SAN FRANCISCO INTERNATIONAL AIRPORT · 2020. 1. 2. · san francisco international airport...

24
SAN FRANCISCO INTERNATIONAL AIRPORT CONSOLIDATED ADMINISTRATION CAMPUS PHASE 1 CDR DESIGN DEVELOPMENT REVIEW, JULY 18 2016

Transcript of SAN FRANCISCO INTERNATIONAL AIRPORT · 2020. 1. 2. · san francisco international airport...

Page 1: SAN FRANCISCO INTERNATIONAL AIRPORT · 2020. 1. 2. · san francisco international airport consolidated administration campus phase 1 cdr design development review, july 18 2016.

SAN FRANCISCO INTERNATIONAL AIRPORT

CONSOLIDATED ADMINISTRATION CAMPUSPHASE 1

CDR DESIGN DEVELOPMENT REVIEW, JULY 18 2016

Page 2: SAN FRANCISCO INTERNATIONAL AIRPORT · 2020. 1. 2. · san francisco international airport consolidated administration campus phase 1 cdr design development review, july 18 2016.

THE SITE

Page 3: SAN FRANCISCO INTERNATIONAL AIRPORT · 2020. 1. 2. · san francisco international airport consolidated administration campus phase 1 cdr design development review, july 18 2016.

HIG

HW

AY 101

N M

CD

ON

NELL R

D

US POST

OFFICE

WEST

FIELD

CARGO

BUILDING

EXISTING

MUSEUM

BUILDING

AIRTRAIN

MAINT.

BUILDING

FACILITIES

MAINT.

BUILDING

EXISTING

DESIGN

& CONST.

BUILDING

AIRTRAIN

STATION

WEST FIELD ROAD

THE SITE

Page 4: SAN FRANCISCO INTERNATIONAL AIRPORT · 2020. 1. 2. · san francisco international airport consolidated administration campus phase 1 cdr design development review, july 18 2016.

EXISTING SITE CONDITIONS

AIRTRAIN STATION

PLANNED PARKING

STRUCTURE

FACILITIES MAINT.

BUILDING

EXISTING MUSEUM

EEEEEEEEEEEEEEEEEEEEEEEEEEEEEXXXXISTING DDESIGNN & COONSTRUCTIOOOOOOOOOOOOOOOOOOOOOOOOOOOOONNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNNN

US POST OFFICE

AAAAIRTRAIN MAINT.

BUILDINGGGGGGGG

HIGHWAY 101

WEST FIELD ROAD

Page 5: SAN FRANCISCO INTERNATIONAL AIRPORT · 2020. 1. 2. · san francisco international airport consolidated administration campus phase 1 cdr design development review, july 18 2016.

DESIGN & CONSTRUCTION DIVISIONAIRPORT & ENVIRONMENTAL PLANNING DIVISIONITT DIVISIONMUSEUM DIVISION

PHASE 1 PROGRAM

IDENTITY CONNECTIVITY OUTDOOR SPACE PERFORMANCE & WELLNESS

Page 6: SAN FRANCISCO INTERNATIONAL AIRPORT · 2020. 1. 2. · san francisco international airport consolidated administration campus phase 1 cdr design development review, july 18 2016.

REMOVAL OF EXISTING BUILDINGS

AIRTRAIN STATION

PLANNED PARKING

STRUCTURE

FACILITIES MAINT.

BUILDING

US POST OFFICE

AAAAIRTRAIN MAINT.

BUILDINGGGGGGGG

HIGHWAY 101

WEST FIELD ROAD

Page 7: SAN FRANCISCO INTERNATIONAL AIRPORT · 2020. 1. 2. · san francisco international airport consolidated administration campus phase 1 cdr design development review, july 18 2016.

PHASE 1

ACOUSTIC BUFFER

RENEWABLE ENERGY

TRANSIT CONNECTION

BUILDING ORIENTATION

EFFICIENT FLOOR PLATES

USABLE OUTDOOR SPACE

HEALTH & WELLNESS

BICYCLE FRIENDLY

Page 8: SAN FRANCISCO INTERNATIONAL AIRPORT · 2020. 1. 2. · san francisco international airport consolidated administration campus phase 1 cdr design development review, july 18 2016.

PHASE 1 STACKING

OFFICE WORKPLACE

BUILDING AMENITY

MUSEUM CURATORIAL

PHASE 1 STACKING

Page 9: SAN FRANCISCO INTERNATIONAL AIRPORT · 2020. 1. 2. · san francisco international airport consolidated administration campus phase 1 cdr design development review, july 18 2016.

DAYLIGHTING STRATEGIESINCREASE FLOOR-TO-FLOOR HEIGHT

Page 10: SAN FRANCISCO INTERNATIONAL AIRPORT · 2020. 1. 2. · san francisco international airport consolidated administration campus phase 1 cdr design development review, july 18 2016.

CDR IMAGE MAY 2016

Page 11: SAN FRANCISCO INTERNATIONAL AIRPORT · 2020. 1. 2. · san francisco international airport consolidated administration campus phase 1 cdr design development review, july 18 2016.

AERIAL VIEW

Page 12: SAN FRANCISCO INTERNATIONAL AIRPORT · 2020. 1. 2. · san francisco international airport consolidated administration campus phase 1 cdr design development review, july 18 2016.

ARRIVAL VIEWARRIVAL VIEW

Page 13: SAN FRANCISCO INTERNATIONAL AIRPORT · 2020. 1. 2. · san francisco international airport consolidated administration campus phase 1 cdr design development review, july 18 2016.

VIEW AT STAIR TOWER

Page 14: SAN FRANCISCO INTERNATIONAL AIRPORT · 2020. 1. 2. · san francisco international airport consolidated administration campus phase 1 cdr design development review, july 18 2016.

VIEW AT ENTRANCE

Page 15: SAN FRANCISCO INTERNATIONAL AIRPORT · 2020. 1. 2. · san francisco international airport consolidated administration campus phase 1 cdr design development review, july 18 2016.

VIEW LOOKING WEST

Page 16: SAN FRANCISCO INTERNATIONAL AIRPORT · 2020. 1. 2. · san francisco international airport consolidated administration campus phase 1 cdr design development review, july 18 2016.

SOUTH ELEVATION

Page 17: SAN FRANCISCO INTERNATIONAL AIRPORT · 2020. 1. 2. · san francisco international airport consolidated administration campus phase 1 cdr design development review, july 18 2016.

30’-00”

15’-00”15’-00”

15’-00”5’-00” 5’-00”6’-00” 6’-00” 4’-00”

DETAIL AT ELEVATION

Page 18: SAN FRANCISCO INTERNATIONAL AIRPORT · 2020. 1. 2. · san francisco international airport consolidated administration campus phase 1 cdr design development review, july 18 2016.

15’-00”

3’-00”6’-00”

2’-00”2’-00”

2’-00”

14” ALUMINUMSUNSHADES

DAYLIGHT REDIRECTINGFILM ON UPPER TRANSOM

INSULATED METAL PANELCLADDING

ALUMINUM STOREFRONT W/INSULATED GLAZING

(PPG SOLARBAN 70XL)

EXPOSED DECK FORRADIANT HEATING/COOLING

DETAIL AT TYPICAL MODULE

Page 19: SAN FRANCISCO INTERNATIONAL AIRPORT · 2020. 1. 2. · san francisco international airport consolidated administration campus phase 1 cdr design development review, july 18 2016.

15’-00”

10’-00”18”

18”2’-00”

INSULATED METAL PANELCLADDING, TYP

ALUMINUM STOREFRONTW/ FRITTED INSULATED

GLAZING UNIT(PPG SOLARBAN 90)

EXPOSED DECK FORRADIANT HEATING/COOLING

TYPICAL DETAIL AT POPOUT

Page 20: SAN FRANCISCO INTERNATIONAL AIRPORT · 2020. 1. 2. · san francisco international airport consolidated administration campus phase 1 cdr design development review, july 18 2016.

VIEW FROM NORTHEAST

Page 21: SAN FRANCISCO INTERNATIONAL AIRPORT · 2020. 1. 2. · san francisco international airport consolidated administration campus phase 1 cdr design development review, july 18 2016.

AERIAL VIEW

Page 22: SAN FRANCISCO INTERNATIONAL AIRPORT · 2020. 1. 2. · san francisco international airport consolidated administration campus phase 1 cdr design development review, july 18 2016.

NORTH ELEVATION

Page 23: SAN FRANCISCO INTERNATIONAL AIRPORT · 2020. 1. 2. · san francisco international airport consolidated administration campus phase 1 cdr design development review, july 18 2016.

WEST ELEVATION

Page 24: SAN FRANCISCO INTERNATIONAL AIRPORT · 2020. 1. 2. · san francisco international airport consolidated administration campus phase 1 cdr design development review, july 18 2016.

EAST ELEVATION