SDLC Agenda (sample)
-
Upload
margaret-dischler -
Category
Business
-
view
141 -
download
4
description
Transcript of SDLC Agenda (sample)
Today’s Agenda
• Breakfast
• Agenda Overview
• Review SDLC “Mission Statement”
• Are We Ready? Brief Updates
• Work Stream Detail Reviews
• TouchPoint Wrap-Up
• Plan Next Steps/Future Considerations
"To develop a repeatable and consistent process for the System Development Life Cycle (SDLC) for COIS to better meet the business needs of our clients through the quality of the deliverable and through quality of communication between our clients and
us and among ourselves."
COIS SDLCMission
Statement
Work Stream I - Project Management
Work Stream II - Process
Work Stream III - Data
Work Stream IV - Network/Technology
Are We Ready?Brief Updates
Per Work Stream, share Written Materials for examples and general definitions for each deliverable
Guide members through material slowly
Give quiet time to read/digest material as needed
Allow members to discuss TouchPoints
Reach agreement on items to include in final SDLC draft
Table items that need further investigation or a separate meeting
Work Stream Detail Review
Process
Review all TouchPoints™ discussed
Note those that have been resolved
Note those that have not yet been resolved
If time, explore these TouchPoints again for inconsistencies and see if they can be resolved
For those that have not been resolved, develop an action plan to resolve them
TouchPoint™ Wrap-Up
There is a dependency between the Process Decomposition category under the Process workstream and the Conceptual Model (formerly the E/R diagram) under the Data workstream (the former drives the latter).
Training--there has been a wide range of discussion across groups as to where training belongs. (I am documenting meeting notes from the tapes right now & will get back to you with further details on this. There was extensive discussion on this in the large meeting and some additional discussion in the Network/Technology smaller meeting. Suggestions for new deliverable names also emerged from both discussions.).
There was some discussion about potential overlap between the System Test Protocols under Process and the Test Plan under Network/Technology.
TouchPoints™ Were These Mentioned?