy production.

Page 5: Selfsufficient Settlement

5

Listing of processable waste

The processing technology for thermal waste disposal, including the production of fuel, electricity and thermal energy is applicable to a wide range of waste material, including:

● Municipal waste● Hazardous waste● Sewage sludge of wastewater treatment plants● Agricultural waste (biomass)● Rubber waste● Chemical waste● Waste of electronic industry● Plastics● etc.

Page 6: Selfsufficient Settlement

6

Construction design

Page 7: Selfsufficient Settlement

7

Legend (System components) :

1: EPU waste gasification plant for solid municipality waste

2: Evaporation of urban sewage sludge

3: Solar thermal collector box,

4a: burner for process and synthetic gas from Gasifikation and landfill gas and vaporizer

4b: Burners for dry matter from sewage sludge and evaporator

5a 5b: GE Global Engine system to generate electricity

6: Power supply

7: depot for purified water

: Heatexchanger for heating/cooling system for residential allotment

Construction design

Page 8: Selfsufficient Settlement

8

Sample calculation

of self-sufficient energy supply with combined and intergrated waste-to-energy concept for a residential allotment with 35.000 houses

It is assumed, that every household consumes 4 kW electricity per hour

The consumption of airconditioning is not counted, because the buildings are cooled solar.

Consumption is calculated for a 4-person household per unit.

DemandElectricity

Residential allotment 35.000 houses to 200 qm to 4.500kWh

Total demand electricity 157.500.000 kWh

Overall performace demand 18 MW

Page 9: Selfsufficient Settlement

9

Calculation of wasteMunicipality waste

Waste per day 140.000 Inhabitants 520 kg/year 199 to/day

pot. electric energy 5 MW

pot. therm. energy 5 MW

Wastewater 125 ltr/day 17.500m3/day

4% sol id content 700 to/day

pot. electric energy 15MW

pot. therm. energy 15MW

Sample calculation

Page 10: Selfsufficient Settlement

10

OutputElectricity 20MW

Heat 20MW

clean water 6.000.000m3

Fuel depending on composition of waste

Raw materials depending on composition of waste

Investment incl. installation of solar heating/cooling systemTotal 490.000.000€

per house per sqm

14.000 € (avaraged) 70 € (avaraged)

Saving (no heating/cooling equipment) 3.000 € (avaraged) 15 € (avaraged)

net Invest 11.000 € (avaraged) 57 € (avaraged)

Sample calculation

Page 11: Selfsufficient Settlement

11

The Houses

Our goal is it to convert the optimal connection of ecological and economic aspects as well as of functionality and architectural organization with construction of buildings. Consistently we set for the realization of our projects on our economical construction system. With a large attention we observed and converted world wide construction trends by us. By using the newest construction and building technologies we are always „up to date“.

Framework construction - for a pleasant indoor climate

The timber frame construction, in America, Scandinavia and Western Europe and in Germany has long been proven successful for over 10 years, is an efficient network system.

It is in the range of cost-saving construction and proven surface, a special design principle. This is in accordance with the recommendations of the German federal government worked Carpenters (BDZ).

The supporting elements are made of solid timber. The structural reinforcement of the Ge-edifice is the cladding of external walls, roof and ceilings with wood based panel achieved with quality verified OSB.

Page 12: Selfsufficient Settlement

12

Sample outside wall

Page 13: Selfsufficient Settlement

13

Sample construction phases

Page 14: Selfsufficient Settlement

14

Sample houses

Page 15: Selfsufficient Settlement

15

Pricing houses

Prefabricated houses can be designed in nearly every architectural style.

To include in a project waste utilization a minimum number of 15.000 houses is needed to make it feasible, because a waste treatment plant is modular and the smallest unit utilizes 100 to of waste per day.

Depending on style, equipment, etc. turnkey prices for e.g. 190 sqm houses of such a project start at about 89.000 - 94.000 €.

Taking in consideration that there will be no energy costs at all for lifetime of the houses and all waste handling is included, the real feasibility and advantages are obvious.

Additional profit because of e.g. surplus production of energy have to be calculated depending on given projects.

Page 16: Selfsufficient Settlement

16

The Opportunity

Climate change due to CO2 emissions, the oil’s high price and its nature of limited resource make up the case for Renewable Energies as strategic investments for institutional investors and governments.

Climate change is forcing governments worldwide to establish legal frameworks, such as the Law on Renewable Energy in Germany and other European countries, or current laws being approved in Canada.

Opportunities also arise in Waste to Energy from the harmonization trend within the EU regarding environmental requirements and the development of the East European countries.

Page 17: Selfsufficient Settlement

17

Philosophy

muench group’s philosophy is the identification of problems and the proposal of solutions

muench group focuses on developing and implementing projects to solve particular problems and utilizing the best technical and economical solution available

Helping clients to meet Kyoto protocol’s objectives Multidisciplinary approach

Page 18: Selfsufficient Settlement

18

Technology

The company has secured preferential technology rights, access to patents and commercialisation rights for several technologies

Major progress has already been made in negotiating co-operation rights and business alliances with other engineering companies, general constructors, technology providers, facility operators and other companies

Other patents and products under study lead to the expansion of in-house proprietary technology. Further subsidies can be obtained for utilizing new technologies in projects.

Proprietary technology can also be exported via technology transfer services.

Page 19: Selfsufficient Settlement

19

Project Development: Renewable energy

Solar Thermal Power Plants with special designed collectors producing temperatures up to 400° C and more

Biomass Power Plants with different gasification technologies patents in combination with Global Engine, Organic Rankine Cycle or Kalina Cycle, which lead to the maximum possible energy efficiency.

Geothermal Power Plants with Global Engine and Kalina Cycle, which provide a higher yield than any other known power generation technology with low thermal water temperatures.

Combinations of Technologies depending on project and geographical/climatical circumstances

Page 20: Selfsufficient Settlement

20

Project Development: Recycling, W2E,..

Waste to Energy Plants with different gasification / pyrolisis technologies patents in combination with Global Engine, which lead to the maximum possible energy efficiency.

Gas, water and soil cleaning systems Tyre Recycling plants Plastic to Diesel

Page 21: Selfsufficient Settlement

21

Project Development: Ecological Architecture

Passivehouse and zeroenergy/plusenergy house concepts combined with urban structure development

Production lines for prefabricated houses developed as zero-energy factories

Page 22: Selfsufficient Settlement

22

Karl H. Muench (CEO)TR-35540 Çiğli – İzmir

Tel: +90 232 324 80 61 mobil: +90 538 594 86 89

eMail: [email protected]

Further technical informations available at:

www.muenchgroup.comwww.ecologic-architecture.org/main

If you have any questions, don't hesitate to contact us!