SAMPLE EROSION AND SEDIMENT CONTROL PLAN (ESCP) … · 30' 80' 50' BUFFER FROM OHWL OHWL 50' BUFFER...

6
GI C-C 183,336 SF (4.21 ACRES) ASPHALT | GRAVEL REQUIRED 20' ROW DEDICATION BICYCLE PARKING SAN WTR XE XE XE XE XE XE XE XE XE XE XE G G G E E E E COM COM EXIST COMMERCIAL D/W EXIST COMMERCIAL D/W STM STM STM STM STM FF = 49.0± FLOW LINE OF NO NAME CREEK EXIST COMMERCIAL D/W EXIST RESIDENTAIL D/W XG XG XG XG XG XG XG XG XG XG XG XG XG XG XG XG XG XG XG XG XG XG XG XG XG XG XG XG XG XG XG EXISTING 8 5/8" GAS LINE EXISTING 12" GAS LINE > > > > > > > > > > > > > > STM STM FD FD FD FD FD FD FD FD FD FD FD MASS UTILITY PAVING FINAL WET WEATHER CLEARING GRADING INSTALLATION CONSTRUCTION STABILIZATION (OCT. 1 - MAY 31ST) EROSION PREVENTION PRESERVE NATURAL VEGETATION GROUND COVER HYDRAULIC APPLICATIONS PLASTIC SHEETING STRAW MULCH COVER DUST CONTROL TEMPORARY/PERMANENT SEEDING OTHER: SEDIMENT CONTROL STRAW WATTLES OTHER: RUN OFF CONTROL CONSTRUCTION ENTRANCE PIPE SLOPE DRAIN OTHER: POLLUTION PREVENTION PROPER SIGNAGE HAZ WASTE MGMT SPILL KIT ON-SITE CONCRETE WASHOUT AREA OTHER: CJD BUFFER ZONE SEDIMENT FENCE (INTERIOR) FILTER BERM INLET PROTECTION DEWATERING NATURAL BUFFER ENCROACHMENT OUTLET PROTECTION SURFACE ROUGHENING CHECK DAMS SEDIMENT TRAP X X X X X X X X X X X X X X X X X * * X X X X X X * * X X X X X X X X X * * X X X X X X X X X X X X X X X X X X X X X X X X X X ROCK COVER X 1 2 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X SAMPLE EROSION AND SEDIMENT CONTROL PLAN (ESCP) DRAWINGS Engineer Stamp Here XXX XXX XXX XXXX XXXX (XXXXX PROJECT NAME XXX XXX

Transcript of SAMPLE EROSION AND SEDIMENT CONTROL PLAN (ESCP) … · 30' 80' 50' BUFFER FROM OHWL OHWL 50' BUFFER...

Page 1: SAMPLE EROSION AND SEDIMENT CONTROL PLAN (ESCP) … · 30' 80' 50' BUFFER FROM OHWL OHWL 50' BUFFER FROM OHWL 50' BUFFER FROM OHWL 50' BUFFER FROM OHWL OHWL OHWL OHWL. 1 2. When drafting

GI

C-C

183,336 SF

(4.21 ACRES)

ASPHA

LT | GRA

VEL

REQUIRED 20'ROW DEDICATION

BICYC

LE PARKIN

G

S

A

N

WT

R

XE

XE

XE

XE

XE

XE

XE

XE

XE

X

E

X

E

G

G

G

E

E

E

E

CO

M

CO

M

EX

IST

CO

MM

ER

CIA

L

D/W

EX

IST

CO

MM

ER

CIA

L

D/W

ST

M

ST

M

ST

M

ST

M

ST

M

FF = 4

9.0±

FLOW LINE OF

NO NAME CREEK

EX

IST

CO

MM

ER

CIA

L

D/W

EXIST

RE

SID

EN

TAIL

D/W

XG

XG

XG

XG

XG

XG

XG

XG

XG

XG

XG

XG

XG

XG

XG

XG

XG

XG

XG

XG

XG

XG

XG

XG

XG

XG

XG

XG

XG

XG

XG

EXISTIN

G 8

5/8

" GAS L

INE

EXISTIN

G 1

2" GAS L

INE

>

>

>

>

>

>

>

>

>

>

>

>

>

>

ST

M

ST

M

FD

FD

FD

FD

FD

FD

FD

FD

FD

FD

FD

MASS UTILITY PAVING FINAL WET WEATHER

CLEARING GRADING INSTALLATION CONSTRUCTION STABILIZATION(OCT. 1 - MAY 31ST)

EROSION PREVENTION

PRESERVE NATURAL VEGETATION

GROUND COVER

HYDRAULIC APPLICATIONS

PLASTIC SHEETING

STRAW MULCH COVER

DUST CONTROL

TEMPORARY/PERMANENT SEEDING

OTHER:

SEDIMENT CONTROL

STRAW WATTLES

OTHER:

RUN OFF CONTROL

CONSTRUCTION ENTRANCE

PIPE SLOPE DRAIN

OTHER:

POLLUTION PREVENTION

PROPER SIGNAGE

HAZ WASTE MGMT

SPILL KIT ON-SITE

CONCRETE WASHOUT AREA

OTHER:

CJD

BUFFER ZONE

SEDIMENT FENCE (INTERIOR)

FILTER BERM

INLET PROTECTION

DEWATERING

NATURAL BUFFER ENCROACHMENT

OUTLET PROTECTION

SURFACE ROUGHENING

CHECK DAMS

SEDIMENT TRAP

X X

XXX

XXX X

XXX X XX

X X

* * X

XXX X X* * X

XX X X

XXX X* * X

XX X X

XXX X XX

XXX X XX

XXX X XX

X X X

ROCK COVER X

1

2

XXX X XX

X

X X X

X

X X X

X

XXX X XX

X

XXX X XX

XX

X

SAMPLE EROSION AND SEDIMENT CONTROL PLAN (ESCP) DRAWINGS

EngineerStamp Here

XXX XXX

XXX

XXXX XXXX (XXXXX

PROJECT NAME

XXX XXX

mkennedy
Text Box
Draft an ESCP sheet for each of these stages. More if necessary and depending on the size of the project.
mkennedy
Line
mkennedy
Text Box
Consider the soil type and topography when selecting BMPs. Erosion control methods are not one size fits all.
mkennedy
Line
mkennedy
Text Box
Fill out these parts
mkennedy
Text Box
Don't forget to update DEQ if a new inspector is selected.
Page 2: SAMPLE EROSION AND SEDIMENT CONTROL PLAN (ESCP) … · 30' 80' 50' BUFFER FROM OHWL OHWL 50' BUFFER FROM OHWL 50' BUFFER FROM OHWL 50' BUFFER FROM OHWL OHWL OHWL OHWL. 1 2. When drafting

30'

80'

50' BUFFER

FROM OHWL

OHWL

50' BUFFER FROM OHWL

50' BUFFER

FROM OHWL

50' BUFFER

FROM OHWL

OHWL

OHWL

OHWL

1

2

mkennedy
Text Box
When drafting your Erosion and Sediment Control Plan, consider the different stages of your project and the specific erosion and sediment control needs of each stage. Also consider your audience: make sure the construction crews can read and understand the plans.
mkennedy
Text Box
The first sheet should communicate the existing conditions - how is stormwater flowing at the beginning of the project? What structures will be demolished? The beginning stages of the project may not involve grading, but have a level of ground disturbance and staging that have specific erosion and sediment control needs.
mkennedy
Line
mkennedy
Text Box
Removing a lot of trees? Draft a sheet specifically for that. Cutting trees and removing root balls, especially on multiple acres, generates a large amount of disturbed and loose soil. Make sure to have a plan for proper management of that activity.
mkennedy
Text Box
Don't crowd the map! Provide the minimum amount of information necessary to communicate the erosion and sediment control needs for the specific stage of development. Also consider scale, don't try to fit a 10+ acre site on one sheet. Tile your drawings and make a key map. Review time is greatly reduced when the plan is easy to read and interpret.
mkennedy
Text Box
The Natural Buffer is measured from the edge of the waterbody toward the upland.
mkennedy
Line
mkennedy
Line
mkennedy
Text Box
A legend is always necessary. Any symbol you use needs to be defined here. You can use numbered or lettered keynotes for descriptions as well.
mkennedy
Line
mkennedy
Line
mkennedy
Text Box
If less than 50' of the Natural Buffer is maintained, be sure to provide additional erosion controls and the rationale for choosing the selected BMP.
mkennedy
Line
Page 3: SAMPLE EROSION AND SEDIMENT CONTROL PLAN (ESCP) … · 30' 80' 50' BUFFER FROM OHWL OHWL 50' BUFFER FROM OHWL 50' BUFFER FROM OHWL 50' BUFFER FROM OHWL OHWL OHWL OHWL. 1 2. When drafting

S

A

N

SA

N

WT

R

XE

XE

XE

XE

XE

XE

XE

XE

XE

XE

XE

X

E

X

E

G

G

G

G

E

E

E

E

E

E

CO

M

CO

M

EX

IST

CO

MM

ER

CIA

L

D/W

EX

IST

CO

MM

ER

CIA

L

D/W

FF = 4

9.0±

EX

IST

CO

MM

ER

CIA

L

D/W

EXIST

RE

SID

EN

TAIL

D/W

XG

XG

XG

XG

XG

XG

XG

XG

XG

XG

XG

XG

XG

XG

XG

XG

XG

XG

XG

XG

XG

XG

XG

XG

XG

XG

XG

XG

XG

XG

XG

XG

XG

XG

XG

XG

XG

XG

XG

EX

IST

ING

8 5

/8"

GA

S L

INE

EX

IST

ING

12"

GA

S L

INE

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

FD

FD

FD

FD

FD

FD

FD

FD

FD

FD

FD

FD

FD

FD

S

T

M

6

5

6

3

6

1

5

9

5

7

5

5

54

53

52

51

5

0

4

9

4

9

5

0

5

1

5

2

5

3

48

4

8

4

8

4

7

4

8

4

9

4

8

45

44

4

5

4

6

4

6

50' BUFFER

FROM OHWL

OHWL

50' BUFFER

FROM OHWL

OHWL

OHWL

EXISTING

CONTOUR (TYP)

AS SHOWN

ON ALL SHEET LEGENDS.

PROPOSED

CONTOUR (TYP)

AS SHOWN

ON ALL SHEET LEGENDS.

1

2

SEE CONSTRUCTION

DOCUMENTS FOR POND GRADING

DETAILS AND PLANTING PLANS

AREA OF NO

PROPOSED

DISTURBANCE

AREA OF NO

PROPOSED

DISTURBANCE

DISCHARGE OF CONSTRUCTION DEWATERING FOR UTILTY TRENCHES AND FOUNDATION WORK IN THIS AREA. CONTRACTOR TO PROVIDE PUMP AND HOSE SYSTEM FOR DEWATERING. DURING CONSTRUCTION CONTRACTOR SHALL MONITOR DEWATERING AND ADJUST FILTER BASIN SIZE BASED ON DEWATERING NEEDS. DEWATERING BASIN MAY BE ADJUSTED TO A MAXIMUM SIZE OF 30' X 30'.

ONCE THE DETENTION BASIN AND

OUTLET STRUCTURE ARE

INSTALLED ALONG WITH

PERMANENT STABILIZATION, THEN

DEWATERING MAY BE ROUTED TO

THIS BASIN.

2

8

mkennedy
Text Box
Note: There are no defined wet/dry seasons or dates in the 1200-C permit, or allowance for the assumption of dry conditions. The site is expected to manage stormwater any time of year.
mkennedy
Text Box
All dewatering must be addressed and managed appropriately, even authorized (non-polluted) dewatering.
mkennedy
Line
mkennedy
Text Box
Include the scale of any constructed outfalls, including associated BMPs.
mkennedy
Text Box
Onsite detention is a great BMP for stormwater management/treatment. Remember to stabilize the infrastructure prior to use so it does not become a sediment source itself. Consider long term functionality impacts if the feature will be used for post-construction stormwater management.
mkennedy
Line
mkennedy
Text Box
Continue to be mindful of data crowding throughout the plan. Only provide information necessary to the specific stage.
Page 4: SAMPLE EROSION AND SEDIMENT CONTROL PLAN (ESCP) … · 30' 80' 50' BUFFER FROM OHWL OHWL 50' BUFFER FROM OHWL 50' BUFFER FROM OHWL 50' BUFFER FROM OHWL OHWL OHWL OHWL. 1 2. When drafting

S

A

N

SA

N

WT

R

XE

XE

XE

XE

XE

XE

XE

XE

XE

XE

XE

X

E

X

E

G

G

G

G

E

E

E

E

E

E

CO

M

CO

M

EX

IST

CO

MM

ER

CIA

L

D/W

EX

IST

CO

MM

ER

CIA

L

D/W

ST

M

ST

M

ST

M

STM

ST

MFF =

49.0

±

EX

IST

CO

MM

ER

CIA

L

D/W

EXIST

RE

SID

EN

TAIL

D/W

XG

XG

XG

XG

XG

XG

XG

XG

XG

XG

XG

XG

XG

XG

XG

XG

XG

XG

XG

XG

XG

XG

XG

XG

XG

XG

XG

XG

XG

XG

XG

XG

XG

XG

XG

XG

XG

XG

XG

EX

IST

ING

8 5

/8"

GA

S L

INE

EX

IST

ING

12"

GA

S L

INE

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

ST

M

STM

FD

FD

FD

FD

FD

FD

FD

FD

FD

FD

FD

FD

FD

FD

S

T

M

50' BUFFER

FROM OHWL

OHWL

50' BUFFER

FROM OHWL

OHWL

OHWL

NO NAME CREEK

NATURAL BACKGROUND

TURBIDITY EQUALS 1.23 NTU.

1

2

SEE CONSTRUCTION

DOCUMENTS FOR POND GRADING

DETAILS AND PLANTING PLANS

INSTALL NEW STORM, SANITARY, WATER

AND OTHER UTILITIES PER APPROVED PERMIT DRAWINGS

(TYP.)

INSTALL NEW STORM, SANITARY, WATER

AND OTHER UTILITIES PER APPROVED PERMIT DRAWINGS

INSTALL NEW STORM,

SANITARY, WATER

AND OTHER UTILITIES PER

APPROVED PERMIT DRAWINGS

AREA OF NO

PROPOSED

DISTURBANCE

AREA OF NO

PROPOSED

DISTURBANCE

1

1

2

DISCHARGE OF CONSTRUCTION

DEWATERING FOR UTILTY TRENCHES

AND FOUNDATION WORK IN THIS

AREA. CONTRACTOR TO PROVIDE

PUMP AND HOSE SYSTEM FOR

DEWATERING. DURING

CONSTRUCTION CONTRACTOR SHALL

MONITOR DEWATERING AND ADJUST

FILTER BASIN SIZE BASED ON

DEWATERING NEEDS. DEWATERING

BASIN MAY BE ADJUSTED TO A

MAXIMUM SIZE OF 30' X 30'.

8

mkennedy
Text Box
Features that will be present through multiple stages or throughout the duration of the project need to be reflected on each sheet. Examples include construction entrances, natural buffer areas, and dewatering.
mkennedy
Line
mkennedy
Line
mkennedy
Line
mkennedy
Text Box
Utility installation presents unique erosion and sediment control challenges. Developing a separate sheet for this stage of the project helps ensure compliance with the 1200-C.
mkennedy
Line
mkennedy
Text Box
If possible, determine the background turbidity of the receiving waterbody. Make sure that the discharges from your site are no more than 10% higher than that number.
mkennedy
Line
Page 5: SAMPLE EROSION AND SEDIMENT CONTROL PLAN (ESCP) … · 30' 80' 50' BUFFER FROM OHWL OHWL 50' BUFFER FROM OHWL 50' BUFFER FROM OHWL 50' BUFFER FROM OHWL OHWL OHWL OHWL. 1 2. When drafting

S2

HD-HDU4

HD-HDU4

S6

HD-HDU2

HD-HDU2

S6

HD-HDU4

HD-HDQ8

HD-HDQ8

S

A

N

SA

N

WT

R

XE

XE

XE

XE

XE

XE

XE

XE

XE

XE

XE

X

E

X

E

G

G

G

G

E

E

E

E

E

E

CO

M

CO

M

EX

IST

CO

MM

ER

CIA

L

D/W

EX

IST

CO

MM

ER

CIA

L

D/W

ST

M

ST

M

ST

M

STM

ST

MFF =

49.0

±

EX

IST

CO

MM

ER

CIA

L

D/W

EXIST

RE

SID

EN

TAIL

D/W

XG

XG

XG

XG

XG

XG

XG

XG

XG

XG

XG

XG

XG

XG

XG

XG

XG

XG

XG

XG

XG

XG

XG

XG

XG

XG

XG

XG

XG

XG

XG

XG

XG

XG

XG

XG

XG

XG

XG

EX

IST

ING

8 5

/8"

GA

S L

INE

EX

IST

ING

12"

GA

S L

INE

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

ST

M

STM

FD

FD

FD

FD

FD

FD

FD

FD

FD

FD

FD

FD

FD

FD

S

T

M

50' BUFFER

FROM OHWL

OHWL

50' BUFFER

FROM OHWL

OHWL

OHWL

PROPOSED

CONTOUR (TYP)

AS SHOWN

ON ALL SHEET LEGENDS.

BUILDING

FOUNDATION PLAN

SEE STRUCTURAL

DWGS.

FINAL GRAVEL DRIVES

AND PARKING PER APPROVED

PERMIT DRAWINGS.

AC PAVEMENT WITH CURBS

PER PERMIT DRAWINGS.

1

2

DISCHARGE OF CONSTRUCTION

DEWATERING FOR UTILTY TRENCHES

AND FOUNDATION WORK IN THIS

AREA. CONTRACTOR TO PROVIDE

PUMP AND HOSE SYSTEM FOR

DEWATERING. DURING

CONSTRUCTION CONTRACTOR SHALL

MONITOR DEWATERING AND ADJUST

FILTER BASIN SIZE BASED ON

DEWATERING NEEDS. DEWATERING

BASIN MAY BE ADJUSTED TO A

MAXIMUM SIZE OF 30' X 30'.

EXISTING CONTOUR (TYP)

AS SHOWN

ON ALL SHEET LEGENDS.

2

8

Page 6: SAMPLE EROSION AND SEDIMENT CONTROL PLAN (ESCP) … · 30' 80' 50' BUFFER FROM OHWL OHWL 50' BUFFER FROM OHWL 50' BUFFER FROM OHWL 50' BUFFER FROM OHWL OHWL OHWL OHWL. 1 2. When drafting

FOAM

DUMP STRAP

BAG DETAIL

DUMP STRAP

Regular Flow Only

Do not use High Flow Insert Bags.

N.T.S.

EXPANSION RESTRAINT (1/4" NYLON

ROPE, 2" FLAT WASHERS)

2 EACH DUMP STRAP

1" REBAR FOR

BAG REMOVAL

FROM INLET

SILTSACK

®

N.T.S.

AREA DRAINCATCH BASIN

N.T.S. N.T.S.

MAY BE USED SHORT TERM

W/ UTILITY WORK AND W/

PHASING OF DEVELOPMENT

CONTROL NOTES

SEE EROSION

DEPTH

18" MIN.

*20' MIN. FOR SINGLE FAMILY AND DUPLEX RESIDENTIAL

6''-3'' CLEAN PIT RUN ROCK

RADIUS = 25' MIN.

S

E

E

P

L

A

N

V

I

E

W

N.T.S.

5

0

'

M

I

N

.

*

P

R

O

V

I

D

E

F

U

L

L

W

I

D

T

H

O

F

I

N

G

R

E

S

S

/

E

G

R

E

S

S

A

R

E

A

P

E

R

P

L

A

N

*

SUBGRADE REINFORCEMENT

GEOTEXTILE, AS REQUIRED

IN SPECIFICATIONS

E

X

I

S

T

I

N

G

P

A

V

E

M

E

N

T

O

R

A

P

P

R

O

V

E

D

A

C

C

E

S

S

P

O

I

N

T

4'-0

"

6"

2'-6

"

INTERLOCKED

2" x 2" POSTS

AND ATTACH.

ANGLE BOTH ENDS OF SEDIMENT FENCE

TO ASSURE SOIL IS TRAPPED.

4'-6"

N.T.S.

5'-0"

FROM TOE

OF SLOPE

BUT NOT PAST

PROPERTY

LINE

NOTES:

1. BURY BOTTOM OF FILTER FABRIC 6" MIN. VERTICALLY BELOW GRADE.

2. 2" x 2" FIR, PINE, OR STEEL FENCE POSTS.

3. STITCHED LOOPS TO BE INSTALLED UPHILL SIDE OF SLOPE.

4. COMPACT NATIVE FILL IN ON BOTH SIDES OF FILTER FABRIC TRENCH.

N.T.S.

STAGGER

JOINTS

FLOW FLOW FLOW

STAKING

SPACING

4' O.C.

TIGHTLY ABUT

ADJACENT

WATTLES.

WOOD STAKE

S

L

O

P

E

RICE, COCONUT OR

EXCELSIOR WATTLES

PLACE WATTLES ALONG SLOPE CONTOURS.

NOTES:

1. STAKING SPECIFICATIONS:

a. 1"X2" WOODEN STAKES

b. ADDITIONAL STAKES MAY BE

INSTALLED ON DOWNHILL SIDE

OF WATTLES, ON STEEP SLOPE

OR HIGHLY EROSIVE SOILS.

PLAN VIEW

PROFILE

SECTION

2' MIN1'

3' BY 3' MIN

TO CONTAIN

CONCRETE

EXISTING GRADE

SECTION A-A

NOT TO SCALE

3'

MIN 1' HIGH BERM

9' BY 9' MIN

TO CONTAIN

CONCRETE

A

PLAN

NOT TO SCALE

72"

36"

PLYWOOD

48" BY 24"

PAINTED

WHITE

BLACK

LETTERS

6" HEIGHT

CONCRETE

WASHOUT

AREA

CONCRETE WASHOUT SIGN DETAIL

(OR EQUIVALENT)

NOT TO SCALE

NOTES:

1. WASHOUT FACILITIES SHALL BE MAINTAINED TO PROVIDE

ADEQUATE HOLDING CAPACITY WITH A MINIMUM FREEBOARD

OF 12 INCHES.

2. WASHOUT FACILITIES MUST BE CLEANED, OR NEW FACILITIES

MUST BE CONSTRUCTED AND READY FOR USE ONCE THE

WASHOUT IS 75% FULL.

3. IF THE WASHOUT IS NEARING CAPACITY, VACUUM AND DISPOSE

OF THE WASTE MATERIAL IN AN APPROVED MANNER.

4. TEMPORARY CONCRETE WASHOUT FACILITIES SHALL BE

LOCATED A MINIMUM OF 50 FT FROM SENSITIVE AREAS

INCLUDING OPEN DRAINAGE FACILITIES AND WATER SOURCES.

5. CONCRETE WASHOUT FACILITIES SHALL BE CONSTRUCTED

AND MAINTAINED IN SUFFICIENT QUANTITY AND SIZE TO

CONTAIN ALL LIQUID AND CONCRETE WASTE GENERATED BY

WASHOUT OPERATIONS.

6. INSTALL CONCRETE WASHOUT SIGN WITHIN 30 FEET OF

TEMPORARY CONCRETE WASHOUT FACILITY.

7. TEMPORARY CONCRETE WASHOUTS MAY BE A PREFABRICATED

CONTAINER THAT IS PORTABLE AND REUSABLE.

3"-6" ROCK WITH A

MINIMUM 8" DEPTH

EXCAVATED MATERIAL

MAY BE USED FOR

PERIMETER BERM

1' MIN

1' MIN

EXISTING GRADE 3' BY 3' MIN AT BOTTOM

OF WASHOUT TO

CONTAIN CONCRETE

N.T.S.

A

2% SLOPE

NOTES:

1. MINIMUM 12" OVERLAP OF ALL

SEAMS REQUIRED.

2. BARRIER REQUIRED @ TOE OF

STOCKPILE.

3. COVERING MAINTAINED TIGHTLY

IN PLACE BY USING SANDBAGS

OR APPROVED EQUAL ON ROPES

WITH A MAXIMUM 10' GRID

SPACING IN ALL DIRECTIONS.

4. PLASTIC TO EXTEND MINIMUM 1'

BEYOND TOE OF SLOPE.

FOR FURTHER INFORMATION

ON DESIGN CRITERIA SEE

CHAPTER 4 OF CLEAN WATER

SERVICES EROSION PREVENTION

AND SEDIMENT CONTROL

PLANNING AND DESIGN MANUAL.

EROSION CONTROL

BARRIER REQUIRED

@ TOE OF SLOPE.

SEE NOTE NO. 3

N.T.S.

MINIMUM 12" OVERLAP

OF SEAMS.

SOIL STOCKPILE WITH

PLASTIC SHEETING

N.T.S.

8' (MAX)

4' (M

IN

)

USE 8'' WIRE 'U' TO

SECURE FENCE BOTTOM

ORANGE TENSAR

FENCINGANCHOR POSTS MUST BE

INSTALLED TO A DEPTH OF

NO LESS THAN 1/3 THE

TOTAL HEIGHT OF POST

ANCHOR POSTS SHOULD BE

MINIMUM 2'' STEEL U CHANNEL

OR 2'' x 2'' TIMBER, 6' IN LENGTH

HIGHLY VISIBLE

FLAGGING ATTACHED

TO TOP OF POSTS

USE 2x4 LUMBER

FOR CROSS

BRACING

EXIST. STREAM BANK

EXIST

STREAM BED

1'-6''

2'-0''

6''

CREEK

C.L.

1'-6'' THK x 5'-0'' (MIN) WIDE X 10' (MIN) LONG LAYER OF CLASS 100

RIP RAP PER SECTION 02330 OF OREGON DOT

STD. CONSTRUCTION SPECIFICATIONS (TOP SURFACE

TO MATCH EXIST STREAM BANK EA. SIDE OF PIPE

6'' THK. LAYER OF 1 1/2''-0''

CRUSHED ROCK

GEOTEXTILE FABRIC

(MIRAFI 500X)

NATIVE SOIL

STM PIPE

SEE PLAN VIEW

EXTEND RIP RAP TO

TOP OF EXIST BANK

(FIELD LOCATE)

N.T.S.

EXISTING SLOPE TO

REMAIN = 30% +/-

GENERAL NOTES:

SEE PLAN

1'

SLOPE:

NATIVE SOIL

3' TYPICAL

12" MIN

TOP SOIL

4'

SIDE VIEW

NTS

FRONT VIEW

NTS

STAPLE

8" MIN.

1'

2'

055

10

N.T.S.

EROSION BLANKET INSTALLATION DETAIL

(TYP)

INSTALL EROSION

CONTROL BLANKETS

OVER HYDROSEED

(TYPICAL)

INSTALL STAPLES

2" FROM EDGE OF

FABRIC (TYPICAL)

TAMP SOIL OVER

MATERIAL AND BLANKET

NATIVE OR

COMPACTED

BACKFILL

TAMP SOIL OVER

MATERIAL AND

BLANKET

INSTALL HYDROSEED

OVER ALL CUT AND FILL

SLOPES (TYP)

EROSION BLANKET

OVER HYDROSEED

END OF

FABRIC

SEE

PLAN

VIEWS

PLACE EROSION BLANKET OVER HYDROSEED WITHIN (7) DAY'S OF

SLOPE GRADING.

SLOPE SURFACE SHALL BE FREE OF ROCKS, CLODS, STICKS AND

GRASS. MATS/BLANKETS SHALL HAVE GOOD SOIL CONTACT.

LAY BLANKETS LOOSELY AND STAKE OR STAPLE TO MAINTAIN

DIRECT CONTACT WITH THE SOIL. DO NOT STRETCH.

BLANKETS MUST BE STAPLED USING STAPLES A MINIMUM OF 6'' IN

LENGTH AND SPACED AS SPECIFIED IN THE FRONT VIEW. 12" LONG

STAPLES MAY BE REQUIRED DEPENDING ON SOIL CONDITIONS.

6'

TYPICAL

12"

MIN

TYPICAL 4"

MIN. OVERLAP

1