SC 19 report to SC 18 June 2015 SC 19 covers Perforating, Packers & Bridge Plugs, Subsurface Flow...

3
SC 19 report to SC 18 June 2015 SC 19 covers Perforating, Packers & Bridge Plugs, Subsurface Flow Control, Sand Screen, Gas-Lift, Barrier Valves, Completion Accessories, Liner Hangers, Test tools, Chemical injection systems. 26 standards in revision / newly created, 4 published, 4 SR3s submitted Completion Equipment Documents – 14 A – SCSSVs - recently published 14 B – SSSV installation – ballot complete in resolution – publish Q2 2015 14 L – SR3 submitted for next revision – HPHT requirements + updating 11 D1 – Packers and Bridge Plugs – Published 19 AC – Completion Accessories – adopt-back of ISO 14998 – ballot passed comment resolutions ongoing publish in Q3 2015, SR 3 on HPHT annex 19 SS – Sand Screens – adopt-back of ISO 17824 – ballot in Q3 2015 19 LH – Liner Hangers – in process – estimate pre- ballot Q4 2015 19 TT1 – Downhole Well Test Tools – ballot passed in comment resolution

Transcript of SC 19 report to SC 18 June 2015 SC 19 covers Perforating, Packers & Bridge Plugs, Subsurface Flow...

Page 1: SC 19 report to SC 18 June 2015 SC 19 covers Perforating, Packers & Bridge Plugs, Subsurface Flow Control, Sand Screen, Gas-Lift, Barrier Valves, Completion.

SC 19 report to SC 18 June 2015SC 19 covers Perforating, Packers & Bridge Plugs, Subsurface Flow Control, Sand Screen, Gas-Lift, Barrier Valves, Completion Accessories, Liner Hangers, Test tools, Chemical injection systems.

26 standards in revision / newly created, 4 published, 4 SR3s submittedCompletion Equipment Documents – • 14 A – SCSSVs - recently published• 14 B – SSSV installation – ballot complete in resolution – publish Q2 2015• 14 L – SR3 submitted for next revision – HPHT requirements + updating• 11 D1 – Packers and Bridge Plugs – Published • 19 AC – Completion Accessories – adopt-back of ISO 14998 – ballot passed

comment resolutions ongoing publish in Q3 2015, SR 3 on HPHT annex• 19 SS – Sand Screens – adopt-back of ISO 17824 – ballot in Q3 2015• 19 LH – Liner Hangers – in process – estimate pre-ballot Q4 2015• 19 TT1 – Downhole Well Test Tools – ballot passed in comment resolution• 19 V –Barrier valves- Published, TG inactive until review in 2016• 19 OH – Openhole Isolation Equip. – New- draft at 30%, ballot Q2 2016• 19 CI – Chemical Injection Valves – New- draft at 15%, ballot date not set

Page 2: SC 19 report to SC 18 June 2015 SC 19 covers Perforating, Packers & Bridge Plugs, Subsurface Flow Control, Sand Screen, Gas-Lift, Barrier Valves, Completion.

SC 19 report to SC 18 June 2015Gas-Lift Equipment Documents –

• Gas-Lift Handbook – replaces 7+ RPs – plan to publish in Early 2017• 19 G1 – Side-pocket mandrels – SR3 was approved, TG assessing scope• 19 G2 – Flow control devices – Ballot comment review underway, extensive• 19 G3 – Run/pull/KOT/latches for SPM flow controllers, published• 19 G4 – Practices used with SPM equipment, published• 19 G5 – Operations Maintenance of GL - SR3 was approved, work progressing• 19 G6 – Design of installations using IPO valves – 97% complete – initial ballot

Q3 2014• 19G9 - Design and Operation of Intermittent Gas-lift – Review 90% complete,

ballot Q2 2015• 19 G10 – Dual gas-lift systems, comment resolutions underway • 19G11 – Dynamic Simulation of Gas-Lift Wells and Systems –failed ballot,

resolving comments• 19G12 – Gas-lift Automation – 30% Complete ongoing, ballot Q3 1015• 19 G13– HP Gas-lift – 20% on hold • 19 G14 – Liquid unloading of gas wells –05% on hold

Page 3: SC 19 report to SC 18 June 2015 SC 19 covers Perforating, Packers & Bridge Plugs, Subsurface Flow Control, Sand Screen, Gas-Lift, Barrier Valves, Completion.

SC19 report to SC18 June 2015Perforating Documents –

• 19B – Perforators – Revising by section • 19B1 – Evaluation in Concrete Targets – Ready for ballot• 19B2 – Evaluation under stress – Released• 19B3 – Evaluation at temperature – In Process• 19B4 – Evaluation of Flow Performance – Revision complete• 19B5 – Debris Evaluation – Draft complete• 19B6 -- Gun Swell – Ready to publish• RP67 – Explosive Safety – revising entire document (just beginning, divided in

11 Task Groups) Two SR3 documents approved at SC19 for CSOEM funding of testing, 2015 50k 2016 150k, to help establish accurate explosive hold times at elevated temperatures.

SC 19 approved two SR3s for thermal decomposition testing of charges presented to CSOEM