SARATOGA ASSOCIATES · 2017. 11. 2. · Project Team Engineer of Record –Ammann & Whitney Project...
Transcript of SARATOGA ASSOCIATES · 2017. 11. 2. · Project Team Engineer of Record –Ammann & Whitney Project...
HOW THE ARTFUL DESIGN OF THE MOHAWK VALLEY GATEWAY
OVERLOOK RECONNECTED THE CITY OF AMSTERDAM
SARATOGA ASSOCIATES LANDSCAPE ARCHITECTS, ARCHITECTS,
ENGINEERS, AND PLANNERS, P.C.
Presentation Overview
Background
Design Process and Goals
Concepts
Design Development
Public Participation Process
Construction
Finished Product and Project Impact
Background
Project Team
Engineer of Record – Ammann & Whitney
Project Designer, Landscape Architecture, Architecture –
Saratoga Associates
Civil Engineer – MJ Engineering & Surveyors
Environmental Engineering – Louis Berger
Electrical Engineering – Maita Associates
Geotechnical Engineering – GZA GeoEnvironmental
Contractor – Kubricky Construction Corporation
Sub Contractor – DA Collins
Pedestrian Bridges Can Be Many Things
Conveyance
A gathering place for the community
An economic catalyst by increasing tourism
An iconic piece of architecture and engineering for an entire
region
A place to learn
An eyesore
7
Design Process and Goals
“…add green space …. promote cultural and
commercial revitalization.”
“Though the High Line is not fully completed —
more than two million people have already
visited.”
Case Studies
High Line
Manhattan, NY
Walkway over the HudsonPoughkeepsie, NY
Bridge of Flowers
Shelburn Falls, MA
Inspiration - More Than a Bridge
Common Design Themes
Events Program and FuntionMore than a bridge…
Concepts
• Efficiency of material
• Graceful presence
• Longer span
Suspension – Option A
Suspension – Option B
• Asymmetrical Design
• Efficiency in materials
• Long Span – opens navigation
clearance
Cable Stay – Option C
Original Design Inspiration
Original Design - 2001
Original Design in New Base Model
New Base Model
Design
Development
Alternative 1: Traditional Cable Stay
Alternate 1- Perspective Overview
Alternative 2: Park Over the River - Straight
Alternate 2- Perspective Overview
Alternative 3: Park Over the River – Curved
Alternate 3- Perspective Overview
Public
Participation
Process
Where We Were
Where We Are
Chalmer’s Site
Parking
South Shore
Mohawk River
Picnic
Shelter
North Shore
Where We Are
Design Elements – Overall Systems
Planter WallsPlant Materials Paving
Retaining Walls
Guard Rails
Architecture Lighting Site Fixtures
Interpretive Elements
Bridge Piers
Construction
Construction Details
3 Span structure
Steel plate girders – 135; 235; &141 Feet
511ft long x 30ft wide
Prefabricated Bridge
700 cubic yards of concrete
17,000 bolts used
Construction from Fall 2014 to Spring 2016
Finished Product and
Project Impact
Since its grand opening in the Fall of 2016, the MVGO has already become a center of community activity.
Birds Eye View East
A variety of interpretive elements highlight the history and culture of the City and its relationship to the Mohawk.
Closeup View West
The unique “Park over the River” theme for the pedestrian bridge extends a greenway across the Mohawk, including
extensive landscape planting, viewing areas, and gathering spaces for large functions.
Infusing New Life
Reconnecting the City of Amsterdam’s north and south side neighborhoods which were divided long ago by a
utilitarian and pedestrian unfriendly arterial bridge.
Connection
A large compass was added to the design elements to remind the city of its multifaceted history and future
Compass
The 30 foot wide bridge spans 511 feet over the Mohawk River and connects Riverlink Park on the north shore of the
river and Bridge Street on the south shore.
View From the Water
Serves as a reminder of the industrial past of the river and its use in running mills and powering commerce.
Stone Retaining Wall
Brightly colored flowers were placed to bring a sense of vibrancy, life, and beauty to the walkway.
Vegetation
Decorative plaques tell a more detailed story of Amsterdam’s History.
Interpretive Signs
The bridge’s design vocabulary incorporates interpretive architectural and landscape architectural elements to celebrate
the story of Amsterdam.
Groundwork Hudson Valley
View from the Bridge
The entire length of the bridge provides information on the history and importance of the region and the waterway.
Culture
The Amsterdam high school marching band on the MVGO.
Community
Members of the Amsterdam community enjoy the newly opened greenway.
Community
A view of the greenway in early Autumn.
Autumn View
MVGO Results After One Year
Number of visitors greater than projected
Real estate values increasing in vicinity of bridge
City of Amsterdam has programmed activities at bridge all
year long
Has sparred additional events in connected parks and
neighborhoods
Created an estimated $2M in economic impact within the first
year
Things to Consider for Your Pedestrian Bridge
Maximize nodes of connectivity
Gather public input
Consider aesthetic design elements
Can it be more than a bridge?
PDH Questions
1. What three types of bridge designs were considered?
Ans. – traditional cablestay, park over river (straight), park over river (curved)
2. In addition to physically reconnecting the city, what was other goal?
Ans. – Build metaphorical bridge that celebrates city’s cultural diversity.
3. What is required navigational clearance height of MVGO for water
vessels?
Ans. – 20 feet above high water level
Thank You
Daniel Shearer, PE, LEED AP
President & CEO
Saratoga Associates
518-831-5754
www.saratogaassociates.com
Facebook.com/SaratogaAssociates
Youtube.com/user/SaratogaAssociates
Twitter.com/SaratogaAssoc
Linkedin.com/company/saratoga-associates/