Bellingen Shire Council Schedule of Fees and Charges 2015-2016
Page 1 of 67
This page has been intentionally left blank
Page 2 of 67
Table of Contents
Table of Contents Goods and Services Tax .............................................................................................................. 4
Pricing Methodology .................................................................................................................... 5
Schedule of Fees and Charges 2015/2016 .................................................................................. 6
Resilient Economy ....................................................................................................................... 6
Economic Development ................................................................................................................................ 6
Tourism Services .......................................................................................................................................... 7
Community Wellbeing .................................................................................................................. 8
Places for People ......................................................................................................................... 9
Cemeteries ................................................................................................................................................... 9
Council Facilities and Halls ........................................................................................................................... 9
Library Services .......................................................................................................................................... 14
Museums .................................................................................................................................................... 15
Parks and Reserves ................................................................................................................................... 16
Strategic Land Use Planning ...................................................................................................................... 17
Swimming Pools ......................................................................................................................................... 18
Living Environment .................................................................................................................... 20
Environmental Health and Regulation ........................................................................................................ 20
Ranger Services ......................................................................................................................................... 22
Section 68 Activities ................................................................................................................................... 23
Sewer Availability Charge - Sec 501 NSW Local Government Act 1993 ..................................................... 26
Sewerage Management ............................................................................................................................. 27
Waste Management ................................................................................................................................... 28
Water Availability Charge - Section 501, 502 & 556 of NSW Local Government Act, 1993 ......................... 34
Civic Leadership ........................................................................................................................ 36
Administrative Fees .................................................................................................................................... 36
Building and Development Assessment...................................................................................................... 38
Development Assessment .......................................................................................................................... 41
Developer Contributions ............................................................................................................................. 45
Engineering Operations .............................................................................................................................. 46
Ordinary Rates ........................................................................................................................................... 47
Page 3 of 67
Lease Fees - Council Land ......................................................................................................................... 49
Property - Crown Reserves or State Parks ................................................................................................. 49
Roads Act 1993 .......................................................................................................................................... 49
Information & Knowledge ........................................................................................................................... 50
ANNEXURE A ........................................................................................................................... 52
Annexure B - Bellingen Shire Youth Centre – Hire Rate Schedule ......................................................... 53
ANNEXURE C - CF&OS ............................................................................................................ 56
ANNEXURE C - CF&OS ............................................................................................................ 57
ANNEXURE D - ROADS............................................................................................................ 58
Appendices ................................................................................................................................ 61
Appendix 1 – Waste Management Services ............................................................................... 61
Appendix 2 – Private Works ....................................................................................................... 61
Appendix 3 – Annual Water Charge – Usage Allowance ............................................................ 61
Appendix 4 – Council Facilities / Halls........................................................................................ 61
Index .......................................................................................................................................... 62
Page 4 of 67
Goods and Services Tax
Introduction
The Goods and Services Tax (GST) passed through legislation on 30 June 1999 and received Royal Ascent on the 8
July 1999. The introduction of the Goods and Services Tax meant that certain fees and charges levied by Bellingen
Shire Council attract GST, however Local Government benefits from a number of exemptions outlined in the
Federal Treasurer’s (Division 81) Determination.
Transparency
Council has gone to great lengths to ensure it has been totally transparent in reporting the applicability of the GST
to it fees and charges. This document has been set out in such a way so that you, as the user, will know exactly
where the GST applies to fee and charges. Three columns in particular within this document relate to GST:
Charge (excl. GST): This is the actual fee or charge without GST applied to it.
GST: If GST is applicable, this column will show the value of the GST to be applied (for one unit) and is
rounded to the nearest cent. If we are unable to determine the cost of a food or service at the time of
printing (eg the cost may vary during the year), “calculate” will appear in the fee line and GST will be
calculated once the fee is known. If the column is blank yet the Fee Amount field contains a fee, it
indicates GST is not applicable.
Charge (incl. GST): This column should only be used for indicative purposes only (refer to “GST
Calculations” below). The Column displays the Total Charge for one unit with GST included.
GST Calculations
In most cases Council has been able to calculate the GST charge and report it as a dollar figure. This amount is
based on one unit.
If Council was unable to calculate the unit charge at the time of printing, the word “calculate” will be shown in the
fee line. In this case, GST will be calculated one the Fee Amount is known.
GST Amendments
While the fee amount in this document will not alter without a resolution of Council, followed by a subsequent
period on public exhibition, the applicability of the GST to the fees and charge may, depending on the
interpretations and rulings as the GST legislation evolves.
Page 5 of 67
Pricing Methodology
In determining the appropriate fees to be charged for Council services and facilities in 2015-2016, the basic principle applied was that charges should be considered fair and equitable to the general community. Individual members of the community should not be precluded from essential services because of economic circumstances. The range of services provided by Council to the community is diverse and requires different considerations when determining the associated fee or charge. The level of the fee or charge was determined having regard to the following categories (which have been included in this document next to the relevant fee or charge):
Code Description
A Economic Cost Total cost of providing services for private good.
B
Community Service Services considered to have a level of benefit to the community. Generally benefits are not solely confined to users. Partially funded by rates.
C Regulated Charges Federal or State Government set charges
D
User Pays Principal Services under this category are such that individual cots can be determined and met by the user of the service.
E
Market Forces Services that Council operates in a competitive market and needs to fix charges similar to other providers.
F Cost Plus Services provided on a commercial basis with an amount of risk profit included
G
Section 94 (Developer Contributions) Items are priced at the level determined by the adoption of Council’s Section 94 Plan. The Section 94 Plan provides for quarterly increases in these fees based on Consumer Price Index (CPI) increases.
Page 6 of 67
Schedule of Fees and Charges 2015/2016
Fee Description Pricing Policy
Fee Text
Charge
(excl.
GST) $
GST $
Charge
(incl. GST)
$ Unit
Resilient Economy
Economic Development
Dorrigo Saleyards
Agents fees - calves, etc E
0.50 0.05 0.55 per head
Casual use - yards E
3.00 0.30 3.30 per head
Casual use - scales E
3.00 0.30 3.30 per head
Casual use - crush E
3.00 0.30 3.30 per head
Casual use - operator E
31.82 3.18 35.00 per hour
Emergency NLIS tag installation E
25.00 2.50 27.50 per head
NLIS levy - vendor E
0.50 0.05 0.55 per head
NLIS transfer - vendor E
2.00 0.20 2.20 per head
NLIS transfer - agent E
0.64 0.06 0.70 per head
Paddock rent
E
2.00 0.20 2.20 per head/per
day
Truck wash down bay E
1.82 0.18 2.00 per 8 minutes
Unlocking of yards E
31.82 3.18 35.00 each
Yard dues - cattle - over scales E
5.00 0.50 5.50 per head
Yard dues - cattle - open auction E
4.00 0.40 4.40 per head
Yard dues - calves, pigs & sheep E
2.00 0.20 2.20 per head
7A Funda Close
Registrar - overnight
B
78.55 7.85 86.40 per night
Nurses & other Allied Health Workers - overnight
B
60.00 6.00 66.00 per night
Medical Students - overnight
B
41.64 4.16 45.80 per night
Registrar - weekly rate
B
275.45 27.55 303.00 per week
Nurses & other Allied Health Workers - weekly rate
B
210.82 21.08 231.90 per week
Medical Students - weekly rate
B
146.09 14.61 160.70 per week
Bond - refundable
B
200.00 0.00 200.00 per booking
Page 7 of 67
Film & Television Activities
Bond (Optional)
D by quotation $ $ $ quotation
Bond Administration Fee Applied where bond is greater than
$500 D
113.64 11.36 125.00 each
Public Liability Insurance
D to be
determined
by Council $ $ $ each
Use of Council facilities for filming
D by quotation $ $ $ each
Tourism Services
Urunga Visitor Information Centre
Booking Fees/Deposits
Accommodation Nil charge B 0.00 0.00 0.00 per booking
Coaches Nil charge B
0.00 0.00 0.00 per booking
Country Link Train ticketing Nil charge B 0.00 0.00 0.00 per booking
Tours Nil charge B 0.00 0.00 0.00 per booking
Commission
Events display signs Nil charge B 0.00 0.00 0.00 N/A
Accommodation/travel bookings Refer to confidential schedule for
commercial details B
0.00 0.00 0.00
Merchandise Sale at cost plus mark-up - various
items
50%
Waterfall Way Visitor Information Centre
Brochure Advertising per year D
90.91 9.09 100.00 per year
Meeting Room Hire D Per Day 54.55 5.45 60.00 per day
Commercial Event Ticket Commission A 0.00 0.00 10% Commission
Not for Profit Event Ticket Commission A 0.00 0.00 8% Commission
Merchandise Sale at cost plus mark-up - various
items F
0.00 0.00 50%
Page 8 of 67
Community Wellbeing
Bellingen Shire Youth Centre
Refer Annexure B
B
Dorrigo Community Services - Community Bus
Hire of Bus Not for Profit Groups B
0.91 0.09 1.00 per kilometre
Hire of Bus Commercial Group B
1.18 0.12 1.30 per kilometre
Hire of Bus All Other Groups B
1.00 0.10 1.10 per kilometre
Excess Payable in the event of an accident F
0.00 0.00 1,000.00 each
North Bellingen Children’s Centre
Morning Star Kindy (Chrysalis School for Rudolph Steiner Education Limited)
D per week 272.80 24.80 248.00 per week
Dawnsong Long Day Care D per week 272.80 24.80 248.00 per week
Open Arms Care D per week 272.80 24.80 248.00 per week
Page 9 of 67
Places for People
Cemeteries
Reservations
New Purchase (reservation) Shire Resident A 772.73 77.27 850.00 each
New Purchase (reservation) Non Shire Resident A 909.09 90.91 1,000.00 each
Internment
New Purchase/internment (immediate use) Shire Resident A
772.73 77.27 850.00 each
New Purchase/internment (immediate use) Non Shire Resident A
909.09 90.91 1,000.00 each
Reopening of grave for burial Second Burial A
218.18 21.82 240.00 each
Internment after reservation
A
218.18 21.82 240.00 each
Other
Inurnment of ashes into existing grave A 218.18 21.82 240.00 each
Exhumation
A
2,045.45 204.55 2,250.00 each
Private Burial
A
240.00 0.00 240.00 each
Monumental Masonry
A
180.00 0.00 180.00 each
Purchase of Niche
A
381.82 38.18 420.00 each
Enquiry Fee (Family History) Plus $50 per 15 minutes of research A
105.00 0.00 105.00 each
Council Facilities and Halls
Bellingen Citizens Centre
Community groups RSL, Seniors, Red Cross D Nil charge 0.00 0.00 0.00 Nil charge
Kitchen Use (in addition to above) D
5.00 0.50 5.50 per booking
Large Room & Small Room Regular bookings - Morning 9am-1pm
D
10.00 1.00 11.00 per booking
Regular bookings - Afternoon 1pm-
5pm D
10.00 1.00 11.00 per booking
Regular bookings - All Day 9am-5pm D
20.00 2.00 22.00 per booking
Kitchen Use (in addition to above) D
5.00 0.50 5.50 per booking
Large Room & Small Room Ad Hoc bookings - Morning 9am-1pm D
20.00 2.00 22.00 per booking
Ad Hoc bookings - Afternoon 1pm-5pm
D
20.00 2.00 22.00 per booking
Ad Hoc bookings - All Day 9am-5pm D
40.00 4.00 44.00 per booking
Kitchen Use (in addition to above) D
10.00 1.00 11.00 per booking
Page 10 of 67
Bellingen Memorial Hall
Refer Annexure A
D
Brierfield Hall
Hall Hire
D 4.55 0.45 5.00 per hour
Hall Hire
D 50.00 5.00 55.00 per day
Deposit - refundable Refundable after inspection D 300.00 0.00 300.00 per booking
Deer Vale Hall
Cleaning Deposit
D
150.00 0.00 150.00 per booking
Meetings
D
45.45 4.55 50.00 per booking
Parties
D
90.91 9.09 100.00 per booking
Dorrigo Community Centre
Casual Hourly Bookings
Full payment is payable in advance at time
of booking
Meeting Room Excludes catering facilities D
9.09 0.91 10.00 per hour
Main Hall & Stage (dancing, aerobics, martial
arts, etc) Excludes catering facilities D
9.09 0.91 10.00 per hour
Meetings/Function Room Excludes catering facilities D
9.09 0.91 10.00 per hour
Use of Kitchen facilities In addition to above Hire Rates D
27.27 2.73 30.00 per booking
Cleaning Fee If applicable D
45.45 4.55 50.00 per booking
Functions and Exhibitions
Daily Rate Art Exhibitions, Public Meetings,
Public Ceremonies B
63.64 6.36 70.00 per day
Cleaning Fee In addition to Daily Rate above D
113.64 11.36 125.00 per day
Key Deposit Refundable
100.00 0.00 100.00 each
Weddings, Dinners, Luncheons, Balls,
Concerts, Drama, Theatre, Musical Events - Hall, Stage & Kitchen Facilities
Event Rate Including use of kitchen facilities,
tables, chairs, crockery & cutlery D
227.27 22.73 250.00 per event
Cleaning Fee In addition to above D
136.36 13.64 150.00 per event
Damage & Key Deposit Refundable D
90.91 9.09 100.00 per event
Federal/State/Local Government Elections
Hall rate (no kitchen facilities provided) F
By negotiation
By negotiation per event
Cleaning Fee In addition to above F
136.36 13.64 150.00 per event
Key Deposit Refundable F 90.91 9.09 100.00 per event
Page 11 of 67
Other items (By Negotiation)
Special Cleaning Fee F
By
negotiation
By
negotiation per event
Special Equipment Hire
F
By
negotiation
By
negotiation per event
Other (specify)
F
By negotiation
By negotiation per event
Terms and Conditions
The Management Committee reserves the right to negotiate a special key deposit, cleaning fee, electricity charge, and/or damage deposit if circumstances warrant.
In special circumstances, the management committee may negotiate hiring rates different to those set out above. Nothing is to be attached to, hooked to, lent against or otherwise come in contact with the acoustives wall at the eastern end of the hall. Damage to the acoustics wall must be
avoided at all costs.
Parties renting the hall will be held responsible for any damage incurred to the acoustic wall.
Hickory House
Casual Use of Heater in Main Room
D
1.00 0.10 1.10 per hour
Front Office Annual Usage D
1,000.00 100.00 1,100.00 Annually
Small Office Annual Usage D
700.00 70.00 770.00 Annually
Small Room
D
7.00 0.70 7.70 per hour
General Room Hire Rate 1 October to 30 April D
7.00 0.70 7.70 per hour
1 May to 30 September (includes
heater) D
8.00 0.80 8.80 per hour
Kitchen Hire Rate Use of stove, utensils, crockery, etc D
5.00 0.50 5.50 per day
Meals On Wheels Kitchen Use and Electricity D per month 18.18 1.82 20.00 per month
Use of Tea & Coffs Making Facilities
D Nil charge 0.00 0.00 0.00 Nil charge
Megan Hall & Recreation Reserve
Courts & Environs Use
B
0.00 0.00 0.00 Donation
Functions (not included above) Hire cost D
77.27 7.73 85.00 per function
Cleaning Fee D
20.00 2.00 22.00 per function
Refundable deposit D
27.27 2.73 30.00 per function
Meetings & social gatherings of local
organisations
B Nil charge 0.00 0.00 0.00 No charge
Short Term Hire Per Hour daily or part thereof D
5.00 0.50 5.50 per hour
Per Hour nightly or part thereof D
7.05 0.70 7.75 per hour
Table/Chair/Crockery Hire Deposit refunded on return in good condition
D 50.00 0.00 50.00
Refundable deposit
Mylestom Hall
Community Groups Pension Assoc, CWA, Playgroup B
4.45 0.45 4.90 per hour
Page 12 of 67
Doctors Surgery
B
54.55 5.45 60.00 half day
Funerals
B by Donation 0.00 0.00 0.00 By donation
Hire of Chairs
D
0.45 0.05 0.50 per unit
Hire of Tables
D
2.73 0.27 3.00 per unit
Local Groups Pilates, Yoga, Singing, etc D
5.00 0.50 5.50 per hour
Parties & Weddings
F
18.18 1.82 20.00 per hour
Parties & Weddings -deposit Refundable Deposit F
0.00 0.00 100.00 per event
Use of kitchen
D
27.27 2.73 30.00 per booking
Electoral Commission
D
18.18 1.82 20.00 per hour
Raleigh Hall
Casual hire - Daily - Hourly
More than 10 participants - includes
the use of the kitchen facilities
including urn, stove, fridge and china
D
10.00 1.00 11.00 per hour
Casual hire - Daily - Full Day
More than 10 participants - includes
the use of the kitchen facilities including urn, stove, fridge and china
D
40.00 4.00 44.00 per day
Casual hire - Daily - Hourly
Less than 10 participants - includes
the use of the kitchen facilities including urn, stove, fridge and
china. Eg yoga, Pilates, music groups
D
5.00 0.50 5.50 per hour
Casual hire - Daily - Full Day
Less than 10 participants - includes the use of the kitchen facilities
including urn, stove, fridge and china. Eg yoga, Pilates, music groups
D
22.73 2.27 25.00 per day
Casual evening hire - after 6pm An extra charge will apply for casual evening hire on top of hourly rate
D
4.00 0.40 4.40 per hour
School use Daytime use D
100.00 10.00 110.00 per annum
Evening use - casual evening hourly
rate D
14.00 1.40 15.40 per hour
Private Functions
Birthday parties
Note: Birthday parties for 25 year
olds and under that continue past 10:00pm are required to hire and
pay the cost of a licensed security guard for a minimum of 2 hours
D
100.00 10.00 110.00 per day
Birthday party refundable deposit D
181.82 18.18 200.00 per event
Weddings Setting up days prior to wedding D
10.00 1.00 11.00 per hour
Setting up days prior to wedding -
Maximum D
40.00 4.00 44.00 per day
Wedding Day D
20.00 2.00 22.00 per hour
Wedding Day - Refundable Bond D
181.82 18.18 200.00 per event
Furniture Hire Trestle tables and 2 bench stools D
10.00 1.00 11.00 per 2 days
Page 13 of 67
Tables and bench stools individually
D
5.00 0.50 5.50 each per 2
days
Other charges for all bookings
Cleaning charges - if the facilities are
not left clean. All rubbish to be removed form premises
D
54.55 5.45 60.00 per event
All breakages and damages must be
paid for at full cost D
$ $ $ Actual Cost
Thora Hall
Hourly Rate
D
5.45 0.55 6.00 per hour
Hall Hire Rates
D
Profit based events 1-20 People D
45.45 4.55 50.00 per event
21-100 People D
90.91 9.09 100.00 per event
101 & Over People D
131.82 13.18 145.00 per event
Non-Profit based events - includes private
parties, functions, receptions, conferences,
rehearsals, etc. 1-20 People
D
36.36 3.64 40.00 per event
21-100 People D
72.73 7.27 80.00 per event
101 & Over People D
90.91 9.09 100.00 per event
Kitchen Hire Rate Daily hire rate D
27.27 2.73 30.00 per event
Kitchen bond rate D
90.91 9.09 100.00 per event
Bond Rate - Profit 1-20 People D
181.82 18.18 200.00 per event
21-100 People D
181.82 18.18 200.00 per event
101 & Over People D
181.82 18.18 200.00 per event
Bond Rate - Non- Profit 1-20 People D
45.45 4.55 50.00 per event
21-100 People D
72.73 7.27 80.00 per event
101 & Over People D
181.82 18.18 200.00 per event
Repair of any damage or removal of remaining debris/refuse shall be deducted from bond deposit. Refund of deposit shall be determined after inspection. To retain full deposit, the hall shall be left in good/clean/tidy condition. To safeguard deposit, the hirer should notify the Booking Officer of any unseen or suspected damage prior to or at the start of the hire period.
Any crockery breakages will be deducted from the bond deposit
The provision of additional consumable materials in addition to what is supplied by the hall Committee may be required. This advice, along with general requirements will be communicated to the Hirer by the Booking Officer prior to Hiring.
For more information and bookings phone (02) 6655 8506
Peak rates apply to bookings made for Friday, Saturday and Public Holiday events. All other bookings are considered "off peak"
For event bookings less than three (3) hours in duration, an hourly rate structure is available
Urunga Literary Institute & Senior Citizens Hall Management
Hire Charges:
Page 14 of 67
Non Profit and Charitable Organisations
D
8.00 0.80 8.80 per hour
Regular Users
D
8.00 0.80 8.80 per hour
Local Organisations/Persons Casual Users:
Hall
D per hour 14.00 1.40 15.40 per hour
Hall
D per day (8
hours) 90.00 9.00 99.00 per day
Use of Kitchen
D per day 25.00 2.50 27.50 per day
Hall - 6pm to midnight
D 90.00 9.00 99.00 per booking
Hall - after midnight
D 14.00 1.40 15.40 per hour
Cleaning/Damage deposit Paid in advance D all bookings 150.00 0.00 150.00 per booking
Non Local Organisation/Personal Casual
Use and Parties
Hall
D 16.00 1.60 17.60 per hour
Hall
D per day (8
hours) 108.00 10.80 118.80 per day
Use of kitchen
D
25.00 2.50 27.50 per day
Hall - 6pm to midnight
D
108.00 10.80 118.80 per booking
Hall - after midnight
D
16.00 1.60 17.60 per hour
Cleaning/Damage deposit Paid in advance D all bookings 150.00 0.00 150.00 per booking
Other (Special Arrangements):
D
Urunga Radio Convention (Easter Weekend) Seniors Hall D
230.91 23.09 254.00 per booking
Holding Deposit Paid in advance D
150.00 0.00 150.00 per booking
Scripture Union Missions 9 days - use of 2 kitchens D
1,096.18 109.62 1,205.80 per booking
Holding Deposit Paid in Advance D
300.00 0.00 300.00 per booking
Library Services
Clarence Regional Library
Library Bag
E 5.00 0.50 5.50 per bag
Interlibrary Loan Fee per title outside of Clarence Regional
Library E
5.00 0.50 5.50 per item
Lost/Damaged Books Cost of replacement book and fee E 5.00 0.50 5.50 per item
Overdue fines per item per day up to maximum of $10.00
E
0.10 0.00 0.10 per item per
day
Replacement for lost membership card
E 3.00 0.00 3.00 per card
Faxes
Outgoing
E
3.00 0.00 3.00 per page
Incoming
E
0.20 0.00 0.20 per page
Page 15 of 67
Meeting Rooms
Bellingen Library - Small Room Commercial Hire E 3.00 0.00 3.00 per hour
Bellingen Library - Small Room Community - Not for Profit B Nil charge 0.00 0.00 0.00 Nil charge
Bellingen Library - Large Room Commercial Hire E 5.00 0.00 5.00 per hour
Bellingen Library - Large Room Community - Not for Profit B Nil charge 0.00 0.00 0.00 Nil charge
Dorrigo Library - Meeting Room Commercial Hire E 5.00 0.00 5.00 per hour
Dorrigo Library - Meeting Room Community - Not for Profit B Nil charge 0.00 0.00 0.00 Nil charge
Printing and Copying
Photocopying/Printing A4 E 0.20 0.00 0.20 per page
Photocopying/Printing A3 E 1.00 0.10 1.10 per page
Scanning E 0.20 0.00 0.20 per page
Photocopying - transparency paper E 1.82 0.18 2.00 per page
Museums
Bellinger Valley Historical Society
Admission Bellingen - Adult
D
2.73 0.27 3.00 each
Admission Bellingen - Children (supervised)
D Nil charge 0.00 0.00 0.00 Nil charge
Admission Urunga - Adult
D
1.82 0.18 2.00 each
Admission Urunga - Children (supervised)
D Nil charge 0.00 0.00 0.00 Nil charge
Membership
D Annual 6.00 0.00 6.00 per person
Photos - 6x4
B
4.55 0.45 5.00 each
Photos - A4
B
9.09 0.91 10.00 each
Photo research Per photo - max charge $5.00 B
1.00 0.00 1.00 each
Photo email
B
4.55 0.45 5.00 each
Photographs of images (visitors)
B
1.82 0.18 2.00 per copy
Photocopy from microfilm or archives per A4
B
0.91 0.09 1.00 per copy
Photocopy from microfilm or archives per A3
B
1.36 0.14 1.50 per copy
Research fees
B Half hour minimum 5.00 0.00 5.00 per half hour
Sale of merchandise
F At cost plus
mark up $ $ $
Urunga Museum
Admission - Adult
D
1.82 0.18 2.00 each
Admission - Under 18
B Nil charge 0.00 0.00 0.00 Nil charge
Page 16 of 67
Parks and Reserves
Bellingen & Connell Parks
Bellingen Archers Inc
B
181.82 18.18 200.00 per season
Bellingen/Dorrigo Junior Rugby League
B
181.82 18.18 200.00 per season
Bellingen Soccer Club Bellingen Soccer Club B
363.64 36.36 400.00 per season
Plus Lights - 2 Poles D
18.18 1.82 20.00 each
Plus Lights - 4 Poles D
36.36 3.64 40.00 each
Bellingen High School B
363.64 36.36 400.00 per year
St Mary's Primary School
B
363.64 36.36 400.00 per year
Bellingen Primary School
B
363.64 36.36 400.00 per year
Bellingen Cricket Club
B
181.82 18.18 200.00 per year
North Coast Cricket Club
B
90.91 9.09 100.00 per year
All other Casual Users Use of fields B
90.91 9.09 100.00 per day
Bootcamp activities B 181.82 18.18 200.00 per annum
Senior Bellingen/Dorrigo Rugby League B 181.82 18.18 200.00 per season
Markets and Plant Fair
B
36.36 3.64 40.00
per use/per
day
Burdett Park
Canteen Hire per use/per day D 20.00 0.00 20.00 per use/per
day
Sporting group use Per sporting season D
150.00 15.00 165.00 per season
Dorrigo Recreation Reserve
Recreation ground for sporting clubs
per player/per season B
5.00 0.50 5.50
per
player/season
Use of ground lights per hour D
13.64 1.36 15.00 per hour
Security Deposit Refundable upon satisfactory inspection
D
250.00 0.00 250.00 each
Hire of Sports room/canteen - annual per club/per year D
500.00 50.00 550.00 Annual
Hire of Sports room/canteen - one off - Day
D
30.00 3.00 33.00 per booking
Hire of Sports room/canteen - one off - Night
D
50.00 5.00 55.00 per booking
Stadium (Note: lights additional as per above) D
10.00 1.00 11.00 per hour
Page 17 of 67
Stadium box per box/per hour D
2.73 0.27 3.00 per hour
Urunga Recreation Reserve
Urunga Senior Soccer
B
900.00 90.00 990.00 per year
Urunga Six a Side Football
B
900.00 90.00 990.00 per year
Urunga Junior Football
B
600.00 60.00 660.00 per year
All other users Hockey, Junior and Senior Cricket,
Little A's, UPS, Bootcamp B
300.00 30.00 330.00 per year
One off users per day B
100.00 10.00 110.00 per day
Half day users up to 4 hours B
50.00 5.00 55.00 0-4 hours
Canteen Hire per day B
25.00 2.50 27.50 per day
Light usage per hour D
15.00 1.50 16.50 per hour
Electricity usage Paid by Senior, Junior Football and
Little A's D
$ $ $ As invoiced
Electricity Service Availability Paid by Urunga Recreation Reserve Management Committee
D $ $ $ As invoiced
Strategic Land Use Planning
Agreements and Contributions
Advertising Fee
D each 610.00 0.00 610.00 each
Voluntary Planning Agreement or developer
Contributions Plan necessary to facilitate development
By prior written agreement with Council Note: 1 The full
cost of any supporting studies deemed necessary by Council shall
be separately borne by the
Proponent and formalised in agreement with Council. Note 2: The
full cost of legal expenses for drafting and finalisation of a Planning
Agreement shall be additionally borne by the Proponent
D per hour 46.36 4.64 51.00 per hour
Development Control Plan (DCP)
Advertising Fee
D each 545.45 54.55 600.00 each
Development Control Plan
Necessary to facilitate development - by prior written agreement with
Council. Note: The full cost of any supporting studies
deemed necessary by Council shall
be separately borne by the Proponent and formalised in
D per hour 45.45 4.55 50.00 per hour
Page 18 of 67
agreement with Council
Developer Charges
Refer Annexures C & D
Planning Proposal
Planning Proposal not scheduled in Councils'
Delivery Plan and Operational Plan
Stage 1 - Lodgement fee through to
Gateway Determination D each
1,668.18 166.82 1,835.00 each
Stage 2 - Advertising Fee D each 554.55 55.45 610.00 each
Stage 3 - Exhibition through to
Publication D each
4,895.45 489.55 5,385.00 each
NOTE: the full cost of any supporting
studies deemed necessary by Council
shall be separately borne by the Proponent, and formalised in
agreement with Council
Planning Proposal scheduled in Councils Delivery
Plan and Operational Plan
NOTE: the full cost of any supporting
studies deemed necessary by Council
shall be separately borne by the Proponent, and formalised in
agreement with Council
B & D nil 0.00 0.00 0.00 each
Swimming Pools
Bellingen
Bellingen pool season tickets - family D Per season 254.55 25.45 280.00 Per season
Bellingen pool season tickets - single (from 2yrs old)
D Per season 136.37 13.63 150.00 Per season
Bellingen pool occasional entry - adults (swimming)
D Per season 3.64 0.36 4.00 Per season
Bellingen pool occasional entry - adults (non swimming/supervising)
D Per season 1.82 0.18 2.00 Per season
Bellingen pool occasional entry - children
D Per season 2.73 0.27 3.00 Per season
Bellingen pool occasional entry - children (school visits)
D Per season 2.28 0.22 2.50 Per season
Dorrigo
Dorrigo pool season ticket - family D Per season 254.55 25.45 280.00 Per season
Page 19 of 67
Dorrigo pool season ticket - single (from 2yrs old)
D Per season 136.37 13.63 150.00 Per season
Dorrigo pool occasional entry - adults (swimming)
D Per season 3.64 0.36 4.00 Per season
Dorrigo pool occasional entry - adults (non swimming/supervising)
D Per season 1.82 0.18 2.00 Per season
Dorrigo pool occasional entry - children
D Per season 2.73 0.27 3.00 Per season
Dorrigo pool occasional entry - children (school visits)
D Per season 2.28 0.22 2.50 Per season
Page 20 of 67
Living Environment
Environmental Health and Regulation
Issue of Clean Up, Prevention and Noise Control
Notices POEO Act Statutory Fee C each
466.00 0.00 466.00 each
Overgrown Land - Administration Fee
D each 109.09 10.91 120.00 each
Overgrown Land Clearing Fee Actual cost of clearing land by
Contractor D at cost
at cost
Order - Protection of the Environment &
Operations Act Administration
C each System 466.00 0.00 466.00 each system
Control of Burning
Application/Approval
E each 54.55 5.45 60.00 each
Inspection If Required E each 118.18 11.82 130.00 each
Food Premises Inspections
Inspection - Class 3 Low Risk (based on performance) D per
inspection 122.00 0.00 122.00 each
Inspection - Class 2 Medium Risk (based on
performance) D
per
inspection 249.00 0.00 249.00 each
Inspection - Class 1 High Risk (based on performance) D per
inspection 290.00 0.00 290.00 each
General Inspections
Where work is required Eg. Issue of orders, private burial, etc
D per hour 132.00 0.00 132.00 per hour
Public Health
Administration Fee Annual fee E
54.55 5.45 60.00 each
Skin Penetration Premises Inspection
F
118.18 11.82 130.00 each
Public Swimming Pools Inspection (Water
Quality)
F
118.18 11.82 130.00 each
Regulated Systems Inspection
Warm water systems and cooling
towers F
118.18 11.82 130.00 each
Improvement Notices - Regulated Systems
C
481.82 48.18 530.00 each
Improvement Notices - Other Systems
C
236.36 23.64 260.00 each
Prohibition Orders - Regulated Systems
C
481.82 48.18 530.00 each
Prohibition Orders - Other Systems
C
236.36 23.64 260.00 each
Re-Inspections 30 Minutes minimum charge D
118.18 11.82 130.00 per hour
Page 21 of 67
Swimming Pools Act 1992
Private Swimming Pools Application for Exemption - Section 22
C each 70.00 0.00 70.00 each
Inspections C each 150.00 0.00 150.00 each
Re-Inspection C each 100.00 0.00 100.00 each
Registration C each 10.00 0.00 10.00 each
Trade Waste Charges
Annual Trade Waste Fee
D
199.70 0.00 199.70 per annum
Application Fee
D
258.00 0.00 258.00 each
Connection Fee See also "Activities" under Section 68 LGA
D
80.00 0.00 80.00 each
Re-inspection Fee
D
0.00 0.00 134.00 each
Liquid Trade Waste Usage Charges
Liquid Trade Waste Availability Charge
D
199.70 0.00 199.70 each
Category 1 Compliant Nil Charge D
0.00 0.00 0.00 Nil Charge
Category 1 Non Compliant Consumption x Trade Factor x Charge p/kl
D
1.42 0.00 1.42 per kilolitre
Category 2 Compliant Consumption x Trade Factor x
Charge p/kl D
1.42 0.00 1.42 per kilolitre
Category 2 Non Compliant Consumption x Trade Factor x
Charge p/kl D
14.88 0.00 14.88 per kilolitre
Category 3 Non Compliant Stormwater Consumption x Trade Factor x Charge p/kl
D
14.88 1.35 14.88 per kilolitre
NSW Noxious Weeds Act 1993
Section 18 Re-Inspection - recovery of expenses Recovery of Expenses under Section
26 C
each 170.85 0.00 170.85 each
Section 20 Expenses incurred by Council through
implementation of weed control on private
property
Recovery of Expenses under Section 26
C Actual Cost $ $ $ Actual Cost
Section 64 Noxious Weeds Certificate Recovery of Expenses under Section
26 C
each 77.30 0.00 77.30 each
Section 64 Noxious Weeds Certificate with Inspection
Recovery of Expenses under Section 26
C each 179.00 0.00 179.00 each
Tree Injector D per week 13.40 0.00 13.40 per week
Page 22 of 67
Ranger Services
Abandoned Vehicles
Release from Pound
D per vehicle 200.00 0.00 200.00
plus actual cost + 25%
Release from Pound and Disposal by Sale
D per vehicle $ $ $
Actual cost of
removal + 25%
Companion Animals Act - registration
Assistance Animal Nil charge 0.00 0.00 0.00 Nil charge
Desexed Animal One-off payment C per animal 51.00 0.00 51.00 per animal
Desexed Animal - Pension Concession Rate One-off payment C per animal 20.00 0.00 20.00 per animal
Non-Desexed Animal One-off payment C per animal 188.00 0.00 188.00 per animal
Breeder Concession One-off payment - Evidence required C per animal 51.00 0.00 51.00 per animal
Farm/working Dog
C Nil charge 0.00 0.00 0.00 Nil charge
Impounding
Animal Impounding Fee (other than cats or dogs)
per animal/per day or part thereof D
per
animal/per
day
$100.00 plus $25.00
per
additional beast
$100.00 plus
$25.00 per
additional beast
per
animal/per
day
Animal impounding - private pound Cost to impound plus administration
costs D each
$ $ $
Cost to
impound determined
by GM plus administration
costs
Animal transport fee - to or from pound Actual cost plus 25% administration fee
D each
$ $ $
Actual cost 25%
administration fee
Dog or cat impounding fee - first day
D
per
animal/per day 45.00 0.00 45.00
per
animal/per day
Dog or cat impounding fee - subsequent days
D
per
animal/per day 25.00 0.00 25.00
per
animal/per day
Dog or cat impounding - Repeat offence in 12
month period
D per
animal/per 65.00 0.00 65.00
per
animal/per
Page 23 of 67
day day
Microchipping D per animal 56.00 0.00 56.00 per animal
Stock driving and yard fee
D per hour 45.00 0.00 45.00 per hour
Stock driving and yard fee - sustenance
D per day 35.00 0.00 35.00 per day
Surrender animal (Euthanize)
D per animal 0.00 0.00 160.00 per animal
Services
Inspection - Declared Dog Compliance Includes Certificate of Compliance F each 118.18 11.82 130.00 each
Collar - Declared Dog High Visibility Collar Supply D each 64.00 0.00 64.00 each
Microchipping D each 50.91 5.09 56.00 each
Muzzle - nylon Supply D each 44.00 0.00 44.00 each
Dangerous Dog Sign Supply of Compliant Signage D each 56.00 0.00 56.00 each
Trap Hire
Cat Trap Hire
D weekly 16.36 1.64 18.00 weekly
Cat Trap Deposit
D per trap 0.00 0.00 120.00 per trap
Dog Trap Hire
D weekly 45.45 4.55 50.00 weekly
Dog Trap Deposit
D per trap 0.00 0.00 250.00 per trap
Pension rate - hire of cat/dog
B per trap 20.00 2.00 22.00 per trap
Section 68 Activities
Made by or on behalf of non-profit community
organisation Must satisfy Council criteria nil 0.00 0.00 0.00 nil
Part A - Manufactured Homes, Removable
Application/Approval
E
101.82 10.18 112.00 each
Water Connection (if applicable)
E
54.55 5.45 60.00 each
Sewerage Inspection
E
118.18 11.82 130.00 each
Compliance Inspection (footings, tie down, etc)
E
118.18 11.82 130.00 each
Install temporary structure on residential
land
Application/Approval
E
101.82 10.18 112.00 each
Water Connection (if applicable)
E
54.55 5.45 60.00 each
Sewerage Inspection
E
118.18 11.82 130.00 each
Compliance Inspection (footings, tie down, etc)
E
118.18 11.82 130.00 each
Security Bond Refunded upon removal of structure E
600.00 0.00 600.00 each
Install temporary structure on rural land
Application/Approval
E
101.82 10.18 112.00 each
Sewerage Inspection
E
118.18 11.82 130.00 each
Compliance Inspection (footings, tie down, etc)
E
118.18 11.82 130.00 each
Page 24 of 67
Security Bond Refunded upon removal of structure E 600.00 0.00 600.00 each
Part B - Water Supply, Sewerage and
Stormwater supply
Connect to Sewer
Application/Approval
E
101.82 10.18 112.00 each
Inspection per inspection E
118.18 11.82 130.00 each
Amended Sewer Applications plus inspection fee E
54.55 5.45 60.00 each
Connect to Stormwater system, onsite
disposal
Application/Approval
E
101.82 10.18 112.00 each
Inspection per inspection E
118.18 11.82 130.00 each
Amended Applications plus inspection fee E
54.55 5.45 60.00 each
Connect Water storage tank to reticulated supply (excludes rainwater tanks or other
private systems)
Application/Approval
E
54.55 5.45 60.00 each
Inspection per inspection E
118.18 11.82 130.00 each
Connect to Water Supply (reticulated)
Application/Approval
E
101.82 10.18 112.00 each
Inspection per inspection E
118.18 11.82 130.00 each
Amended Applications
E
54.55 5.45 60.00 each
Install or alter Water Meter
Install 20mm water meter
E
184.55 18.45 203.00 each
Disconnect or remove water meter
E
83.64 8.36 92.00 each
Draw water from Council standpipe Potable D per kl 8.70 0.00 8.70 per kl
Draw water from Council standpipe Non Potable D per kl 2.60 0.00 2.60 per kl
Install non-standard size/length By Quotation
At Cost At cost
Water Carter, Septic/Grease trap waste transporters
Application/Approval
E
54.55 5.45 60.00 each
Inspection Annual Inspection required - per vehicle
E
118.18 11.82 130.00 each
Amended Applications
E
54.55 5.45 60.00 each
Backflow Prevention
Application/Approval
E
54.55 5.45 60.00 each
Inspection
E
118.18 11.82 130.00 each
Annual Fee
E
27.27 2.73 30.00 each
Testing of backflow device By Quotation E At Cost At cost
Page 25 of 67
Part C - Management of Waste
OSMS
Approval to install an OSMS Section 68 NSW Local Government
Act 1993 F
107.27 10.73 118.00 each
Approval to Operate an OSMS Includes change of ownership details F
62.27 6.23 68.50 each
OSMS Inspection Fee Including Councils OSMS program F
82.27 8.23 90.50 each
Sewer/Liquid Trade Waste
Application/Approval Includes Inspection E
101.82 10.18 112.00 each
Inspection Re-Inspections E
118.18 11.82 130.00 each
Septic Tank Effluent Disposal
Application/Approval Includes Inspection E
101.82 10.18 112.00 each
Inspection Re-Inspections E
118.18 11.82 130.00 each
Disposal at treatment works Untreated E per kilolitre 26.70 0.00 26.70 per kilolitre
Disposal at treatment works Pre-treated E per kilolitre 7.70 0.00 7.70 per kilolitre
Caravan Dump Effluent Disposal
Application/Approval Includes Inspection E
101.82 10.18 112.00 each
Inspection Re-Inspections E
118.18 11.82 130.00 each
Part D - Community Land
Engage in Trade or Business Non Profit organisations Excluded
Commercial activities in Parks and Reserves plus inspection fee E
101.82 10.18 112.00 each
Street Trading plus inspection fee E
101.82 10.18 112.00 each
Inspection Annual Inspection E
118.18 11.82 130.00 each
Part E - Public Roads
Swing or Hoist Goods over Public Road
Application/Approval
E
54.55 5.45 60.00 each
Inspection E 118.18 11.82 130.00 each
Part F - Other Activities
Operate a Caravan Park or Camping
Ground or Manufactured Home Estate
Application for Renewal of Licence per site (1 year/3 year/5 year
approval based on risk) E
4.55 0.45 5.00 each
Annual Inspection Fee (2-100 Sites)
E
118.18 11.82 130.00 each
Annual Inspection Fee (101-150 Sites)
E
236.36 23.64 260.00 each
Annual Inspection Fee (151-500 Sites)
E
354.55 35.45 390.00 each
Annual Inspection Fee (>500 Sites)
E
472.73 47.27 520.00 each
Install a Domestic Oil or Solid Fuel Heating
Appliance
Application/Approval Not required if lodged with DA E 54.55 5.45 60.00 each
Page 26 of 67
Inspection Not required if lodged with DA E 118.18 11.82 130.00 each
Install or Operate an Amusement Device
Approval and Inspection per device E
36.36 3.64 40.00 per device
Continue over page
Use a Standing Vehicle for the purpose of
selling any article in a public place
Approval Includes Mobile Food Vendors, Hawkers, etc.
E 101.82 10.18 112.00 each
Inspection
E
118.18 11.82 130.00 each
Combined Fees for Multiple Section 68
Approvals
Approval Minimum $112 + 50% of additional application fees
E 101.82 10.18 112.00 each
Inspection
Actual number of inspections
required E
118.18 11.82 130.00 each
All Other Section 68 Approvals Not Listed
Above
Application/Approval
E
101.82 10.18 112.00 each
Inspection
E
118.18 11.82 130.00 each
Sewer Availability Charge - Sec 501 NSW Local Government Act 1993
Annual Availability Charge - Residential
Vacant Land Availability Charge - unconnected C
793.00 0.00 793.00 per annum/per
meter
Charge per Meter Size 20 mm Meter C
882.00 0.00 882.00 per annum/per
meter
Charge per Meter Size 25 mm Meter C
1,375.00 0.00 1,375.00 per annum/per
meter
Charge per Meter Size 32 mm Meter C
2,257.00 0.00 2,257.00 per annum/per
meter
Charge per Meter Size 40 mm Meter C
3,528.00 0.00 3,528.00 per annum/per
meter
Charge per Meter Size 50 mm Meter C
5,512.00 0.00 5,512.00 per annum/per
meter
Charge per Meter Size 65 mm Meter C
9,313.00 0.00 9,313.00 per annum/per
meter
Charge per Meter Size 80 mm Meter C
14,112.00 0.00 14,112.00 per annum/per
meter
Charge per Meter Size 90 mm Meter C
17,860.00 0.00 17,860.00 per annum/per
meter
Charge per Meter Size 100 mm Meter C
22,050.00 0.00 22,050.00 per annum/per
meter
Page 27 of 67
Annual Availability Charge - Non Residential
Vacant Land Availability Charge - unconnected C
793.00 0.00 793.00 per annum/per
meter
Charge per Meter Size 20 mm Meter C
882.00 0.00 882.00 per annum/per
meter
Charge per Meter Size 25 mm Meter C
1,375.00 0.00 1,375.00 per annum/per
meter
Charge per Meter Size 32 mm Meter C
2,257.00 0.00 2,257.00 per annum/per
meter
Charge per Meter Size 40 mm Meter C
3,528.00 0.00 3,528.00 per annum/per
meter
Charge per Meter Size 50 mm Meter C
5,512.00 0.00 5,512.00 per annum/per
meter
Charge per Meter Size 65 mm Meter C
9,313.00 0.00 9,313.00 per annum/per
meter
Charge per Meter Size 80 mm Meter C
14,112.00 0.00 14,112.00 per annum/per
meter
Charge per Meter Size 90 mm Meter C
17,860.00 0.00 17,860.00 per annum/per
meter
Charge per Meter Size 100 mm Meter C
22,050.00 0.00 22,050.00 per annum/per
meter
Sewer Usage Charge - Sec 502 NSW Local Government Act 1993
Sewer Usage Charge Consumption x Sewer Discharge Factor x Sewer Usage charge p/kl
C
0.97 0.00 0.97 per kilolitre
Sewerage Management
Sewer Connection Loan - Newry Island
Connection Works Per connection for each residential
property connected D At Cost
$ $ $
At Cost
Interest on loan
The Interest rate on the Newry Island Loan Facility is at the average
investment rate for the previous
quarter.
E
% % % Varies
Sewer Diagram
Copy of diagram involving preparation or
checking of diagram D
40.80 0.00 40.80 each
Wastewater Disposal
Clean rags from septic strainer D
15.50 0.00 15.50
each
Discharge septic waste from tanker
D
26.70 0.00 26.70 per kilolitre
Page 28 of 67
Discharge pre-treated sewerage effluent from
tanker
NOTE: An Approval under Section 68 of the NSW Local Government Act
1993 is required to dispose of waste into a sewer of the Council
D
7.70 0.00 7.70 per kilolitre
Waste Management
Commercial Waste Management Standard Service
Commercial - Full service
Weekly service (per separate
occupancy). Consisting of 3 x 240 litre mobile garbage bins (1 mixed
waste and 1 recycling collected
fortnightly, 1 organics collected weekly)
D
Levied on
Annual Rate Account
617.27 61.73 679.00 each/per
annum
Commercial - Full service - Non Rateable
Properties
Weekly service (per separate
occupancy). Consisting of 3 x 240 litre mobile garbage bins (1 mixed
waste and 1 recycling collected fortnightly, 1 organics collected
weekly)
D Levied on
Annual Rate
Account
617.27 61.73 679.00 each/per
annum
Commercial Waste Management Additional Services
Additional 240 litre Organics - weekly collection In addition to Full Commercial
Service D
Levied on Annual Rate
Account 194.55 19.45 214.00
each/per
annum
Additional 240 litre Mixed - fortnightly collection In addition to Full Commercial
Service D
Levied on Annual Rate
Account 155.45 15.55 171.00
each/per
annum
Additional 240 litre Recycling - fortnightly collection
In addition to Full Commercial Service
D Levied on
Annual Rate
Account 62.73 6.27 69.00
each/per
annum
Additional 360 litre Recycling - fortnightly collection
In addition to Full Commercial Service
D
Levied on
Annual Rate
Account 94.55 9.45 104.00
each/per
annum
Additional 660 litre Mixed - weekly collection In addition to Full Commercial Service
D
Levied on
Annual Rate
Account 853.64 85.36 939.00
each/per
annum
Additional 660 litre Recycling - weekly collection In addition to Full Commercial Service
D
Levied on
Annual Rate Account 346.36 34.64 381.00
each/per annum
Additional 660 litre Organics - weekly collection In addition to Full Commercial Service
D
Levied on
Annual Rate Account 535.45 53.55 589.00
each/per annum
Page 29 of 67
Additional 660 litre Mixed - fortnightly collection In addition to Full Commercial Service
D Levied on
Annual Rate
Account 426.36 42.64 469.00
each/per
annum
Additional 1100 litre Mixed - weekly collection In addition to Full Commercial Service
D
Levied on
Annual Rate
Account 1,421.82 142.18 1,564.00
each/per
annum
Additional 1100 litre Recycling - weekly collection
In addition to Full Commercial Service
D
Levied on
Annual Rate
Account 577.27 57.73 635.00
each/per
annum
Additional 1100 litre Organics - weekly collection In addition to Full Commercial Service
D
Levied on
Annual Rate Account 891.82 89.18 981.00
each/per annum
Additional 1100 litre Mixed - fortnightly
collection
In addition to Full Commercial
Service D
Levied on
Annual Rate Account 710.91 71.09 782.00
each/per annum
Upsize 360 litre Recycling - fortnightly collection
In exchange of standard 240 litre
Recycling bin currently comprising part of full Commercial service.
D
Levied on
Annual Rate Account
28.18 2.82 31.00 each/per
annum
Upsize 660 litre Mixed - weekly collection
In exchange of standard 240 litre
Mixed bin currently comprising part of full Commercial service.
D
Levied on
Annual Rate Account
812.73 81.27 894.00 each/per
annum
Upsize 660 litre Recycling - weekly collection
In exchange of standard 240 litre
Recycling bin currently comprising part of full Commercial service.
D
Levied on
Annual Rate Account
280.00 28.00 308.00 each/per
annum
Upsize 660 litre Organics - weekly collection In exchange of standard 240 litre Organics bin currently comprising
part of full Commercial service.
D Levied on
Annual Rate
Account
473.64 47.36 521.00 each/per
annum
Upsize 660 litre Mixed - fortnightly collection In exchange of standard 240 litre Mixed bin currently comprising part
of full Commercial service.
D Levied on
Annual Rate
Account
386.36 38.64 425.00 each/per
annum
Upsize 1100 litre Mixed - weekly collection In exchange of standard 240 litre Mixed bin currently comprising part
of full Commercial service.
D Levied on
Annual Rate
Account
1,380.91 138.09 1,519.00 each/per
annum
Upsize 1100 litre Recycling - weekly collection In exchange of standard 240 litre Recycling bin currently comprising
part of full Commercial service.
D Levied on
Annual Rate
Account
510.91 51.09 562.00 each/per
annum
Upsize 1100 litre Organics - weekly collection In exchange of standard 240 litre Organics bin currently comprising
part of full Commercial service.
D Levied on
Annual Rate
Account
830.00 83.00 913.00 each/per annum
Upsize 1100 litre Mixed - fortnightly collection In exchange of standard 240 litre Mixed bin currently comprising part
of full Commercial service.
D Levied on
Annual Rate
Account
670.00 67.00 737.00 each/per annum
Bin Trim 360L In addition to Full Commercial Service
D Levied on
Annual Rate Account
0.00 0.00 0.00 each/per annum
Page 30 of 67
Domestic Waste Management Standard Service
Domestic - Full Service
Weekly service (per separate occupancy). Consisting of 3 x 240
litre mobile garbage bins (1 mixed
waste and 1 recycling collected fortnightly, 1 organics collected
weekly)
D Levied on
Annual Rate
Account
617.00 0.00 617.00 each/per
annum
Domestic - Vacant Land Where service is available/on defined waste collection route
D
Levied on
Annual Rate
Account 162.50 0.00 162.50
each/per
annum
Domestic Waste Management Additional Services
Additional 240 litre Organics - weekly collection In addition to Full Domestic Service D
Levied on
Annual Rate
Account 195.00 0.00 195.00
each/per
annum
Additional 240 litre Mixed - fortnightly collection In addition to Full Domestic Service D
Levied on
Annual Rate
Account 155.00 0.00 155.00
each/per
annum
Additional 240 litre Recycling - fortnightly collection
In addition to Full Domestic Service D
Levied on
Annual Rate Account 63.00 0.00 63.00
each/per annum
Additional 360 litre Recycling - fortnightly collection
In addition to Full Domestic Service D
Levied on
Annual Rate Account 94.00 0.00 94.00
each/per annum
Additional 660 litre Mixed - weekly collection In addition to Full Domestic Service D
Levied on
Annual Rate Account 854.00 0.00 854.00
each/per annum
Additional 660 litre Recycling - weekly collection In addition to Full Domestic Service D
Levied on
Annual Rate Account 346.00 0.00 346.00
each/per annum
Additional 660 litre Organics - weekly collection In addition to Full Domestic Service D
Levied on
Annual Rate Account 535.00 0.00 535.00
each/per annum
Additional 660 litre Mixed - fortnightly collection In addition to Full Domestic Service D
Levied on
Annual Rate Account 427.00 0.00 427.00
each/per annum
Additional 1100 litre Mixed - weekly collection In addition to Full Domestic Service D Levied on
Annual Rate
Account 1,422.00 0.00 1,422.00
each/per
annum
Additional 1100 litre Recycling - weekly
collection In addition to Full Domestic Service D
Levied on Annual Rate
Account 577.00 0.00 577.00
each/per
annum
Additional 1100 litre Organics - weekly collection In addition to Full Domestic Service D Levied on 891.00 0.00 891.00 each/per
Page 31 of 67
Annual Rate Account
annum
Additional 1100 litre Mixed - fortnightly
collection In addition to Full Domestic Service D
Levied on Annual Rate
Account 711.00 0.00 711.00
each/per
annum
Upsize 660 litre Mixed - weekly collection In exchange of standard 240 litre Mixed bin currently comprising part
of full Domestic service.
D Levied on
Annual Rate
Account 739.09 73.91 813.00
each/per
annum
Upsize 660 litre Recycling - weekly collection In exchange of standard 240 litre Recycling bin currently comprising
part of full Domestic service.
D Levied on
Annual Rate
Account 254.55 25.45 280.00
each/per
annum
Upsize 660 litre Organics - weekly collection In exchange of standard 240 litre Organics bin currently comprising
part of full Domestic service.
D Levied on
Annual Rate
Account 430.91 43.09 474.00
each/per
annum
Upsize 660 litre Mixed - fortnightly collection In exchange of standard 240 litre Mixed bin currently comprising part
of full Domestic service.
D Levied on
Annual Rate
Account 350.91 35.09 386.00
each/per
annum
Upsize 1100 litre Mixed - weekly collection
In exchange of standard 240 litre
Mixed bin currently comprising part
of full Domestic service.
D
Levied on
Annual Rate
Account 1,255.45 125.55 1,381.00
each/per
annum
Upsize 1100 litre Recycling - weekly collection
In exchange of standard 240 litre
Recycling bin currently comprising
part of full Domestic service.
D
Levied on
Annual Rate
Account 464.55 46.45 511.00
each/per
annum
Upsize 1100 litre Organics - weekly collection
In exchange of standard 240 litre
Organics bin currently comprising part of full Domestic service.
D
Levied on
Annual Rate Account 754.55 75.45 830.00
each/per annum
Upsize 1100 litre Mixed - fortnightly collection
In exchange of standard 240 litre
Mixed bin currently comprising part of full Domestic service.
D
Levied on
Annual Rate Account 609.09 60.91 670.00
each/per annum
Waste Facility Access Charge
Waste Facility Access Charge Levied on all rate assessments not on the defined collection route
D
Levied on
Annual Rate Account 161.82 16.18 178.00 per annum
Waste Facility / Transfer Station Fees
Animal disposal Small includes waste & environment
levy D
each 26.36 2.64 29.00
each
Large includes waste & environment levy
D each
92.73 9.27 102.00 each
Asbestos Direct to landfill D per tonne 300.00 30.00 330.00 per tonne
E-waste TV's, computers, Hi-Fi equipment D each No Charge No Charge each
Chemicals & hazardous materials Chemicals & hazardous materials - including gas bottles & light globes
D
No charge No charge per kg
Page 32 of 67
Green Waste/organics Green waste/organics - Oversize only - trees, stumps, logs
D per cubic
metre 7.27 0.73 8.00 per cubic
metre
Green waste/organics - Household up to 0.5 cubic metre
D
0.5 cubic metre/0.5
tonne of load
or part thereof No Charge No Charge
0.5 cubic metre/0.5
tonne of load
or part thereof
Green waste/organics - Household
over 0.5 cubic metre D
0.5 cubic
metre/0.5 tonne of load
or part thereof 14.55 1.45 16.00
0.5 cubic
metre/0.5 tonne of load
or part thereof
Mattresses Mattresses D 26.36 2.64 29.00 each
Mixed Waste Directed to landfill D
0.5 cubic
metre/0.5
tonne of load or part
thereof
36.36 3.64 40.00
0.5 cubic
metre/0.5
tonne of load or part
thereof
Construction & demolition waste -
directed to landfill D
0.5 cubic metre/0.5
tonne of load or part
thereof
36.36 3.64 40.00
0.5 cubic metre/0.5
tonne of load or part
thereof
Virgin excavated natural material waste - directed to landfill
D
0.5 cubic metre/0.5
tonne of load or part
thereof
36.36 3.64 40.00
0.5 cubic metre/0.5
tonne of load or part
thereof
Household recyclable materials -
plastic, paper, cardboard, aluminium or steel only - up to 0.5 cubic
meters
D
0.5 cubic metre/0.5
tonne of load or part
thereof
No charge No charge
0.5 cubic metre/0.5
tonne of load or part
thereof
Household recyclable materials -
plastic, paper, cardboard, aluminium
or steel only - over 0.5 cubic meters
D
0.5 cubic metre/0.5
tonne of load
or part thereof
15.45 1.55 17.00
0.5 cubic metre/0.5
tonne of load
or part thereof
Commercial recyclable materials - plastic, paper, cardboard, aluminium
or steel only
D
0.5 cubic
metre/0.5 tonne of load
or part thereof
15.45 1.55 17.00
0.5 cubic
metre/0.5 tonne of load
or part thereof
Page 33 of 67
NSW EPA Waste & Environmental Levy
Vehicle Type A - Car, station wagon - mixed waste - 0.06 tonne per
vehicle
D
0.06 tonnes per vehicle
(based on $76.70 NSW
EPA waste & environment
levy)
4.00 0.00 4.00
0.06 tonnes per vehicle
(based on $76.70 NSW
EPA waste & environment
levy)
Vehicle Type B - Van, ute, trailer -
mixed waste - 0.30 tonne per vehicle D
0.30 tonnes per vehicle
(based on
$76.70 NSW EPA waste &
environment levy)
20.00 0.00 20.00
0.30 tonnes per vehicle
(based on
$76.70 NSW EPA waste &
environment levy)
Vehicle Type C - Single rear axle
truck - mixed waste - 1.16 tonne per vehicle
D
1.16 tonnes
per vehicle (based on
$76.70 NSW EPA waste &
environment
levy)
76.00 76.00
1.16 tonnes
per vehicle (based on
$76.70 NSW EPA waste &
environment
levy)
Vehicle Type D - Single rear axle
truck - construction & demolition -
2.76 tonne per vehicle
D
2.76 tonnes
per vehicle (based on
$76.70 NSW
EPA waste & environment
levy)
181.00
181.00
2.76 tonnes
per vehicle (based on
$76.70 NSW
EPA waste & environment
levy)
Vehicle Type D - Single rear axle truck - virgin excavated natural
materials - 2.76 tonne per vehicle
D
5.58 tonnes per vehicle
(based on $76.70 NSW
EPA waste &
environment levy)
363.00 363.00
5.58 tonnes per vehicle
(based on $76.70 NSW
EPA waste &
environment levy)
Vehicle Type D - Bogie drive truck -
mixed waste - 3.74 tonne per vehicle D
3.74 tonnes per vehicle
(based on
$76.70 NSW EPA waste &
environment levy)
245.00
245.00
3.74 tonnes per vehicle
(based on
$76.70 NSW EPA waste &
environment levy)
Page 34 of 67
Vehicle Type E - Bogie drive truck - construction & demolition - 7.14
tonne per vehicle
D
7.14 tonnes per vehicle
(based on $76.70 NSW
EPA waste &
environment levy)
467.00 467.00
7.14 tonnes per vehicle
(based on $76.70 NSW
EPA waste &
environment levy)
Vehicle Type E - Bogie drive truck -
virgin excavated natural materials - 10.97 tonne per vehicle
D
10.97 tonnes
per vehicle (based on
$76.70 NSW EPA waste &
environment levy)
717.00 717.00
10.97 tonnes
per vehicle (based on
$76.70 NSW EPA waste &
environment levy)
Scrap Metal Scrap Metal (no contamination) D per tonne No Charge No Charge per tonne
Used lead acid batteries D each No Charge No Charge each
Refrigerators to be de-gassed D each No Charge No Charge each
Tyres Passenger D each 3.18 0.32 3.50 each
Light Truck D each 7.27 0.73 8.00 each
Truck D each 14.55 1.45 16.00 each
Water Availability Charge - Section 501, 502 & 556 of NSW Local Government Act, 1993
Annual Availability Charge
Fire Service
C
117.00 0.00 117.00
per
annum/per meter
Vacant Land Availability Charge - unconnected C
105.00 0.00 105.00
per
annum/per meter
Charge per Meter Size 20 mm Meter C
117.00 0.00 117.00 per
annum/per
meter
Charge per Meter Size 25 mm Meter C
183.00 0.00 183.00 per
annum/per
meter
Charge per Meter Size 32 mm Meter C
300.00 0.00 300.00 per
annum/per
meter
Charge per Meter Size 40 mm Meter C
468.00 0.00 468.00 per
annum/per
meter
Page 35 of 67
Charge per Meter Size 50 mm Meter C
731.00 0.00 731.00 per
annum/per
meter
Charge per Meter Size 65 mm Meter C
1,236.00 0.00 1,236.00
per
annum/per
meter
Charge per Meter Size 80 mm Meter C
1,872.00 0.00 1,872.00
per
annum/per
meter
Charge per Meter Size 90 mm Meter C
2,369.00 0.00 2,369.00
per
annum/per meter
Charge per Meter Size 100 mm Meter C
2,925.00 0.00 2,925.00
per
annum/per meter
Usage Charges - Inclining Block Tariff
Water Consumption - Tier 1 Where usage does not exceed 1 kl
per day within the billing period C
1.63 0.00 1.63 per kl
Water Consumption - Tier 2 Where usage exceeds 1 kl per day within the billing period C
Residential properties
only
2.45 0.00 2.45
per kl
Miscellaneous
Disconnection/Reconnection of Water Supply
D
114.00 0.00 114.00 each
Water restriction - Connection out of hours
D
60.80 0.00 60.80 each
Extension - Other side of road
D
1,414.75 0.00 1,414.75 each
Extension - Same side of road
D
645.50 0.00 645.50 each
Flow/pressure reading
D
169.00 0.00 169.00 each
Meter Testing Fee
D At Cost $ $ $ At cost
Private water sample testing
Plus analysis costs D
plus analysis
costs 86.00 0.00 86.00
each
Replacement of Water Meter damaged or
illegally removed by Ratepayer/other
D At Cost $ $ $ At cost
Replacement of Water Restrictor Damaged by Ratepayer/owner
D At Cost $ $ $ At cost
Restrictor Installation and Removal Fee
D
199.00 0.00 199.00 each
Service Fee to be charged upon the issue of a
Final Notice of Intention to Disconnect Water
D
57.00 0.00 57.00 each
Special Water Meter Reading Requests
D 94.00 0.00 94.00 per reading
Special Water Meter reading - Urgency fee In addition to SWMR reading D 54.00 0.00 54.00 per reading
Water Main Pressure Testing Hourly rate for all time spent setting up and pressure testing main.
D
131.00 0.00 131.00 per hour
Page 36 of 67
Civic Leadership
Administrative Fees
Credit Card Surcharge - Payment by credit card
is available on a limited basis
* GST may be applicable to the credit card surcharge, depending on
GST treatment of original
transaction.
D
% of the credit card payment (charge in line with merchant
facility fee charged to Council)
0.00 0.00 0.00 each
Cheque Dishonour Administration Fee
D 25.70 0.00 25.70 each
Cheque Dishonour Administration Fee - Australia
Post
D
43.60 0.00 43.60 each
Account Keeping Fee Sundry Debtor Accounts only A
15.00 0.00 15.00 per month
Account Late fee Default on Invoice terms - Sundry
Debtor accounts only
15.00 0.00 15.00 each
Legal Costs - For Recovery of Rates and Charges Recoverable via rate account
Actual Cost
Refund Fee Fee to cover administration costs related to refunds
E
25.00 0.00 25.00 each
Reproduce Rate or Water Account
D
6.00 0.60 6.60 each
Tender Documentation
32.50 0.00 32.50 each
Beach Driving Permits
Beach Driving Permits Annual Permit B
28.00 0.00 28.00 each
Certificates
Section 603 Certificate per rateable assessment C each 75.00 0.00 75.00 each
Urgency fee (Section 603 Certificate issued within 24 hours) - in addition to normal Sect 603
certificate fee
per rateable assessment E each 54.55 5.45 60.00 each
Section 735A Certificate & (EPA Act 1979) Section 121ZP Outstanding Notices
C each 46.00 0.00 46.00 each
149(2) Note: 1 Certificate per each Lot
unless rated together C each
53.00 0.00 53.00 each
149(2)&(5) Note: 1 Certificate per each Lot
unless rated together (max of 5 lots
per certificate)
C each 133.00 0.00 133.00 each
Reproduction Fee Reproduce Certificate D each 30.00 0.00 30.00 each
Urgency Fee Certificate produced within 48 hours - in addition to Certificate Fee
D each 113.64 11.36 125.00 each
Page 37 of 67
Copying
Approvals (Supplied to Solicitors)
D
12.20 0.00 12.20 each
Bellingen Master Concept Plan
D
36.60 0.00 36.60 each
Bushfire Map extract
D each 15.25 0.00 15.25 each
Business Paper and Minutes Postage
D per annum 70.15 0.00 70.15 per annum
Certified copy of Document, Map or Plan Referred to in Section 150(2) of the
Environmental Planning &
Assessment Act 1979
C each 53.90 0.00 53.90 each
Development Control Plan
Per chapter D
per chapter 19.30 0.00 19.30
each/per
chapter
Environmental Impact Statements
C each 25.45 0.00 25.45 each
Flood Study and Maps
D each 43.75 0.00 43.75 each
LEP (Document)
D
32.55 0.00 32.55 each
LEP Maps - Single Sheet BLEP 2003 D
22.40 0.00 22.40 each
LEP Maps - Full Set BLEP 2003 D
334.60 0.00 334.60 each
LEP Maps - Zoning Extract BLEP 2003 D
41.70 0.00 41.70 each
LEP Maps - Zoning Extract BLEP 2010 D each 15.25 0.00 15.25 each
Library Copying See Library Fees
See Library fees
see library
fees
Map Digital Data Preparation & Administration
Minimum $15.00 D
per hour/min
$15 61.00 0.00 61.00
per hour
Maps/Documents - A3 B&W
D per page 1.95 0.00 1.95 per page
Maps/Documents - A4 Single Sided
D
0.70 0.00 0.70 per page
Maps/Documents - A4 Double Sided
D
1.15 0.00 1.15 per page
Maps - plan printing A1 B&W only
D
9.05 0.00 9.05 per page
Maps - plan printing A2 B&W only
D
7.30 0.00 7.30 per page
Maps - plan printing greater than A1 B&W only
D
13.20 0.00 13.20 per page
Other A4 for non-regulatory services (not listed elsewhere)
D per sheet 0.27 0.03 0.30 per sheet
Other A4 for regulatory services (not listed
elsewhere)
D per sheet 0.25 0.00 0.25 per sheet
Other A3 for non-regulatory services (not listed
elsewhere)
D per sheet 1.05 0.10 1.15 per sheet
Other A3 for regulatory services (not listed elsewhere)
D per sheet 1.00 0.00 1.00 per sheet
Sewer Diagram - Copy of diagram Involving preparation or checking of
diagram D
See
Wastewater Disposal
See
Wastewater disposal
Sewer Diagram - Photocopy only
D each 0.70 0.00 0.70 each
Shire Profile, Social Plan or DDA Plan
D each 19.40 0.00 19.40 each
State of Environment Report
D each 25.45 0.00 25.45 each
Page 38 of 67
Enquiry
Land Use Services advice/enquiry - written 1-2 hours D
64.60 0.00 64.60 each
2-5 hours D
130.20 0.00 130.20 each
>5 hours D
In addition to
incremental cost below 130.20 0.00 130.20 each
>5 hours
In addition
to flat charge above 23.70 0.00 23.70
per 15 minutes
Interest Rate
Interest rate on overdue rates & charges
C
As per the
rate determined
by the Division of
Local
Government
8.5'%
Building and Development Assessment
Archiving
Privately Certified documentation Complying Development C each 36.00 0.00 36.00 each
Construction Certificate C each 36.00 0.00 36.00 each
Occupation Certificate C each 36.00 0.00 36.00 each
Subdivision Certificate C each 36.00 0.00 36.00 each
Building Records Search
Building Records Search Fee Excludes photocopying and postage D per hour 57.73 5.77 63.50 per hour
General Building Fees
Temporary Occupation Permit
Temporary Occupation of shed or the like for 12 months during
construction of dwelling - includes
inspection
E each 118.18 11.82 130.00 each
Dwelling Removal Inspections For relocated dwellings E each 236.36 23.64 260.00 each
Bond to render dwelling uninhabitable Includes inspection - refunded upon satisfactory inspection
D each 1,090.91 109.09 1,200.00 each
Standard Housing specification
each 10.00 1.00 11.00 each
Page 39 of 67
Building Certification
Certification and PCA Duties By Quotation only F Quotation By Quotation
Complying Development Applications By Quotation only (DA Fee + 90% of
CC Fee) F Quotation
By Quotation
Construction Certificates By Quotation only F Quotation By Quotation
Occupation Certificates By Quotation only F Quotation By Quotation
Archiving Fee Statutory Fee - EPA Reg Cl 263 C each 32.73 3.27 36.00 each
Complying Development Preliminary Assessment If development is subsequently submitted to Council this fee will be
deducted from the CDC fee
E each 118.18 11.82 130.00 each
Modification of Complying Development
F each 136.36 13.64 150.00 each
Modification of CC
F each 136.36 13.64 150.00 each
Modification of CC with Alternative Solution By Quotation only F each By Quotation
Inspections
Critical stage inspection for Occupation
Certificate, Construction Certificate or Complying Development Certificate
Nil charge where estimated cost of
complying development is less than $10,000
D each 118.18 11.82 130.00 each
Critical stage inspection for Subdivision Certificate
Required for new community road x
1; new public road x 3; new vehicular accesses. Also see section
68 approvals/inspections
D each 118.18 11.82 130.00 each
Building Certificates
Additional fee in accordance with Clause 260(3A) of regulation for new or altered building
in contravention of the Act within 2 years
preceding the application
Maximum amount payable for application for development consent
or complying development certificate plus maximum amount payable for
construction certificate
C each 0.00 0.00 0.00 each
Class 1 Building (together with any class 10 buildings on the site) or a class 10 building
C each 250.00 0.00 250.00 each
Any other class of building not exceeding 200m2
C each 250.00 0.00 250.00 each
Any other Class of building exceeding 200m2
but not exceeding 2,000m2 $250 + $0.50 per m2 > 200 C refer formula
0.00 0.00 0.00 refer formula
Any other class of building exceeding 2,000m2 $1,165 + $0.75 per m2 > 2,000 C refer formula 0.00 0.00 0.00 refer formula
Any case relating to a part of a building and that
part consists of an external wall only or has no floor area
C each 250.00 0.00 250.00 each
Building Certificate Inspection Nil charge for initial inspection C each 90.00 0.00 90.00 each
Copy of Building Certificate
C each 13.00 0.00 13.00 each
Page 40 of 67
Bushfire Assessment
Bushfire Attack Level Certificate
E each 545.45 54.55 600.00 each
Bushfire Attack Level Certificate
Associated with Complying
Development Certificate lodged with BSC
E each 227.27 22.73 250.00 each
Cancellation of Application
Withdrawn prior to Determination by Council
Refund of all fees except Planning
Reform Fund, Long Service Levy, 30% of Application fees, referral fee
and advertising where undertaken
D each $ $ $ each
Withdrawn prior to Determination by Council - site inspection undertaken
As above plus minus $130.00 (at discretion of Manager)
D each $ $ $ each
Certificates - Other
Certificate as to Orders Section 121ZP C each 46.00 0.00 46.00 each
Compliance Certificate Section 109C C each 150.00 0.00 150.00 each
Compliance Certificate Section 305 Water Management Act
2000 D
each
64.00 0.00 64.00 each
Sign Documents under Part 6 Division 4
Conveyancing Act 1919
No charge if in conjunction with
Subdivision Certificate or Strata Certificate application
D each 135.00 0.00 135.00 each
Strata Certificate Part 2 Division 4 Strata Schemes
(Freehold Development) Act 1973 D each 275.00 0.00 275.00 each
Subdivision Certificate
D each 275.00 0.00 275.00 each
Subdivision Construction Certificate
D hour 142.00 0.00 142.00 hour
Subdivision or Strata Certificate - Re-Signing
D each 135.00 0.00 135.00 each
Certificates - Planning
149(2) Note: 1 Certificate per each Lot unless rated together
C each 53.00 0.00 53.00 each
149(2)&(5)
Note: 1 Certificate per each Lot
unless rated together (max 5 lots per certificate)
C each 133.00 0.00 133.00 each
Reproduction Fee Reproduce Certificate D each 30.00 0.00 30.00 each
Urgency Fee Certificate produced within 48 hours - in addition to Certificate Fee
D each 125.00 0.00 125.00 each
Page 41 of 67
Complying Development
Complying Development Certificate The cost of a development application for the same work
D each $ $ $ each
Notification
D each 77.27 7.73 85.00 each
Registration of Private Certifier Certificate Development, Construction or Occupation Certificates
C each see
Archiving Refer
'Archiving'
Development Assessment
Advertising - Development Application
Advertisement in Courier Sun
C In addition
to DA fees 365.00 0.00 365.00
each
Advertisement in Don Dorrigo Gazette
C In addition
to DA fees 200.00 0.00 200.00
each
DA Notification
D In addition to DA fees
85.00 0.00 85.00 each
Designated
D In addition
to DA fees 1,650.00 0.00 1,650.00
each
New Road Name
D In addition
to DA fees 80.00 0.00 80.00
each
Re-advertising (following receipt of additional information)
Advertisement in Courier Sun C In addition to DA fees
365.00 0.00 365.00 each
Advertisement in Don Dorrigo
Gazette C
In addition
to DA fees 200.00 0.00 200.00
each
Re-notification
C In addition
to DA fees 50.00 0.00 50.00
each
Review of Determination under Section 82A
Applies to DA's that DO NOT involve the erection of a building, the
carrying out of work or the
demolition of a work or building
C each 50% of original DA fee
Development Applications
Application Fees (all)
EP&A regulation 2000 refer cl 246B
C
as per
statutory
scale of fees
$ $ $
estimate
Change/establishment of land use
C per DA 285.00 0.00 285.00 per DA
Concurrence/approval fee (Includes Integrated)
C In addition to DA fee
320.00 0.00 320.00 each
Council Processing Fee (includes Integrated)
Payable to each authority/body C
In addition
to DA fee 140.00 0.00 140.00
each
Damage or removal of vegetation Includes Inspection Fee C per DA 130.00 0.00 130.00 per DA
Page 42 of 67
Designated Development In addition to DA fees D each 920.00 0.00 920.00 each
Development involving the erection of a
building, the carrying out of work, or the demolition of a work or a building, and having
an estimated cost of:
Up to $5,000 C per DA 110.00 0.00 110.00
$5,001 to $50,000 C per DA
$170 plus an additional $3 for each $1,000 (or part of $1,000) of the estimated cost
$50,001 to $250,000 C per DA
$352 plus an additional $3.64 for each $1,000 (or part of
$1,000) of the estimated cost exceeds $50,000
$250,001 to $500,000 C per DA
$1,160 plus an additional $2.34 for each $1,000 (or part of
$1,000) of the estimated cost exceeds $250,000
$500,001 to $1,000,000 C per DA
$1,745 plus an additional $1.64 for each $1,000 (or part of $1,000) of the estimated cost exceeds $500,000
$1,000,001 to $10,000,000 C per DA
$2,615 plus an additional $1.44 for each $1,000 (or part of
$1,000) of the estimated cost exceeds $1,000,000
More than $10,000,000 C per DA
$15,875 plus an additional $1.19 for each $1,000 (or part
of $1,000) of the estimated cost exceeds $10,000,000
Dwelling-house With estimated cost of construction
of $100,000 or less C per DA
455.00 0.00 455.00 per DA
Environmental restoration works
D per DA 55.00 0.00 55.00 per DA
Footpath activities - refer separate heading
Integrated Development / Concurrence Referral
Made by or on behalf of non-profit community
organisation Must satisfy Council criteria nil
0.00 0.00 0.00 nil
Residential flat buildings
Required to be referred to a design
review panel under State
Environmental Planning Policy No 65-Design Quality of Residential Flat
Development
D In addition
to DA fees 760.00 0.00 760.00
in addition to
DA fee
Signage
D per DA $154 for up to 2 signs plus $93 for each in excess of 2
Strata Subdivision
D per DA $330 plus $65 for each additional lot created
Subdivision (other than strata subdivision) Involving the opening of a public
road D per $665 plus $65 for each additional lot created
Subdivision (other than strata subdivision) Not involving the openings of a public road
D per DA $330 plus 53 for each additional lot created
Tree Removal application/approval includes inspection fee B per DA 130.00 0.00 130.00 per DA
Page 43 of 67
Footpath activities
A-frame Development Application fee D
157.00 0.00 157.00 If both A-frame &
trading table;
$157 DA fee per premises
and $210 RA & LG fee per
premises
Combined Roads Act & LG Act
approval D
210.00 0.00 210.00
Trading Table Development Application fee D
157.00 0.00 157.00
Combined Roads Act & LG Act
approval
D
210.00 0.00 210.00
Footpath Dining Development Application fee
D
nil - exempt development
Combined Roads Act & LG Act
approval D
210.00 0.00 210.00
RMS concurrence fee
D
142.00 0.00 142.00
each
premises with frontage to
classified road
Compliance inspection
D
132.00 0.00 132.00 each premises
Modifications of Consent under Section 96
Advertising where required under Section 96(2)
or 96AA(1) of the Act Advertisement in Courier Sun D each 331.82 33.18 365.00
each
Advertisement in Don Dorrigo Gazette
D each 181.82 18.18 200.00 each
Modifications involving Council error each occasion C nil charge 0.00 0.00 0.00 nil charge
Modifications involving minor error, incorrect
description or miscalculation 96(1) each occasion C
each
occasion 75.00 0.00 75.00
each
Modifications involving minimal environmental impact 96(1A) each occasion
C each
occasion Fee is $645.00 or 50% of the fee for the original DA, whichever is less
Other modifications-original DA fee <$100.
96(2)
Where the fee for the original DA
was less than $100 C
each
occasion 50% of original DA fee
Other modifications-original DA fee >$100
Not involving the erection of a
building, or the demolition of a work
or building, where the fee for the original application was $100 or
more
C each
occasion 50% of original DA fee
Other modifications-construction cost <$100,000
Involving the erection of a dwelling
house with an estimated construction
cost of $100,000 or less
C each
occasion 190.00 0.00 190.00 each
Page 44 of 67
Other modifications of estimated cost of: Up to $5,000 C
55.00 0.00 55.00 each
$5,001 to $250,000 C
$85 plus an additional $1.50 for each $1,000 (or part
$1,000)
$250,001 to $500,000 C
$500 plus an additional $0.85 for each $1,000 (or part $1,000) greater than $250,000
$500,001 to $1,000,000 C
$712 plus an additional $0.50 for each $1,000 (or part
$1,000) greater than $500,000
$1,000,001 to $10,000,000 C
$987 plus an additional $0.40 for each $1,000 (or part
$1,000) greater than $1,000,000
More than $10,000,000 C
$4,737 plus an additional $0.27 for each $1,000 (or part $1,000) greater than $10,000,000
Review of Development Application
Review of Determination under Section 82A
Applies to DA's that involve the
erection of a dwelling-house with an
estimated cost of construction of $100,000 or less
C each 190.00 0.00 190.00 each
Review of Determination under Section 82A with respect to any other Development Application
having an estimated cost of:
Up to $5,000 C each 55.00 0.00 55.00 each
$5,001 to $250,000 C each $85 plus an additional $1.50 for each $1,000 (or part
$1,000)
$250,001 to $500,000 C each $500 plus an additional $0.85 for each $1,000 (or part $1,000) greater than $250,000
$500,001 to $1,000,000 C each $712 plus an additional $0.50 for each $1,000 (or part
$1,000) greater than $500,000
$1,000,001 to $10,000,000 C each $987 plus an additional $0.40 for each $1,000 (or part
$1,000) greater than $1,000,000
More than $10,000,000 C each $4,737 plus an additional $0.27 for each $1,000 (or part $1,000) greater than $10,000,000
Review of rejection under Section 82B having an
estimated cost of: Less than $100,000 C each
55.00 0.00 55.00 each
$100,000 to $1,000,000 C each 150.00 0.00 150.00 each
Greater than $1,000,000 C each 250.00 0.00 250.00 each
Review of Modification under Section 96AB
C each 50% of the fee that was payable in respect of the
application that is the subject of the review
Section 82A - Advertisement - Courier Sun
C each 365.00 0.00 365.00 each
Section 82A - Advertisement - Don Dorrigo
Gazette
C each 200.00 0.00 200.00 each
Page 45 of 67
Developer Contributions
Section 64 Sewerage
Bellingen C
5,358.00 0.00 5,358.00 each
Dorrigo C
6,479.00 0.00 6,479.00 each
Urunga C
2,586.00 0.00 2,586.00 each
Section 64 Water
Bellingen C
5,855.00 0.00 5,855.00 each
Fernmount C
2,923.00 0.00 2,923.00 each
Mylestom, Repton, Raleigh North C
12,307.00 0.00 12,307.00 each
Urunga and Raleigh South C
5,335.00 0.00 5,335.00 each
Dorrigo C 5,430.00 0.00 5,430.00 each
Section 94 Contributions The base rate is adjusted by the previous 12 months to March CPI (Sydney All Groups) at July each year. Check with Council for current contribution.
Section 94 Contributions - Bushfire Services Shire Bushfire G
Indexed
01/07/2015
Sep Qtr CPI 2014 106.6 475.00 0.00 475.00
Base rate per lot/dwelling
Glennifer Bushfire G
Indexed
01/07/2015 Sep Qtr CPI
2014 106.6 69.00 0.00 69.00
Base rate per
lot/dwelling
Boggy Creek Bushfire G
Indexed
01/07/2015
Sep Qtr CPI 2014 106.6 8.00 0.00 8.00
Base rate per lot/dwelling
Hydes Creek Bushfire G
Indexed
01/07/2015 Sep Qtr CPI
2014 106.6 265.00 0.00 265.00
Base rate per
lot/dwelling
Sunny Corner Bushfire G
Indexed
01/07/2015
Sep Qtr CPI 2014 106.6 17.00 0.00 17.00
Base rate per lot/dwelling
Brierfield Bushfire G
Indexed
01/07/2015 Sep Qtr CPI
2014 106.6 272.00 0.00 272.00
Base rate per
lot/dwelling
North Bank Road Bushfire G Indexed
01/07/2015 15.00 0.00 15.00
Base rate per
lot/dwelling
Page 46 of 67
Sep Qtr CPI 2014 106.6
Fernmount Bushfire G
Indexed 01/07/2015
Sep Qtr CPI
2014 106.6 199.00 0.00 199.00
Base rate per
lot/dwelling
Raleigh Bushfire G
Indexed
01/07/2015
Sep Qtr CPI 2014 106.6 321.00 0.00 321.00
Base rate per lot/dwelling
Urunga Bushfire G
Indexed 01/07/2015
Sep Qtr CPI
2014 106.6 557.00 0.00 557.00
Base rate per
lot/dwelling
Repton Bushfire G
Indexed
01/07/2015
Sep Qtr CPI 2014 106.6 874.00 0.00 874.00
Base rate per lot/dwelling
Section 94 Contributions - Community Facilities & Open Spaces Annexure C
Section 94 Contributions - Projection
Administration
Applies to DA's approved after 1 July
2007 G
6% of S94
charges
The base rate is adjusted by the previous 12 months to December CPI (Sydney All Groups) at July each year. Check with Council for current contribution.
Section 94 Contributions - Road Contribution
Plan Annexure D
Engineering Operations
Bonds
Engineering inquiries, inspections requiring
investigation & additional private development
works inspections
Regulatory in nature - GST Exempt Non Regulatory - GST applicable
D per hour or part thereof
137.00 0.00 137.00 per hour
File Search/Enquiry Including up to 5 photocopies (A3) D each, plus
per 15 mins
(below) 43.50 0.00 43.50
each, plus per
15mins
File Search/Enquiry - additional 15 minutes research
In addition to initial Enquiry (above) D per 15
minutes 25.25 0.00 25.25 per 15 mins
Infrastructure work testing/supervision bond
D 6% of work
value $ $ $
6% of work
value
Maintenance (defects liability) bond for civil To be held for a period of 15 months D 8% of $ $ $ 8% of
Page 47 of 67
works construction cost
construction cost
Private Works
Private Works Each job by Quotation D by quotation $ $ $ by quotation
Quarry Products
D by quotation $ $ $ by quotation
Supply & Install directional sign Supply and install directional signage D each 355.00 35.50 390.50 each
Plan Approval, Inspection & Investigation
Rural Roadworks
per linear meter (min 20m) D
per linear
meter 5.50 0.00 5.50
per linear
meter
Urban Roadworks
D
per lot or dwelling or
20 lineal meter of
infrastructure
424.00 0.00 424.00
per lot or dwelling or 20
lineal meter of
infrastructure
Ordinary Rates
Base amount by Category
Business C
429.00 0.00 429.00 per
assessment
Business Bellingen C
429.00 0.00 429.00 per
assessment
Business Dorrigo C
392.20 0.00 392.20 per assessment
Business Urunga C
429.00 0.00 429.00 per
assessment
Farmland C
429.00 0.00 429.00 per
assessment
Residential C
429.00 0.00 429.00 per assessment
Residential Bellingen C
429.00 0.00 429.00 per
assessment
Residential Dorrigo C
379.90 0.00 379.90 per
assessment
Residential Mylestom C
429.00 0.00 429.00 per assessment
Residential Rural C
429.00 0.00 429.00 per
assessment
Residential Urunga C
429.00 0.00 429.00 per
assessment
Page 48 of 67
Rate in $ by Category
Business
C Multiplied by rateable land
value
0.00242913 0.00 0.00242913 Ad Valorem
Rate
Business Bellingen
C Multiplied by rateable land
value
0.00349541 0.00 0.00349541 Ad Valorem
Rate
Business Dorrigo
C Multiplied by rateable land
value
0.00423115 0.00 0.00423115 Ad Valorem
Rate
Business Urunga
C Multiplied by rateable land
value
0.00373345 0.00 0.00373345 Ad Valorem
Rate
Farmland
C
Multiplied by
rateable land
value
0.00261180 0.00 0.00261180
Ad Valorem
Rate
Residential
C
Multiplied by
rateable land
value
0.00291635 0.00 0.00291635
Ad Valorem
Rate
Residential Bellingen C
Multiplied by
rateable land value
0.00281232 0.00 0.00281232
Ad Valorem Rate
Residential Dorrigo C
Multiplied by
rateable land value
0.00374215 0.00 0.00374215
Ad Valorem Rate
Residential Mylestom C
Multiplied by
rateable land value
0.00261982 0.00 0.00261982
Ad Valorem Rate
Residential Rural C
Multiplied by
rateable land value
0.00291544 0.00 0.00291544
Ad Valorem Rate
Residential Urunga C
Multiplied by
rateable land value
0.00333418 0.00 0.00333418
Ad Valorem Rate
Page 49 of 67
Lease Fees - Council Land
Lease Application
Administration Fee Commercial & Community D
600.00 60.00 660.00 each
Legal Costs D At cost $ $ $ At cost
Renewal/Assignment of Lease / Licence not requiring amendment
D
230.00 23.00 253.00 each
Survey Fees in association with lease
preparation
D At Cost
$ $ $ each
Valuation Fees associated with lease
D At Cost $ $ $ each
Lease Rental
Commercial To be set by valuation D Market Value $ $ $ each
Outdoor Dining - Rental Fees
Rental for outdoor dining per m2/annum D
0.00 0.00 0.00
per square
meter/per
annum
Supply and Installation of approval markers At cost D 0.00 0.00 0.00 Actual cost
Property - Crown Reserves or State Parks
Temporary Licence Application Fee For use of Crown Reserve in accordance with Crown Lands Act and Regulations or National Parks and Wildlife Act and Regulations
State Park and other Crown Reserves
Where usage is more than 7 days D
Each
Application
Equivalent to Crown Lands Act 1989 Statutory Minimal
Rental
State Park and other Crown Reserves Additional Charges for Commercial
Activity D
Each
Application Fee to be determined by Council
Use of Crown Reserves - First Day
D Each
Application 109.55 10.95 120.50 each
Use of Crown Reserves - Second Day D per day 82.18 8.22 90.40 per day
Roads Act 1993
Applications and Works
Application - Work in Road Reserve B each 94.50 0.00 94.50 each
Application - Work in Road Reserve -Non Profit
Organisation Section 138 Roads Act 1993 B No Charge
0.00 0.00 0.00 nil charge
Contribution to Works - Footpath Construction
C per square
meter 57.00 0.00 57.00 50% of cost
Page 50 of 67
Contribution to Works - Kerb & Gutter
C per linear
meter 70.50 0.00 70.50 50% of cost
Public Gates Applications
D each 324.00 0.00 324.00 each
Road Closure - Application
Road Closure Application - Council
Road (excludes State Government Fees)
D each 340.50 0.00 340.50 each
Road Closure - State Govt Processing Additional fee if Application is forwarded to State Government for
processing
D
In addition
to Application
fee above
368.50 0.00 368.50 each
Road Closure - Temporary
A Each 49.85 0.00 49.85 each
Road Closure - Temporary - Advertising Fee
A Actual Cost $ $ $ At Cost
Road Restoration - Bitumen Road Applies to public utilities, plumbers, drainers, etc and access to property
D per square
meter 225.60 0.00 225.60
per square
meter
Road Restoration - 1.2m Concrete Footpaths Applies to public utilities, plumbers, drainers, etc and access to property
D per square
meter 122.00 0.00 122.00
per square meter
Road Restoration - Gravel Road Applies to public utilities, plumbers,
drainers, etc and access to property D
per square meter
77.60 0.00 77.60 per square
meter
Section 138 Application
Work in the road reserve application B each 94.50 0.00 94.50 each
Work in the road reserve application for non-
profit organisation
Or where work is primarily for an
improvement to the public road infrastructure
B nil 0.00 0.00 0.00 nil
Naming & Renaming of Roads & Reserves
Naming / Renaming of a Crown / Council Public
Road / Reserve
Application Fee D
0.00 0.00 0.00 each
Information & Knowledge
Certified Copy (for evidence)
Certified Copy of Document, Map or Plan - EP&A Act S.150(2) & EP&A Reg 2000 cl.262
C
0.00 0.00 0.00 each
Government Information (Public Access) Act 2009 (GIPA) - a 50% reduction
in fees may apply for customers suffering financial hardship or of special benefit to the public generally.
Access to Records - Personal Records
Application Fee
C
30.00 0.00 30.00 each
Processing Charge After first 20 hours C
30.00 0.00 30.00 per hour
Access to Records - Formal Applications
Page 51 of 67
Application Fee
C
30.00 0.00 30.00 each
Processing Charge First hour free C
30.00 0.00 30.00 per hour
Access to Records - Internal Review
Internal Review Application Fee
C
40.00 0.00 40.00 each
Open Access Information
Viewing of Information
C
0.00 0.00 0.00 free
Information - PIPPA
Application Fee for access to personal
information
C
32.00 0.00 32.00 each
Subpoenas - Conduct Money
Hourly Access Fee Staff time including subpoena, proactive requests, includes
photocopying
D
99.00 0.00 99.00 per hour
Page 52 of 67
ANNEXURE A
Bellingen Memorial Hall Management Committee
Hire Charges
A B C D E
Hire of Hall Per hour $39.90 $26.60 $15.95 $12.00 $7.95
Per day $399.00 $266.00 $159.70 $133.00 $79.80
Per half day $199.50 $133.00 $79.80 $66.50 $39.90
(Half day is before or after 3pm or more than 5hours. These rates include the use of flats, curtains,
portable stages, tables & chairs if available.)
Hire of Super Room
Per hour $12.00 $8.00 $6.60 $5.35 $5.35
Per day $133.00 $79.80 $66.50 $53.25 $53.25
Per half day $66.50 $39.90 $33.25 $26.60 $26.60
(Half day is before or after 3pm or more than 5hours. )
Use of Piano Contact Booking Agent. Tuning is responsibility of user (No hire cost)
Lights and Sound Equipment (Contact Booking Agent to arrange)
Lights $60.50 for two trees
$181.50 small number of lamps
$242.00 large set up (includes desk)
Sound $85.00 amplifier and microphone
$242.00 full set up (includes desk and multi-core lead)
(All charges include set and dismantle fee.)
Booking Deposit $27.50 or total hire charge, whichever is the lesser
Cleaning and Damage Deposit Hall
$242.00 $121.00 $60.50 $60.50 $60.50
Supper Room
$60.50 $60.50 $24.20 $24.20 $24.20
(Deposits for permanent users may be waived)
Hire of Hall Equipment Off The Premises - [Per 48 Hours] Community rates apply to charity functions and local non for profit organisations
Commercial rate is charge for private hire Portable Stages $33.00 per panel
ALL THE ABOVE CHARGES (Except Deposits) INCLUDE 10% GST
Page 53 of 67
Annexure B - Bellingen Shire Youth Centre – Hire Rate Schedule
All prices include GST. Commercial Businesses
Funded Not-for-profit & community groups.
Commercial Individuals.
Non-Funded Not-for-Profit & community groups. Individuals.
Area Comment Per
Hour Half Day
Full Day
Per Hour
Half Day
Full Day
Per Hour Half Day
Full Day
Reception Office
Where available.
-
- 77.00
-
-
- -
-
-
Office 1
- - 88.00
-
-
-
-
-
-
Office 2
- - 66.00
-
-
-
-
-
-
Meeting Room 1
Includes usage of kitchenette and whiteboard.
44.00 99.00 143.00 33.00 70.00 88.00 12.00 22.00 33.00
Meeting Room 2
44.00 99.00 143.00 33.00 70.00 88.00 12.00 22.00 33.00
Meeting Rooms 1 & 2
66.00 140.00 170.00 44.00 90.00 120.00 15.00 35.00 50.00
Music Studio Flat $30 for evening session.
-
-
- 25.00 55.00 80.00 15.00 40.00 60.00
Computer Room
Includes access to available Computer equipment.
-
99.00 165.00 40.00 85.00 110.00 15.00 33.00 44.00
Exercise Room
33.00 77.00 99.00 20.00 48.00 70.00 10.00 22.00 33.00
Art Park Does not include any materials costs.
-
-
-
15.00 40.00 70.00 10.00 22.00 33.00
Resource Room
-
-
- 20.00 44.00 66.00 8.00 15.00 22.00
Common Area
Common and kitchen areas are generally not available for hire as they are available to all users.
Main Kitchen Area
Under certain circumstances they can be hired independently utilising the “Meeting Rooms 1 & 2” rate.
Bellingen Shire Youth Centre Pricing Policy
Background The Bellingen Shire Youth Centre’s mission is “An innovative place to foster positive outcomes for young people by
providing access to programs,
Its pricing policy is designed to support this mission, provide accessible resources to the community and derive long
term sustainability for the centre.
Update Intent
The BSYC was opened in August 2012. This pricing policy and rate card update is based on experience to date and the analysis of the needs of the Bellingen Shire Council, the Centre and the community.
Page 54 of 67
Pricing Categories
Commercial Funded Community Non-Funded
Tier Significant "Commercial" businesses or organisations operating for profit events
"Funded" Community and not-for-profits organisations, commercial individuals or small entities
"Non-funded" Communitity and not-for-profits organisations, individuals
Detail Commercial prices for large businesses and organisations running events or activities where there is an intention that a profit will be made
Prices for local community or not-for-profit organisations that have grant or government funding for their operation or event. Includes local, commercial individuals with borderline profitability
Prices for local community or non-for-profit organisations or events that do not have any funding for their activity or event
Example - Commercial hire eg banks, larger companies
- Bellingen Shire Council, local government usage
- Non-funded community group gatherings, meeting an events
- Schools, TAFE - Examples : Gumbaynggir
- Funded NFP organisations such as Nortec, BSYS, Youth Directions
language Classes, Local Made meetings, Bellingen Mentor Group
- Events such as Camp Creative, Readers & Writers, Jazz Festival
- Individual room hire
- Individual and small training events eg coaching, counselling, workshops, classes like yoga, dancing, karate
Category Commentary
of the centre, the commercial value or the facilities, the profile and capacity of the intended users, and the competitive positioning of the centre.
This category is also intended for individuals or smaller organisations benefit the youth or community by conducting training, workshops, coaching or events where
Non Funded Youth Organisation/Event Pricing. Individual Hire.
One of the key strategies for the sustainability and delivery of the centre’s mission is to develop and foster long term relationships with community organisations engaged in youth activities.
1. Bring youth and community groups to the centre that would otherwise NOT have access or use the centre because of funding limitations 2. Acknowledge the value and support of the volunteers and community groups that assist our youth
3. Promote partnerships amongst youth organisations 4. Seed other opportunities through inclusiveness and involvement
This category also provides avenue for an agreed in-kind arrangement where the contribution of the hiring group provides mutual
Page 55 of 67
benefit to the centre and the youth of the shire.
These in-kind agreements would:
• Consider the value of the proposal or event to the youth of the shire
• Be intended to assist the sustainability of the organisation
• Be viewed in relation to other events, activities and support the organisation gave to the centre
• Include an assessment of the financial impact on the centre
• Be subject to a review after a specific period of time
• Be required to be signed off by an appropriate authority
• Likely have a clause relating to priority usage for the youth
Examples
• Organisations like Local Made, Bellingen Mentor Group and Bellingen EYE could use the centre for their meetings because of accessible rates (can be supported by nominal fees, gold coin donation or in-kind contribution)
• Youth events like the “Open Mic Night” would not considered centre ‘hire’ but an in-kind event provided for the youth and ‘managed’ by the
supporting organisation (e.g. Local Made) • Note: this rate card only applies when these organisations are “non-funded”
Page 56 of 67
ANNEXURE C - CF&OS Community Facilities and Open Space Contributions Summary
Indexed 01/07/15 March Qtr CPI 2015 107.3 Application Type
Catchment Base rate
[per person] Subdivision /
New Lot
Detached Dwellings Semi/Row/ Townhouse Additions/Increased capacity
Self-Contained / Independent Seniors Living
Tourist per bed 1 Bedroom 2 Bedroom 3 Bedroom 1 Bedroom 2 Bedroom 3 Bedroom 1 Bedroom 2 Bedroom 3 Bedroom
1. Hydes Creek Residential Release
Local Contribution $ 202.31 $ 471.38 $ 323.70 $ 384.39 $ 471.38 $ 242.77 $ 465.31 $ 465.31 $ 60.69 $ 121.39 $ 161.85 $ 202.31 $ 60.69
Shire Contribution
Total Contribution Payable $ 471.38 $ 323.70 $ 384.39 $ 471.38 $ 242.77 $ 465.31 $ 465.31 $ 60.69 $ 121.39 $ 161.85 $ 202.31 $ 60.69
2.Hydes Creek Road Rural Residential [A]
Local Contribution $ 166.75 $ 388.53 $ 266.80 $ 316.83 $ 388.53 $ 200.10 $ 383.53 $ 383.53 $ 50.03 $ 100.05 $ 133.40 $ 166.75 $ 50.03
Shire Contribution
Total Contribution Payable $ 388.53 $ 266.80 $ 316.83 $ 388.53 $ 200.10 $ 383.53 $ 383.53 $ 50.03 $ 100.05 $ 133.40 $ 166.75 $ 50.03
3.Hydes Creek Road Rural Residential [B]
Local Contribution $ 288.02 $ 671.09 $ 460.83 $ 547.24 $ 671.09 $ 345.62 $ 662.45 $ 662.45 $ 86.41 $ 172.81 $ 230.42 $ 288.02 $ 86.41
Shire Contribution
Total Contribution Payable $ 671.09 $ 460.83 $ 547.24 $ 671.09 $ 345.62 $ 662.45 $ 662.45 $ 86.41 $ 172.81 $ 230.42 $ 288.02 $ 86.41
4. North Bellingen Rural Residential Release
Local Contribution $ 156.08 $ 363.67 $ 249.73 $ 296.55 $ 363.67 $ 187.30 $ 358.98 $ 358.98 $ 46.82 $ 93.65 $ 124.86 $ 156.08 $ 46.82
Shire Contribution
Total Contribution Payable $ 363.67 $ 249.73 $ 296.55 $ 363.67 $ 187.30 $ 358.98 $ 358.98 $ 46.82 $ 93.65 $ 124.86 $ 156.08 $ 46.82
5. North Bellingen Established Areas
Local Contribution $ 101.43 $ 236.33 $ 162.29 $ 192.72 $ 236.33 $ 121.72 $ 233.29 $ 233.29 $ 30.43 $ 60.86 $ 81.14 $ 101.43 $ 30.43
Shire Contribution
Total Contribution Payable $ 236.33 $ 162.29 $ 192.72 $ 236.33 $ 121.72 $ 233.29 $ 233.29 $ 30.43 $ 60.86 $ 81.14 $ 101.43 $ 30.43
6. East Bellingen Release
Local Contribution $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
Shire Contribution $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
Total Contribution Payable $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
7. South Bellingen Established Areas [A]
Local Contribution $ 304.31 $ 709.04 $ 486.90 $ 578.19 $ 709.04 $ 365.17 $ 699.91 $ 699.91 $ 91.29 $ 182.59 $ 243.45 $ 304.31 $ 91.29
Shire Contribution
Total Contribution Payable $ 709.04 $ 486.90 $ 578.19 $ 709.04 $ 365.17 $ 699.91 $ 699.91 $ 91.29 $ 182.59 $ 243.45 $ 304.31 $ 91.29
8. South Bellingen Established Areas [B]
Local Contribution $ 304.31 $ 709.04 $ 486.90 $ 578.19 $ 709.04 $ 365.17 $ 699.91 $ 699.91 $ 91.29 $ 182.59 $ 243.45 $ 304.31 $ 91.29
Shire Contribution
Total Contribution Payable $ 709.04 $ 486.90 $ 578.19 $ 709.04 $ 365.17 $ 699.91 $ 699.91 $ 91.29 $ 182.59 $ 243.45 $ 304.31 $ 91.29
9. South Bellingen Established Areas [C]
Local Contribution $ 304.31 $ 709.04 $ 486.90 $ 578.19 $ 709.04 $ 365.17 $ 699.91 $ 699.91 $ 91.29 $ 182.59 $ 243.45 $ 304.31 $ 91.29
Shire Contribution
Total Contribution Payable $ 709.04 $ 486.90 $ 578.19 $ 709.04 $ 365.17 $ 699.91 $ 699.91 $ 91.29 $ 182.59 $ 243.45 $ 304.31 $ 91.29
Page 57 of 67
ANNEXURE C - CF&OS Community Facilities and Open Space Contributions Summary
Indexed 01/07/15 March Qtr CPI 2015 107.3 Application Type
Catchment
Base rate [per
person] Subdivision / New Lot
Detached Dwellings Semi/Row/ Townhouse Additions/Increased capacity
Self-Contained / Independent Seniors Living
Tourist per bed 1 Bedroom 2 Bedroom 3 Bedroom 1 Bedroom 2 Bedroom 3 Bedroom 1 Bedroom 2 Bedroom 3 Bedroom
10. South Bellingen Established Areas [D]
Local Contribution $ 304.31 $ 709.04 $ 486.90 $ 578.19 $ 709.04 $ 365.17 $ 699.91 $ 699.91 $ 91.29 $ 182.59 $ 243.45 $ 304.31 $ 91.29
Shire Contribution
Total Contribution Payable $ 709.04 $ 486.90 $ 578.19 $ 709.04 $ 365.17 $ 699.91 $ 699.91 $ 91.29 $ 182.59 $ 243.45 $ 304.31 $ 91.29
11. Urunga Established Areas
Local Contribution $ 301.78 $ 703.15 $ 482.85 $ 573.38 $ 703.15 $ 362.14 $ 694.09 $ 694.09 $ 90.53 $ 181.07 $ 241.42 $ 301.78 $ 90.53
Shire Contribution
Total Contribution Payable $ 703.15 $ 482.85 $ 573.38 $ 703.15 $ 362.14 $ 694.09 $ 694.09 $ 90.53 $ 181.07 $ 241.42 $ 301.78 $ 90.53
12. South Urunga Established Areas
Local Contribution $ 123.18 $ 287.01 $ 197.09 $ 234.04 $ 287.01 $ 147.82 $ 283.31 $ 283.31 $ 36.95 $ 73.91 $ 98.54 $ 123.18 $ 36.95
Shire Contribution
Total Contribution Payable $ 287.01 $ 197.09 $ 234.04 $ 287.01 $ 147.82 $ 283.31 $ 283.31 $ 36.95 $ 73.91 $ 98.54 $ 123.18 $ 36.95
13. Hungry Head
Local Contribution $ 698.00 $ 1,626.34 $ 1,116.80 $ 1,326.20 $ 1,626.34 $ 837.60 $ 1,605.40 $ 1,605.40 $ 209.40 $ 418.80 $ 558.40 $ 698.00 $ 209.40
Shire Contribution
Total Contribution Payable $ 1,626.34 $ 1,116.80 $ 1,326.20 $ 1,626.34 $ 837.60 $ 1,605.40 $ 1,605.40 $ 209.40 $ 418.80 $ 558.40 $ 698.00 $ 209.40
14. Raleigh West
Local Contribution $ 902.03 $ 2,101.73 $ 1,443.25 $ 1,713.86 $ 2,101.73 $ 1,082.44 $ 2,074.67 $ 2,074.67 $ 270.61 $ 541.22 $ 721.62 $ 902.03 $ 270.61
Shire Contribution
Total Contribution Payable $ 2,101.73 $ 1,443.25 $ 1,713.86 $ 2,101.73 $ 1,082.44 $ 2,074.67 $ 2,074.67 $ 270.61 $ 541.22 $ 721.62 $ 902.03 $ 270.61
15. Repton
Local Contribution $ 715.03 $ 1,666.02 $ 1,144.05 $ 1,358.56 $ 1,666.02 $ 858.04 $ 1,644.57 $ 1,644.57 $ 214.51 $ 429.02 $ 572.02 $ 715.03 $ 214.51
Shire Contribution
Total Contribution Payable $ 1,666.02 $ 1,144.05 $ 1,358.56 $ 1,666.02 $ 858.04 $ 1,644.57 $ 1,644.57 $ 214.51 $ 429.02 $ 572.02 $ 715.03 $ 214.51
16. Dorrigo Established Areas
Local Contribution $ 191.61 $ 446.45 $ 306.58 $ 364.06 $ 446.45 $ 229.93 $ 440.70 $ 440.70 $ 57.48 $ 114.97 $ 153.29 $ 191.61 $ 57.48
Shire Contribution
Total Contribution Payable $ 446.45 $ 306.58 $ 364.06 $ 446.45 $ 229.93 $ 440.70 $ 440.70 $ 57.48 $ 114.97 $ 153.29 $ 191.61 $ 57.48
Notes:
Indexed 01/07/15 March Qrt CPI 2015 107.3
Indexed 01/07/14 March Qrt CPI 2014 105.6
Original Base Rate CPI: December Qtr 2013 105
Page 58 of 67
ANNEXURE D - ROADS
Local Roads and Traffic Infrastructure Contributions Summary
Indexed 01/07/14 March Qtr CPI 2014 105.6 Application Type
Catchment
Indexed Base rate
[per person]
Subdivision / New Lot
Detached Dwellings Semi/Row/ Townhouse
Additions/Increased capacity
Self-Contained / Independent Seniors Living
Tourist per bed
1 Bedroo
m 2 Bedroom 3 Bedroom 1 Bedroom 2 Bedroom 3 Bedroom 1
Bedroom 2
Bedroom 3
Bedroom
1. Hydes Creek Residential Release
Local Contribution
1,545.04
3,708.10
2,472.06
2,935.58
3,708.10 1,854.05
3,553.59
3,553.59
463.51
927.02
1,236.03
1,545.04
463.51
Shire Contribution
184.17
442.01
294.67
349.92
442.01 221.00
423.59
423.59
55.25
110.50
147.34
184.17
55.25
Total Contribution Payable
4,150.11
2,766.73
3,285.50
4,150.11 2,075.05
3,977.18
3,977.18
518.76
1,037.52
1,383.37
1,729.21
518.76
2.Hydes Creek Road Rural Residential [A]
Local Contribution
2,362.93
5,671.03
3,780.69
4,489.57
5,671.03 2,835.52
5,434.74
5,434.74
708.88
1,417.76
1,890.34
2,362.93
708.88
Shire Contribution
184.17
442.01
294.67
349.92
442.01 221.00
423.59
423.59
55.25
110.50
147.34
187.17
55.25
Total Contribution Payable
6,113.04
4,075.36
4,839.49
6,113.04 3,056.52
5,858.33
5,858.33
764.13
1,528.26
2,037.68
2,550.10
764.13
3.Hydes Creek Road Rural Residential [B]
Local Contribution
3,796.00
9,110.40
6,073.60
7,212.40
9,110.40 4,555.20
8,730.80
8,730.80
1,138.80
2,277.60
3,036.80
3,796.00
1,138.80
Shire Contribution
184.17
442.01
294.67
349.92
442.01 221.00
423.59
423.59
55.25
110.50
147.34
184.17
55.25
Total Contribution Payable
9,552.41
6,368.27
7,562.32
9,552.41 4,776.20
9,154.39
9,154.39
1,194.05
2,388.10
3,184.14
3,980.17
1,194.05
4. North Bellingen Rural Residential Release
Local Contribution
1,728.82
4,149.17
2,766.11
3,284.76
4,149.17 2,074.58
3,976.29
3,976.29
518.65
1,037.29
1,383.06
1,728.82
518.65
Shire Contribution
184.17
442.01
294.67
349.92
442.01 221.00
423.59
423.59
55.25
110.50
147.34
184.17
55.25
Total Contribution Payable
4,591.18
3,060.78
3,634.68
4,591.18 2,295.58
4,399.88
4,399.88
573.90
1,147.79
1,530.40
1,912.99
573.90
5. North Bellingen Established Areas
Local Contribution
1,221.85
2,932.44
1,954.96
2,321.52
2,932.44 1,466.22
2,810.26
2,810.26
366.56
733.11
977.48
1,221.85
366.56
Shire Contribution
184.17
442.01
294.67
349.92
442.01 221.00
423.59
423.59
55.25
110.50
147.34
184.17
55.25
Total Contribution Payable
3,374.45
2,249.63
2,671.44
3,374.45 1,687.22
3,233.85
3,233.85
421.81
843.61
1,124.82
1,406.02
421.81
6. East Bellingen Release
Local Contribution
- -
- - - -
- - -
-
-
-
-
Shire Contribution
- -
- - - -
- - -
-
-
-
-
Total Contribution Payable - - - - - -
Page 59 of 67
- - - - - -
7. South Bellingen Established Areas [A]
Local Contribution
1,780.82
4,273.97
2,849.31
3,383.56
4,273.97 2,136.98
4,095.89
4,095.89
534.25
1,068.49
1,424.66
1,780.82
534.25
Shire Contribution
184.17
442.01
294.67
349.92
442.01 221.00
423.59
423.59
55.25
110.50
147.34
184.17
55.25
Total Contribution Payable
4,715.98
3,143.98
3,733.48
4,715.98 2,357.98
4,519.48
4,519.48
589.50
1,178.99
1,572.00
1,964.99
589.50
8. South Bellingen Established Areas [B]
Local Contribution
1,489.07
3,573.77
2,382.51
2,829.23
3,573.77 1,786.88
3,424.86
3,424.86
446.72
893.44
1,191.26
1,489.07
446.72
Shire Contribution
184.17
442.01
294.67
349.92
442.01 221.00
423.59
423.59
55.25
110.50
147.34
184.17
55.25
Total Contribution Payable
4,015.78
2,677.18
3,179.15
4,015.78 2,007.88
3,848.45
3,848.45
501.97
1,003.94
1,338.60
1,673.24
501.97
9. South Bellingen Established Areas [C]
Local Contribution
1,101.07
2,642.57
1,761.71
2,092.03
2,642.57 1,321.28
2,532.46
2,532.46
330.32
660.64
880.86
1,101.07
330.32
Shire Contribution
184.17
442.01
294.67
349.92
442.01 221.00
423.59
423.59
55.25
110.50
147.34
184.17
55.25
Total Contribution Payable
3,084.58
2,056.38
2,441.95
3,084.58 1,542.28
2,956.05
2,956.05
385.57
771.14
1,028.20
1,285.24
385.57
10. South Bellingen Established Areas [D]
Local Contribution
716.95
1,720.68
1,147.12
1,362.21
1,720.68 860.34
1,648.99
1,648.99
215.09
430.17
573.56
716.95
215.09
Shire Contribution
184.17
442.01
294.67
349.92
442.01 221.00
423.59
423.59
55.25
110.50
147.34
184.17
55.25
Total Contribution Payable
2,162.69
1,441.79
1,712.13
2,162.69 1,081.34
2,072.58
2,072.58
270.34
540.67
720.90
901.12
270.34
11. Urunga Established Areas
Local Contribution
4,123.81
3,417.14
2,278.10
2,705.24
3,417.14 1,708.57
3,274.76
3,274.76
427.14
854.29
1,139.05
1,423.81
427.14
Shire Contribution
184.17
442.01
294.67
349.92
442.01 221.00
423.59
423.59
55.25
110.50
147.34
184.17
55.25
Total Contribution Payable
3,859.15
2,572.77
3,055.16
3,859.15 1,929.57
3,698.35
3,698.35
482.39
964.79
1,286.39
1,607.98
482.39
12. South Urunga Established Areas
Local Contribution
1,822.22
4,373.33
2,915.55
3,462.22
4,373.33 2,186.66
4,191.11
4,191.11
546.67
1,093.33
1,457.78
1,822.22
546.67
Shire Contribution
184.17
442.01
294.67
349.92
442.01 221.00
423.59
423.59
55.25
110.50
147.34
184.17
55.25
Total Contribution Payable
4,815.34
3,210.22
3,812.14
4,815.34 2,407.66
4,614.70
4,614.70
601.92
1,203.83
1,605.12
2,006.39
601.92
Page 60 of 67
ANNEXURE D - ROADS Local Roads and Traffic Infrastructure Contributions Summary
Indexed 01/07/14 March Qtr CPI 2014 105.6 Application Type
Catchment
Indexed Base rate
[per person]
Subdivision / New Lot
Detached Dwellings Semi/Row/ Townhouse Additions/Increased
capacity
Self-Contained / Independent Seniors Living
Tourist per bed
1 Bedroom 2 Bedroom 3 Bedroom 1 Bedroom 2 Bedroom 3 Bedroom 1 Bedroom 2 Bedroom
3 Bedroom
13. Hungry Head
Local Contribution
2,064.08
4,953.79
3,302.53 3,921.75 4,953.79 2,476.90
4,747.38 4,747.38
619.22
1,238.45
1,651.26
2,064.08
619.22
Shire Contribution
184.17 442.01
294.67 349.92 442.01 221.00
423.59 423.59 55.25
110.50
147.34
184.17
55.25
Total Contribution Payable
5,395.80
3,597.20 4,271.67 5,395.80 2,697.90
5,170.97 5,170.97
674.47
1,348.95
1,798.60
2,248.25
674.47
14. Raleigh West
Local Contribution
1,000.89
2,402.14
1,601.42 1,901.69 2,402.14 1,201.07
2,302.05 2,302.05
300.27
600.53
800.71
1,000.89
300.27
Shire Contribution
184.17 442.01
294.67 349.92 442.01 221.00
423.59 423.59 55.25
110.50
147.34
184.17
55.25
Total Contribution Payable
2,844.15
1,896.09 2,251.61 2,844.15 1,422.07
2,725.64 2,725.64
355.52
711.03
948.05
1,185.06
355.52
15. Repton
Local Contribution
1,468.08
3,523.39
2,348.93 2,789.35 3,523.39 1,761.70
3,376.58 3,376.58
440.42
880.85
1,174.46
1,468.08
440.42
Shire Contribution
184.17 442.01
294.67 349.92 442.01 221.00
423.59 423.59 55.25
110.50
147.34
184.17
55.25
Total Contribution Payable
3,965.40
2,643.60 3,139.27 3,965.40 1,982.70
3,800.17 3,800.17
495.67
991.35
1,321.80
1,652.25
495.67
16. Dorrigo Established Areas
Local Contribution
776.72
1,864.13
1,242.75 1,475.77 1,864.13 932.06
1,786.46 1,786.46
233.02
466.03
621.38
776.72
233.02
Shire Contribution
184.17 442.01
294.67 349.92 442.01 221.00
423.59 423.59 55.25
110.50
147.34
184.17
55.25
Total Contribution Payable
2,306.14
1,537.42 1,825.69 2,306.14 1,153.06
2,210.05 2,210.05
288.27
576.53
768.72
960.89
288.27
17. Shire
Local Contribution
- -
- - - - - - -
- -
- -
Shire Contribution
184.17 442.01
294.67 349.92 442.01 221.00
423.59 423.59 55.25
110.50
147.34
184.17
55.25
Total Contribution Payable 442.01
294.67 349.92 442.01 221.00
423.59 423.59 55.25
110.50
147.34
184.17
55.25
Notes:
Original Base Rate CPI: March Qtr 2009 Indexed 01/07/10 March Qtr CPI 2010
95.2
Indexed 01/07/11 March Qtr CPI 2011
98.2
Indexed 01/07/12 March Qtr CPI 2012
99.9
Indexed 01/07/13 March Qtr CPI 2013
102.7
Indexed 01/07/2014 March Qtr CPI
105.6
Indexed 01/07/2015 March Qtr CPI
107.3
Page 61 of 67
Appendices
Appendix 1 – Waste Management Services
Under Section 88 of the Protection of the Environment Operations Act 1997 (POEO Act), Council is required to pay the Waste & Environment Levy. For further explanation of this levy and how it has been considered in setting the fees in this ‘Fees & Charges’ document please refer to www.epa.nsw.gov.au/wasteregulation/waste-levy.htm
Appendix 2 – Private Works
The Local Government Act 1993 enables Council to carry out the following works for residents and organisations on private property.
Paving and road marking (Paving and road marking (GST applies)
Kerbing and guttering (GST exempt)
Demolition and excavation (GST applies)
Water, sewerage and drainage connections (GST applies)
Land clearing and tree felling (GST applies)
Tree planting and tree maintenance (GST applies)
Fencing and ditching (GST applies)
Appendix 3 – Annual Water Charge – Usage Allowance
Usage allowance – 1kL/day in billing period Refer to body of document for relevant water consumption charges.
Appendix 4 – Council Facilities / Halls
Explanation of Fee Categories:
Commercial & Other – includes activities staged by individuals, groups, organisations that are not incorporated under the
Associated Incorporations Act NSW (1984) were revenue generated by use of the building goes back to these individuals,
groups, organisations. This rate enables Council to take a full cost recovery approach to this use. Example – Local dance
school.
Private Functions – includes activities that have admission restricted to an identifiable group. Example – Birthday Party,
Wedding Reception. This rate recognises that no financial gain will be gained from activity and that significant discount is
applied.
Not for Profit Rate – includes activities provided by community groups, clubs and organisations for the physical, social,
cultural, intellectual development or welfare of the local community. Organisations eligible for this rate should be
incorporated under the Associated Incorporations Act NSW (1984). This rate recognises the benefit these activities provide to
the community and therefore a major discount applies, while allowing users to make a contribution to the cost facility. Eg
Local Quilting Group.
General Bonds - Refundable – Please note that refunds will only be granted if the hall, room, key or equipment is returned in
good and clean condition. Council or the Management Committee / Booking Officer have the right to deduct appropriate
recovery costs.
Alcohol Bond – Refundable – Please note that refunds will only be granted if the hall, room, key or equipment is returned in
good and clean condition. Council or the Management Committee / Booking Officer have the rights to deduct appropriate
recovery costs. It is the responsibility of the hirer to obtain the necessary approvals from Police to undertake an event
involving alcohol. Refer to hire conditions for each of the facilities.
Page 62 of 67
Index
Abandoned Vehicles ....................................................................................................................................... 22 Access to Records
Formal Applications ..................................................................................................................................... 50 Open Access Information ............................................................................................................................ 51 Personal Records ........................................................................................................................................ 50
Administrative Fees ........................................................................................................................................ 36 Advertising - Development Application ............................................................................................................ 41 Agreements and Contributions........................................................................................................................ 17 Alcohol Bond – Refundable
Explanation of Fee Categories .................................................................................................................... 61 ANNEXURE A ................................................................................................................................................ 52 ANNEXURES
Annexure A ................................................................................................................................................. 52 Annexure B ................................................................................................................................................. 53 Annexure C - CF&OS .............................................................................................................................56, 57 Annexure D - Roads ...............................................................................................................................58, 60
Annual Availability Charge ............................................................................................................................... 34 Appendices ..................................................................................................................................................... 61 Appendix 1 – Waste Management Services ................................................................................................ 61 Appendix 2 – Private Works ......................................................................................................................... 61 Appendix 3 – Annual Water Charge – Usage Allowance ........................................................................... 61 Appendix 4 – Council Facilities / Halls ........................................................................................................ 61 Applications and Works .................................................................................................................................. 49 Archiving ......................................................................................................................................................... 38 Beach Driving Permits .................................................................................................................................... 36 Bellingen & Connell Parks .............................................................................................................................. 16 Bellingen Memorial Hall .............................................................................................................................10, 52 Bellingen Shire Youth Centre ...................................................................................................................... 8, 53 Bellinger Valley Historical Society ................................................................................................................... 15 Bonds ............................................................................................................................................................. 46 Brierfield Hall .................................................................................................................................................. 10 BUILDING AND DEVELOPMENT ASSESSMENT ......................................................................................... 38 Building Certificates ........................................................................................................................................ 39 Building Certification ....................................................................................................................................... 39 Building Records Search ................................................................................................................................ 38 Burdett Park .................................................................................................................................................... 16 Burning ........................................................................................................................................................... 20 Bus ................................................................................................................................................................... 8 Bushfire Assessment ...................................................................................................................................... 40 Cancellation of Application .............................................................................................................................. 40 CEMETERIES .................................................................................................................................................. 9 Certificates...................................................................................................................................................... 36 Certificates - Other .......................................................................................................................................... 40 Certificates - Planning ..................................................................................................................................... 40 Certified Copy ................................................................................................................................................ 50 Civic Leadership ............................................................................................................................................. 36 Commercial & Other
Explanation of Fee Categories .................................................................................................................... 61 Commercial Waste Management Additional Services ..................................................................................... 28 Commercial Waste Management Standard Service ........................................................................................ 28 Community Land............................................................................................................................................. 25 Community Wellbeing ....................................................................................................................................... 8 Companion Animals Act - registration ............................................................................................................. 22 Complying Development ................................................................................................................................. 41 Contributions .................................................................................................................................................. 17
Section 94 ................................................................................................................................................... 45
Page 63 of 67
Control of Burning ........................................................................................................................................... 20 Copy ............................................................................................................................................................... 50 Copying .......................................................................................................................................................... 37 COUNCIL FACILITIES/HALLS ......................................................................................................................... 9 DCP ................................................................................................................................................................ 17 Deer Vale Hall ................................................................................................................................................ 10 Developer Charges ......................................................................................................................................... 18 DEVELOPER CONTRIBUTIONS ................................................................................................................... 45 Development Application ................................................................................................................................ 41
Review ........................................................................................................................................................ 44 Development Applications .............................................................................................................................. 41 DEVELOPMENT ASSESSMENT ................................................................................................................... 41 Development Control Plan (DCP) ................................................................................................................... 17 Domestic Waste Management Additional Services ......................................................................................... 30 Domestic Waste Management Standard Service ............................................................................................ 30 Dorrigo Community Centre ............................................................................................................................. 10 Dorrigo Community Services - Community Bus ................................................................................................ 8 Dorrigo Museum ............................................................................................................................................. 15 Dorrigo Recreation Reserve ........................................................................................................................... 16 Dorrigo Saleyards ............................................................................................................................................. 6 ECONOMIC DEVELOPMENT .......................................................................................................................... 6 ENGINEERING OPERATIONS ...................................................................................................................... 46 Enquiry ........................................................................................................................................................... 38 ENVIRONMENTAL HEALTH AND REGULATION .......................................................................................... 20 Film & Television Activities ............................................................................................................................... 7 Food Premises Inspections ............................................................................................................................. 20 Footpath activities ........................................................................................................................................... 43 Funda Close ..................................................................................................................................................... 6 General Bonds - Refundable
Explanation of Fee Categories .................................................................................................................... 61 General Building Fees .................................................................................................................................... 38 General Inspections ........................................................................................................................................ 20
GIPA .............................................................................................................................................................. 50 Subpoenas .................................................................................................................................................. 51
Goods and Services Tax ................................................................................................................................... 4
Government Information (Public Access) Act 2009 (GIPA) ................................................................. 50 Halls ................................................................................................................................................................. 9
Bellingen Memorial Hall ..........................................................................................................................10, 52 Brierfield ...................................................................................................................................................... 10 Dorrigo ........................................................................................................................................................ 10 Megan ......................................................................................................................................................... 11 Raleigh ........................................................................................................................................................ 12 Thora .......................................................................................................................................................... 13 Urunga ........................................................................................................................................................ 14
Hickory House ................................................................................................................................................ 11 Impounding ..................................................................................................................................................... 22 Information - PIPPA ........................................................................................................................................ 51 Information & Knowledge ................................................................................................................................ 50 Inspections ..................................................................................................................................................... 39
Food ............................................................................................................................................................ 20 General ....................................................................................................................................................... 20
Interest Rate ................................................................................................................................................... 38 LEASE FEES - COUNCIL LAND .................................................................................................................... 49 Lease Rental .................................................................................................................................................. 49 LIBRARY SERVICES ..................................................................................................................................... 14 Liquid Trade Waste Usage Charges ............................................................................................................... 21 Living Environment ......................................................................................................................................... 20 Local Roads and Traffic Infrastructure Contributions Summary .............................................................. 60
Page 64 of 67
Megan Hall & Recreation Reserve .................................................................................................................. 11 Modifications of Consent under Section 96 ..................................................................................................... 43 Museum
Bellingen ..................................................................................................................................................... 15 Dorrigo ........................................................................................................................................................ 15 Urunga ........................................................................................................................................................ 15
MUSEUMS ..................................................................................................................................................... 15 Mylestom Hall ................................................................................................................................................. 12 Naming & Renaming of Roads & Reserves .................................................................................................... 50 North Bellingen Childrens Centre ...................................................................................................................... 8 Not for Profit Rate
Explanation of Fee Categories .................................................................................................................... 61 NSW NOXIOUS WEEDS ACT 1993 ............................................................................................................... 21 ORDINARY RATES ........................................................................................................................................ 47 Park
Bellingen & Connell Parks ........................................................................................................................... 16 Parks
Burdett Park ................................................................................................................................................ 16 Dorrigo Recreation Reserve ........................................................................................................................ 16 Urunga Recreation Reserve ........................................................................................................................ 17
PARKS AND RESERVES ............................................................................................................................... 16 PIPPA ............................................................................................................................................................. 51 Places for People.............................................................................................................................................. 9 Planning Proposal ........................................................................................................................................... 18 Pools
Bellingen ..................................................................................................................................................... 18 Dorrigo ........................................................................................................................................................ 18 Swimming Pools Act 1992 ........................................................................................................................... 21
POOLS ........................................................................................................................................................... 18 Pricing Policy .................................................................................................................................................... 5 Private Functions
Explanation of Fee Categories .................................................................................................................... 61 Private Works ................................................................................................................................................. 47 PROPERTY - CROWN RESERVES or STATE PARK .................................................................................... 49 Public Health .................................................................................................................................................. 20 Public Roads .................................................................................................................................................. 25 Raleigh Hall .................................................................................................................................................... 12 Ranger Services
Impounding ................................................................................................................................................. 22 RANGER SERVICES ..................................................................................................................................... 22 Rates .............................................................................................................................................................. 47
Base amount by Category ........................................................................................................................... 47 Interest Rates .............................................................................................................................................. 38 Rate in $ by Category.................................................................................................................................. 48
Resilient Economy ............................................................................................................................................ 6 Review of Development Application ................................................................................................................ 44 Roads .................................................................................................................................................. 25, 58, 60
Local Roads and Traffic Infrastructure Contributions Summary ................................................................... 58 Roads Act
Applications and Works ............................................................................................................................... 49 ROADS ACT 1993 .......................................................................................................................................... 49 Schedule of Fees and Charges 2015/2016 ....................................................................................................... 6 Section 138 Application .................................................................................................................................. 50 Section 64 Sewerage ...................................................................................................................................... 45 Section 64 Water ............................................................................................................................................ 45 Section 68
Part A - Manufactured Homes, Removable ................................................................................................. 23 Part B - Water Supply, Sewerage and Stormwater supply ........................................................................... 24
Page 65 of 67
Part C - Management of Waste ................................................................................................................... 25 Part D - Community Land ............................................................................................................................ 25 Part E - Public Roads .................................................................................................................................. 25 Part F - Other Activities ............................................................................................................................... 25
SECTION 68 ACTIVITIES .............................................................................................................................. 23 Section 96....................................................................................................................................................... 43 Sewer
Annual Availability Charge .......................................................................................................................... 26 Annual Availability Charge - Non Residential .............................................................................................. 27
SEWER AVAILABILITY CHARGE - Sec 501 NSW Local Government Act 1993 ............................................ 26 Sewer Usage Charge ..................................................................................................................................... 27 Sewerage
Section 64 ................................................................................................................................................... 45 STRATEGIC LAND USE PLANNING ............................................................................................................. 17 Subpoenas ..................................................................................................................................................... 51 SWIMMING POOLS ....................................................................................................................................... 18 Swimming Pools Act 1992 .............................................................................................................................. 21 Temporary Licence Application Fee ................................................................................................................ 49 Thora Hall ....................................................................................................................................................... 13 Tourism Services .............................................................................................................................................. 7 Trade Waste Charges ..................................................................................................................................... 21
Annual Trade Waste Fee ............................................................................................................................ 21 Trap Hire ........................................................................................................................................................ 23 Urunga Literary Institute .................................................................................................................................. 14 Urunga Museum ............................................................................................................................................. 15 Urunga Recreation Reserve ........................................................................................................................... 17 Urunga Senior Citizens Hall ............................................................................................................................ 14 Urunga Visitor Information Centre ..................................................................................................................... 7 Vehicles
Abandoned .................................................................................................................................................. 22 Waste Facility / Transfer Station Fees ............................................................................................................ 31 Waste Facility Access Charge ........................................................................................................................ 31 Waste Management
Commercial Waste Management Additional Service ................................................................................... 28 Commercial Waste Management Standard Service .................................................................................... 28
WASTE MANAGEMENT ................................................................................................................................ 28 Water
Section 64 ................................................................................................................................................... 45 Water Availability
Annual Availability Charge .......................................................................................................................... 34 WATER AVAILABILITY CHARGE - Section 501, 502 & 556 of NSW Local Government Act, 1993 ................ 34 Water Usage
Usage Charges - Inclining Block Tariff ........................................................................................................ 35 Waterfall Way Visitor Information Centre .......................................................................................................... 7 Youth Hub....................................................................................................................................................... 53
Page 66 of 67
The photographic images in this report were taken by Gethin Coles Photography