LEAD CHARGES ALL RATES IN THIS FILE ARE LINKED WITH RATES IN BASIC DATA / HIRE CHARGES FILES TO THE EXTENT THEY ARE RELEVANT. IN THE DIALOG BOX THAT APPEARS ON THE MONITOR ON OPENING THIS FILE CLICK ' YES ' AND ' SAVE ' THE FILE. CHANGES MADE IN BASIC DATA / HIRE CHARGES FILES GET INCORPORATED IN THIS FILE AUTOMATICALLY. ALL DATA IN THIS FILE IS PROTECTED BY PASS WORD. GOVERNMENT OF KARNATAKA WATER RESOURCES DEPARTMENT SCHEDULE OF RATES DATA FOR COMPUTATION OF LEAD / LIFT CHARGES AND LOADING / UNLOADING CHARGES FOR THE YEAR : 2003-2004 DATA PREPARED BY SCHEDULE OF RATES COMMITTEE 37

Transcript of SCHEDULE OF RATES - Karnatakawaterresources.kar.nic.in/scheduleofrates/Lead charges.pdf · LEAD...

LEAD CHARGES

ALL RATES IN THIS FILE ARE LINKED WITH RATES IN BASIC DATA / HIRE CHARGES FILES TO THE EXTENT THEY ARE RELEVANT. IN THE DIALOG BOX THAT APPEARS ON THE MONITOR ON OPENING THIS FILE CLICK ' YES ' AND ' SAVE ' THE FILE. CHANGES MADE IN BASIC DATA / HIRE CHARGES FILES GET INCORPORATED IN THIS FILE AUTOMATICALLY. ALL DATA IN THIS FILE IS PROTECTED BY PASS WORD.

GOVERNMENT OF KARNATAKA

WATER RESOURCES DEPARTMENT

SCHEDULE OF RATES

DATA FOR COMPUTATION OF

LEAD / LIFT CHARGES

AND

LOADING / UNLOADING CHARGES

FOR THE YEAR : 2003-2004

DATA PREPARED BY SCHEDULE OF RATES COMMITTEE

37

LEAD CHARGES

JUNE, 2003

38

LEAD CHARGES

LEAD / LIFT / LOADING & UNLOADING CHARGES REFERENCE DATA FOR THE YEAR: 2003-2004HIRE CHARGES OF MACHINERY: Hire Fuel Crew

Charge Charge ChargeTruck 10 t per hour Rs: 239.00 117.00 32.90Tipper 5 cum per hour Rs: 240.00 117.00 32.90Water tanker 8000 ltr per hour Rs: 231.00 117.00 32.90Pump 5 hp diesel per hour Rs: 5.00 31.00 20.75

WAGES OF WORKERS: Per Day

Cement / Steel handling mazdoor Rs: 81.60Heavy mazdoor Rs: 80.90Light mazdoor Rs: 76.40

Sundries Rs: 22.50

39

LEAD CHARGES

NOTES ON SCHEDULE OF RATESLEAD, LIFT, LOADING AND UNLOADING CHARGES FOR MOTERIALS FOR THE YEAR: 2003-2004

1. For total lead upto 150 m ( including initial lead ) lead charges by head load only shall beadopted irrespective of mode of conveyance.

2. For total lead exceeding 150 m conveyance by mechanical means only shall be adopted irrespective of mode of conveyance.

3. The rates for lead charges by head load and upto 5 km by any mode are cumulative andinclusive of lead charges for preceding lead.Example:Lead charges for conveyance of Earth / Sand for total lead of 100 m shall be corrosponding to lead charges ' Total lead upto 100 m ' in the statement of lead charges by head load.

Lead charges for Earth / Sand for total lead of 100 m Rs: 14.30 / cum

Lead charges for conveyance of Earth / Sand for total lead of 4 kms shall be corrosponding to lead charges ' Beyond 3 km upto 4 km ' in the statement of lead charges by any mode.

Lead charges for Earth / Sand for total lead of 4 km Rs: 40.80 / cum

4. Unless otherwise specified lead charges for Earth / Sand / Gravel / Aggregates and Stonesare for loose volume and not for compacted or in-situ volume.

5. The rates for lift charges are cumulative and inclusive of rates for preceding lift.Example :Lift charges for total lift of 6 m shall be orrosponding to lift charges ' 4.50 m to 6.00 m ' inthe statement of lift charges.

Lift charges for Earth / Sand for total lift of 6 m Rs: 7.50 / cum

6. Lift charges are not payable where conveyance of materials is by mechanical means to final placing point.

7. Loading and unloading charges are not payable for conveyance by head load.

8. Loading charges are not payable for conveyance by mechanical means for disposal ofexcavated materials beyond initial lead of 50 m wherever specified.

9. Loading and unloading charges are not payable for conveyance by mechanical means fordisposal of excavated materials beyond initial lead of 1 km wherever specified.

10. The rates for unloading of materials except earth, sand, gravel, coarse aggregate, rubble,size stone and cut stone are inclusive of stacking.

40

LEAD CHARGES

CONVEYANCE CHARGES FOR MATERIALS BY HEAD LOAD FOR THE YEAR: 2003-2004

Sl No. Total distance Earth / Sand /Gravel / Cement / PCC slab/ ( Total lead includes initial lead ) Murrum/ Lime/ Surki/ Reinforce- Shahbad

Size stone / Cut stone ment steel slab / CCRubble / Coarse Str steel block/ BSaggregate slab/ Late-

rite / Wood Rs / cum Rs / tonne Rs / cum

1 2 3 4 51 Total lead upto 50 m (covered by item rate) initial lead initial lead initial lead

2 Total lead upto 100 m 14.30 8.90 19.30

3 Total lead upto 150 m 28.60 17.80 38.50

Notes: 1. No loading or unloading charges are admissible for conveyance by head load.2. For total lead exceeding 150 m conveyance charges by mechanical means only shall be adopted irrespective of mode of conveyance.

CONVEYANCE CHARGES FOR MATERIALS BY ANY MODE FOR THE YEAR: 2003-2004 ( Excluding loading and unloading charges )

Sl No. Distance Earth / Rubble / Cement / PCC slab/Sand / Size stone/ Steel / Shahbad WaterMurum / Cut stone / Pipes / slab / B.S Gravel / Coarse AC sheet/ slab / CC Lime / aggregate GI sheet / block /

RCC pole Laterite / Wood

in Rs / in Rs / in Rs / in Rs / in Rs /cum cum tonne cum 1000 ltr

1 2 3 4 5 6 7 1 Lead upto 1 km 24.10 33.20 25.90 64.30 19.50

2 Lead more than 1 km upto 2 km 29.90 39.00 29.40 72.70 23.00

3 Lead more than 2 km upto 3 km 35.50 44.60 33.00 81.00 26.30

4 Lead more than 3 km upto 4 km 40.80 49.80 36.30 88.70 29.40

5 Lead more than 4 km upto 5 km 45.90 55.00 39.40 96.30 32.50

6 Every km beyond 5 km upto 30 km 4.90 4.90 3.10 7.20 2.90

7 Every km beyond 30 km 4.60 4.60 2.90 6.80 2.70

41

LEAD CHARGES

LOADING AND UNLOADING CHARGES FOR MATERIALS FOR THE YEAR: 2003-2004

Sl No. Description of item Earth / Rubble / Cement / PCC slab/ WaterSand / Size stone/ Steel / Shahabad Murum / Cut stone / AC sheet/ slab / B.SGravel / Coarse GI sheet / slab / CCLime / aggregate RCC pole/ block /

Hume pipe Laterite / Wood

in Rs / in Rs / in Rs / in Rs / in Rs /cum cum tonne cum 1000 ltr

1 2 3 4 5 6 71 Loading 24.80 29.50 27.70 26.50 8.20

2 Unloading 6.20 14.75 27.70 26.50 Gravity

Note: Unloading of materials includes stacking wherever applicable.

CONVEYANCE CHARGES FOR MATERIALS BY HEAD LOAD LIFT CHARGES FOR MATERIALS FOR THE YEAR: 2003-2004

Sl No. Total lift Earth / Sand /Gravel / Cement / PCC slab/ ( Total lift includes initial lift ) Murrum/ Lime/ Surki/ Reinforce- Shahbad

Size stone / Cut stone ment steel slab / CCRubble / Coarse Str steel block/ BSaggregate slab / Late-

rite / Wood Rs / cum Rs / tonne Rs / cum

1 2 3 4 51 Total lift upto 1.50 m (covered by item rate) Initial lift Initial lift Initial lift

2 Total lift upto 3.00 m 2.50 1.90 3.50

3 Total lift upto 4.50 m 5.00 3.80 7.10

4 Total lift upto 6.00 m 7.50 5.70 10.60

5 Total lift upto 7.50 m 10.00 7.60 14.10

42

LEAD CHARGES

LEAD / LIFT / LOADING & UNLOADING CHARGES - DATA RATES

I. GENERAL DATA FOR LEAD / LIFT / LOADING & UNLOADING:

a. Grouping of materials :

For the purpose of working out additional lead / lift / loading and unloading charges various construction materials / manufactured products are grouped into five categories as under :

CATEGORY- I : Earth/ Sand/ Murum/ Gravel/ LimeCATEGORY- II : Rubble/ Size stone/ Cut stone/ Coarse aggregate CATEGORY- III : Cement/ Steel/ Pipes/ AC & GI sheets/ Packed

materials / RCC poles.CATEGORY- IV : PCC/ Shahabad/ B S slabs / CC block / Laterite / Wood CATEGORY- V : Water

Notes:1. For materials under categories I and II truck or tipper can be deployed for conveyance. Loading can be either by manual labour or by mechanical loader. Unloading can be either by manual labour or by mechanical tipping arrangement. For the purpose of data rate analysis tipper with manual loading and mechanical unloading is assumed for category I and truck with manual loading and unloading is assumed for category II.2. For materials under categories III & IV truck is considered for conveyance with loading and unloading by manual labour.3. For material under category V water tanker is considered for conveyance with loading by running 5 hp diesel pump and unloading by gravity flow.

b. Average quantity of material per load :

Materials under category - I : 5.00 cum ( approx 8 t )Materials under category - II : 5.00 cum ( approx 8 t )Materials under category - III : 8.00 tonneMaterials under category - IV : 3.40 cum ( approx 8 t )Materials under category - V : 8000 litres ( 8 tonne )

c. Loading and unloading time per load :

CATEGORY- I : Earth/ Sand/ Murum/ Gravel/ LimeLoading : Manual Unloading : Mechanical tippingQuantity per load: : 5.00 cumOutput of 1 heavy and 1 light mazdoor per day for loading : : 10.00 cumDeploy 7 heavy and 5 light mazdoors for loading.Output of 7 heavy and 5 light mazdoor per day for loading : 50.00 cumTime for loading 5 cum ( 480 x 5 / 50 ) : 50 minutesTime for unloading by mechanical tipping say : 2.50 minutesNumber of loads / day for loading ( 50 / 5 ) : 10.00

CATEGORY- II : Rubble/ Size stone/ Cut stone/ Coarse aggregate Quantity per load: : 5.00 cumOutput of 1 heavy & 1 light mazdoor per day for loading : 8.00 cumDeploy 7 heavy and 5 light mazdoors for loading.Deploy 5 heavy mazdoors for unloading.Output of 12 heavy and 5 light mazdoor per day : 40.00 cum

43

LEAD CHARGES

Time for loading 5 cum ( 480 x 5 / 40 ) : 60 minutesTime for unloading @ 50 percent of loading ( Manual ) : 30 minutesNumber of loads / day for loading or unloading ( 40 / 5 ) : 8.00CATEGORY- III : Cement/ Steel/ Pipes/ AC & GI sheets/ Packed

materials / RCC poles.Consider loading and unloading cement. Quantity per load: : 8.00 tonneOutput of 4 heavy mazdoor per day for loading or unloading : 16.00 tonneDeploy 16 heavy mazdoors for loading Deploy 16 heavy mazdoors for unloading Output of 32 heavy mazdoors per day : 64.00 tonneTime for loading 160 bags ( 480 x 8 / 64 ) : 60 minutesTime for unloading 160 bags same as loading : 60 minutesNumber of loads / day for loading or unloading ( 64 / 8 ) : 8.00

CATEGORY- IV : PCC / Shahabad / B.S slab / CC block / Laterite / WoodConsider PCC slabs of size 550 x 550 x 55 mm Approximate weight of each slab : 40 kgQuantity per load: : 3.40 cumNumber of slabs for 3.40 cum @ 60 slabs / cum : 200Output of 2 heavy mazdoors per day for loading @ 60 slabs / hour : 480 slabsDeploy 6 heavy mazdoors for loading Deploy 6 heavy mazdoors for unloading Output of 12 heavy mazdoors per day : 24.00 cumTime for loading 200 slabs ( 480 x 3.4 / 24 ) : 68 minutesTime for unloading 200 slabs same as loading : 68 minutesNumber of loads / day for loading or unloading ( 24/ 3.4 ) say : 7.00

CATEGORY- V : WaterOutput of 5 hp diesel pump considered : 250 ltr / minTime for loading 8000 litres ( 8000 / 250 ) : 32 minutesTime for unloading by gravity flow @ av 150 ltr / min : 53 minutes

Loading / Unloading time per load : Loading Unloading Totalconsidering 50 min / hr working in minutes in minutes in minutesCATEGORY- I 50 0 50CATEGORY- II 60 30 90CATEGORY- III 60 60 120CATEGORY- IV 68 68 136CATEGORY- V 32 53 85

Note : For category I manual loading and mechanical unloading is considered for analysis.For category II, III and IV manual loading and manual unloading is considered for analysis.For category V loading by pump and unloading by gravity flow is considered for analysis.

d. Conveyance time per round trip : ( common to all categories )

Lead upto 1 km : Speed : 15 km / hr for loaded & 20 km / hr for empty conditions assumed.Turning & spotting time at loading / unloading points : 2.00 minutesRunning time for 2 km @ av. 15 & 20 km / hour : 6.80 minutes

Total : 8.80 minutes

44

LEAD CHARGES

Lead more than 1 km upto 2 km :Turning & spotting time at loading / unloading points : 2.00 minutesRunning time for 2 km initial lead @ av. 15 & 20 km / hour : 6.80 minutesRunning time for 2 km additional lead @ av. 30.00 km / hour : 4.00 minutes

Total : 12.80 minutesLead more than 2 km upto 3 km :Turning & spotting time at loading / unloading points : 2.00 minutesRunning time for 2 km initial lead @ av. 15 & 20 km / hour : 6.80 minutesRunning time for 4 km additional lead @ 30.50 km / hour : 7.90 minutes

Total : 16.70 minutesLead more than 3 km upto 4 km :Turning & spotting time at loading / unloading points : 2.00 minutesRunning time for 2 km initial lead @ av. 15 & 20 km / hour : 6.80 minutesRunning time for 6 km additional lead @ 31.00 km / hour : 11.55 minutes

Total : 20.35 minutesLead more than 4 km upto 5 km :Turning & spotting time at loading / unloading points : 2.00 minutesRunning time for 2 km initial lead @ av. 15 & 20 km / hour : 6.80 minutesRunning time for 8 km additional lead @ 31.75 km / hour : 15.10 minutes

Total : 23.90 minutesLead beyond 5 km upto 30 km for every km :Running time for 2 km @ av speed of 35 km / hr : 3.40 minutes

Lead beyond 30 km for every km :Running time for 2 km @ av speed of 40 km / hr : 3.20 minutes

II. DATA FOR LEAD CHARGES BY HEAD LOAD :

For the purpose of working out conveyance charges by head load the category of materials asclassified in ( I ) above are grouped together as under :

CATEGORY I & II : Earth / Sand / Gravel / Murrum / Lime / Surki / Coarse aggregate / Rubble stone / Size stone / Cut stone In this group materials which are comperatively lighter and generally conveyed by head load

by light / heavy mazdoor are included. Method of conveyance, apprximate weight per loadand time required to cover specified additional distance will be generally same whether thematerial belongs to Category-I or Category-II of the classification. Therefore common data isconsidered for conveyance by head load for materials under these two categories.

CATEGORY III : Cement in bag / Reinforcement steel / Structural steel sections In this group the materials in packed / rolled / fabricated condition which are heavier per load compared to the materials under Category-I and II and which can not be split into small quantities for the purpose of conveyance are included. The unit of measurement for thesematerials is per tonne.

CATEGORY IV : PCC slab / Shahabad stone slab / CC block / Laterite stone / BS slab / Wood In this group the materials in moulded condition / cut to standard size which are heavier per

load compared to materials under Category-I and II are included.

45

LEAD CHARGES

FOR MATERIALS UNDER CATEGORY I & II :

Lead: Upto 50 m :This is initial lead and cost is covered under item basic rate.

Lead: Upto 100 m :Average distance to be covered beyond initial lead of 50 m : 25 mAverage speed of conveyance by head load : 60 m / minuteRound trip cycle time for 25 m considering 50 min/ hr working ( 2 x 25 x 60 / 50 / 60 ) : 1 minNo. of trips per day for additional lead ( 8 x 60 / 1 ) : 480Quantity of material by head load per load : 0.015 cum Quantity of material by head load per day ( 480 x 0.015 ) say : 7.00 cumDeploy one mazdoor for every 50 m additional lead beyond initial lead.

Unit: 7.00 cumSl No. Description Unit Quanty Rate Amount

in Rs. in Rs.1 Light mazdoor Day 1.00 76.40 76.40

Total Rs: 76.40

Add for small T & P @ 1% Rs: 0.76Add for contractors profit @ 10% Rs: 7.64Add for hidden cost on labour @ 15% Rs: 11.46Add for over heads @ 5% Rs: 3.82Total for materials under Category I or II for 7.00 cum Rs: 100.08 Rate per cum Rs: 14.30

Lead: Upto 150 m :Average distance to be covered beyond initial of 50 m : 50 mDeploy two mazdoors for conveyance beyond initial lead.

Unit: 7.00 cumSl No. Description Unit Quanty Rate Amount

in Rs. in Rs.1 Light mazdoor Day 2.00 76.40 152.80

Total Rs: 152.80

Add for small T & P @ 1% Rs: 1.53Add for contractors profit @ 10% Rs: 15.28Add for hidden cost on labour @ 15% Rs: 22.92Add for over heads @ 5% Rs: 7.64Total for 7.00 cum Rs: 200.17 Rate per cum Rs: 28.60

FOR MATERIALS UNDER CATEGORY III :

Lead: Upto 50 m :This is initial lead and cost is covered under item basic rate.

46

LEAD CHARGES

Lead: Upto 100 m :Average distance to be covered beyond initial lead of 50 m : 25 mAverage speed of conveyance by head load : 30 m / minuteRound trip cycle time for 25 m considering 50 min/ hr working ( 2 x 25 x 60 / 50 / 30 ) : 2 minNo. of trips per day for lead upto 100 m ( 8 x 60 / 2 ) : 240Quantity of material by head load per load : 50 kgQuantity of material by head load per day ( 240 x 50 / 1000 ) :12 tonneDeploy one mazdoor for every 50 m additional lead beyond initial lead.

Unit: 12.00 tonneSl No. Description Unit Quanty Rate Amount

in Rs. in Rs.1 Cement /Steel handling mazdoor Day 1.00 81.60 81.60

Total Rs: 81.60

Add for small T & P @ 1% Rs: 0.82Add for contractors profit @ 10% Rs: 8.16Add for hidden cost on labour @ 15% Rs: 12.24Add for over heads @ 5% Rs: 4.08Total for 12.00 tonne Rs: 106.90 Rate per tonne Rs: 8.90

Lead: Upto 150 m :Average distance to be covered beyond initial of 50 m : 50 mDeploy two mazdoors for conveyance beyond initial lead.

Unit: 12.00 tonneSl No. Description Unit Quanty Rate Amount

in Rs. in Rs.1 Cement / Steel handling mazdoor Day 2.00 81.60 163.20

Total Rs: 163.20

Add for small T & P @ 1% Rs: 1.63Add for contractors profit @ 10% Rs: 16.32Add for hidden cost on labour @ 15% Rs: 24.48Add for over heads @ 5% Rs: 8.16Total for 12.00 tonne Rs: 213.79 Rate per tonne Rs: 17.80

FOR MATERIALS UNDER CATEGORY IV :

Lead: Upto 50 m :This is initial lead and cost is covered under item basic rate.

Lead: Upto 100 m :Average distance to be covered beyond initial lead of 50 m : 25 mAverage speed of conveyance by head load : 40 m / minuteRound trip cycle time for 25 m considering 50 min/ hr working ( 2 x 25 x 60 / 50 / 40 ) : 1.5 minNo. of trips per day for lead upto 100 m ( 8 x 60 / 1.5 ) : 320Quantity of material by head load per load : 0.017 cumQuantity of material by head load per day ( 320 x 0.017 ) say :5.50 cum

47

LEAD CHARGES

Deploy one mazdoor for every 50 m additional lead beyond initial lead. Unit: 5.50 cum

Sl No. Description Unit Quanty Rate Amountin Rs. in Rs.

1 Heavy mazdoor Day 1.00 80.90 80.90

Total Rs: 80.90Add for small T & P @ 1% Rs: 0.81Add for contractors profit @ 10% Rs: 8.09Add for hidden cost on labour @ 15% Rs: 12.14Add for over heads @ 5% Rs: 4.05Total for 5.50 cum Rs: 105.98 Rate per cum Rs: 19.30

Lead: Upto 150 m :Average distance to be covered beyond initial of 50 m : 50 mDeploy two mazdoors for conveyance beyond initial lead.

Unit: 5.50 cumSl No. Description Unit Quanty Rate Amount

in Rs. in Rs.1 Heavy mazdoor Day 2.00 80.90 161.80

Total Rs: 161.80

Add for small T & P @ 1% Rs: 1.62Add for contractors profit @ 10% Rs: 16.18Add for hidden cost on labour @ 15% Rs: 24.27Add for over heads @ 5% Rs: 8.09Total for 5.50 cum Rs: 211.96 Rate per cum Rs: 38.50

III. DATA FOR LEAD CHARGES BY ANY MODE

a. HIRE CHARGES INCLUDING CREW FOR LOADING / UNLOADING WAITING TIME :Note: For waiting period during loading and unloading the idle hire charge at 10 percent of normal hire

charge ( approximately 25 percent of depreciation ) is considered since the vehicle will be in stationary condition. However, full crew charges are considered since operating crew will be onduty during loading and unloading waiting period.

For category- I : Earth / Sand / Gravel / Murum / Lime / Surki Loading waiting time : 50 minutes. Unit: 5.00 cum

Sl No. Description Unit Quanty Rate Amountin Rs. in Rs.

1 Tipper idle hire charges @ 10 % Hour 0.83 24.00 19.922 Crew charges ( full ) Hour 0.83 32.90 27.31

Total Rs: 47.23Add for small T & P @ 1% Rs: 0.47Add for profit on crew @ 10% Rs: 2.73Add for hidden cost on crew @ 15% Rs: 4.10Add for over heads @ 5% Rs: 2.36Total for 5.00 cum Rs: 56.89

48

LEAD CHARGES

For category- II : Rubble / Size stones / Cut stones / Coarse aggregateLoading and unloading waiting time : 90 minutes. Unit: 5.00 cum

Sl No. Description Unit Quanty Rate Amountin Rs. in Rs.

1 Truck idle hire charges @ 10 % Hour 1.50 23.90 35.852 Crew charges Hour 1.50 32.90 49.35

Total Rs: 85.20Add for small T & P @ 1% Rs: 0.85Add for profit on crew @ 10% Rs: 4.94Add for hidden cost on crew @ 15% Rs: 7.40Add for over heads @ 5% Rs: 4.26Total for 5.00 cum Rs: 102.65

For category- III : Cement / Steel / Pipes / RCC poles / AC & GI sheets / Packed materialsLoading and unloading waiting time : 120 minutes. Unit: 8.00 tonne

Sl No. Description Unit Quanty Rate Amountin Rs. in Rs.

1 Truck idle hire charges @ 10 % Hour 2.00 23.90 47.802 Crew charges Hour 2.00 32.90 65.803 Sundries ( extra waiting time / tarpaulin etc ) LS 0.25 22.50 5.63

Total Rs: 119.23Add for small T & P @ 1% Rs: 1.19Add for profit on crew & sundries @ 10% Rs: 7.14Add for hidden cost on crew @ 15% Rs: 9.87Add for over heads @ 5% Rs: 5.96Total for 8.00 tonne Rs: 143.39

For category- IV : PCC slabs / Shahabad slabs / BS slabs / CC & Laterite blocks / WoodLoading and unloading waiting time : 136 minutes. Unit: 3.40 cum

Sl No. Description Unit Quanty Rate Amountin Rs. in Rs.

1 Truck idle hire charges @ 10 % Hour 2.27 23.90 54.172 Crew charges Hour 2.27 32.90 74.57

Total Rs: 128.75Add for small T & P @ 1% Rs: 1.29Add for profit on fuel & crew @ 10% Rs: 7.46Add for hidden cost on crew @ 15% Rs: 11.19Add for over heads @ 5% Rs: 6.44Total for 3.40 cum Rs: 155.11

For category-V : WaterLoading and unloading waiting time : 85 minutes. Unit: 8000.00 litres

Sl No. Description Unit Quanty Rate Amountin Rs. in Rs.

1 Water tanker idle hire charges @ 10 % Hour 1.42 23.10 32.732 Crew charges Hour 1.42 32.90 46.61

Total Rs: 79.33Add for small T & P @ 1% Rs: 0.79Add for profit on fuel & crew @ 10% Rs: 4.66Add for hidden cost on crew @ 15% Rs: 6.99Add for over heads @ 5% Rs: 3.97Total for 8000.00 litres Rs: 95.75

49

LEAD CHARGES

b. HIRE CHARGES INCLUDING FUEL & CREW FOR CONVEYANCE TIME :

For category- I : Earth / Sand / Gravel / Murum / Lime / Surki

For total lead upto 1 km Unit: 5.00 cumSl No. Description Unit Quanty Rate Amount

in Rs. in Rs.1 Tipper hire charges Hour 0.15 240.00 35.20

Fuel charges Hour 0.15 117.00 17.162 Crew charges Hour 0.15 32.90 4.83

Total Rs: 57.19Add for small T & P @ 1% Rs: 0.57Add for profit on fuel & crew @ 10% Rs: 2.20Add for hidden cost on crew @ 15% Rs: 0.72Add for over heads @ 5% Rs: 2.86Total for 5.00 cum Rs: 63.54

For category- I : Earth / Sand / Gravel / Murum / Lime / Surki

For total lead more than 1 km upto 2 km Unit: 5.00 cumSl No. Description Unit Quanty Rate Amount

in Rs. in Rs.1 Tipper hire charges Hour 0.21 240.00 51.20

Fuel charges Hour 0.21 117.00 24.962 Crew charges Hour 0.21 32.90 7.02

Total Rs: 83.18Add for small T & P @ 1% Rs: 0.83Add for profit on fuel & crew @ 10% Rs: 3.20Add for hidden cost on crew @ 15% Rs: 1.05Add for over heads @ 5% Rs: 4.16Total for 5.00 cum Rs: 92.42

For category- I : Earth / Sand / Gravel / Murum / Lime / Surki

For total lead more than 2 km upto 3 km Unit: 5.00 cumSl No. Description Unit Quanty Rate Amount

in Rs. in Rs.1 Tipper hire charges Hour 0.28 240.00 66.80

Fuel charges Hour 0.28 117.00 32.572 Crew charges Hour 0.28 32.90 9.16

Total Rs: 108.52Add for small T & P @ 1% Rs: 1.09Add for profit on fuel & crew @ 10% Rs: 4.17Add for hidden cost on crew @ 15% Rs: 1.37Add for over heads @ 5% Rs: 5.43Total for 5.00 cum Rs: 120.58

50

LEAD CHARGES

For category- I : Earth / Sand / Gravel / Murum / Lime / Surki For total lead more than 3 km upto 4 km Unit: 5.00 cum

Sl No. Description Unit Quanty Rate Amountin Rs. in Rs.

1 Tipper hire charges Hour 0.34 240.00 81.40Fuel charges Hour 0.34 117.00 39.68

2 Crew charges Hour 0.34 32.90 11.16Total Rs: 132.24

Add for small T & P @ 1% Rs: 1.32Add for profit on fuel & crew @ 10% Rs: 5.08Add for hidden cost on crew @ 15% Rs: 1.67Add for over heads @ 5% Rs: 6.61Total for 5.00 cum Rs: 146.93

For category- I : Earth / Sand / Gravel / Murum / Lime / Surki For total lead more than 4 km upto 5 km Unit: 5.00 cum

Sl No. Description Unit Quanty Rate Amountin Rs. in Rs.

1 Tipper hire charges Hour 0.40 240.00 95.60Fuel charges Hour 0.40 117.00 46.61

2 Crew charges Hour 0.40 32.90 13.11Total Rs: 155.31

Add for small T & P @ 1% Rs: 1.55Add for profit on fuel & crew @ 10% Rs: 5.97Add for hidden cost on crew @ 15% Rs: 1.97Add for over heads @ 5% Rs: 7.77Total for 5.00 cum Rs: 172.57

For category- I : Earth / Sand / Gravel / Murum / Lime / Surki For lead beyond 5 km upto 30 km for every km Unit: 5.00 cum

Sl No. Description Unit Quanty Rate Amountin Rs. in Rs.

1 Tipper hire charges Hour 0.06 240.00 13.60Fuel charges Hour 0.06 117.00 6.63

2 Crew charges Hour 0.06 32.90 1.86Total Rs: 22.09

Add for small T & P @ 1% Rs: 0.22Add for profit on fuel & crew @ 10% Rs: 0.85Add for hidden cost on crew @ 15% Rs: 0.28Add for over heads @ 5% Rs: 1.10Total for 5.00 cum Rs: 24.55

For category- I : Earth / Sand / Gravel / Murum / Lime / Surki For lead beyond 30 km for every km Unit: 5.00 cum

Sl No. Description Unit Quanty Rate Amountin Rs. in Rs.

1 Tipper hire charges Hour 0.05 240.00 12.80Fuel charges Hour 0.05 117.00 6.24

2 Crew charges Hour 0.05 32.90 1.75Total Rs: 20.79

Add for small T & P @ 1% Rs: 0.21Add for profit on fuel & crew @ 10% Rs: 0.80Add for hidden cost on crew @ 15% Rs: 0.26Add for over heads @ 5% Rs: 1.04Total for category I & II 5.00 cum Rs: 23.11

51

LEAD CHARGES

For category- II : Rubble / Size stones / Cut stones / Coarse aggregateFor total lead upto 1 km Unit: 5.00 cum

Sl No. Description Unit Quanty Rate Amountin Rs. in Rs.

1 Truck hire charges Hour 0.15 239.00 35.05Fuel charges Hour 0.15 117.00 17.16

2 Crew charges Hour 0.15 32.90 4.83Total Rs: 57.04

Add for small T & P @ 1% Rs: 0.57Add for profit on fuel & crew @ 10% Rs: 2.20Add for hidden cost on crew @ 15% Rs: 0.72Add for over heads @ 5% Rs: 2.85Total for 5.00 cum Rs: 63.38

For category- II : Rubble / Size stones / Cut stones / Coarse aggregateFor total lead more than 1 km upto 2 km Unit: 5.00 cum

Sl No. Description Unit Quanty Rate Amountin Rs. in Rs.

1 Truck hire charges Hour 0.21 239.00 50.99Fuel charges Hour 0.21 117.00 24.96

2 Crew charges Hour 0.21 32.90 7.02Total Rs: 82.97

Add for small T & P @ 1% Rs: 0.83Add for profit on fuel & crew @ 10% Rs: 3.20Add for hidden cost on crew @ 15% Rs: 1.05Add for over heads @ 5% Rs: 4.15Total for 5.00 cum Rs: 92.19

For category- II : Rubble / Size stones / Cut stones / Coarse aggregateFor total lead more than 2 km upto 3 km Unit: 5.00 cum

Sl No. Description Unit Quanty Rate Amountin Rs. in Rs.

1 Truck hire charges Hour 0.28 239.00 66.52Fuel charges Hour 0.28 117.00 32.57

2 Crew charges Hour 0.28 32.90 9.16Total Rs: 108.24

Add for small T & P @ 1% Rs: 1.08Add for profit on fuel & crew @ 10% Rs: 4.17Add for hidden cost on crew @ 15% Rs: 1.37Add for over heads @ 5% Rs: 5.41Total for 5.00 cum Rs: 120.28

For category- II : Rubble / Size stones / Cut stones / Coarse aggregateFor total lead more than 3 km upto 4 km Unit: 5.00 cum

Sl No. Description Unit Quanty Rate Amountin Rs. in Rs.

1 Truck hire charges Hour 0.34 239.00 81.06Fuel charges Hour 0.34 117.00 39.68

2 Crew charges Hour 0.34 32.90 11.16Total Rs: 131.90

Add for small T & P @ 1% Rs: 1.32Add for profit on fuel & crew @ 10% Rs: 5.08Add for hidden cost on crew @ 15% Rs: 1.67Add for over heads @ 5% Rs: 6.60Total for 5.00 cum Rs: 146.57

52

LEAD CHARGES

For category- II : Rubble / Size stones / Cut stones / Coarse aggregateFor total lead more than 4 km upto 5 km Unit: 5.00 cum

Sl No. Description Unit Quanty Rate Amountin Rs. in Rs.

1 Truck hire charges Hour 0.40 239.00 95.20Fuel charges Hour 0.40 117.00 46.61

2 Crew charges Hour 0.40 32.90 13.11Total Rs: 154.91

Add for small T & P @ 1% Rs: 1.55Add for profit on fuel & crew @ 10% Rs: 5.97Add for hidden cost on crew @ 15% Rs: 1.97Add for over heads @ 5% Rs: 7.75Total for 5.00 cum Rs: 172.14

For category- II : Rubble / Size stones / Cut stones / Coarse aggregateFor lead beyond 5 km upto 30 km for every km Unit: 5.00 cum

Sl No. Description Unit Quanty Rate Amountin Rs. in Rs.

1 Truck hire charges Hour 0.06 239.00 13.54Fuel charges Hour 0.06 117.00 6.63

2 Crew charges Hour 0.06 32.90 1.86Total Rs: 22.04

Add for small T & P @ 1% Rs: 0.22Add for profit on fuel & crew @ 10% Rs: 0.85Add for hidden cost on crew @ 15% Rs: 0.28Add for over heads @ 5% Rs: 1.10Total for 5.00 cum Rs: 24.49

For category- II : Rubble / Size stones / Cut stones / Coarse aggregateFor lead beyond 30 km for every km Unit: 5.00 cum

Sl No. Description Unit Quanty Rate Amountin Rs. in Rs.

1 Truck hire charges Hour 0.05 239.00 12.75Fuel charges Hour 0.05 117.00 6.24

2 Crew charges Hour 0.05 32.90 1.75Total Rs: 20.74

Add for small T & P @ 1% Rs: 0.21Add for profit on fuel & crew @ 10% Rs: 0.80Add for hidden cost on crew @ 15% Rs: 0.26Add for over heads @ 5% Rs: 1.04Total for category I & II 5.00 cum Rs: 23.05

For category- III : Cement / Steel / Pipes / RCC poles / AC & GI sheets / Packed materialsFor category- IV : PCC slabs / Shahabad slabs / BS slabs / CC & Laterite blocks / Wood

For total lead upto 1 km For category III : Unit: 8.00 tonne For category IV : Unit: 3.40 cum

Sl No. Description Unit Quanty Rate Amountin Rs. in Rs.

1 Truck hire charges Hour 0.15 239.00 35.05Fuel charges Hour 0.15 117.00 17.16

2 Crew charges Hour 0.15 32.90 4.94Total Rs: 57.15

Add for small T & P @ 1% Rs: 0.57Add for profit on fuel & crew @ 10% Rs: 2.21

53

LEAD CHARGES

Add for hidden cost on crew @ 15% Rs: 0.74Add for over heads @ 5% Rs: 2.86Total for category III 8.00 tonne Rs: 63.53Total for category IV 3.40 cum Rs: 63.53

For category- III : Cement / Steel / Pipes / RCC poles / AC & GI sheets / Packed materialsFor category- IV : PCC slabs / Shahabad slabs / BS slabs / CC & Laterite blocks / Wood

For total lead more than 1 km upto 2 km For III Unit: 8.00 tonneFor IV Unit: 3.40 cum

Sl No. Description Unit Quanty Rate Amountin Rs. in Rs.

1 Truck hire charges Hour 0.21 239.00 50.99Fuel charges Hour 0.21 117.00 24.96

2 Crew charges Hour 0.21 32.90 6.91Total Rs: 82.86

Add for small T & P @ 1% Rs: 0.83Add for profit on fuel & crew @ 10% Rs: 3.19Add for hidden cost on crew @ 15% Rs: 1.04Add for over heads @ 5% Rs: 4.14Total for category III 8.00 tonne Rs: 92.05Total for category IV 3.40 cum Rs: 92.05

For category- III : Cement / Steel / Pipes / RCC poles / AC & GI sheets / Packed materialsFor category- IV : PCC slabs / Shahabad slabs / BS slabs / CC & Laterite blocks / Wood

For total lead more than 2 km upto 3 km For III Unit: 8.00 tonneFor IV Unit: 3.40 cum

Sl No. Description Unit Quanty Rate Amountin Rs. in Rs.

1 Truck hire charges Hour 0.28 239.00 66.52Fuel charges Hour 0.28 117.00 32.57

2 Crew charges Hour 0.28 32.90 9.21Total Rs: 108.30

Add for small T & P @ 1% Rs: 1.08Add for profit on fuel & crew @ 10% Rs: 4.18Add for hidden cost on crew @ 15% Rs: 1.38Add for over heads @ 5% Rs: 5.41Total for category III 8.00 tonne Rs: 120.36Total for category IV 3.40 cum Rs: 120.36

For category- III : Cement / Steel / Pipes / RCC poles / AC & GI sheets / Packed materialsFor category- IV : PCC slabs / Shahabad slabs / BS slabs / CC & Laterite blocks / Wood

For total lead more than 3 km upto 4 km For III Unit: 8.00 tonneFor IV Unit: 3.40 cum

Sl No. Description Unit Quanty Rate Amountin Rs. in Rs.

1 Truck hire charges Hour 0.34 239.00 81.06Fuel charges Hour 0.34 117.00 39.68

2 Crew charges Hour 0.34 32.90 11.19Total Rs: 131.93

Add for small T & P @ 1% Rs: 1.32Add for profit on fuel & crew @ 10% Rs: 5.09Add for hidden cost on crew @ 15% Rs: 1.68Add for over heads @ 5% Rs: 6.60Total for category III 8.00 tonne Rs: 146.61Total for category IV 3.40 cum Rs: 146.61

54

LEAD CHARGES

For category- III : Cement / Steel / Pipes / RCC poles / AC & GI sheets / Packed materialsFor category- IV : PCC slabs / Shahabad slabs / BS slabs / CC & Laterite blocks / Wood

For total lead more than 4 km upto 5 km For III Unit: 8.00 tonneFor IV Unit: 3.40 cum

Sl No. Description Unit Quanty Rate Amountin Rs. in Rs.

1 Truck hire charges Hour 0.40 239.00 95.20Fuel charges Hour 0.40 117.00 46.61

2 Crew charges Hour 0.40 32.90 13.11Total Rs: 154.91

Add for small T & P @ 1% Rs: 1.55Add for profit on fuel & crew @ 10% Rs: 5.97Add for hidden cost on crew @ 15% Rs: 1.97Add for over heads @ 5% Rs: 7.75Total for category III 8.00 tonne Rs: 172.14Total for category IV 3.40 cum Rs: 172.14

For category- III : Cement / Steel / Pipes / RCC poles / AC & GI sheets / Packed materialsFor category- IV : PCC slabs / Shahabad slabs / BS slabs / CC & Laterite blocks / Wood

For lead beyond 5 km upto 30 km for every km For lll Unit: 8.00 tonne For IV Unit: 3.40 cum

Sl No. Description Unit Quanty Rate Amountin Rs. in Rs.

1 Truck hire charges Hour 0.06 239.00 13.54Fuel charges Hour 0.06 117.00 6.63

2 Crew charges Hour 0.06 32.90 1.86Total Rs: 22.04

Add for small T & P @ 1% Rs: 0.22Add for profit on fuel & crew @ 10% Rs: 0.85Add for hidden cost on crew @ 15% Rs: 0.28Add for over heads @ 5% Rs: 1.10Total for category III 8.00 tonne Rs: 24.49Total for category IV 3.40 cum Rs: 24.49

For category- III : Cement / Steel / Pipes / RCC poles / AC & GI sheets / Packed materialsFor category- IV : PCC slabs / Shahabad slabs / BS slabs / CC & Laterite blocks / Wood

For lead beyond 30 km for every km For III Unit: 8.00 tonneFor IV Unit: 3.40 cum

Sl No. Description Unit Quanty Rate Amountin Rs. in Rs.

1 Truck hire charges Hour 0.05 239.00 12.75Fuel charges Hour 0.05 117.00 6.24

2 Crew charges Hour 0.05 32.90 1.75Total Rs: 20.74

Add for small T & P @ 1% Rs: 0.21Add for profit on fuel & crew @ 10% Rs: 0.80Add for hidden cost on crew @ 15% Rs: 0.26Add for over heads @ 5% Rs: 1.04Total for category III 8.00 tonne Rs: 23.05Total for category IV 3.40 cum Rs: 23.05

55

LEAD CHARGES

For category-V : WaterFor total lead upto 1 km Unit: 8000.00 Litres

Sl No. Description Unit Quanty Rate Amountin Rs. in Rs.

1 Water tanker hire charges Hour 0.15 231.00 33.88Fuel charges Hour 0.15 117.00 17.16

2 Crew charges Hour 0.15 32.90 4.83Total Rs: 55.87

Add for small T & P @ 1% Rs: 0.56Add for profit on fuel & crew @ 10% Rs: 0.48Add for hidden cost on crew @ 15% Rs: 0.72Add for over heads @ 5% Rs: 2.79Total for 8000.00 Litres Rs: 60.42

For category-V : WaterFor total lead more than 1 km upto 2 km Unit: 8000.00 Litres

Sl No. Description Unit Quanty Rate Amountin Rs. in Rs.

1 Water tanker hire charges Hour 0.21 231.00 49.28Fuel charges Hour 0.21 117.00 24.96

2 Crew charges Hour 0.21 32.90 7.02Total Rs: 81.26

Add for small T & P @ 1% Rs: 0.81Add for profit on fuel & crew @ 10% Rs: 0.70Add for hidden cost on crew @ 15% Rs: 1.05Add for over heads @ 5% Rs: 4.06Total for 8000.00 Litres Rs: 87.89

For category-V : WaterFor total lead more than 2 km upto 3 km Unit: 8000.00 Litres

Sl No. Description Unit Quanty Rate Amountin Rs. in Rs.

1 Water tanker hire charges Hour 0.28 231.00 64.30Fuel charges Hour 0.28 117.00 32.57

2 Crew charges Hour 0.28 32.90 9.16Total Rs: 106.02

Add for small T & P @ 1% Rs: 1.06Add for profit on fuel & crew @ 10% Rs: 0.92Add for hidden cost on crew @ 15% Rs: 1.37Add for over heads @ 5% Rs: 5.30Total for 8000.00 Litres Rs: 114.67

For category-V : WaterFor total lead more than 3 km upto 4 km Unit: 8000.00 Litres

Sl No. Description Unit Quanty Rate Amountin Rs. in Rs.

1 Water tanker hire charges Hour 0.34 231.00 78.35Fuel charges Hour 0.34 117.00 39.68

2 Crew charges Hour 0.34 32.90 11.16Total Rs: 129.19

Add for small T & P @ 1% Rs: 1.29Add for profit on fuel & crew @ 10% Rs: 1.12Add for hidden cost on crew @ 15% Rs: 1.67Add for over heads @ 5% Rs: 6.46Total for 8000.00 Litres Rs: 139.73

56

LEAD CHARGES

For category-V : WaterFor total lead more than 4 km upto 5 km Unit: 8000.00 Litres

Sl No. Description Unit Quanty Rate Amountin Rs. in Rs.

1 Water tanker hire charges Hour 0.40 231.00 92.02Fuel charges Hour 0.40 117.00 46.61

2 Crew charges Hour 0.40 32.90 13.11Total Rs: 151.73

Add for small T & P @ 1% Rs: 1.52Add for profit on fuel & crew @ 10% Rs: 1.31Add for hidden cost on crew @ 15% Rs: 1.97Add for over heads @ 5% Rs: 7.59Total for 8000.00 Litres Rs: 164.10

For category-V : WaterFor lead beyond 5 km upto 30 km for every km: Unit: 8000.00 Litres

Sl No. Description Unit Quanty Rate Amountin Rs. in Rs.

1 Water tanker hire charges Hour 0.06 231.00 13.09Fuel charges Hour 0.06 117.00 6.63

2 Crew charges Hour 0.06 32.90 1.86Total Rs: 21.58

Add for small T & P @ 1% Rs: 0.22Add for profit on fuel & crew @ 10% Rs: 0.19Add for hidden cost on crew @ 15% Rs: 0.28Add for over heads @ 5% Rs: 1.08Total for 8000.00 Litres Rs: 23.35

For category-V : WaterFor lead beyond 30 km for every km: Unit: 8000.00 Litres

Sl No. Description Unit Quanty Rate Amountin Rs. in Rs.

1 Water tanker hire charges Hour 0.05 231.00 12.32Fuel charges Hour 0.05 117.00 6.24

2 Crew charges Hour 0.05 32.90 1.75Total Rs: 20.31

Add for small T & P @ 1% Rs: 0.20Add for profit on fuel & crew @ 10% Rs: 0.18Add for hidden cost on crew @ 15% Rs: 0.26Add for over heads @ 5% Rs: 1.02Total for 8000.00 Litres Rs: 21.97

c. LEAD CHARGES:

FOR CATEGORY- I : Earth / Sand / Gravel / Murum / Lime / Surki

For lead upto 1 km:Waiting time idle hire charges Rs: 56.89Running time hire charges Rs: 63.54Total for 5.00 cum Rs: 120.43

Rate per cum Rs: 24.10

57

LEAD CHARGES

For lead more than 1 km upto 2 km:Waiting time idle hire charges Rs: 56.89Running time hire charges Rs: 92.42Total for 5.00 cum Rs: 149.31

Rate per cum Rs: 29.90For lead more than 2 km upto 3 km:

Waiting time idle hire charges Rs: 56.89Running time hire charges Rs: 120.58Total for 5.00 cum Rs: 177.47

Rate per cum Rs: 35.50For lead more than 3 km upto 4 km:

Waiting time idle hire charges Rs: 56.89Running time hire charges Rs: 146.93Total for 5.00 cum Rs: 203.82

Rate per cum Rs: 40.80For lead more than 4 km upto 5 km:

Waiting time idle hire charges Rs: 56.89Running time hire charges Rs: 172.57Total for 5.00 cum Rs: 229.45

Rate per cum Rs: 45.90For lead beyond 5 km upto 30 km:

Waiting time idle hire charges Rs: 0.00Running time hire charges Rs: 24.55Total for 5.00 cum Rs: 24.55

Rate per cum / km Rs: 4.90For lead beyond 30 km:

Waiting time idle hire charges Rs: 0.00Running time hire charges Rs: 23.11Total for 5.00 cum Rs: 23.11

Rate per cum / km Rs: 4.60

FOR CATEGORY- II : Rubble / Size stone / Cut stone / Coarse aggregate

For lead upto 1 km:Waiting time idle hire charges Rs: 102.65Running time hire charges Rs: 63.38Total for 5.00 cum Rs: 166.03

Rate per cum Rs: 33.20For lead more than 1 km upto 2 km:

Waiting time idle hire charges Rs: 102.65Running time hire charges Rs: 92.19Total for 5.00 cum Rs: 194.84

Rate per cum Rs: 39.00For lead more than 2 km upto 3 km:

Waiting time idle hire charges Rs: 102.65Running time hire charges Rs: 120.28Total for 5.00 cum Rs: 222.93

Rate per cum Rs: 44.60For lead more than 3 km upto 4 km:

Waiting time idle hire charges Rs: 102.65Running time hire charges Rs: 146.57Total for 5.00 cum Rs: 249.22

Rate per cum Rs: 49.80

58

LEAD CHARGES

For lead more than 4 km upto 5 km:Waiting time idle hire charges Rs: 102.65Running time hire charges Rs: 172.14Total for 5.00 cum Rs: 274.79

Rate per cum Rs: 55.00For lead beyond 5 km upto 30 km:

Waiting time idle hire charges Rs: 0.00Running time hire charges Rs: 24.49Total for 5.00 cum Rs: 24.49

Rate per cum / km Rs: 4.90For lead beyond 30 km:

Waiting time idle hire charges Rs: 0.00Running time hire charges Rs: 23.05Total for 5.00 cum Rs: 23.05

Rate per cum / km Rs: 4.60

FOR CATEGORY- III : Cement / Steel / Pipes / AC & GI sheet / RCC pole / Packed materials

For lead upto 1 km:Waiting time idle hire charges Rs: 143.39Running time hire charges Rs: 63.53Total for 8.00 tonne Rs: 206.92

Rate per tonne Rs: 25.90

For lead more than 1 km upto 2 km:Waiting time idle hire charges Rs: 143.39Running time hire charges Rs: 92.05Total for 8.00 tonne Rs: 235.44

Rate per tonne Rs: 29.40

For lead more than 2 km upto 3 km:Waiting time idle hire charges Rs: 143.39Running time hire charges Rs: 120.36Total for 8.00 tonne Rs: 263.75

Rate per tonne Rs: 33.00

For lead more than 3 km upto 4 km:Waiting time idle hire charges Rs: 143.39Running time hire charges Rs: 146.61Total for 8.00 tonne Rs: 290.00

Rate per tonne Rs: 36.30

For lead more than 4 km upto 5 km:Waiting time idle hire charges Rs: 143.39Running time hire charges Rs: 172.14Total for 8.00 tonne Rs: 315.53

Rate per tonne Rs: 39.40

For lead beyond 5 km upto 30 km:Waiting time idle hire charges Rs: 0.00Running time hire charges Rs: 24.49Total for 8.00 tonne Rs: 24.49

Rate per tonne / km Rs: 3.10

59

LEAD CHARGES

For lead beyond 30 km:Waiting time idle hire charges Rs: 0.00Running time hire charges Rs: 23.05Total for 8.00 tonne Rs: 23.05

Rate per tonne / km Rs: 2.90

FOR CATEGORY- IV : PCC slab / Shahabad slab / BS slab / CC & Laterite block / Wood

For lead upto 1 km:Waiting time idle hire charges Rs: 155.11Running time hire charges Rs: 63.53Total for 3.40 cum Rs: 218.64

Rate per cum Rs: 64.30For lead more than 1 km upto 2 km:

Waiting time idle hire charges Rs: 155.11Running time hire charges Rs: 92.05Total for 3.40 cum Rs: 247.17

Rate per cum Rs: 72.70For lead more than 2 km upto 3 km:

Waiting time idle hire charges Rs: 155.11Running time hire charges Rs: 120.36Total for 3.40 cum Rs: 275.47

Rate per cum Rs: 81.00For lead more than 3 km upto 4 km:

Waiting time idle hire charges Rs: 155.11Running time hire charges Rs: 146.61Total for 3.40 cum Rs: 301.72

Rate per cum Rs: 88.70For lead more than 4 km upto 5 km:

Waiting time idle hire charges Rs: 155.11Running time hire charges Rs: 172.14Total for 3.40 cum Rs: 327.26

Rate per cum Rs: 96.30For lead beyond 5 km upto 30 km:

Waiting time idle hire charges Rs: 0.00Running time hire charges Rs: 24.49Total for 3.40 cum Rs: 24.49

Rate per cum / km Rs: 7.20For lead beyond 30 km:

Waiting time idle hire charges Rs: 0.00Running time hire charges Rs: 23.05Total for 3.40 cum Rs: 23.05

Rate per cum / km Rs: 6.80

FOR CATEGORY- V : Water

For lead upto 1 km:Waiting time idle hire charges Rs: 95.75Running time hire charges Rs: 60.42Total for 8000.00 ltrs Rs: 156.17

Rate per 1000 ltr Rs: 19.50

60

LEAD CHARGES

For lead more than 1 km upto 2 km:Waiting time idle hire charges Rs: 95.75Running time hire charges Rs: 87.89Total for 8000.00 ltrs Rs: 183.63

Rate per 1000 ltr Rs: 23.00For lead more than 2 km upto 3 km:

Waiting time idle hire charges Rs: 95.75Running time hire charges Rs: 114.67Total for 8000.00 ltrs Rs: 210.41

Rate per 1000 ltr Rs: 26.30For lead more than 3 km upto 4 km:

Waiting time idle hire charges Rs: 95.75Running time hire charges Rs: 139.73Total for 8000.00 ltrs Rs: 235.47

Rate per 1000 ltr Rs: 29.40For lead more than 4 km upto 5 km:

Waiting time idle hire charges Rs: 95.75Running time hire charges Rs: 164.10Total for 8000.00 ltrs Rs: 259.85

Rate per 1000 ltr Rs: 32.50For lead beyond 5 km upto 30 km:

Waiting time idle hire charges Rs: 0.00Running time hire charges Rs: 23.35Total for 8000.00 ltrs Rs: 23.35

Rate per 1000 ltr / km Rs: 2.90For lead beyond 30 km:

Waiting time idle hire charges Rs: 0.00Running time hire charges Rs: 21.97Total for 8000.00 ltrs Rs: 21.97

Rate per 1000 ltr / km Rs: 2.70

IV. LOADING AND UNLOADING CHARGES

For loading or unloading materials are grouped into 5 categories as in case of lead charges.

FOR CATEGORY- I : Earth / Sand / Gravel / Murum / Lime / Surki

Quantity of material per load : 5.00 cumNumber of loads per day ( refer lead charges for details ) : 10 Deploy 7 heavy and 5 light mazdoors for loading.Deploy tipper 25 minutes for mechanical tipping and 1 heavy mazdoor at unloading spot.

LOADING : Unit: 50.00 cumSl No. Description Unit Quanty Rate Amount

in Rs. in Rs.1 Heavy mazdoor Day 7.00 80.90 566.302 Light mazdoor Day 5.00 76.40 382.00

Total Rs: 948.30Add for small T & P @ 1% Rs: 9.48Add for contractors profit @ 10% Rs: 94.83Add for hidden cost on labour @ 15% Rs: 142.25Add for over heads @ 5% Rs: 47.42Total for 50.00 cum Rs: 1242.27Loading Rate per cum Rs: 24.80

61

LEAD CHARGES

UNLOADING : Unit: 50.00 cumSl No. Description Unit Quanty Rate Amount

in Rs. in Rs.1 Tipper 5 cum capacity Hour 0.42 240.00 100.80

Fuel / Energy charges Hour 0.42 117.00 49.14Crew charges Hour 0.42 32.90 13.82

2 Heavy mazdoor Day 1.00 80.90 80.90Total Rs: 244.66

Add for small T & P @ 1% Rs: 2.45Add for contractors profit @ 10% Rs: 13.00Add for hidden cost on labour @ 15% Rs: 36.70Add for over heads @ 5% Rs: 12.23Total for 50.00 cum Rs: 309.04Unloading Rate per cum Rs: 6.20

FOR CATEGORY- II : Rubble / Size stone / Cut stone / Coarse aggregate

Quantity of material per load : 5.00 cumNumber of loads per day ( refer lead charges for details ) : 8 Deploy 7 heavy and 5 light mazdoors for loading.Deploy 5 heavy mazdoors for unloading.Total cost is apportioned at 2 / 3 for loading and 1 / 3 for unloading.

Unit: 40.00 cumSl No. Description Unit Quanty Rate Amount

in Rs. in Rs.1 Heavy mazdoor Day 12.00 80.90 970.802 Light mazdoor Day 5.00 76.40 382.00

Total Rs: 1352.80Add for small T & P @ 1% Rs: 13.53Add for contractors profit @ 10% Rs: 135.28Add for hidden cost on labour @ 15% Rs: 202.92Add for over heads @ 5% Rs: 67.64Total for 40.00 cum Rs: 1772.17Loading Rate per cum Rs: 29.50Unloading @ 50 % of loading Rate per cum Rs: 14.75

FOR CATEGORY- III : Cement / Steel / Pipes / AC & GI sheet / RCC pole / Packed materials

Quantity of material per load : 8.00 tonneNumber of loads per day ( refer lead charges for details ) : 8 Deploy 16 heavy mazdoors for loading.Deploy16 heavy mazdoors for unloading and stacking.Total cost is apportioned at 1/ 2 for loading and 1/ 2 for unloading including stacking.

Unit: 64.00 tonneSl No. Description Unit Quanty Rate Amount

in Rs. in Rs.1 Cement / Steel handling mazdoor Day 32.00 81.60 2611.20

Total Rs: 2611.20Add for small T & P @ 1% Rs: 26.11Add for contractors profit @ 10% Rs: 261.12Add for hidden cost on labour @ 15% Rs: 391.68Add for additional hidden cost @ 5% 130.56

62

LEAD CHARGES

Add for over heads @ 5% Rs: 130.56Total for 64.00 tonne Rs: 3551.23Loading at 50 % apportioning Rate per tonne Rs: 27.70Unloading & stacking same rate as loading Rate per tonne Rs: 27.70

FOR CATEGORY- IV : PCC slab / Shahabad slab / BS slab / CC block / Laterite block / Wood

Quantity of material per load : 3.40 cumNumber of loads per day ( refer lead charges for details ) : 7 Deploy 6 heavy mazdoors for loading.Deploy 6 heavy mazdoors for unloading and stacking.Total cost is apportioned at 1/ 2 for loading and 1/ 2 for unloading including stacking.

Unit: 24.00 cumSl No. Description Unit Quanty Rate Amount

in Rs. in Rs.1 Heavy mazdoor Day 12.00 80.90 970.80

Total Rs: 970.80Add for small T & P @ 1% Rs: 9.71Add for contractors profit @ 10% Rs: 97.08Add for hidden cost on labour @ 15% Rs: 145.62Add for over heads @ 5% Rs: 48.54Total for 24.00 cum Rs: 1271.75Loading at 50 % apportioning Rate per cum Rs: 26.50Unloading & stacking same rate as loading Rate per cum Rs: 26.50

FOR CATEGORY-V : Water

Quantity of material per load : 8000 litresDeploy 5 hp diesel pump for filling and unloading by gravity flow. Time required for filling at 250 ltr per minute : 32 minutes

Unit: 8000.00 ltrsSl No. Description Unit Quanty Rate Amount

in Rs. in Rs.1 Dewatering pump 5 hp ( Diesel ) Hour 0.53 5.00 2.65

Fuel charges Hour 0.53 31.00 16.432 Crew charges including idle time Hour 1.50 20.75 31.13

Total Rs: 50.21Add for small T & P @ 1% Rs: 0.50Add for contractors profit on fuel & crew @ 10% Rs: 4.76Add for hidden cost on labour @ 15% Rs: 7.53Add for over heads @ 5% Rs: 2.51Total for 8000.00 ltrs Rs: 65.50Loading Rate per 1000 ltrs Rs: 8.20Unloading By gravity flow Rs: -------

63

LEAD CHARGES

V. DATA FOR ADDITIONAL LIFT CHARGES

For the purpose of working out lift charges by head load the category of materials as classified in ( I ) above are grouped together as under :

CATEGORY I & II : Earth / Sand / Gravel / Murrum / Lime / Surki / Coarse aggregate / Rubble stone / Size stone / Cut stone In this group the materials which are comperatively lighter and generally conveyed by head

load by light / heavy mazdoor are included. Method of conveyance, apprximate weight per loadand the time required to cover specified additional distance will be generally same whetherthe material belongs to Category-I or Category-II of the classification. Therefore, common datais considered for lift by head load for materials under these two categories.

CATEGORY III : Cement bag / Reinforcement steel / Structural steel sections In this group materials in packed / rolled / fabricated condition which are heavier per load compared to the materials under Category -I and II and which can not be split into small quantities for the purpose of lift charges are included. The unit of measurement for thesematerials is per tonne.

CATEGORY IV : PCC slab / Shahabad stone slab / CC block / Laterite stone / BS slab / Wood In this group the materials in moulded condition / cut to standard size which are heavier per

load compared to materials under Category-I and II are included.

FOR CATEGORY I & II : Earth / Sand / Gravel / Murrum / Lime / Surki / Coarse aggregate / Rubble stone / Size stone / Cut stone

Lift : Upto 1.50 mThis is the initial lift and forms integral part of the activities in the basic rate of work item.Lift charges are admissible only lifting effort beyond initial lift specified in the work item.

Lift : Upto 3.00 mFor lift upto 3 m average additional lift beyond initial lift : 0.75 m1 m lift is reckoned as equivalent to 6 m lead.Equivalent distance for 0.75 m lift ( 0.75 x 6 ) : 4.50 mAverage speed of conveyance by head load : 60 m / minuteRound trip cycle time for 4.5 m considering 50 min/ hr working ( 2 x 4.5 x 60 / 50 / 60 ) : 0.18 minNo. of trips per day for lift 1.5 m to 3 m ( 8 x 60 / 0.18 ) : 2667Quantity of material by head load : 0.015 cum Quantity of material by head load per day ( 2667 x 0.015 ) : 40 cumDeploy 1 mazdoor for every additional lift of 1.5 m beyond initial lift.

Lift : Upto 3.00 m for materials under Category I & II. Unit: 40.00 cumSl No. Description Unit Quanty Rate Amount

in Rs. in Rs.1 Light mazdoor Day 1.00 76.40 76.40

Total Rs: 76.40

Add for small T & P @ 1% Rs: 0.76Add for contractors profit @ 10% Rs: 7.64Add for hidden cost on labour @ 15% Rs: 11.46Add for over heads @ 5% Rs: 3.82Total for 40.00 cum Rs: 100.08 Rate per cum Rs: 2.50

64

LEAD CHARGES

Lift : Upto 4.50 mFor lift upto 4.5 m additional lift of upto 3 m is involved. Deploy 2 mazdoors.

Lift : Upto 4.50 m for materials under Category I & II. Unit: 40.00 cumSl No. Description Unit Quanty Rate Amount

in Rs. in Rs.1 Light mazdoor Day 2.00 76.40 152.80

Total Rs: 152.80

Add for small T & P @ 1% Rs: 1.53Add for contractors profit @ 10% Rs: 15.28Add for hidden cost on labour @ 15% Rs: 22.92Add for over heads @ 5% Rs: 7.64Total for 40.00 cum Rs: 200.17 Rate per cum Rs: 5.00

Lift : Upto 6.00 mFor lift upto 6 m additional lift of upto 4.5 m is involved.Deploy 3 mazdoors.

Lift : Upto 6.00 m for materials under Category I & II. Unit: 40.00 cumSl No. Description Unit Quanty Rate Amount

in Rs. in Rs.1 Light mazdoor Day 3.00 76.40 229.20

Total Rs: 229.20

Add for small T & P @ 1% Rs: 2.29Add for contractors profit @ 10% Rs: 22.92Add for hidden cost on labour @ 15% Rs: 34.38Add for over heads @ 5% Rs: 11.46Total for 40.00 cum Rs: 300.25 Rate per cum Rs: 7.50

Lift : Upto 7.50 mFor lift upto 7.5 m additional lift of upto 6 m is involved.Deploy 4 mazdoors.

Lift : Upto 7.50 m for materials under Category I & II. Unit: 40.00 cumSl No. Description Unit Quanty Rate Amount

in Rs. in Rs.1 Light mazdoor Day 4.00 76.40 305.60

Total Rs: 305.60

Add for small T & P @ 1% Rs: 3.06Add for contractors profit @ 10% Rs: 30.56Add for hidden cost on labour @ 15% Rs: 45.84Add for over heads @ 5% Rs: 15.28Total for 40.00 cum Rs: 400.34 Rate per cum Rs: 10.00

FOR CATEGORY III : Cement bag / Reinforcement steel / Structural steel sections

Lift : Upto 1.50 mThis is the initial lift and forms integral part of the activities in the basic rate of work item.Lift charges are admissible only lifting effort beyond initial lift specified in the work item.

65

LEAD CHARGES

Lift : Upto 3.00 mFor lift upto 3 m average additional lift beyond initial lift : 0.75 m1 m lift is reckoned as equivalent to 6 m lead.Equivalent distance for 0.75 m lift ( 0.75 x 6 ) : 4.50 mAverage speed of conveyance by head load : 25 m / minuteRound trip cycle time for 4.5 m considering 50 min/ hr working ( 2 x 4.5 x 60 / 50 / 25 ) : 0.43 minNo. of trips per day for lift upto 3 m ( 8 x 60 / 0.43 ) : 1116Quantity of material by head load : 50 kg Quantity of material by head load per day ( 1116 x 50 / 1000 ) : 56 tonneDeploy 1 mazdoor for every additional lift of 1.5 m beyond initial lift.

Lift : Upto 3.00 m for materials under Category I & II. Unit: 56.00 tonneSl No. Description Unit Quanty Rate Amount

in Rs. in Rs.1 Cement / Steel handling mazdoor Day 1.00 81.60 81.60

Total Rs: 81.60

Add for small T & P @ 1% Rs: 0.82Add for contractors profit @ 10% Rs: 8.16Add for hidden cost on labour @ 15% Rs: 12.24Add for over heads @ 5% Rs: 4.08Total for 56.00 tonne Rs: 106.90 Rate per tonne Rs: 1.90

Lift : Upto 4.50 mFor lift upto 4.5 m additional lift of upto 3 m is involved.Deploy 2 mazdoors.

Lift : Upto 4.50 m for materials under Category III. Unit: 56.00 tonneSl No. Description Unit Quanty Rate Amount

in Rs. in Rs.1 Cement / Steel handling mazdoor Day 2.00 81.60 163.20

Total Rs: 163.20

Add for small T & P @ 1% Rs: 1.63Add for contractors profit @ 10% Rs: 16.32Add for hidden cost on labour @ 15% Rs: 24.48Add for over heads @ 5% Rs: 8.16Total for 56.00 tonne Rs: 213.79 Rate per tonne Rs: 3.80

Lift : Upto 6.00 mFor lift upto 6 m additional lift of upto 4.5 m is involved.Deploy 3 mazdoors.

Lift : Upto 6.00 m for materials under Category III. Unit: 56.00 tonneSl No. Description Unit Quanty Rate Amount

in Rs. in Rs.1 Cement / Steel handling mazdoor Day 3.00 81.60 244.80

Total Rs: 244.80

Add for small T & P @ 1% Rs: 2.45Add for contractors profit @ 10% Rs: 24.48Add for hidden cost on labour @ 15% Rs: 36.72Add for over heads @ 5% Rs: 12.24Total for 56.00 tonne Rs: 320.69 Rate per tonne Rs: 5.70

66

LEAD CHARGES

Lift : Upto 7.50 mFor lift upto 7.5 m additional lift of upto 6 m is involved.Deploy 4 mazdoors.

Lift : Upto 7.50 m for materials under Category III. Unit: 56.00 tonneSl No. Description Unit Quanty Rate Amount

in Rs. in Rs.1 Cement / Steel handling mazdoor Day 4.00 81.60 326.40

Total Rs: 326.40

Add for small T & P @ 1% Rs: 3.26Add for contractors profit @ 10% Rs: 32.64Add for hidden cost on labour @ 15% Rs: 48.96Add for over heads @ 5% Rs: 16.32Total for 56.00 tonne Rs: 427.58 Rate per tonne Rs: 7.60

FOR CATEGORY IV : PCC slab / Shahabad stone slab / CC block / Laterite stone / BS slab / Wood

Lift : Upto 1.50 mThis is the initial lift and forms integral part of the activities in the basic rate of work item.Lift charges are admissible only lifting effort beyond initial lift specified in the work item.

Lift : Upto 3.00 mFor lift upto 3 m average additional lift beyond initial lift : 0.75 m1 m lift is reckoned as equivalent to 6 m lead.Equivalent distance for 0.75 m lift ( 0.75 x 6 ) : 4.50 mAverage speed of conveyance by head load : 40 m / minuteRound trip cycle time for 4.5 m considering 50 min/ hr working ( 2 x 4.5 x 60 / 50 / 40 ) : 0.27 minNo. of trips per day for lift upto 3 m ( 8 x 60 / 0.27 ) : 1778Quantity of material by head load : 0.017 cum Quantity of material by head load per day ( 1778 x 0.017 ) : 30 cumDeploy 1 mazdoor for every additional lift of 1.5 m beyond initial lift.

Lift : Upto 3.00 m for materials under Category IV. Unit: 30.00 cumSl No. Description Unit Quanty Rate Amount

in Rs. in Rs.1 Heavy mazdoor Day 1.00 80.90 80.90

Total Rs: 80.90

Add for small T & P @ 1% Rs: 0.81Add for contractors profit @ 10% Rs: 8.09Add for hidden cost on labour @ 15% Rs: 12.14Add for over heads @ 5% Rs: 4.05Total for 30.00 cum Rs: 105.98 Rate per cum Rs: 3.50

Lift : Upto 4.50 mFor lift upto 4.5 m additional lift of upto 3 m is involved.Deploy 2 mazdoors.

67

LEAD CHARGES

Lift : Upto 4.50 m for materials under Category IV. Unit: 30.00 cumSl No. Description Unit Quanty Rate Amount

in Rs. in Rs.1 Heavy mazdoor Day 2.00 80.90 161.80

Total Rs: 161.80

Add for small T & P @ 1% Rs: 1.62Add for contractors profit @ 10% Rs: 16.18Add for hidden cost on labour @ 15% Rs: 24.27Add for over heads @ 5% Rs: 8.09Total for 30.00 cum Rs: 211.96 Rate per cum Rs: 7.10

Lift : Upto 6.00 mFor lift upto 6.00 m additional lift of upto 4.50 m is involved.Deploy 3 mazdoors.

Lift : Upto 6.00 m for materials under Category IV. Unit: 30.00 cumSl No. Description Unit Quanty Rate Amount

in Rs. in Rs.1 Heavy mazdoor Day 3.00 80.90 242.70

Total Rs: 242.70

Add for small T & P @ 1% Rs: 2.43Add for contractors profit @ 10% Rs: 24.27Add for hidden cost on labour @ 15% Rs: 36.41Add for over heads @ 5% Rs: 12.14Total for 30.00 cum Rs: 317.94 Rate per cum Rs: 10.60

Lift : Upto 7.50 mFor lift upto 7.50 m additional lift of upto 6.00 m is involved.Deploy 4 mazdoors.

Lift : Upto 7.50 m for materials under Category IV. Unit: 30.00 cumSl No. Description Unit Quanty Rate Amount

in Rs. in Rs.1 Heavy mazdoor Day 4.00 80.90 323.60

Total Rs: 323.60

Add for small T & P @ 1% Rs: 3.24Add for contractors profit @ 10% Rs: 32.36Add for hidden cost on labour @ 15% Rs: 48.54Add for over heads @ 5% Rs: 16.18Total for 30.00 cum Rs: 423.92 Rate per cum Rs: 14.10

68