Section 5 : Terms of Reference 48 Section 5: Terms of Reference (TOR) 1. Background: Nganglam Drungkhag under Pemagatshel Dzongkhag has 3 Geogs namely Norbugang (442 HH), Chhokorling (256 HH) and Dechheling (513 HH). The total population of Nganglam is around 14,117. Its elevation ranges from 200m to 2200m and the climate varies from sub- tropical to cool temperate. The major existing government, corporate and private infrastructures and facilities in Nganglam include, but not limited to, Drungkhag Administration, BHU Grade I, RBA, RBP, Middle Secondary School, RNR Range Office, Helipad, Dungsam Cement Corporation Limited, Bhutan Telecom, Druk Satair Quarry, Bhutan Post, RICB, Bhutan Oil Distributor, Dungsam Polymers and Druk Gypsum. Nganglam is strategically located in the Eastern Bhutan in terms of its distance to the 6 Eastern Districts. With the completion of the construction of the following road networks, Nganglam would be within a day’s drive to the 6 Eastern Districts. Nganglam-Dewathang (75 km), Nganglam-Gyalpoizhing (74 km),Nganglam-Panbang (55 km), Nganglam- Pemagatshel (120 km) and Nganglam is close to the Indian market, namely Partshala and Potali which are 48 km and 38 km away, respectively. To facilitate trade and commerce, there is a proposal from the Indian side to connect Potali by railway. This connectivity would not only further reinforce Nganglam’s access to Indian market, but it would also enhance its access to Bangladesh. As Nganglam is strategically located and within a day’s reach to the six Eastern Districts and part of central Bhutan and also because of its proximity to the India and Bangladesh, there is a high potential in setting up a dry-port to clear customs and store in-coming and out- going goods. Such facility would facilitate and promote trade and commerce in the Eastern Bhutan, in particular. The existence of large stretch of cultivable land and favorable sub- tropical climate to produce pineapple, passion fruit, mandarin, banana, and sugarcane on a large scale and Nganglam’s close proximity to India and Bangladesh demonstrate the commercial viability of agro- business in Nganglam. Further, Nganglam can also source such agro-based raw materials from Monggar which produces them in large quantity. A large stretch of government land in Rinchenthang, Nganglam suitable for Regional Hub development overlaps with Biological Corridor (BC-5), which is critical for the free movement of animals between Royal Manas National Park (RMNP) and Khaling Wildlife Sanctuary (KWS). Rinchenthang was also earmarked for new Nganglam Township for which Local Area Plan (LAP) was prepared and two water distribution tanks with capacity to supply water to 50,000 people were constructed. Prior to the preparation of Regional Hub development plan in Nganglam, it is immensely essential to have details topographical datasets. Therefore, the Department of Human Settlement (DHS) intends to carry out detailed topographical survey (ground survey) using total station for the proposed study area. 2. Descriptions of the proposed Survey Area: The total area identified to conduct topographical survey is about 1236.00 Acre (5.0 Sq.Km). It consists of about 60% forest coverage mostly with shrubs and bushes. The proposed survey boundary starts from Bypass Road (under construction) in the South- East, following the Biological Corridor till it reaches Nganglam-Partsala existing road.

Transcript of Section 5: Terms of Reference (TOR) ·  · 2014-11-27Section 5 : Terms of Reference 48 Section 5:...

Section 5 : Terms of Reference

48

Section 5: Terms of Reference (TOR)

1. Background:

Nganglam Drungkhag under Pemagatshel Dzongkhag has 3 Geogs namely Norbugang (442 HH), Chhokorling (256 HH) and Dechheling (513 HH). The total population of Nganglam is around 14,117. Its elevation ranges from 200m to 2200m and the climate varies from sub- tropical to cool temperate.

The major existing government, corporate and private infrastructures and facilities in Nganglam include, but not limited to, Drungkhag Administration, BHU Grade I, RBA, RBP, Middle Secondary School, RNR Range Office, Helipad, Dungsam Cement Corporation Limited, Bhutan Telecom, Druk Satair Quarry, Bhutan Post, RICB, Bhutan Oil Distributor, Dungsam Polymers and Druk Gypsum.

Nganglam is strategically located in the Eastern Bhutan in terms of its distance to the 6 Eastern Districts. With the completion of the construction of the following road networks, Nganglam would be within a day’s drive to the 6 Eastern Districts. Nganglam-Dewathang (75 km), Nganglam-Gyalpoizhing (74 km),Nganglam-Panbang (55 km), Nganglam-Pemagatshel (120 km) and Nganglam is close to the Indian market, namely Partshala and Potali which are 48 km and 38 km away, respectively. To facilitate trade and commerce, there is a proposal from the Indian side to connect Potali by railway. This connectivity would not only further reinforce Nganglam’s access to Indian market, but it would also enhance its access to Bangladesh.

As Nganglam is strategically located and within a day’s reach to the six Eastern Districts and part of central Bhutan and also because of its proximity to the India and Bangladesh, there is a high potential in setting up a dry-port to clear customs and store in-coming and out- going goods. Such facility would facilitate and promote trade and commerce in the Eastern Bhutan, in particular.

The existence of large stretch of cultivable land and favorable sub- tropical climate to produce pineapple, passion fruit, mandarin, banana, and sugarcane on a large scale and Nganglam’s close proximity to India and Bangladesh demonstrate the commercial viability of agro- business in Nganglam. Further, Nganglam can also source such agro-based raw materials from Monggar which produces them in large quantity.

A large stretch of government land in Rinchenthang, Nganglam suitable for Regional Hub development overlaps with Biological Corridor (BC-5), which is critical for the free movement of animals between Royal Manas National Park (RMNP) and Khaling Wildlife Sanctuary (KWS). Rinchenthang was also earmarked for new Nganglam Township for which Local Area Plan (LAP) was prepared and two water distribution tanks with capacity to supply water to 50,000 people were constructed.

Prior to the preparation of Regional Hub development plan in Nganglam, it is immensely essential to have details topographical datasets. Therefore, the Department of Human Settlement (DHS) intends to carry out detailed topographical survey (ground survey) using total station for the proposed study area. 2. Descriptions of the proposed Survey Area:

The total area identified to conduct topographical survey is about 1236.00 Acre (≈ 5.0 Sq.Km). It consists of about 60% forest coverage mostly with shrubs and bushes. The proposed survey boundary starts from Bypass Road (under construction) in the South-East, following the Biological Corridor till it reaches Nganglam-Partsala existing road.

Section 5 : Terms of Reference

49

Follows along the road and crosses the streams below Jazama. It follows along the existing access road leading to Tangzema. Connects to stream(west of Tangzema), follows along the stream covering all the settlement of Tangzema. It joins in the confluence of streams above Sa-tsalo. Follows above Sa-tsalo settlement and connects to Nganglam Lower Secondary School till it reaches to Dungkhag Guest House and covers all the existing town and crosses Kirung Ri in the North. From North, it covers Higher Secondary School and follows along forest boundary till it reaches to the centre of existing town and follows along the Nganglam-Deothang proposed highway (under construction) and covers RBA campus in the East. It follows along the thick forest above Jazama and connects to Nganglam-Partsala road and covers the settlement above the road and follows along the existing road till it reaches to Bypass road (under construction) in the South East.

For details , refer the image map (Reference Map-1) for the proposed survey area. 3. Objectives:

To carryout topographic survey for the area identified for Regional Development to facilitate preparation of Development Plan of Regional Hub of Nganglam. The assignment includes, i) establishment of permanent ground control points and ii) Detail topographic survey (as per scope of the work with the scale 1: 1000)

4. Scope of Work:

The scope of the work of the survey includes the following:

4.1. Control Points. Establishment of bench mark (horizontal and vertical control points) on the ground at strategic locations to carry out detailed survey.

Sufficient permanent control points must be constructed at strategic places and coordinated both horizontally and vertically.

Control points should be established evenly/uniformly throughout the survey area. If the control points are established using GPS, survey stations should have inter visibility at least between two control points.

The coordinates system shall be based on National Reference System (Drukref Local Coordinate System)

The accuracy of the control points should be of secondary/tertiary level accuracy.

The structure of the survey stations should be as per the requirement of the client.

Upon completion of ground control survey, a report consisting of description of the station and coordinates (X, Y, Z) and traverse /control network maps should be submitted to the procuring agency along with the inception report before starting the detail survey. The detail survey should commence only upon mutual acceptance of the accuracy of the control point.

4.2. Detailed Survey.

All notable physical features both man-made and natural which shall be, but not limited to, buildings, monuments, burial grounds, cremation grounds, places of worship, posts,

Section 5 : Terms of Reference 50

pipelines, existing roads and stream/ river/ canal crossings, cross-drainage structures, septic tanks, manholes etc. which are found on the ground should be surveyed.

4.3. Contour Survey.

Contour survey must be carried out in consideration to finally generate a map/data with contour interval of 1 meter. The spot heights should also be picked up as to incorporate any elevation variation of 1meter on the ground considering Bank Top and Bank Toe (bunds). Spot heights should also be given at a grid mesh of 5-10M depending upon the terrain but wherever there is change of elevation of the ground, spot heights should be taken to indicate it.

4.4. Instruments and software requirement

Precise GPS instruments shall be used for the control points if NLC’s control points do not exist on the ground. Total station with angular accuracy of 2”/3” and distance accuracy of 1.5 mm+2 ppm should be used for the detailed survey. LISCAD and AutoCAD Software of compatible versions shall be used for data processing.

4.5. Work Process

Control points should be established within the survey area with the accuracy of secondary/tertiary level control points by means of traverse using the control points. Upon completion of the provision of the control point, the detail survey should be carried out.

The data editing should be carried out daily basis in LISCAD See file and update regularly in the field.

Upon completion of the detail survey, the data set should be finally edited in LISCAD See file and export to AutoCAD drawing. The final edited survey data/map should be delivered both in LISCAD See. file and AutoCAD drawing with proper colour codes and layers.

The units of measure shall be in Metres unless specified.

The standard feature codes (Alpha) should be used for all the features.

5. Reporting and timing of the assignment:

The consultancy work is expected to be completed within 135 days, which includes 100 days field work and 35 days desk work. The consultant shall work closely with DHS officials.

The inception report should be submitted to DHS within Thirty (30) days after the start of the assignment. The inception report shall fully describe the work plan, methodologies and provide the list of equipment(s), hardware and software for completing both field work and desk work.

The draft report (3 colour hard copies printout topographic maps along with control & detailed survey report; and 1 soft copy of both control & detailed survey data and report)

Section 5 : Terms of Reference

51

should be submitted within 114 days of the commencement of the assignment. The consultant shall conduct half day / a daylong discussion to present the report to the Department of Human Settlement for comments. The comment from DHS and other stakeholders shall be incorporated in the final report.

The final report (3 colour hard copies printout topographic maps along with control & detailed survey report; and 1 soft copy of both control & detailed survey data and report) shall be submitted to DHS within 14 days after the receipt of the final comments from DHS and other stakeholders.

6. Support services to be provided by the client:

The following services and facilities will be provided by the Procuring Agency:

1) If available, the control points details shall be provided by DHS from NLCS.

2) Feature codes of DHS topographical survey shall be adopted for uniform standard. Refer TOR Annexure-1.

3) Assist the consulting firm to process for work & special route permit for foreign nationals in case if the firm hires expert(s) as its employee from outside Bhutan for special inputs that are not available with the national firm.

4) In order to conduct the study smoothly, the Procuring Agency will seek the concerned Dzongkhag's / Dungkhag's / Municipal's support to avoid any obstruction that impedes during the field works.

5) The counterpart staff of the Procuring Agency will monitor the quality and progress of work time to time, verify the invoices, conducting meetings, discussions, arrangement of final presentation etc.

The consultant shall work closely with DHS and where necessary with relevant Dzongkhag officials. The client may also, at its discretion, consider fielding of its representative to accompany the consultant’s study team during field work upon receipt of written request from the consultant. However, the responsibility of completing the assignment successfully will lie solely with the consultant.

7. Final Deliverables

The Survey Data shall be submitted in Soft Copy and all the Printed Maps along Survey Report shall be in a good quality paper. The final delivery shall be as per the table below:

Sl .No. Descriptions Quantity

1 Detailed Control Survey Report (both soft and hard copies) 3 - Hard Copies 1 - Soft Copy

2 Digital Copy of Topographic Datasets (in both LISCAD see file format and AutoCAD drawing format)

1- Soft Copy

3 Printout Copy of Topographical Map in a required paper size to fit all details with clear and legible )

3 - Hard Copies

4 Detailed Survey Report 3 - Hard Copies

Section 5 : Terms of Reference 52

8. Qualification & Experience:

Key Experts:

As mentioned under ITC Clause 11.4(a), Joint Venture (JV) / Consortium / Association with International firms shall not be permitted. However, if there is need of special inputs that are not available in the local market, the firm can hire individuals from India as employee. It is to be noted that, hiring external expert(s)/consultant(s) as employee(s) from other countries other than Bhutan or India will be not be permitted. This is as per the letter received from GNHC vide letter no. GNHC/DCD/GoI-General/2818 dated 16th September, 2014 as the fund for this project is under Government of India's Project-tied Assistance. All the experts who have a crucial role in implementing the contract are referred to as key experts and detail profiles of these key experts required for this assignment are given below. Overall, the Consulting Firm shall provide a suitably qualified team to carry out the detailed surveying.

The firm shall appoint a Survey Team Leader who shall be responsible for management and co-ordination of all project activities. The following key personnel are considered to be essential for the proper execution of the assignment:

Sl. No.

Experts Qualifications / Experiences Tasks / Responsibilities

1

Survey Engineer / Team Leader (1 No.)

Bachelors Degree with 500 Survey Engineering with above 4 years of professional experience in the relevant field (topographic surveying).

OR

Diploma (400 Surveying Course) with above 7 years of professional experience in the relevant field (topographic surveying).

Must be thoroughly familiar with all the large scale topographic procedures using GPS, Total Stations, Liscad softwares and AutoCAD.

Should have practical experience in carrying out topographic survey with a proven record of supervising, organizing, managing project preparation and executing topographic survey of towns / settlements.

Will function as the Team Leader.

Will be responsible for the implementation of all activities including timely completion.

Shall guide, supervise, coordinate and monitor the works of survey teams.

Provide protocols for dealing with public with regard to issues related to land.

Provide surveying backstopping on survey data editing and software usage with proper feature coding.

Review and edit the survey

data surveyed by field surveyors.

Prepare a final report and maps for submission to Client.

Section 5 : Terms of Reference

53

2

Field Surveyors (3 Nos.)

Diploma (400 surveying Level Course) with above 3 years of professional experience in large scale topographic surveying.

OR

Certificate (150 Surveying Course) with above 6 years of professional experience in the relevant field (topographical surveying).

Must be thoroughly familiar with all the large scale topographic procedures for any topography.

Should have thoroughly familiar with the usage of GPS, Total Stations, Liscad softwares and AutoCAD.

Rundown traverse for the densification of control points.

Collect the survey field data using total station.

Work closely with the team leader.

Edit data on daily basis.

Maintain field book for

daily field observations- instrument height, reflector’s height and any other related information should be noted.

3

Survey Field Assistants (3 Nos. Experience SFAs & 6 Temporary SFAs)

Minimum Class VIII with above 3

years of experience as Survey Field Assistant.

Must be thoroughly familiar with all the large scale topographic survey procedures of any topography.

Should have familiar in leveling

and handling of latest total stations.

Carry survey equipments to the site.

Carry the reflector poles during the field survey.

Make sure the continuity of the daily work without leaving any details.

Guide the Temporary Survey Field Assistants in handling survey equipments and carrying reflector poles during survey.

Besides above key experts, if there are inputs or backstopping required in the consulting firm shall be identified by the firm and incorporate in the financial proposal. The task and responsibilities specified above are generic in nature and the experts will have to undertake all the activities required for them to complete the project as defined in the detail scope of work. Preference shall be given to experts having experiences in the Himalayan regions. The qualifications / experiences shall be supported by academic qualification and experience certificates (in English). Attested translations in English must be submitted along with the copy of original if the certificates are not in English. 9. Terms and Conditions of Payment:

As per SC Clause- 6.4.

Point Code Page 1 of 4

Code Group Elevation Contourable Symbol1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

32

33

34

BL BOUNDARY Yes YesBLDG BUILDING Yes YesBM BENCH-MARK Yes YesBNUT BETELNUT Yes YesBPLR BOUNDARY-PILLAR Yes YesBRGE BRIDGE Yes YesBWAL BOUNDARY-WALL Yes YesCHTN CHORTEN Yes YesCL CENTRELINE Yes YesCNUT COCONUT Yes YesCULT CULVERT Yes YesDEFAULT DEFAULT Yes YesDP DISTRUBUTION-POINT Yes YesDRN DRAINAGE Yes YesDWAY METALLED-ROAD Yes YesELP LAMPOST Yes YesEP ELECTRIC Yes YesES SPOT-LEVEL Yes YesFENC FENCE Yes YesFHYD FIRE-HYDRANT Yes YesFLAG FLAGPOLE Yes YesGATE GATE Yes YesGPIT GARBAGE-PIT Yes YesHUT HUT Yes YesIBP INDO-BHUTAN-BOUNDARY Yes YesKMP KILOMETRE-POST Yes YesMB MUNICIPAL-BOUNDARY Yes YesMH MANHOLE Yes YesMTWR MOBILE-TOWER Yes YesPATH FOOTPATH Yes YesPGRD PLAY-GROUND Yes YesPOND POND Yes YesPTRE PINE-TREE Yes YesPYLN

Descriptions BOUNDARY LINE

BUILDINGBENCH MARKBETEL NUTPLOT BOUNDARY PILLAR

BRIDGEBOUNDARY WALL

CHORTENROAD CENTRELINE

COCONUTCULVERTDEFAULTDISTRIBUTION POINT

DRAINDRIVE WAYPOLE & LIGHTELECTRIC POLESPOT LEVELFENCEFIRE HYDRANTFLAG POLEGATEGARBAGE PITHUTINDO-BHUTAN BDRY PILLAR

KILOMETRE POST

MUNICIPAL BOUNDARY

MANHOLEMOBILE TOWER

FOOTPATHPLAY GROUNDPONDPINE TREEPYLON PYLON Yes Yes

TOR Annexure-1:

Page 2 of 4

Code Description Group Elevation Contourable Symbol35

36

37

38

39

40

41

42

43

44

45

46

47

48

49

50

RET RETAINING WALL RETAINING-WALL Yes YesRIVR RIVER EDGE RIVER Yes YesSEMP SEMI PERMANENT HOUSE SEMI-PERMANENT-HOUSE Yes YesSEPT SEPTIC TANK SEPTIC-TANK Yes YesSHED SHED SHED Yes YesSTN INSTRUMENT STATION SURVEY Yes YesSTRM STREAM STREAM Yes YesTAP WATER TAP WATER-TAP Yes YesTOE BANK TOE BANKTOE Yes YesTOP BANKTOP BANK TOP Yes YesTPOL TELEPHONE POLE TELEPHONE-POLE Yes YesTREE TREE TREE Yes YesTTWR TELEPHONE TOWER TELEPHONE-TOWER Yes YesUMRD UNMTALLED ROAD UNMETALLED-ROAD Yes YesWM WATER METER WATE-METER Yes YesWTK WATER TANK WATER TANK Yes Yes

Point Code

Line Codes Page 3 of 4

Code Stringable Description Group Breakline Line Style

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

32

33

34

BL Yes BOUNDARY LINE BOUNDARY NoBLDG Yes BUILDING BUILDING NoBM No BENCH-MARK NoBNUT No BETEL NUT BETELNUT YesBPLR Yes PLOT BOUNDARY PILLAR BOUNDARY-PILLAR YesBRGE Yes BRIDGE EDGE BRIDGE NoBWAL Yes BOUNDARY WALL BOUNDARY-WALL NoCHTN Yes CHORTEN CHORTEN NoCL Yes ROAD CENTRELINE CENTRELINE NoCNUT Yes COCONUT YesCULT Yes CULVERT CULVERT NoDEFAULT Yes DEFAULT YesDP No DISTRUBUTION-POINT NoDRN Yes DRAIN DRAINAGE YesDWAY Yes DRIVEWAY METALLED-ROAD YesELP No LAMPOST NoEP No ELECTRIC LINE ELECTRIC-LINE NoES No SPOTLEVEL NoFENC Yes FENCE FENCE NoFHYD No WATER NoFLAG Yes FLAGPOLE YesGATE No GATE NoGPIT Yes GARBAGE PIT GARBAGE-PIT YesHUT Yes HUT HUT NoIBP Yes INDO-BHUTAN BDRY LINE INDO-BHUTAN-BOUNDARY NoKMP No KILOMETRE-POST NoMB Yes MUNICIPAL BOUNDARY MUNICIPAl-BOUNDARY YesMH Yes MANHOLE MANHOLE YesMTWR No MOBILE TOWER MOBILE-TOWER YesPATH Yes FOOTPATH FOOTPATH YesPGRD Yes PLAY GROUND PLAY-GROUND NoPOND Yes EDGE OF POND POND YesPTRE Yes PINE-TREE YesPYLN No PYLON PYLON No

Page 4 of 4

Code Stringable Description Group Breakline Line Style

35

36

37

38

39

40

41

42

43

44

45

46

47

48

49

50

RET Yes RETAINING WALL RETAINING_WALL YesRIVR Yes RIVER EDGE RIVER YesSEMP Yes SEMI PERMANENT HOUSE SEMI-PERMANENT-HOUSE YesSEPT Yes SEPTIC TANK SEPTIC TANK NoSHED Yes SHED SHED NoSTN No SURVEY NoSTRM Yes STREAM STREAM YesTAP Yes WATER-TAP YesTOE Yes TOE OF BANK BANKTOE YesTOP Yes TOP OF BANK BANK TOP YesTPOL Yes TELEPHONE LINE TELEPNONE-LINE NoTREE No TREE NoTTWR No TELEPHONE TOWER TELEPHONE-TOWER YesUMRD Yes UNMETALLED ROAD UNMETALLED-ROAD YesWM No WATER-METER NoWTK Yes WATER TANK WATER-TANK No

Line Codes