Main Distribution Frame aka MDF single port faceplate: (1) phone
Intermediate Distribution Frame aka IDF single port faceplate: (1) data
office & amenity area IDF two port faceplate: video & data
underground conduit three port faceplate: phone & data
above ground conduit four port faceplate: data
fiber optic cable apartment distribution panel aka JBOX
pull-box or hand-hole flush to grade 125v 15 amp duplex receptacle
24” x 24” ceiling fire-rated hatch 240v 15 amp duplex receptacle
Prewire Wi-Fi access point busbar bonded to electrical service ground
MDF
Wi-Fi
IDF
office/amenity
ADP
D DD D
DV
D
pb
hatch
P
PD D
120v
240v
busbar
TitlePage
VVD.a1
February 10, 2017
Springtown Endeavor Voice Video Data
© 2016 RealPage, Inc. All trademarks and copyrights are properties of their respective owners
VVD.a Title Page
VVD.b Table of Contents
VVD.c Project Information
VVD.d General Requirements
VVD.e Site Pathways
VVD.f Closet Elevations
VVD.g Office & Amenity layouts
VVD.h Unit Wiring layout
VVD.i Network Requirements
Table of Contents
VVD.b1
February 10, 2017
SITE
S IN
TERST
ATE
35
CS
COVER SHEET
CONTACT: NELSON CROWE III
PROJECT CONTACT: CHRISTOPHER CAMPOMANES
ENDEAVOR REAL ESTATE GROUP
PHONE: 512-682-5500
OWNER:
ARCHITECT:
PRINT RECORD
HUMPHREYS & PARTNERS ARCHITECTS, L.C.C.
INTERIORS CONTRACTOR GOVERNMENT
REASON
REVISION RECORDDATE
VICINITY MAP
EMAIL: [email protected]
EMAIL: [email protected]
A.O.R.: JAMES RYAN MCLEAN, RA, NCARB, CDT
CITY OF SAN MARCOS
JRM
HPAD
DEVELOPMENT SERVICES - PERMIT CENTER630 E. HOPKINS
SAN MARCOS, TX 78666PHONE: 512-393-8000
5339 ALPHA ROAD, SUITE 250DALLAS, TX 75240
PHONE: 972-596-1700
ACCESSIBILITYMEPSTRUCTURAL LANDSCAPE
SAN MARCOS, TX
TELECOMMUNICATIONS
CONTACT: ABBY CASEYEMAIL: [email protected]
PE SERVICES
8350 NORTH CENTRAL EXPWYSUITE M-2175
DALLAS, TX 75026PHONE: 513-836-3810
CONTACT: AJ MEYEREMAIL: [email protected]
CONTACT: STEVE VAN PATTENEMAIL: [email protected]
DALLAS - NEWPORT BEACH - NEW ORLEANS
(972) 701-9636 (972) 701-9639
5339 ALPHA ROAD STE 300 DALLAS, TEXAS 75240
500 WEST 5TH STREET, SUITE 700 | AUSTIN, TX 78701
ORLANDO - SAN RAMON - SCOTTSDALE
TEXAS STATE UNIVERSITY
CONTACT: MAURILIO RICO R.
HPLA
EMAIL: [email protected]
5339 ALPHA ROAD, Suite 300DALLAS, TX 75240
PHONE: 214-269-5150
CIVIL
CONTACT: HARRISON HUDSONEMAIL: [email protected]
10814 JOLLYVILLE ROAD, AVALLON IV, SUITE 300AUSTIN, TX 78759
PHONE: 512-418-4534
KIMLEY-HORN XXXXXX
XXXXXXXXXXX
XXXXXXX
CONTACT: XXXXXXXEMAIL: XXXXXXXXXXX
SHEET CONTENTS:
Issue for Construction
Revisions:
Issue for Permit Application:
Architect of Record:
Drawn by:
Designed by:
Date Plotted:
#
SHEET NO.
Issue for Pricing / Bidding:
DATE COMMENTS
The architectural works depicted herein are thesole property of Humphreys & Partners Architects,L.P. and may not be constructed or used withoutits express written permission. No permission tomodify or reproduce any of the architecturalworks, including without limitation the constructionof any building, is expressed or should be impliedfrom delivery of preliminary drawings or unsealedconstruction drawings. Permission to constructthe building depicted in sealed constructiondrawings is expressly conditioned on the full andtimely payment of all fees otherwise dueHumphreys & Partners Architects, L.P. and, in theabsence of any written agreement to the contrary,is limited to a one-time use on the site indicatedon these plans.
© by Humphreys & PartnersArchitects, L.P.All Rights Reserved
2017
DE
SIG
N D
EV
ELO
PM
EN
T S
ET
16273
EN
DE
AV
OR
RE
SID
EN
TIA
L
SP
RIN
GTO
WN
EN
DE
AV
OR
SA
N M
AR
CO
S, T
X.
GLJ
RM
JAN 19 2017
DA
LLA
SC
HIC
AG
O
.
. NE
W O
RLE
AN
S
. NE
W Y
OR
KN
EW
PO
RT
BE
AC
HO
RLA
ND
OS
AN
RA
MO
N
.
. SC
OTT
SD
ALE
ED
MO
NTO
N
. TOR
ON
TOC
HE
NN
AI
DU
BA
I
.
. HA
NO
I
. MO
NTE
VID
EO
.. ww
w.h
umph
reys
.com
AR
CH
ITE
CTS
, L.
P.
HUMPHREYS &
PARTNERS
5339
ALP
HA
RO
AD
· SU
ITE
300 ·
DAL
LAS,
TEX
AS 75
240
(972
) 701
- 96
39 ·
(972
) 701
- 96
39 F
AX
These drawings are forpreliminary coordinationonly and not to be used
for regulatory approval orconstruction.
UNITED STRUCTURALCONSULTANTS, INC.
7676 HILLMONT ST. SUITE 191HOUSTON, TX 77040PHONE (713)9967915
CONTACT: ALAN BIRBECKEMAIL: [email protected]
01/19/17 DD SET
© 2016 RealPage, Inc. All trademarks and copyrights are properties of their respective owners
Site Info
VVD.c1
February 10, 2017
© 2016 RealPage, Inc. All trademarks and copyrights are properties of their respective owners
© 2016 RealPage, Inc. All trademarks and copyrights are properties of their respective owners
• Items that are not specified by the Scope of Work or the accompanying Drawings, but are required by local, state and federal authorities, or normally used and required for the system design to perform to specifications and system design intent, will be considered part of the Voice-Video-Data (VVD) Scope of Work & Layouts.
• The Low Voltage Contractor shall assist with General Contractor in ensuring that that fall under the responsibility of parties other than the Low Voltage Contractor are completed.
• Definitions• Low Voltage Contractor means the party who is contracted by the General Contractor to install detailed in the VVD Scope of Work & Layouts.• Facilities are that part of the wire, cable, and equipment on the premises that connects and delivers low voltage services from each provider’s off
premises network to the Point of Entry, usually at the Main Distribution Frame.• Point of Entry (POE) for the purposes of providing services to the premises is the single point where each provider’s Facilities interconnect with
the Distribution Plant (DP), usually at the Main Distribution Frame. • Main Distribution Frame (MDF) is the main distribution point for the site. The Facilities connect to the Distribution Plant in the MDF. • Distribution Plant (DP) is that part of the wire, cable, and equipment on the premises that delivers low voltage services from MDF to each
Intermediate Distribution Frame. Unless otherwise specified, the DP is provided and installed by the service provider(s).• Intermediate Distribution Frame (IDF) is an intermediate distribution point located throughout a multifamily building. The DP connects to the
Home-Run Wiring in the IDF. • Home-Run Wiring (HRW) is that part of the wire, cable, and equipment in each building that delivers low voltage services from the corresponding
IDF to the Apartment Distribution Panel in each unit. • Apartment Distribution Panel (ADP) is a centralized distribution point in each unit. The HRW connects to the Inside Wiring in the ADP. The ADP
is also commonly referred to as a junction box.• Inside Wiring (IW) is that part of the wire, cable, and equipment in each unit that delivers low voltage services from the ADP to each faceplate.
All IW shall be wired in a star configuration from the ADP to each faceplate.
General Requirements
VVD.d1
February 10, 2017
© 2016 RealPage, Inc. All trademarks and copyrights are properties of their respective owners
• All work will meet or exceed the requirements of all applicable statutes, ordinances, rules, codes, regulations, decisions, and orders of all local, state and federal authorities having jurisdiction over the construction of telecommunications cable systems, including, but not limited to, applicable building codes, fire codes, and regulations of the Occupational Safety and Health Administration and Federal Communications Commission.
• All work will meet or exceed the requirements of the 2017 National Electrical Code, other NFPA codes, and any then-current amendments or addenda thereto, including, but not limited to:
• NFPA 70 National Electrical Code 2017 Edition, Article 800• ”Communications Systems”• NFPA 70 National Electrical Code 2017 Edition, Article 200• ”Wiring and Protection”
• Except as otherwise specified in the Scope of Work, all work will meet or exceed the requirements of the ANSI/TIA/EIA telecommunications cabling standards and any then-current amendments or addenda thereto, including, but not limited to:
• ANSI/TIA/EIA-570-B • “Residential Telecommunications Infrastructure Standard” • ANSI/TIA/EIA-568-B.1 and addenda • ”Commercial Building Telecommunications Cabling Standard - Part 1: General Requirements”• ANSI/TIA/EIA-568-B.2 and addenda• ”Commercial Building Telecommunications Cabling Standard - Part 2: Balanced Twisted-Pair”• ANSI/TIA/EIA-568-B.3 and addenda• “Optical Fiber Cabling Components Standard” • ANSI/TIA/EIA-569-A and addenda• ”Commercial Building Standard for Telecommunications Pathways and Spaces”• ANSI/TIA/EIA-606-A and addenda• ”Administration Standard for Commercial Telecommunications Infrastructure”• ANSI/TIA/EIA-607-A and addenda• ”Commercial Building Grounding (Earthing) and Bonding Requirements for Telecommunications”
• All work will meet or exceed the safety requirements and certifications of Underwriters Laboratories Inc. (UL).
• Except as otherwise specified in the Scope of Work, all video cabling will be installed and terminated in accordance with the Society of Cable Telecommunications Engineers standards. General
Requirements
VVD.d2
February 10, 2017
© 2016 RealPage, Inc. All trademarks and copyrights are properties of their respective owners
• All wiring will be riser-rated at a minimum and plenum-rated in such spaces as required it by local, state or national code.
• All voice wiring will:• utilize 4-pair TIA Category 6 unshielded twisted copper cable.• not exceed 300 feet in total length.• be terminated at all IDF and MDF locations on 110 modular jack panels • be terminated at each faceplate on RJ-25c jacks wired to the USOC configuration.
• All video wiring will:• will utilize quad-shield 60% minimum braid Series 6 or Series 11 coaxial cable with a minimum manufacturer’s specification of 2 GHz.• will not exceed 125 feet if Series 6 cable or 175 feet if Series 11 cable is used. • be connectorized at all locations with a radial 360-degree crimp “F” connector using a radial taper compression tool. Hex crimp tools are prohibited. • be terminated in the ADP directly on a 1x6, two-way, 1 GHz, passive video splitter. “Pigtails” are prohibited unless specified.• be terminated at each faceplate on F-81 barrel connectors.
• All data wiring will:• utilize 4-Pair TIA Category 6 unshielded twisted copper cable. • not exceed 300 feet in total length.• be terminated at all IDF and MDF locations on 110 modular jack panels mounted to floor or wall equipment racks.• be terminated at each ADP on a 8-port Category 6 Network Module with (1) 12” patch cable.• be terminated at each faceplate on TIA RJ-45 jacks utilizing the TIA 568a standard configuration.
• All wiring for wireless access points will:• utilize 4-Pair TIA Category 6 unshielded twisted copper cable. • be terminated at all IDF and MDF locations on 110 modular jack panels mounted to floor or wall equipment racks.• be terminated on a standard RJ-45 modular plug utilizing the TIA 568a standard configuration with a 24” tail for the future installation of equipment. • At interior locations, RJ-45 modular plug shall be placed behind a low voltage pass through or blank plate. • At exterior locations the RJ-45 modular plug shall be placed inside an exterior rated box with a blank cover. Wherever possible, the exterior rated box
should be flush to the exterior wall and large enough to avoid damaging the cable.
• All fiber will:• utilize armored single mode with fiber management panels at each end.• utilize fusion splicing and tested to meet ANSI/TIA/EIA standards. • 4 strands will be terminated with SC/UPC connectors. • 2 strands will be terminated with SC/APC connectors.• additional strands will not be terminated.• have 24’ minimum slack cable at all cable ends after termination.
• All microduct will:• 12 MM microduct with drawstring
General Requirements
VVD.d3
February 10, 2017
© 2016 RealPage, Inc. All trademarks and copyrights are properties of their respective owners
• Apartment Distribution Panel will be:• RF Transparent w/vented door and lock.• 30” high x 14” wide x 3.5” deep. • Primex P3000, Leviton 49605-30W or equivalent.• located so that it is not on a fire-rated wall and does not interfere with planned closet poles or shelving. • mounted firmly between two studs so that it is flush with the outer finished surface of the surrounding wall with 1.5” minimum clearance all around the door• Bundled, webbed or jacketed hybrid cable assemblies may be used as long as the component cables and any outer jackets or sheaths of the assembly meet
the referenced requirements.
• A single-gang low voltage mounting ring will be installed during rough-in for each faceplate. Electrical boxes will not be used unless the faceplate is in a fire-rated wall.
• Whenever possible, the Low Voltage Contractor should organize the various cables, wires and fiber with the following color scheme:• Wired Data = Blue• Wireless Data = Green• Voice = White• Video = n/a
• All low voltage wiring and faceplates will be installed at least one stud bay apart from high voltage wiring. Unless there is supplemental shielding, the distance between low voltage and high voltage cables should exceed 4” except where they cross. Low voltage wiring will cross high voltage wiring at right angles with a 2” minimum separation.
• Protecting cabling from damage is the responsibility of the Low Voltage Contractor. The Low Voltage Contractor shall install nail plates where cabling passes through wall studs. Where steel framing is used, plastic bushings will be installed wherever cables pass through metal structural members. The cables will not touch any edges of metal framing.
• The Low Voltage Contractor shall secure and support all cabling at maximum 48” intervals using industry standard fastening methods that will not compress or deform the cables.
• Cable pulling and bend radius will not exceed the manufacturer’s maximum pulling tension recommendations for the cable being installed.
• All microduct and equivalent flexible pathways will be less than 200’, supported at the beginning and end of each bend or turn, maintain a minimum 12” bend radius, and have less than 10 bends or turns.
• Splicing or repair of cabling is not permitted. Any defective wiring, damaged cabling, or any cable or cable installation that does not meet these specifications, will be replaced. The Low Voltage Contractor shall replace the damaged cable at its expense, unless it is the result of gross negligence by another trade or unavoidable because of subsequent changes.
• During rough-in, sufficient extra cable tails will be left for termination. The ends of all rough-in cable in either the MDF or IDFs will be placed in a plastic bag after labeling to prevent damage. In the unit, the cable will be coiled inside the ADP and the panel opening covered with the included cardboard paint shield until the permanent locking cover is installed during trim-out.
• The Low Voltage Contractor is responsible for all fire-stopping, smoke seals, and/or assemblies. No flammable materials will be used to line a chase or hole. All fire-stopping materials will meet applicable guidelines, standards, codes, rules, and regulations.
• The Low Voltage Contractor is responsible for measuring the distance of all cable runs. The distances indicated by the accompanying Drawings or the Scope of Work are estimates.
• Unless otherwise specified, all wiring will be labeled and documented per ANSI/TIA/EIA-606, “Administration Standard for the Telecommunications Infrastructure for Commercial Buildings.
General Requirements
VVD.d4
February 10, 2017
© 2016 RealPage, Inc. All trademarks and copyrights are properties of their respective owners
• Voice Cable Testing• All voice wiring will be tested after installation by the Low Voltage Contractor. All cables will be tested for proper wire mapping, opens, shorts,
crossed and split pairs, and maximum cable length, as well as proper location and identification. Simple continuity testing is not an acceptable alternative, except during rough-in.
• Video Cable Testing• All video wiring will be tested after installation by the Low Voltage Contractor. All cables will be tested for continuity, maximum cable length, as
well as proper location and identification. Simple continuity testing is not an acceptable alternative, except during rough-in.
• Data Cable Testing• All data wiring will be tested after installation by the Low Voltage Contractor. All cables will be tested for proper wiremapping, opens, shorts,
crossed and split pairs, and maximum cable length, as well as proper location and identification. Simple continuity testing is not an acceptable alternative, except during rough-in.
• Fiber Testing• Single-mode fiber shall be tested at 1310nm and 1550nm in both directions, as well as proper location and identification. The cable attenuation
should be 1dB/km at both 1310nm and 1550nm for inside plant cables and .5dB/km at both 1310nm and 1550nm for outside plant cables.
• Test Documentation Requirements• The Low Voltage Contractor shall provide 3 sets of written and signed documentation certifying acceptable test results to the General
Contractor. If the signed documentation is not provided, the Low Voltage Contractor shall re-test at no charge.
General Requirements
VVD.d5
February 10, 2017
© 2016 RealPage, Inc. All trademarks and copyrights are properties of their respective owners
• Construction• All communications rooms will be constructed per the accompanying Drawings.• The walls of the communications rooms will be covered with ¾” plywood over any building materials required by code. The plywood will be 8’ high,
start at 6” AFF and will meet all national, state and local codes. • No piping, ductwork, mechanical equipment, or power cabling should pass through the equipment room.• Rooms must be dry, secure, have power & lighting, and have a ground bar present prior to installation of service provider cable and equipment.
• Secure Access/Lock Boxes• All doors will have a deadbolt style lock. Access will be restricted to authorized personnel.
• HVAC• The General Contractor shall provide sufficient HVAC or ventilation to maintain a temperature of 40-95 degrees Fahrenheit.
• The MDF require HVAC. The heat load averages 15,000 BTUs.• The Office and Amenity IDF(s) require HVAC. The heat load averages 15,000 BTUs.• If MDF and Office and Amenity IDF are combined, the combined average heat load is 25,000 BTUs. • Exterior IDF(s) serving only residential units require HVAC. The heat load averages 12,000 BTUs.• Interior IDF(s) serving only residential units and adjacent to conditioned space require forced ventilation with fan and thermostat.
• Lighting• The General Contractor shall provide at least one fluorescent ceiling fixture to provide sufficient lighting throughout the rooms.
• Electrical• Per the accompanying Drawings, the Electrical Contractor shall provide 20A 120V duplex outlet(s). Circuits shall be dedicated on a per provider
basis.
• Grounding• The Electrical Contractor shall install a solid copper grounding busbar with insulated standoffs in each room. The busbar will be bonded to the
building’s electrical service ground. • The Low Voltage Contractor shall attach all telecommunications equipment, frames, cabinets and voltage protectors that they install to the
busbar. However, the providers will attach their own equipment to the busbar
General Requirements
VVD.d6
February 10, 2017
© 2016 RealPage, Inc. All trademarks and copyrights are properties of their respective owners
General Contractor Low Voltage Contractor Provider 1 Notes
Room Build Out X
Power / Grounding / Lighting X
Door Lock X Room complete for providers will begin work
HVAC X
Conduits & Sleeves X
Equipment Racks X
Fiber rough-in X
Fiber terminate/test/label X
• Facilities and Distribution Plant Wiring• Voice Facilities and Distribution Plant Wiring
• The demarc(s) for VOICE service will be at the MDF. • The Low Voltage Contractor is responsible for all wiring and passive infrastructure beyond the demarc. The provider will install all active equipment.
• Data/Video Facilities and Distribution Plant Wiring• The demarc(s) for DATA service will be at the MDF. • The Low Voltage Contractor is responsible for all wiring and passive infrastructure beyond the demarc. The provider will install all active equipment.• The Low Voltage Contractor shall install the following per the VVD Scope of Work & Layouts:
• 7’ equipment rack for terminating and connecting all of the data wiring and fiber in the MDF and each IDF. The rack will be located within 6' of a power source.
• 12-strands of fiber as a continuous run from the MDF to each IDF including the Office and Amenity Area on the 2nd floor.
General Requirements
VVD.d7
February 10, 2017
© 2016 RealPage, Inc. All trademarks and copyrights are properties of their respective owners
General Contractor Low Voltage Contractor Provider 1 Notes
Equipment Racks X
Cat-6 Rough-In X
Cat-6 terminate/test/label X
RG-6 /RG-11 Rough-In X
RG-6 /RG-11 terminate/test/label X
• Home-run Wiring• The Low Voltage Contractor shall install the following per the VVD Scope of Work & Layouts:
• (1) video cable from the ADP in each unit to the corresponding IDF.• (1) data cable from the ADP to the corresponding IDF.• (1) data cable from the each unit ceiling wireless access point location thru the ADP to the IDF. Some units may have more than one access point.
• All wiring will be installed as directly as possible from the ADP to the IDF.
General Requirements
VVD.d8
February 10, 2017
© 2016 RealPage, Inc. All trademarks and copyrights are properties of their respective owners
• Inside Wiring• ADP
• The Low Voltage Contractor shall install the following per the VVD Scope of Work & Layouts:• an ADP with hinged door and lock. • a video splitter(s) to provide a connection for all IW to incoming video services.• a network module to provide a connection for all IW to incoming data/voice services.
• The Low Voltage Contractor shall place all modules and punch-downs in the upper 12” of the ADP. • The Low Voltage Contractor shall fill out and attach the IW label provided by the manufacturer indicating the IW layout in each unit.
• Wiring• The Low Voltage Contractor shall install the following per the VVD Scope of Work & Layouts:
• (1) video cable from the ADP to each video port on a faceplate. Some faceplates may have more than one video port• (1) data cable from the ADP to each data port on a faceplate. Some faceplates may have more than one data port. • The data cable for wireless access point is home-run back to the corresponding IDF.
• Looped through thru the ADP, but not terminated until IDF.
• All wiring will be installed as directly as possible from the faceplate to the ADP.
General Requirements
VVD.d9
February 10, 2017
© 2016 RealPage, Inc. All trademarks and copyrights are properties of their respective ownersGeneral Contractor Low Voltage
Contractor Provider #1 Notes:
ADP X
Electrical outlet(s) in ADP X
Network Data Module X
Video Splitter X
Device box / mud ring X
Cat-6 Rough-In X
Cat-6 terminate/test/label X
RG-6 /RG-11 Rough-In X
RG-6 /RG-11 terminate/test/label X
General Requirements
VVD.d10
February 10, 2017
© 2016 RealPage, Inc. All trademarks and copyrights are properties of their respective owners
• Office and Amenity Areas• Office and Amenity Areas IDF
• The Low Voltage Contractor shall install per the VVD Scope of Work & Layouts a 7’ high wall mounted rack that will house the incoming connections for voice, data, and video services and distribution of all low voltage services in the Office and Amenity Areas. The Low Voltage Contractor is responsible for proper wire management.
• Wiring• The Low Voltage Contractor shall install the following per the VVD Scope of Work & Layouts:
• (1) video cable from the IDF to each video port on a faceplate. Faceplates may have more than one video port• (1) data cable from the IDF to each data port on a faceplate. Faceplates may have more than one data port.• (1) voice cable from the IDF to each voice port on a faceplate. Faceplates may have more than one voice port.
• All wiring will be installed as directly as possible from the faceplate to the IDF. • Other “House” Requirements
• The Low Voltage Contractor shall install the following from the MDF:• Fire System(s): (1) phone cable from fire system(s) – exact location to be confirmed onsite.• Elevator(s): (1) phone cable from elevator system(s) – exact location to be confirmed onsite.• Pool Emergency Phone(s): (1) pool phone with heavy duty outdoor enclosure per the authority having jurisdiction and (1) phone – exact location to be
confirmed onsite.• Guest Telephone Entry(s): (1) data/phone cable from each guest telephone entry – exact location to be confirmed onsite.
• Tanning Rooms• The low voltage contractor shall install the following from the Office /Clubhouse Resource Room to each tanning room:
• Silver Satin 4 Conductor 26AWG Wire inside a 1” smurf pipe • http://www.allentel.com/store/en/allentel/bulk-flat-line-cable---1000-feet-satin-silver?selected
• At tanning bed/room, the Low Voltage Contractor should leave 10’ of tale of cable near the final location for the tanning bed.• At the Office/Clubhouse Resource Room, the Low Voltage Contractor shall install 4x4 (Double Gang or Quad) electrical box leaving a 2’ tail.
• Connection to Office and Amenity Areas IDF(s)• n/a
General Requirements
VVD.d11
February 10, 2017
© 2016 RealPage, Inc. All trademarks and copyrights are properties of their respective ownersGeneral Contractor Low Voltage
Contractor Provider #1 Notes:
Equipment Racks X
Power & Grounding X
Device box / mud ring X
Cat-6 Rough-In X
Cat-6 terminate/test/label X
RG-6 /RG-11 Rough-In X
RG-6 /RG-11 terminate/test/label X
Amenity Network equipment X
Office Network equipment Assistance Property Management
Office Phone System Assistance Property Management
Cross Connects As Required
General Requirements
VVD.d12
February 10, 2017
© 2016 RealPage, Inc. All trademarks and copyrights are properties of their respective owners
(4) 4” conduits
Exact POE TBD
36” x 36” traffic rated pull-box
(3) 4” conduits undergroundApartment Services(3) 4” conduits Retail
12” x 12” traffic rated pull-box
Site Pathways
VVD.e1
February 10, 2017
36”
36”
12”
(1) 2” conduit underground
12”
MDF
1/A4.16
1/A4.15
2/A
4.17
1/A
4.17
522'-1"
210'
-3"
212'
-3"
519'-10 1/2"
A1-ALT
A3.01
B2
A3.03
A1
A3.01
A1
A3.01
A1
A3.01
B1
A3.02
D2
A3.05
D1
A3.04
D1
A3.04
D1
A3.04
D1
A3.04
A1
A3.01
B1
A3.02
D2
A3.05
A1
A3.01
A1
A3.01
A1
A3.01
A1
A3.01
A1
A3.01
D1
A3.04
D1
A3.04
A1
A3.01
A1
A3.01
CLUBHOUSE
87'-7 1/2" 63'-1 1/2" 73'-5 1/2" 6'-6" 46'-1" 26'-3 1/2" 91'-2 1/2"
123'
-0"
4"61
'-7"
34'-1
"1"
20'-7
"1"
20'-7
"1"
34'-2
"1"
6'-3
"1"
9'-1
1"1"
75'-2
"
54'-6"1"52'-5"1"52'-5"6'-0"9'-11"1"52'-5"1"52'-5"1"54'-6" 2'-0"
2'-0
"
2'-0"
2'-0
"34
'-1"
6'-4
"9'
-10"
1"20
'-7"
20'-9
"20
'-7"
1"9'
-11"
5'-1
1"1"
130'
-3"
151'-7"
6'-0
"1"
9'-3
"6'
-3"
114'
-8"
6'-3
"1"
9'-1
1"1"
10'-11" 3'-9"
11'-10"2'-10"
3'-0
"
9'-0
"2'
-0"
191'-10"
1"20
'-7"
1"20
'-7"
20'-9
"12
'-10"
74'-1
1"
1"20
'-7"
1"20
'-7"
20'-9
"12
'-10"
74'-1
1"
1" 52'-5" 1" 20'-7" 1" 20'-7" 1" 20'-7" 1" 20'-7" 1" 52'-5" 2"
187'-10"
2'-0" 68'-6" 2'-0" 108'-4 1/2"
1B1A2
1A1B
1A2
2B
1A2
1A21C2
1A1A
1A
2B
1A2 1A2
1A
1A1A2
1C1C1C2
1B
2M
2L
2L
2A
2A2A2A
1A
1A1A
1A
2B
1C1C2
1C2
1A21A2
1A
1C21C
1C
1B2
1A
1B2
1C2
1C
1E
1C
1A
2B
2B
1A
1C
1A
2A
2A
2A
2A
1B
1C 1C2
1B
1B1B2
1B
1C21C1E1C2
1B
1C2
2B
2B2B
2B
2B
2B
1B2
1B2
1B
1C
1E
1C
1C
1E1C2
1C2
1B21B
1B 1B
1B2
26'-3 1/2" 26'-6 1/2" 25'-5 1/2" 25'-2 1/2" 25'-2 1/2" 25'-5 1/2" 32'-3" 29'-1 1/2"
1A
1A21A
1A2
1A1B2
1B1A
1A21B
1C
1B2
1B2
1A
1B
1B2
1B2
1B
1C2
1C
1B2
1B2
1B2
1B2
1C
1C2
1B
1B2
1B2
1C
1C
1C
1C2
2B
1C
1C2
1C
1C2
1B
1B
1B
1B
1B
1B2
1B
1B
1B
1B
1B
1B
1A
1A
1B
1B
1B
1A
1A
1B
1B
1A
1B
1B 1B
1A
1A
1A1A
1A 1A
1B
1B
1B 1B
1B
1B
1B
1A
1A
1A1B 1B 1B 1B
1B
2B
2B
2A
2A
2A
2A
A4.10
BLDG 1 FIRST FLOOROVERALL PLAN
BW
SCALE:1 1/16" = 1'-0"
BUILDING I FIRST FLOOR OVERALL PLANSHEET CONTENTS:
Issue for Construction
Revisions:
Issue for Permit Application:
Architect of Record:
Drawn by:
Designed by:
Date Plotted:
#
SHEET NO.
Issue for Pricing / Bidding:
DATE COMMENTS
The architectural works depicted herein are thesole property of Humphreys & Partners Architects,L.P. and may not be constructed or used withoutits express written permission. No permission tomodify or reproduce any of the architecturalworks, including without limitation the constructionof any building, is expressed or should be impliedfrom delivery of preliminary drawings or unsealedconstruction drawings. Permission to constructthe building depicted in sealed constructiondrawings is expressly conditioned on the full andtimely payment of all fees otherwise dueHumphreys & Partners Architects, L.P. and, in theabsence of any written agreement to the contrary,is limited to a one-time use on the site indicatedon these plans.
© by Humphreys & PartnersArchitects, L.P.All Rights Reserved
2017
DE
SIG
N D
EV
ELO
PM
EN
T S
ET
16273
EN
DE
AV
OR
RE
SID
EN
TIA
L
SP
RIN
GTO
WN
EN
DE
AV
OR
SA
N M
AR
CO
S, T
X.
GLJ
RM
JAN 19 2017
DA
LLA
SC
HIC
AG
O
.
. NE
W O
RLE
AN
S
. NE
W Y
OR
KN
EW
PO
RT
BE
AC
HO
RLA
ND
OS
AN
RA
MO
N
.
. SC
OTT
SD
ALE
ED
MO
NTO
N
. TOR
ON
TOC
HE
NN
AI
DU
BA
I
.
. HA
NO
I
. MO
NTE
VID
EO
.. ww
w.h
umph
reys
.com
AR
CH
ITE
CTS
, L.
P.
HUMPHREYS &
PARTNERS
5339
ALP
HA
RO
AD
· SU
ITE
300 ·
DAL
LAS,
TEX
AS 75
240
(972
) 701
- 96
39 ·
(972
) 701
- 96
39 F
AX
These drawings are forpreliminary coordinationonly and not to be used
for regulatory approval orconstruction.
© 2016 RealPage, Inc. All trademarks and copyrights are properties of their respective owners
Site Pathways
VVD.e2
February 10, 2017
MDF
(2) 4” EMT conduits hung on deck 1st to 3rd floor - RISER
(2) 2” conduits from MDF to RoofWeather rated penetrations & goosenecks
1/A4.16
1/A4.15
2/A
4.17
1/A
4.17
B2
A3.03D2
A3.05
A1
A3.01
B2
A3.03
B2
A3.03
A1
A3.01
A1
A3.01
A1-ALT
A3.01
B2
A3.03
A1
A3.01
A1
A3.01
A1
A3.01
A1
A3.01
B1
A3.02
D2
A3.05
D1
A3.04
D1
A3.04
D1
A3.04
D1
A3.04
A1
A3.01
B1
A3.02
D2
A3.05
A1
A3.01
A1
A3.01
A1
A3.01
A1
A3.01
A1
A3.01
A1
A3.01
A1
A3.01
D1
A3.04
D1
A3.04
A1
A3.01
A1
A3.01
522'-1"
212'
-0"
519'-10 1/2"
203'
-3"
65'-0"101'-10"124'-6 1/2"6'-6"73'-5 1/2"86'-3"64'-6"
61'-7
"3'
-0"
6'-0
"10
'-0"
1"6'
-3"
1"34
'-2"
1"34
'-2"
1"54
'-6"
2'-0
"
2'-0" 34'-1" 6'-0" 28'-5"
34'-2
"1"
9'-1
1"6'
-0"
20'-7
"1"
20'-7
"1"
20'-7
"6'
-0"
9'-3
"1"
6'-0
"
133'
-5"
151'-7"
11'-10"2'-10"
1"6'
-0"
9'-1
1"1"
20'-7
"1"
20'-7
"1"
20'-7
"1"
9'-1
0"6'
-4"
34'-1
"2'
-0"
130'
-3"
2'-0" 54'-6" 1" 52'-5" 1" 52'-5" 1" 9'-11" 6'-0" 52'-5" 1" 52'-5" 1" 54'-6" 2'-0"
2'-0
"34
'-1"
1"20
'-7"
1"20
'-7"
1"34
'-2"
1"6'
-3"
1"9'
-11"
1"75
'-2"
110'-4 1/2"
1"20
'-7"
1"20
'-7"
1"20
'-7"
1"
62'-1
"
1" 52'-5" 1" 20'-7" 1" 20'-7" 1" 20'-7" 1" 20'-7" 1" 52'-5" 2"
187'-10"
1"20
'-7"
1"20
'-7"
1"20
'-7"
1"
62'-1
"
191'-10"
1B1A2
1A1B
1B2
2B
1B2
1B21C2
1B1B
1B
2B
1B2 1B2
1B
1A1B2
1C1C1C2
1B
2M
2L
2L
2A
2A2A2A
1B
1B1B
1B
2B
1C1C2
1C2
1B21B2
1B
1C21C
1C
1B2
1B
1B2
1C2
1C
1E
1C
1B
2B
2B
1B
1C
1B
2A
2A
2A
2A
1B
1C 1C2
1B
1B1B2
1B
1C21C1E1C2
1B
1C2
2B
2B2B
2B
2B
2B
2B
2B
1B
1C
1E
1C
1C
1E1C2
1C2
1B21B
1B 1B
1B2
1B
1B21B
1B2
1B1B2
1B1A
1A21B
1C
1B2
1B2
1B
1B
1B2
1B2
1B
1C2
1C
2B
2B
2B
2B
1C
1C2
1B
1B2
1B2
1C
1C
1C
1C2
2B
1C
1C2
1C
1C2
1B
1B
1B
1B
1B
1B2
1B2
1B
1B
1B
1B
1B
1A2
1A
1B
1B
1B
1B
1C
1B
1B
1A
1B
1B 1B
1A
1A
1A1A
1A 1A
1B
1B
1B 1B
1B
1B
1B
1A
1A
1A1B 1B 1B 1B
2A
2A
2A
2A
2A
2A
2A
2B
1B2
1B
1B2
2L
2L
1C2
1C
1C
1C2
1B
1C2
1C
1B
1C
1C
1C
1B
2B
2B
2B
2B
2B
1C2
1C
A4.11
BLDG 1 SECOND FLOOROVERALL PLAN
BW
SCALE:1 1/16" = 1'-0"
BUILDING I SECOND FLOOR OVERALL PLANSHEET CONTENTS:
Issue for Construction
Revisions:
Issue for Permit Application:
Architect of Record:
Drawn by:
Designed by:
Date Plotted:
#
SHEET NO.
Issue for Pricing / Bidding:
DATE COMMENTS
The architectural works depicted herein are thesole property of Humphreys & Partners Architects,L.P. and may not be constructed or used withoutits express written permission. No permission tomodify or reproduce any of the architecturalworks, including without limitation the constructionof any building, is expressed or should be impliedfrom delivery of preliminary drawings or unsealedconstruction drawings. Permission to constructthe building depicted in sealed constructiondrawings is expressly conditioned on the full andtimely payment of all fees otherwise dueHumphreys & Partners Architects, L.P. and, in theabsence of any written agreement to the contrary,is limited to a one-time use on the site indicatedon these plans.
© by Humphreys & PartnersArchitects, L.P.All Rights Reserved
2017
DE
SIG
N D
EV
ELO
PM
EN
T S
ET
16273
EN
DE
AV
OR
RE
SID
EN
TIA
L
SP
RIN
GTO
WN
EN
DE
AV
OR
SA
N M
AR
CO
S, T
X.
GLJ
RM
JAN 19 2017
DA
LLA
SC
HIC
AG
O
.
. NE
W O
RLE
AN
S
. NE
W Y
OR
KN
EW
PO
RT
BE
AC
HO
RLA
ND
OS
AN
RA
MO
N
.
. SC
OTT
SD
ALE
ED
MO
NTO
N
. TOR
ON
TOC
HE
NN
AI
DU
BA
I
.
. HA
NO
I
. MO
NTE
VID
EO
.. ww
w.h
umph
reys
.com
AR
CH
ITE
CTS
, L.
P.
HUMPHREYS &
PARTNERS
5339
ALP
HA
RO
AD
· SU
ITE
300 ·
DAL
LAS,
TEX
AS 75
240
(972
) 701
- 96
39 ·
(972
) 701
- 96
39 F
AX
These drawings are forpreliminary coordinationonly and not to be used
for regulatory approval orconstruction.
© 2016 RealPage, Inc. All trademarks and copyrights are properties of their respective owners
Site Pathways
VVD.e3
February 10, 2017
Amenity
(2) 4” conduits 1st to 3rd floor - RISER
(2) 2” conduits from MDF to RoofWeather rated penetrations & goosenecks (2) 2” conduits 2nd to 3rd floor
1/A4.16
1/A4.15
2/A
4.17
1/A
4.17
A3.03
B2
A3.05
D2
A3.01
A1
A3.03
B2
A3.03
B2
A3.01
A1
A3.01
A1
A3.02
B1A3.04
D1
A3.03
B2
A3.01
A1
A3.05
D2A3.04
D1
A3.04
D1
A3.03
B2
A3.03
B2
A3.04
D1
A3.02
B1
A3.02
B1
A3.03
B2
A3.03
B2
A3.03
B2
A3.04
D1
A3.01
A1
A3.01
A1
A3.01
A1A3.01
A1
A3.04
D1
A3.04
D1
A3.04
D1
A3.05
D2
A3.02
B1
A3.03
B2
A3.01
A1-ALT
A3.03
B2
A3.01
A1
A3.01
A1
A3.01
A1
A3.01
A1A3.02
B1
A3.05
D2
A3.04
D1
A3.04
D1
A3.01
A1
A3.04
D1
A3.04
D1
A3.04
D1
A3.04
D1
A3.01
A1
A3.01
A1A3.02
B1
A3.05
D2
A3.01
A1
A3.01
A1
A3.01
A1
A3.01
A1
A3.01
A1
A3.01
A1
524'-5"
208'
-3 1
/2"
519'-10 1/2"
204'
-3 1
/2"
2'-0"54'-6"1"52'-5"1"52'-5"6'-0"34'-2"1"34'-2"1"34'-2"1"52'-5"1"34'-2"6'-0"52'-5"1"52'-5"1"54'-6"2'-0"
2'-0
"34
'-1"
5'-7
1/2
"20
'-7"
1"9'
-11"
1"6'
-3"
1"34
'-2"
1"34
'-2"
1"54
'-6"
1'-9
"
2'-0" 34'-1" 6'-0" 28'-5" 110'-4 1/2" 2'-0" 54'-6" 1" 52'-5" 1" 52'-5" 1" 9'-11" 6'-0" 52'-5" 1" 52'-5" 1" 54'-6" 2'-0"
2'-0
"33
'-7 1
/2"
1"20
'-7"
1"20
'-7"
1"34
'-2"
1"6'
-3"
1"10
'-3"
5 1/
2"34
'-3"
5'-7
1/2
"34
'-1"
2'-0
"
34'-2
"1"
9'-1
1"6'
-0"
20'-7
"1"
20'-7
"1"
20'-7
"5'
-8"
9'-3
"1/
2"
127'
-0 1
/2"
1" 34'-2" 1" 52'-5" 1" 34'-2" 1"
5 1/
2"5'
-11"
9'-1
1"1"
20'-7
"1"
20'-7
"1"
20'-7
"9'
-10"
6'-4
"34
'-1"
2'-0
"
130'
-3"
1"20
'-7"
1"20
'-7"
1"20
'-7"
1"
1" 52'-5" 1" 20'-7" 1" 20'-7" 1" 20'-7" 1" 52'-5" 2"
1" 52'-5" 1" 20'-7" 1" 20'-7" 2" 20'-7" 1" 20'-7" 1" 52'-5" 1"
1" 20'-7"
62'-1
"
187'-10"
187'-10"
1"20
'-7"
1"20
'-7"
1"20
'-7"
1"
62'-1
"
10"
1"
1B1A2
1A1B
1B2
2B
1B2
1B21C2
1B1B
1B
2B
1B2 1B2
1B
1B1B2
1C1C1C2
1B
2M
2L
2L
2A
2A2A2A
1B
1B1B
1B
2B
1C1C2
1C2
1B21B2
1B
1C21C
1C
1B2
1B
1B2
1C2
1C
1E
1C
1B
2B
2B
1B
1C
1B
2A
2A
2A
2A
1B
1C 1C2
1B
1B1B2
1B
1C21C1E1C2
1B
1C2
2B
2B2B
2B
2B
2B
2B
2B
1B
1C
1E
1C
1C
1E1C2
1C2
1B21B
1B 1B
1B2
B
1B21B
1B2
1B1B2
1B1A
1A21B
1C
1B2
1B2
1B
1B
1B2
1B2
1B
1C2
1C
2B
2B
2B
2B
1C
1C2
1B
1B2
1B2
1C
1C
1C
1C2
2B
1C
1C2
1C
1C2
1B
1B
1B
1B
1B
1B2
1B2
1B
1B
1B
1B
1B
1A
1A
1B2
1B2
1B
1B
1C
1B
1B
1C
1C2
1A2
1B
1A 1A
1C
1B
1B
1C
1B2
2A
2A
2A
2A
2A
2A
2A
2B
1B2
1B2
1B2
2L
2L
1C2
1C
1C
1C2
1B
1C2
1C
1B
1C
1C
1C
1B
2B
2B
2B
2B
2B
1C2
1C
1A2
1B
1B1C
1C
1B1B
1C
1B2 1B
1B
1C
1B2 1B
1C2
1B 1B
1C
1B
1B2
1C
1C
1C
1C
1B1B2
1B
1C 1C2
1B1B2
1B
1C 1C2
1B 1B
1C2 1C
1C21C
1B
1B2 1B
1B
1C21C
1B
1B1B2 1C
1C
1B2
1A1A1A1A1A1A
1A
1A
1A2
1A2
1C1C1C1C
1B
1B1B
1B
1C1C2
1B
1B1B
1B
1C1C2
1B
1B1B
1B
1C 1C2
1B2
1B
1B
1B2
1B1B2
1B1B
1B
1C 1C2
1A
1B
1B1B
1B
1C1C2
1B1B2
1B
1C2
1B1B2
1B
1B2
1B2
1B
2A
2A
2A
2A
2A
2A
2A
2A
2A 2A
2A
2A 2A 2A 2A
2A2A
2A
2A
2A
2A
2A
2A
2C
2C
2C2C
2C
2C
2B
2B
2B 2B 2B2B
2B
2B 2B 2B 2B 2B 2B
2B
2B 2B
2B
2B 2B
2B
2H
2H2H
2H
2H
2H
2H
A4.12
BLDG 1 THIRD - FOURTH FLOOROVERALL PLAN
BW
SCALE:1 1/16" = 1'-0"
BUILDING I THIRD - FOURTH FLOOR OVERALL PLANSHEET CONTENTS:
Issue for Construction
Revisions:
Issue for Permit Application:
Architect of Record:
Drawn by:
Designed by:
Date Plotted:
#
SHEET NO.
Issue for Pricing / Bidding:
DATE COMMENTS
The architectural works depicted herein are thesole property of Humphreys & Partners Architects,L.P. and may not be constructed or used withoutits express written permission. No permission tomodify or reproduce any of the architecturalworks, including without limitation the constructionof any building, is expressed or should be impliedfrom delivery of preliminary drawings or unsealedconstruction drawings. Permission to constructthe building depicted in sealed constructiondrawings is expressly conditioned on the full andtimely payment of all fees otherwise dueHumphreys & Partners Architects, L.P. and, in theabsence of any written agreement to the contrary,is limited to a one-time use on the site indicatedon these plans.
© by Humphreys & PartnersArchitects, L.P.All Rights Reserved
2017
DE
SIG
N D
EV
ELO
PM
EN
T S
ET
16273
EN
DE
AV
OR
RE
SID
EN
TIA
L
SP
RIN
GTO
WN
EN
DE
AV
OR
SA
N M
AR
CO
S, T
X.
GLJ
RM
JAN 19 2017
DA
LLA
SC
HIC
AG
O
.
. NE
W O
RLE
AN
S
. NE
W Y
OR
KN
EW
PO
RT
BE
AC
HO
RLA
ND
OS
AN
RA
MO
N
.
. SC
OTT
SD
ALE
ED
MO
NTO
N
. TOR
ON
TOC
HE
NN
AI
DU
BA
I
.
. HA
NO
I
. MO
NTE
VID
EO
.. ww
w.h
umph
reys
.com
AR
CH
ITE
CTS
, L.
P.
HUMPHREYS &
PARTNERS
5339
ALP
HA
RO
AD
· SU
ITE
300 ·
DAL
LAS,
TEX
AS 75
240
(972
) 701
- 96
39 ·
(972
) 701
- 96
39 F
AX
These drawings are forpreliminary coordinationonly and not to be used
for regulatory approval orconstruction.
© 2016 RealPage, Inc. All trademarks and copyrights are properties of their respective owners
Must included all fire calk and assemblies
(2) 2” flexible conduit/roll pipe
(2) 4” conduits 1st to 3rd floor - RISER
(2) 2” conduits from MDF to RoofWeather rated penetrations & goosenecks (2) 2” conduits 2nd to 3rd floor Site Pathways
VVD.e4
February 10, 2017
The low voltage contractor shall wire directly from IDFs to units
The low voltage contractor shall wire directly from IDFs to units
IDF
IDF
IDFIDF
1/A4.16
1/A4.15
2/A
4.17
1/A
4.17
A3.03
B2
A3.05
D2
A3.01
A1
A3.03
B2
A3.03
B2
A3.01
A1
A3.01
A1
A3.02
B1A3.04
D1
A3.03
B2
A3.01
A1
A3.05
D2A3.04
D1
A3.04
D1
A3.03
B2
A3.03
B2
A3.04
D1
A3.02
B1
A3.02
B1
A3.03
B2
A3.03
B2
A3.03
B2
A3.04
D1
A3.01
A1
A3.01
A1
A3.01
A1A3.01
A1
A3.04
D1
A3.04
D1
A3.04
D1
A3.05
D2
A3.02
B1
A3.03
B2
A3.01
A1-ALT
A3.03
B2
A3.01
A1
A3.01
A1
A3.01
A1
A3.01
A1A3.02
B1
A3.05
D2
A3.04
D1
A3.04
D1
A3.01
A1
A3.04
D1
A3.04
D1
A3.04
D1
A3.04
D1
A3.01
A1
A3.01
A1A3.02
B1
A3.05
D2
A3.01
A1
A3.01
A1
A3.01
A1
A3.01
A1
A3.01
A1
A3.01
A1
524'-5"
208'
-3 1
/2"
519'-10 1/2"
204'
-4"
2'-0"54'-6"1"52'-5"1"52'-5"6'-0"34'-2"1"34'-2"1"34'-2"1"52'-5"1"34'-2"6'-0"52'-5"1"52'-5"1"54'-6"2'-0"
2'-0
"34
'-1"
5'-7
1/2
"20
'-7"
1"9'
-11"
1"6'
-3"
1"34
'-2"
1"34
'-2"
1"54
'-6"
1'-9
"
2'-0" 34'-1" 6'-0" 28'-5" 110'-4 1/2" 2'-0" 54'-6" 1" 52'-5" 1" 52'-5" 1" 9'-11" 6'-0" 52'-5" 1" 52'-5" 1" 54'-6" 2'-0"
2'-0
"33
'-7 1
/2"
1"20
'-7"
1"20
'-7"
1"34
'-2"
1"6'
-3"
1"10
'-3"
5 1/
2"34
'-3"
5'-7
1/2
"34
'-1"
2'-0
"
34'-2
"1"
9'-1
1"6'
-0"
20'-7
"1"
20'-7
"1"
20'-7
"5'
-8"
9'-3
"1/
2"
127'
-0 1
/2"
1" 34'-2" 1" 52'-5" 1" 34'-2" 1"
5 1/
2"5'
-11"
9'-1
1"1"
20'-7
"1"
20'-7
"1"
20'-7
"9'
-10"
6'-4
"34
'-1"
2'-0
"
130'
-3"
1"20
'-7"
1"20
'-7"
1"20
'-7"
1"
1" 52'-5" 1" 20'-7" 1" 20'-7" 1" 20'-7" 1" 52'-5" 2"
1" 52'-5" 1" 20'-7" 1" 20'-7" 2" 20'-7" 1" 20'-7" 1" 52'-5" 1"
1" 20'-7"
62'-1
"
187'-10"
187'-10"
1"20
'-7"
1"20
'-7"
1"20
'-7"
1"
62'-1
"
10"
1"
1B1A2
1A1B
1B2
2B
1B2
1B21C2
1B1B
1B
2B
1B2 1B2
1B
1B1B2
1C1C1C2
1B
2M
2L
2L
2A
2A2A2A
1B
1B1B
1B
2B
1C1C2
1C2
1B21B2
1B
1C21C
1C
1B2
1B
1B2
1C2
1C
1E
1C
1B
2B
2B
1B
1C
1B
2A
2A
2A
2A
1B
1C 1C2
1B
1B1B2
1B
1C21C1E1C2
1B
1C2
2B
2B2B
2B
2B
2B
2B
2B
1B
1C
1E
1C
1C
1E1C2
1C2
1B21B
1B 1B
1B2
B
1B21B
1B2
1B1B2
1B1A
1A21B
1C
1B2
1B2
1B
1B
1B2
1B2
1B
1C2
1C
2B
2B
2B
2B
1C
1C2
1B
1B2
1B2
1C
1C
1C
1C2
2B
1C
1C2
1C
1C2
1B
1B
1B
1B
1B
1B2
1B2
1B
1B
1B
1B
1B
1A
1A
1B2
1B2
1B
1B
1C
1B
1B
1C
1C2
1A2
1B
1A 1A
1C
1B
1B
1C
1B2
2A
2A
2A
2A
2A
2A
2A
2B
1B2
1B2
1B2
2L
2L
1C2
1C
1C
1C2
1B
1C2
1C
1B
1C
1C
1C
1B
2B
2B
2B
2B
2B
1C2
1C
1A2
1B
1B1C
1C
1B1B
1C
1B2 1B
1B
1C
1B2 1B
1C2
1B 1B
1C
1B
1B2
1C
1C
1C
1C
1B1B2
1B
1C 1C2
1B1B2
1B
1C 1C2
1B 1B
1C2 1C
1C21C
1B
1B2 1B
1B
1C21C
1B
1B1B2 1C
1C
1B2
1A1A1A1A1A1A
1A
1A
1A2
1A2
1C1C1C1C
1B
1B1B
1B
1C1C2
1B
1B1B
1B
1C1C2
1B
1B1B
1B
1C 1C2
1B2
1B
1B
1B2
1B1B2
1B1B
1B
1C 1C2
1A
1B
1B1B
1B
1C1C2
1B1B2
1B
1C2
1B1B2
1B
1B2
1B2
1B
2A
2A
2A
2A
2A
2A
2A
2A
2A 2A
2A
2A 2A 2A 2A
2A2A
2A
2A
2A
2A
2A
2A
2C
2C
2C2C
2C
2C
2B
2B
2B 2B 2B2B
2B
2B 2B 2B 2B 2B 2B
2B
2B 2B
2B
2B 2B
2B
2H
2H2H
2H
2H
2H
2H
A4.13
BLDG 1 - FIFTH FLOOROVERALL PLAN
BW
SCALE:1 1/16" = 1'-0"
BUILDING I FIFTH FLOOR OVERALL PLANSHEET CONTENTS:
Issue for Construction
Revisions:
Issue for Permit Application:
Architect of Record:
Drawn by:
Designed by:
Date Plotted:
#
SHEET NO.
Issue for Pricing / Bidding:
DATE COMMENTS
The architectural works depicted herein are thesole property of Humphreys & Partners Architects,L.P. and may not be constructed or used withoutits express written permission. No permission tomodify or reproduce any of the architecturalworks, including without limitation the constructionof any building, is expressed or should be impliedfrom delivery of preliminary drawings or unsealedconstruction drawings. Permission to constructthe building depicted in sealed constructiondrawings is expressly conditioned on the full andtimely payment of all fees otherwise dueHumphreys & Partners Architects, L.P. and, in theabsence of any written agreement to the contrary,is limited to a one-time use on the site indicatedon these plans.
© by Humphreys & PartnersArchitects, L.P.All Rights Reserved
2017
DE
SIG
N D
EV
ELO
PM
EN
T S
ET
16273
EN
DE
AV
OR
RE
SID
EN
TIA
L
SP
RIN
GTO
WN
EN
DE
AV
OR
SA
N M
AR
CO
S, T
X.
GLJ
RM
JAN 19 2017
DA
LLA
SC
HIC
AG
O
.
. NE
W O
RLE
AN
S
. NE
W Y
OR
KN
EW
PO
RT
BE
AC
HO
RLA
ND
OS
AN
RA
MO
N
.
. SC
OTT
SD
ALE
ED
MO
NTO
N
. TOR
ON
TOC
HE
NN
AI
DU
BA
I
.
. HA
NO
I
. MO
NTE
VID
EO
.. ww
w.h
umph
reys
.com
AR
CH
ITE
CTS
, L.
P.
HUMPHREYS &
PARTNERS
5339
ALP
HA
RO
AD
· SU
ITE
300 ·
DAL
LAS,
TEX
AS 75
240
(972
) 701
- 96
39 ·
(972
) 701
- 96
39 F
AX
These drawings are forpreliminary coordinationonly and not to be used
for regulatory approval orconstruction.
© 2016 RealPage, Inc. All trademarks and copyrights are properties of their respective owners
Site Pathways
VVD.e5
February 10, 2017
(2) 2” conduits from MDF to RoofWeather rated penetrations & goosenecks
1/A4.16
1/A4.15
2/A
4.17
1/A
4.17
524'-5"
208'
-3 1
/2"
519'-10 1/2"
204'
-3 1
/2"
A4.14
BLDG 1 ROOFOVERALL PLAN
BW
SCALE:1 1/16" = 1'-0"
BUILDING I ROOF OVERALL PLANSHEET CONTENTS:
Issue for Construction
Revisions:
Issue for Permit Application:
Architect of Record:
Drawn by:
Designed by:
Date Plotted:
#
SHEET NO.
Issue for Pricing / Bidding:
DATE COMMENTS
The architectural works depicted herein are thesole property of Humphreys & Partners Architects,L.P. and may not be constructed or used withoutits express written permission. No permission tomodify or reproduce any of the architecturalworks, including without limitation the constructionof any building, is expressed or should be impliedfrom delivery of preliminary drawings or unsealedconstruction drawings. Permission to constructthe building depicted in sealed constructiondrawings is expressly conditioned on the full andtimely payment of all fees otherwise dueHumphreys & Partners Architects, L.P. and, in theabsence of any written agreement to the contrary,is limited to a one-time use on the site indicatedon these plans.
© by Humphreys & PartnersArchitects, L.P.All Rights Reserved
2017
DE
SIG
N D
EV
ELO
PM
EN
T S
ET
16273
EN
DE
AV
OR
RE
SID
EN
TIA
L
SP
RIN
GTO
WN
EN
DE
AV
OR
SA
N M
AR
CO
S, T
X.
GLJ
RM
JAN 19 2017
DA
LLA
SC
HIC
AG
O
.
. NE
W O
RLE
AN
S
. NE
W Y
OR
KN
EW
PO
RT
BE
AC
HO
RLA
ND
OS
AN
RA
MO
N
.
. SC
OTT
SD
ALE
ED
MO
NTO
N
. TOR
ON
TOC
HE
NN
AI
DU
BA
I
.
. HA
NO
I
. MO
NTE
VID
EO
.. ww
w.h
umph
reys
.com
AR
CH
ITE
CTS
, L.
P.
HUMPHREYS &
PARTNERS
5339
ALP
HA
RO
AD
· SU
ITE
300 ·
DAL
LAS,
TEX
AS 75
240
(972
) 701
- 96
39 ·
(972
) 701
- 96
39 F
AX
These drawings are forpreliminary coordinationonly and not to be used
for regulatory approval orconstruction.
© 2016 RealPage, Inc. All trademarks and copyrights are properties of their respective owners
Site Pathways
VVD.e6
February 10, 2017
(2) 2” conduits from MDF to RoofWeather rated penetrations & goosenecks
© 2016 RealPage, Inc. All trademarks and copyrights are properties of their respective owners
1/A4.16
1/A4.15
2/A
4.17
1/A
4.17
B2
A3.03D2
A3.05
A1
A3.01
B2
A3.03
B2
A3.03
A1
A3.01
A1
A3.01
A1-ALT
A3.01
B2
A3.03
A1
A3.01
A1
A3.01
A1
A3.01
A1
A3.01
B1
A3.02
D2
A3.05
D1
A3.04
D1
A3.04
D1
A3.04
D1
A3.04
A1
A3.01
B1
A3.02
D2
A3.05
A1
A3.01
A1
A3.01
A1
A3.01
A1
A3.01
A1
A3.01
A1
A3.01
A1
A3.01
D1
A3.04
D1
A3.04
A1
A3.01
A1
A3.01
522'-1"
212'
-0"
519'-10 1/2"
203'
-3"
65'-0"101'-10"124'-6 1/2"6'-6"73'-5 1/2"86'-3"64'-6"
61'-7
"3'
-0"
6'-0
"10
'-0"
1"6'
-3"
1"34
'-2"
1"34
'-2"
1"54
'-6"
2'-0
"
2'-0" 34'-1" 6'-0" 28'-5"
34'-2
"1"
9'-1
1"6'
-0"
20'-7
"1"
20'-7
"1"
20'-7
"6'
-0"
9'-3
"1"
6'-0
"
133'
-5"
151'-7"
11'-10"2'-10"
1"6'
-0"
9'-1
1"1"
20'-7
"1"
20'-7
"1"
20'-7
"1"
9'-1
0"6'
-4"
34'-1
"2'
-0"
130'
-3"
2'-0" 54'-6" 1" 52'-5" 1" 52'-5" 1" 9'-11" 6'-0" 52'-5" 1" 52'-5" 1" 54'-6" 2'-0"
2'-0
"34
'-1"
1"20
'-7"
1"20
'-7"
1"34
'-2"
1"6'
-3"
1"9'
-11"
1"75
'-2"
110'-4 1/2"
1"20
'-7"
1"20
'-7"
1"20
'-7"
1"
62'-1
"
1" 52'-5" 1" 20'-7" 1" 20'-7" 1" 20'-7" 1" 20'-7" 1" 52'-5" 2"
187'-10"
1"20
'-7"
1"20
'-7"
1"20
'-7"
1"
62'-1
"
191'-10"
1B1A2
1A1B
1B2
2B
1B2
1B21C2
1B1B
1B
2B
1B2 1B2
1B
1A1B2
1C1C1C2
1B
2M
2L
2L
2A
2A2A2A
1B
1B1B
1B
2B
1C1C2
1C2
1B21B2
1B
1C21C
1C
1B2
1B
1B2
1C2
1C
1E
1C
1B
2B
2B
1B
1C
1B
2A
2A
2A
2A
1B
1C 1C2
1B
1B1B2
1B
1C21C1E1C2
1B
1C2
2B
2B2B
2B
2B
2B
2B
2B
1B
1C
1E
1C
1C
1E1C2
1C2
1B21B
1B 1B
1B2
1B
1B21B
1B2
1B1B2
1B1A
1A21B
1C
1B2
1B2
1B
1B
1B2
1B2
1B
1C2
1C
2B
2B
2B
2B
1C
1C2
1B
1B2
1B2
1C
1C
1C
1C2
2B
1C
1C2
1C
1C2
1B
1B
1B
1B
1B
1B2
1B2
1B
1B
1B
1B
1B
1A2
1A
1B
1B
1B
1B
1C
1B
1B
1A
1B
1B 1B
1A
1A
1A1A
1A 1A
1B
1B
1B 1B
1B
1B
1B
1A
1A
1A1B 1B 1B 1B
2A
2A
2A
2A
2A
2A
2A
2B
1B2
1B
1B2
2L
2L
1C2
1C
1C
1C2
1B
1C2
1C
1B
1C
1C
1C
1B
2B
2B
2B
2B
2B
1C2
1C
A4.11
BLDG 1 SECOND FLOOROVERALL PLAN
BW
SCALE:1 1/16" = 1'-0"
BUILDING I SECOND FLOOR OVERALL PLANSHEET CONTENTS:
Issue for Construction
Revisions:
Issue for Permit Application:
Architect of Record:
Drawn by:
Designed by:
Date Plotted:
#
SHEET NO.
Issue for Pricing / Bidding:
DATE COMMENTS
The architectural works depicted herein are thesole property of Humphreys & Partners Architects,L.P. and may not be constructed or used withoutits express written permission. No permission tomodify or reproduce any of the architecturalworks, including without limitation the constructionof any building, is expressed or should be impliedfrom delivery of preliminary drawings or unsealedconstruction drawings. Permission to constructthe building depicted in sealed constructiondrawings is expressly conditioned on the full andtimely payment of all fees otherwise dueHumphreys & Partners Architects, L.P. and, in theabsence of any written agreement to the contrary,is limited to a one-time use on the site indicatedon these plans.
© by Humphreys & PartnersArchitects, L.P.All Rights Reserved
2017
DE
SIG
N D
EV
ELO
PM
EN
T S
ET
16273
EN
DE
AV
OR
RE
SID
EN
TIA
L
SP
RIN
GTO
WN
EN
DE
AV
OR
SA
N M
AR
CO
S, T
X.
GLJ
RM
JAN 19 2017
DA
LLA
SC
HIC
AG
O
.
. NE
W O
RLE
AN
S
. NE
W Y
OR
KN
EW
PO
RT
BE
AC
HO
RLA
ND
OS
AN
RA
MO
N
.
. SC
OTT
SD
ALE
ED
MO
NTO
N
. TOR
ON
TOC
HE
NN
AI
DU
BA
I
.
. HA
NO
I
. MO
NTE
VID
EO
.. ww
w.h
umph
reys
.com
AR
CH
ITE
CTS
, L.
P.
HUMPHREYS &
PARTNERS
5339
ALP
HA
RO
AD
· SU
ITE
300 ·
DAL
LAS,
TEX
AS 75
240
(972
) 701
- 96
39 ·
(972
) 701
- 96
39 F
AX
These drawings are forpreliminary coordinationonly and not to be used
for regulatory approval orconstruction.
Closet Elevations
VVD.f1
February 10, 2017
CCR/MDF – Clubhouse (Wall #2)
2’ Equipmentspace 3’ work space
5’ total depth including hallway in front of doors
CCR/MDF – Clubhouse (Wall #1)
Access Device
& CCTV
7’h x 2’w
120vD120vD
Access Device
&CCTV
7’h x 2’w
120vD120vD
AudioVideo
7’h x 2’w
120vD120vD
AudioVideo
7’h x 2’w
120vD120vD
Future Use
7’h x 2’w
120vD120vD
Video/Data7’h x 4’w
Phone7’h x 2’w
120vD120vD
busbar
Office & AmenityPhone &
Data7’h x 2’w
120vD120vD
120vD120vD
120vD120vD
Future Use
7’h x 2’w
120vD120vD
MDF
© 2016 RealPage, Inc. All trademarks and copyrights are properties of their respective owners
1/A4.16
1/A4.15
2/A
4.17
1/A
4.17
A3.03
B2
A3.05
D2
A3.01
A1
A3.03
B2
A3.03
B2
A3.01
A1
A3.01
A1
A3.02
B1A3.04
D1
A3.03
B2
A3.01
A1
A3.05
D2A3.04
D1
A3.04
D1
A3.03
B2
A3.03
B2
A3.04
D1
A3.02
B1
A3.02
B1
A3.03
B2
A3.03
B2
A3.03
B2
A3.04
D1
A3.01
A1
A3.01
A1
A3.01
A1A3.01
A1
A3.04
D1
A3.04
D1
A3.04
D1
A3.05
D2
A3.02
B1
A3.03
B2
A3.01
A1-ALT
A3.03
B2
A3.01
A1
A3.01
A1
A3.01
A1
A3.01
A1A3.02
B1
A3.05
D2
A3.04
D1
A3.04
D1
A3.01
A1
A3.04
D1
A3.04
D1
A3.04
D1
A3.04
D1
A3.01
A1
A3.01
A1A3.02
B1
A3.05
D2
A3.01
A1
A3.01
A1
A3.01
A1
A3.01
A1
A3.01
A1
A3.01
A1
524'-5"
208'
-3 1
/2"
519'-10 1/2"
204'
-3 1
/2"
2'-0"54'-6"1"52'-5"1"52'-5"6'-0"34'-2"1"34'-2"1"34'-2"1"52'-5"1"34'-2"6'-0"52'-5"1"52'-5"1"54'-6"2'-0"
2'-0
"34
'-1"
5'-7
1/2
"20
'-7"
1"9'
-11"
1"6'
-3"
1"34
'-2"
1"34
'-2"
1"54
'-6"
1'-9
"
2'-0" 34'-1" 6'-0" 28'-5" 110'-4 1/2" 2'-0" 54'-6" 1" 52'-5" 1" 52'-5" 1" 9'-11" 6'-0" 52'-5" 1" 52'-5" 1" 54'-6" 2'-0"
2'-0
"33
'-7 1
/2"
1"20
'-7"
1"20
'-7"
1"34
'-2"
1"6'
-3"
1"10
'-3"
5 1/
2"34
'-3"
5'-7
1/2
"34
'-1"
2'-0
"
34'-2
"1"
9'-1
1"6'
-0"
20'-7
"1"
20'-7
"1"
20'-7
"5'
-8"
9'-3
"1/
2"
127'
-0 1
/2"
1" 34'-2" 1" 52'-5" 1" 34'-2" 1"
5 1/
2"5'
-11"
9'-1
1"1"
20'-7
"1"
20'-7
"1"
20'-7
"9'
-10"
6'-4
"34
'-1"
2'-0
"
130'
-3"
1"20
'-7"
1"20
'-7"
1"20
'-7"
1"
1" 52'-5" 1" 20'-7" 1" 20'-7" 1" 20'-7" 1" 52'-5" 2"
1" 52'-5" 1" 20'-7" 1" 20'-7" 2" 20'-7" 1" 20'-7" 1" 52'-5" 1"
1" 20'-7"
62'-1
"
187'-10"
187'-10"
1"20
'-7"
1"20
'-7"
1"20
'-7"
1"
62'-1
"
10"
1"
1B1A2
1A1B
1B2
2B
1B2
1B21C2
1B1B
1B
2B
1B2 1B2
1B
1B1B2
1C1C1C2
1B
2M
2L
2L
2A
2A2A2A
1B
1B1B
1B
2B
1C1C2
1C2
1B21B2
1B
1C21C
1C
1B2
1B
1B2
1C2
1C
1E
1C
1B
2B
2B
1B
1C
1B
2A
2A
2A
2A
1B
1C 1C2
1B
1B1B2
1B
1C21C1E1C2
1B
1C2
2B
2B2B
2B
2B
2B
2B
2B
1B
1C
1E
1C
1C
1E1C2
1C2
1B21B
1B 1B
1B2
B
1B21B
1B2
1B1B2
1B1A
1A21B
1C
1B2
1B2
1B
1B
1B2
1B2
1B
1C2
1C
2B
2B
2B
2B
1C
1C2
1B
1B2
1B2
1C
1C
1C
1C2
2B
1C
1C2
1C
1C2
1B
1B
1B
1B
1B
1B2
1B2
1B
1B
1B
1B
1B
1A
1A
1B2
1B2
1B
1B
1C
1B
1B
1C
1C2
1A2
1B
1A 1A
1C
1B
1B
1C
1B2
2A
2A
2A
2A
2A
2A
2A
2B
1B2
1B2
1B2
2L
2L
1C2
1C
1C
1C2
1B
1C2
1C
1B
1C
1C
1C
1B
2B
2B
2B
2B
2B
1C2
1C
1A2
1B
1B1C
1C
1B1B
1C
1B2 1B
1B
1C
1B2 1B
1C2
1B 1B
1C
1B
1B2
1C
1C
1C
1C
1B1B2
1B
1C 1C2
1B1B2
1B
1C 1C2
1B 1B
1C2 1C
1C21C
1B
1B2 1B
1B
1C21C
1B
1B1B2 1C
1C
1B2
1A1A1A1A1A1A
1A
1A
1A2
1A2
1C1C1C1C
1B
1B1B
1B
1C1C2
1B
1B1B
1B
1C1C2
1B
1B1B
1B
1C 1C2
1B2
1B
1B
1B2
1B1B2
1B1B
1B
1C 1C2
1A
1B
1B1B
1B
1C1C2
1B1B2
1B
1C2
1B1B2
1B
1B2
1B2
1B
2A
2A
2A
2A
2A
2A
2A
2A
2A 2A
2A
2A 2A 2A 2A
2A2A
2A
2A
2A
2A
2A
2A
2C
2C
2C2C
2C
2C
2B
2B
2B 2B 2B2B
2B
2B 2B 2B 2B 2B 2B
2B
2B 2B
2B
2B 2B
2B
2H
2H2H
2H
2H
2H
2H
A4.12
BLDG 1 THIRD - FOURTH FLOOROVERALL PLAN
BW
SCALE:1 1/16" = 1'-0"
BUILDING I THIRD - FOURTH FLOOR OVERALL PLANSHEET CONTENTS:
Issue for Construction
Revisions:
Issue for Permit Application:
Architect of Record:
Drawn by:
Designed by:
Date Plotted:
#
SHEET NO.
Issue for Pricing / Bidding:
DATE COMMENTS
The architectural works depicted herein are thesole property of Humphreys & Partners Architects,L.P. and may not be constructed or used withoutits express written permission. No permission tomodify or reproduce any of the architecturalworks, including without limitation the constructionof any building, is expressed or should be impliedfrom delivery of preliminary drawings or unsealedconstruction drawings. Permission to constructthe building depicted in sealed constructiondrawings is expressly conditioned on the full andtimely payment of all fees otherwise dueHumphreys & Partners Architects, L.P. and, in theabsence of any written agreement to the contrary,is limited to a one-time use on the site indicatedon these plans.
© by Humphreys & PartnersArchitects, L.P.All Rights Reserved
2017
DE
SIG
N D
EV
ELO
PM
EN
T S
ET
16273
EN
DE
AV
OR
RE
SID
EN
TIA
L
SP
RIN
GTO
WN
EN
DE
AV
OR
SA
N M
AR
CO
S, T
X.
GLJ
RM
JAN 19 2017
DA
LLA
SC
HIC
AG
O
.
. NE
W O
RLE
AN
S
. NE
W Y
OR
KN
EW
PO
RT
BE
AC
HO
RLA
ND
OS
AN
RA
MO
N
.
. SC
OTT
SD
ALE
ED
MO
NTO
N
. TOR
ON
TOC
HE
NN
AI
DU
BA
I
.
. HA
NO
I
. MO
NTE
VID
EO
.. ww
w.h
umph
reys
.com
AR
CH
ITE
CTS
, L.
P.
HUMPHREYS &
PARTNERS
5339
ALP
HA
RO
AD
· SU
ITE
300 ·
DAL
LAS,
TEX
AS 75
240
(972
) 701
- 96
39 ·
(972
) 701
- 96
39 F
AX
These drawings are forpreliminary coordinationonly and not to be used
for regulatory approval orconstruction.
Closet Elevations
VVD.f2
February 10, 2017
2’ Equipmentspace 3’ work space
5’ total depth including hallway in front of doors
Typical BCR/IDF
Data7’h x 3’ w x 2’d
120vD
Video7’h x 3’ w x 2’d
120vD
120vD
busbar
IDFIDFIDF
IDF
© 2016 RealPage, Inc. All trademarks and copyrights are properties of their respective owners
1/A4.16
1/A4.15
2/A
4.17
1/A
4.17
B2
A3.03D2
A3.05
A1
A3.01
B2
A3.03
B2
A3.03
A1
A3.01
A1
A3.01
A1-ALT
A3.01
B2
A3.03
A1
A3.01
A1
A3.01
A1
A3.01
A1
A3.01
B1
A3.02
D2
A3.05
D1
A3.04
D1
A3.04
D1
A3.04
D1
A3.04
A1
A3.01
B1
A3.02
D2
A3.05
A1
A3.01
A1
A3.01
A1
A3.01
A1
A3.01
A1
A3.01
A1
A3.01
A1
A3.01
D1
A3.04
D1
A3.04
A1
A3.01
A1
A3.01
522'-1"
212'
-0"
519'-10 1/2"
203'
-3"
65'-0"101'-10"124'-6 1/2"6'-6"73'-5 1/2"86'-3"64'-6"
61'-7
"3'
-0"
6'-0
"10
'-0"
1"6'
-3"
1"34
'-2"
1"34
'-2"
1"54
'-6"
2'-0
"
2'-0" 34'-1" 6'-0" 28'-5"
34'-2
"1"
9'-1
1"6'
-0"
20'-7
"1"
20'-7
"1"
20'-7
"6'
-0"
9'-3
"1"
6'-0
"
133'
-5"
151'-7"
11'-10"2'-10"
1"6'
-0"
9'-1
1"1"
20'-7
"1"
20'-7
"1"
20'-7
"1"
9'-1
0"6'
-4"
34'-1
"2'
-0"
130'
-3"
2'-0" 54'-6" 1" 52'-5" 1" 52'-5" 1" 9'-11" 6'-0" 52'-5" 1" 52'-5" 1" 54'-6" 2'-0"
2'-0
"34
'-1"
1"20
'-7"
1"20
'-7"
1"34
'-2"
1"6'
-3"
1"9'
-11"
1"75
'-2"
110'-4 1/2"
1"20
'-7"
1"20
'-7"
1"20
'-7"
1"
62'-1
"
1" 52'-5" 1" 20'-7" 1" 20'-7" 1" 20'-7" 1" 20'-7" 1" 52'-5" 2"
187'-10"
1"20
'-7"
1"20
'-7"
1"20
'-7"
1"
62'-1
"
191'-10"
1B1A2
1A1B
1B2
2B
1B2
1B21C2
1B1B
1B
2B
1B2 1B2
1B
1A1B2
1C1C1C2
1B
2M
2L
2L
2A
2A2A2A
1B
1B1B
1B
2B
1C1C2
1C2
1B21B2
1B
1C21C
1C
1B2
1B
1B2
1C2
1C
1E
1C
1B
2B
2B
1B
1C
1B
2A
2A
2A
2A
1B
1C 1C2
1B
1B1B2
1B
1C21C1E1C2
1B
1C2
2B
2B2B
2B
2B
2B
2B
2B
1B
1C
1E
1C
1C
1E1C2
1C2
1B21B
1B 1B
1B2
1B
1B21B
1B2
1B1B2
1B1A
1A21B
1C
1B2
1B2
1B
1B
1B2
1B2
1B
1C2
1C
2B
2B
2B
2B
1C
1C2
1B
1B2
1B2
1C
1C
1C
1C2
2B
1C
1C2
1C
1C2
1B
1B
1B
1B
1B
1B2
1B2
1B
1B
1B
1B
1B
1A2
1A
1B
1B
1B
1B
1C
1B
1B
1A
1B
1B 1B
1A
1A
1A1A
1A 1A
1B
1B
1B 1B
1B
1B
1B
1A
1A
1A1B 1B 1B 1B
2A
2A
2A
2A
2A
2A
2A
2B
1B2
1B
1B2
2L
2L
1C2
1C
1C
1C2
1B
1C2
1C
1B
1C
1C
1C
1B
2B
2B
2B
2B
2B
1C2
1C
A4.11
BLDG 1 SECOND FLOOROVERALL PLAN
BW
SCALE:1 1/16" = 1'-0"
BUILDING I SECOND FLOOR OVERALL PLANSHEET CONTENTS:
Issue for Construction
Revisions:
Issue for Permit Application:
Architect of Record:
Drawn by:
Designed by:
Date Plotted:
#
SHEET NO.
Issue for Pricing / Bidding:
DATE COMMENTS
The architectural works depicted herein are thesole property of Humphreys & Partners Architects,L.P. and may not be constructed or used withoutits express written permission. No permission tomodify or reproduce any of the architecturalworks, including without limitation the constructionof any building, is expressed or should be impliedfrom delivery of preliminary drawings or unsealedconstruction drawings. Permission to constructthe building depicted in sealed constructiondrawings is expressly conditioned on the full andtimely payment of all fees otherwise dueHumphreys & Partners Architects, L.P. and, in theabsence of any written agreement to the contrary,is limited to a one-time use on the site indicatedon these plans.
© by Humphreys & PartnersArchitects, L.P.All Rights Reserved
2017
DE
SIG
N D
EV
ELO
PM
EN
T S
ET
16273
EN
DE
AV
OR
RE
SID
EN
TIA
L
SP
RIN
GTO
WN
EN
DE
AV
OR
SA
N M
AR
CO
S, T
X.
GLJ
RM
JAN 19 2017
DA
LLA
SC
HIC
AG
O
.
. NE
W O
RLE
AN
S
. NE
W Y
OR
KN
EW
PO
RT
BE
AC
HO
RLA
ND
OS
AN
RA
MO
N
.
. SC
OTT
SD
ALE
ED
MO
NTO
N
. TOR
ON
TOC
HE
NN
AI
DU
BA
I
.
. HA
NO
I
. MO
NTE
VID
EO
.. ww
w.h
umph
reys
.com
AR
CH
ITE
CTS
, L.
P.
HUMPHREYS &
PARTNERS
5339
ALP
HA
RO
AD
· SU
ITE
300 ·
DAL
LAS,
TEX
AS 75
240
(972
) 701
- 96
39 ·
(972
) 701
- 96
39 F
AX
These drawings are forpreliminary coordinationonly and not to be used
for regulatory approval orconstruction.
Closet Elevations
VVD.f3
February 10, 2017
2’ Equipmentspace 3’ work space
5’ total depth including hallway in front of doors
Typical BCR/IDF
Access Control&
Data7’h x 3’ w x 2’d
120vD
Audio-Video7’h x 3’ w x 2’d
120vD
120vD
busbar
IDF
120vD120vD
FURNITURE PLAN - CLUB & LEASING01
FURNITURE PLAN - CLUB& LEASING
ID-4.0
1/4" = 1'-0"
SHEET TITLE:
DATE:
REVISIONS:
#
SHEET NO.
DATE COMMENTS
© by HPA Design Group, LPAll Rights Reserved
2017
The arrangements depicted herein are thesole property of HPA Design Group, LPand may not be reproduced in any formwithout written permission.
5339
ALP
HA R
OAD
SUIT
E 25
0DA
LLAS
, TEX
AS 7
5240
p: 9
72.5
96.1
700
f: 9
72.5
96.1
720
hpadesigngroup.com
SPRI
NGTO
WN
MAL
LSA
N M
ARCO
S, T
X
ENDE
AVOR
REA
L ES
TATE
216152
ISSUE: 50% CD SET
INTERIOR DESIGN SET
01.19.2017
SCALE:
© 2016 RealPage, Inc. All trademarks and copyrights are properties of their respective owners
Office & Amenity Layouts
VVD.g1
February 10, 2017
PD D
DD
PD D
PD DP
D D
PD D
DD
PD D D
D
(1) category 6 and (1) series 6 coaxial cable per aerobic device
Interior Wi-Fi cables on ceilingExterior Wi-Fi Cables on wall minimum 9’ AFF
All cables terminated with 8 position modular plugand routed back to closest IDF
DD
REFLECTED CEILING PLAN - CLUB & LEASING01
L-100
L-100
L-100
L-101
L-101
L-102L-102L-102
L-102L-102L-102
L-103
L-103L-103
L-103 L-103
L-104L-104L-104
L-104 L-104 L-104
L-104L-104
L-104 L-104
L-104L-104
L-105
L-106
L-107
L-107
L-105 L-105
L-108
L-108
L-108
L-108
L-109
L-109
L-109
L-109
L-109
L-109
L-109
L-109
L-109
L-109 L-109
L-109
L-109
L-109
L-109
L-109
L-109
REFLECTED CEILING
PLAN - CLUB & LEASING
ID-2.0
GENERAL NOTES:
1. REFER TO MEP PACKAGE FOR ALL GENERAL LIGHTING
2. REFER TO SCHEDULE OF MATERIALS FOR DECORATIVE LIGHTING FIXTURE SPECIFICATIONS
3.LOUDSPEAKERS, BAFFLES, AIR GRILLES, SLOT DIFFUSERS, ACCESS PANELS, COVER PLATES,
SPRINKLER HEAD ESCUTCHEONS, AND VENTS ARE TO BE PAINTED TO MATCH ADJACENT
SURFACE.
1/4" = 1'-0"
SHEET TITLE:
DATE:
REVISIONS:
#
SHEET NO.
DATE COMMENTS
© by HPA Design Group, LPAll Rights Reserved
2017
The arrangements depicted herein are the
sole property of HPA Design Group, LP
and may not be reproduced in any form
without written permission.
53
39
AL
PH
A R
OA
D S
UIT
E 2
50
DA
LL
AS
, T
EX
AS
75
24
0
p:
97
2.5
96
.17
00
f:
97
2.5
96
.17
20
hpadesigngroup.com
SP
RIN
GT
OW
N M
ALL
SA
N M
AR
CO
S,
TX
EN
DE
AV
OR
RE
AL E
ST
AT
E
216152
ISSUE:
50% CD SET
INTERIOR DESIGN SET
01.19.2017
SCALE:
© 2016 RealPage, Inc. All trademarks and copyrights are properties of their respective owners
Office & Amenity Layouts
VVD.g2
February 10, 2017
Interior Wi-Fi cables on ceilingExterior Wi-Fi Cables on wall minimum 9’ AFF
All cables terminated with 8 position modular plugand routed back to closest IDF
Wi-Fi
Wi-Fi
Wi-Fi
Wi-Fi
Wi-Fi
Wi-Fi
Wi-Fi
1/A4.16
1/A4.15
2/A
4.17
1/A
4.17
522'-1"
210'
-3"
212'
-3"
519'-10 1/2"
A1-ALT
A3.01
B2
A3.03
A1
A3.01
A1
A3.01
A1
A3.01
B1
A3.02
D2
A3.05
D1
A3.04
D1
A3.04
D1
A3.04
D1
A3.04
A1
A3.01
B1
A3.02
D2
A3.05
A1
A3.01
A1
A3.01
A1
A3.01
A1
A3.01
A1
A3.01
D1
A3.04
D1
A3.04
A1
A3.01
A1
A3.01
CLUBHOUSE
87'-7 1/2" 63'-1 1/2" 73'-5 1/2" 6'-6" 46'-1" 26'-3 1/2" 91'-2 1/2"
123'
-0"
4"61
'-7"
34'-1
"1"
20'-7
"1"
20'-7
"1"
34'-2
"1"
6'-3
"1"
9'-1
1"1"
75'-2
"
54'-6"1"52'-5"1"52'-5"6'-0"9'-11"1"52'-5"1"52'-5"1"54'-6" 2'-0"
2'-0
"
2'-0"
2'-0
"34
'-1"
6'-4
"9'
-10"
1"20
'-7"
20'-9
"20
'-7"
1"9'
-11"
5'-1
1"1"
130'
-3"
151'-7"
6'-0
"1"
9'-3
"6'
-3"
114'
-8"
6'-3
"1"
9'-1
1"1"
10'-11" 3'-9"
11'-10"2'-10"
3'-0
"
9'-0
"2'
-0"
191'-10"
1"20
'-7"
1"20
'-7"
20'-9
"12
'-10"
74'-1
1"
1"20
'-7"
1"20
'-7"
20'-9
"12
'-10"
74'-1
1"
1" 52'-5" 1" 20'-7" 1" 20'-7" 1" 20'-7" 1" 20'-7" 1" 52'-5" 2"
187'-10"
2'-0" 68'-6" 2'-0" 108'-4 1/2"
1B1A2
1A1B
1A2
2B
1A2
1A21C2
1A1A
1A
2B
1A2 1A2
1A
1A1A2
1C1C1C2
1B
2M
2L
2L
2A
2A2A2A
1A
1A1A
1A
2B
1C1C2
1C2
1A21A2
1A
1C21C
1C
1B2
1A
1B2
1C2
1C
1E
1C
1A
2B
2B
1A
1C
1A
2A
2A
2A
2A
1B
1C 1C2
1B
1B1B2
1B
1C21C1E1C2
1B
1C2
2B
2B2B
2B
2B
2B
1B2
1B2
1B
1C
1E
1C
1C
1E1C2
1C2
1B21B
1B 1B
1B2
26'-3 1/2" 26'-6 1/2" 25'-5 1/2" 25'-2 1/2" 25'-2 1/2" 25'-5 1/2" 32'-3" 29'-1 1/2"
1A
1A21A
1A2
1A1B2
1B1A
1A21B
1C
1B2
1B2
1A
1B
1B2
1B2
1B
1C2
1C
1B2
1B2
1B2
1B2
1C
1C2
1B
1B2
1B2
1C
1C
1C
1C2
2B
1C
1C2
1C
1C2
1B
1B
1B
1B
1B
1B2
1B
1B
1B
1B
1B
1B
1A
1A
1B
1B
1B
1A
1A
1B
1B
1A
1B
1B 1B
1A
1A
1A1A
1A 1A
1B
1B
1B 1B
1B
1B
1B
1A
1A
1A1B 1B 1B 1B
1B
2B
2B
2A
2A
2A
2A
A4.10
BLDG 1 FIRST FLOOROVERALL PLAN
BW
SCALE:1 1/16" = 1'-0"
BUILDING I FIRST FLOOR OVERALL PLANSHEET CONTENTS:
Issue for Construction
Revisions:
Issue for Permit Application:
Architect of Record:
Drawn by:
Designed by:
Date Plotted:
#
SHEET NO.
Issue for Pricing / Bidding:
DATE COMMENTS
The architectural works depicted herein are thesole property of Humphreys & Partners Architects,L.P. and may not be constructed or used withoutits express written permission. No permission tomodify or reproduce any of the architecturalworks, including without limitation the constructionof any building, is expressed or should be impliedfrom delivery of preliminary drawings or unsealedconstruction drawings. Permission to constructthe building depicted in sealed constructiondrawings is expressly conditioned on the full andtimely payment of all fees otherwise dueHumphreys & Partners Architects, L.P. and, in theabsence of any written agreement to the contrary,is limited to a one-time use on the site indicatedon these plans.
© by Humphreys & PartnersArchitects, L.P.All Rights Reserved
2017
DE
SIG
N D
EV
ELO
PM
EN
T S
ET
16273
EN
DE
AV
OR
RE
SID
EN
TIA
L
SP
RIN
GTO
WN
EN
DE
AV
OR
SA
N M
AR
CO
S, T
X.
GLJ
RM
JAN 19 2017
DA
LLA
SC
HIC
AG
O
.
. NE
W O
RLE
AN
S
. NE
W Y
OR
KN
EW
PO
RT
BE
AC
HO
RLA
ND
OS
AN
RA
MO
N
.
. SC
OTT
SD
ALE
ED
MO
NTO
N
. TOR
ON
TOC
HE
NN
AI
DU
BA
I
.
. HA
NO
I
. MO
NTE
VID
EO
.. ww
w.h
umph
reys
.com
AR
CH
ITE
CTS
, L.
P.
HUMPHREYS &
PARTNERS
5339
ALP
HA
RO
AD
· SU
ITE
300 ·
DAL
LAS,
TEX
AS 75
240
(972
) 701
- 96
39 ·
(972
) 701
- 96
39 F
AX
These drawings are forpreliminary coordinationonly and not to be used
for regulatory approval orconstruction.
© 2016 RealPage, Inc. All trademarks and copyrights are properties of their respective owners
Office & Amenity Layouts
VVD.g3
February 10, 2017
Interior Wi-Fi cables on ceilingExterior Wi-Fi Cables on wall minimum 9’ AFF
All cables terminated with 8 position modular plugand routed back to closest IDF
Wi-Fi
Wi-Fi
Wi-Fi
Wi-Fi
Wi-Fi
Wi-Fi Wi-Fi
Wi-Fi
Wi-Fi
Wi-Fi
Wi-Fi
© 2016 RealPage, Inc. All trademarks and copyrights are properties of their respective owners
Unit Wiring Layout
VVD.h1
February 10, 2017
Unless specified otherwise, all of the below shall be installed by general contractor
Primex P3000 Suttle MediaMAX
Leviton 49605-30Wor equivalent
Leave OpenFor ServicesInstallation
1x8Data
1x6Video
120vD
(1) category 6
(1) series 6 or 11
living area
D DV
(2) category 6
(1) series 6
bdrmdesk
D(1) category 6
Apartment Distribution Panel(ADP)
living area ceiling
RJ-45Plug
Behind Blank
30” R
F Tr
ansp
aren
t En
clos
ure
(1) category 6 home-run through ADP
from BCR/IDF
common areaas close as possible to middle of unit
DV
(1) series 6
bdrmdresser
combine at deskw/ data
if no dresser
© 2016 RealPage, Inc. All trademarks and copyrights are properties of their respective owners
Unit Wiring Layout
VVD.h2
February 10, 2017
DW
REF.
DW
KITCHEN
LIVING
BED
BATH
BATH
BED
CLOSET
CLOSET 1R1S
1R1S
ADP
Wi-Fi
VD D
V
VD
D
Example - Not for Constructionfollow final furniture layouts
Unless specified otherwise, all of the below shall be installed by general contractor