SEA Capacity Building at the World Bank
Fernando LoayzaSr. SEA Specialist
IAIA 27th Annual Conference Seoul, Korea
3 - 9 June 2007
Introduction Pilot Program on
institutions-centered SEA SEA Toolkit Training sessions Conclusion
Structure
SEA Pilot Program
Background Bank’s Environment Strategy &
OP/BP 8.60 ESW: Policy-based SEA (2005)
Policy is not a rational linear process Impacts vs. transmission mechanisms Key factors: political economy,
institutions and governance The OECD DAC Guidance calls for
harmonization but also for knowledge development
Objectives Assist in the implementation
of the Bank’s environment strategy and OP/BP 8.60
Promote learning, develop methods and techniques and test processes for institutions-centered SEA
Components
Grants: pilots in selected sectors, countries and regions
Analytical Work: methods and processes for effective I-SEA
Eligibility - Grants Potential to influence policy-based
or strategic program and plan loans Fully integrated into Bank’s projects Regional task managers lead SEAs Use methods and approaches
considered in the Bank’s analytical work and the OECD DAC Guidance
Analytical component
Draw lessons to test and refine existing approaches to I-SEA
Partner: SIDA’s SEA Help Desk (EEU – University of Gothenburg)
Pilot SEAs (I) 1 pilot completed:
Kenya Forest SEA 3 pilots in implementation:
Sierra Leone Mining SESA Dhaka Urban Development Plans
SEA Hubei-China Road Transport Plans
SEA
Pilot SEAs (II) 2 pilots in preparation:
Pakistan National Trade Corridor SEPSA
Pakistan Mining SESA 1 pilot in identification:
West Africa Minerals Sector SA (regional – multicountry SEA)
Expected outcomes 7 – 9 completed SEAs A book Analytical reports and ESNs Training materials Workshop on Policy SEA Enhanced capacity for SEA in
the Bank and client countries
Duration and budget
Four years: FY06 – FY09 Pilot SEAs completed by the
end of 2008 Budget: US$ 2.5 million
(excluding Bank budget)
SEA toolkit
http://www.worldbank.org/seatoolkit
Objective Support task managers and
environmental and sector specialists to prepare and implement SEAs
When an SEA should be used? Which type of SEA is appropriate? What are the key elements in
formulating effective SEAs? Provide good practices or examples for
designing and implementing SEAs
Content Basic information (concepts and
approaches) More than 40 links to relevant SEA websites 12 workshops and 11 publications at the World
Bank Sector specific documents and links
21sectors 20 handbooks, manuals and guidelines More than 120 SEA reports and summaries
Tools 6 sample ToRs (5 on I-SEA) 23 analytical, descriptive and participatory
techniques The World Bank SEA Toolkit is The World Bank SEA Toolkit is
an SEA library at your fingertips.an SEA library at your fingertips.
What’s new Section on tools which includes
Sample Terms of Reference, and Analytical and participatory SEA
tools New layout to ease surfing
Menu boxes were added on the right side
Training sessions
Training At least two training sessions are
conducted per year: Sector weeks: water, energy, transport,
forestry 5 hours sessions comprising three modules
(basic concepts, case studies, hands-on exercise)
Results: Around 100 bank personal (task managers,
sector and environmental specialists) and consultants have been trained
Training material available in the Bank’s sea website
SEA capacity building in the Bank is supported on two pillars
Knowledge generation through the pilot program on institutions-centered SEA
Knowledge dissemination through the web based toolkit, training sessions and cross-support
Initial results near 2 years of implementation Mining is embracing SEA for sector structural
reform Pilots with high potential in urban development
planning and large and complex transport programs
More than 1500 visitors to the SEA toolkit
Conclusion
Thanks foryour
attention