SA Exploration and MiningConference Hon. Tom KoutsantonisTreasurer Minister for FinanceMinister for State DevelopmentMinister for Mineral Resources and EnergyMinister for Small Business
05 December 2014
OPEN THE DOOR TO SOUTH AUSTRALIA
October 2014 JUMEX SurveyAustralian junior mineral explorersTop ten issues – Exploration industry performance
Funding constraints at crisis point for some
Very strong competition for capital
Commodity price volatility is a major constraint
Regulatory challenges persist
Ongoing constraints will limit operational activities
Future discovery pipeline weak
Employment conditions remain depressed
Mergers and acquisitions outlook is up
Early signs of hope that investor interest may be starting to improve
Improvements will not be dramatic
SA Mineral and Petroleum Production Value2013-14: $7.5 billion ($5.6b – Minerals and $1.9b – Petroleum)
RECORD PRODUCTION
2000-1 to 2013-14
Olympic Dam – long life
Olympic Dam > 200 years resource life - longest life core asset of global mining major, BHP Billiton Contained resource:
78 Mt copper, 2.5 Mt uranium, 95 Moz gold & 307 Moz silver
world’s largest uranium deposit world’s 5th largest copper
deposit ~65% of Australia’s copper
resources
Resource Life - BHP Billiton’s core assets
SA Exploration ExpenditureMinerals and Petroleum exploration expenditure 1998-99 to 2013-14For 2013-14 $647.6 million ($531.3m – Petroleum and $116.3m – Minerals)
Source: ABS data cat. 8412.0 June 2014
Olympic Dam – way forward
2013-14 production
• 184 400t copper, 3988t uranium oxide, 121 335 oz gold, 972 000 oz silver
Lab scale leach testing at Bureau Veritas –results encouraging
Approved to construct heap leach pilot trial
Heap leach trial plan to commence construction Q4 2015
Execution of the 235 Project has begun to expand production by ~50 kt Cu
21 Mtpa Underground Expansion, to deliver ~450 ktpa copper from FY24 is expected to progress to pre-feasibility in 2015 (subject to approval)
GEO-MEMBRANE LINED COPPER HEAP LEACH IN ARIZONA, USA
SA Mineral Exploration Highlights 2014 - 1
Havilah Resources – Crozier Dam Cu prospect (January 2014)
Ironclad Mining – Hercules East Prospect - Mn (January 2014)
Musgrave Minerals – Menninnie Dam Pb–Zn discovery , Frakes Ag prospect (February 2014)
Adelaide Resources – Moonta Cu-Au Project, Alford West deposit (April, July 2014)
Marmota Energy – West Melton Cu Project, Champion discovery (April 2014)
Trafford Resources – Wilcherry Hill , Zealous Tin prospect ( April 2014)
Minotaur Exploration – Mingary Au Project (May 2014)
OZ Minerals – Khamsin IOCG deposit- Maiden Resource 202Mt at 0.6% Cu, 0.1g/t Au, 1.7g/t Ag and 86ppm U, for 1.1Mtcontained Cu, 900,000oz Au and 11Moz Ag (May 2014)
Centrex Metals - Kimba Gap Maiden Resource, 487Mt average head grade 24.7% Fe with DTR 18.5% (July 2014)
Archer Exploration –Campoona/Wilclo South, Australia’s largest graphite resource (August 2014)
Kalyan Resources /Orogenic Exploration Flinders Island micro diamond discovery (October 2014)
Havilah / MMG Exploration – Birsksgate prospect, new copper discovery (October 2014)
Investigator Resources - Paris Ag deposit, continuing significant results after Maiden Resource last year,5.9Mt 110g/t Ag and 0.6%Pb – for 20Moz Ag and 38kt Pb (October 2014)
Apollo Minerals – Commonwealth Hill- Titan Project Fe, ilmenite, apatite (November 2014)
SA Mineral Exploration Highlights 2014 - 2
SA Major Mining Developments 2014
Quasar Resources/Alliance Resource – Four Mile Uranium Mine opened (June 2014)
Havilah Resources – Portia Gold Mine Approved (October 2014)
Rex Minerals – Hillside Cu-Au Project Mineral Lease Approval (September 2014)
Iron Road – Central Eyre Iron Project DFS released (February 2014)
Oz Minerals – Carrapateena Cu-Au deposit PFS released (August 2014)
BHP-Billiton – Olympic Dam Heap Leach Trial Approval (September 2014)
Hillgrove Resources – Kanmantoo Cu mine additional Mining Lease and Revised PEPR (July 2014)
PACE – 10 years of economic impact
Fifteen significant exploration successes from collaborative drilling
Extra $700 million in private mineral exploration expenditure
Extra state mineral production value of $2.4 billion
PACE Frontiers - Collaborative Drilling Round 2015
Opening Date: 5th December 2014.
Closing Date: 30th January 2015.
Industry-Government partnership
Unlocking prospective frontiers
Driving drilling dollars further
PACE collaborative drilling – delivering results
For more details contact PACE General Manager – Miles Davies
SA Eastern Gawler Craton – 3D Model
SA Mineral Systems Drill Program 2015
The Department in partnership with DET CRC is embarking on a mineral systems drilling program in the eastern Gawler Craton.
Funding ~$2M (PACE Frontiers) Q1/Q2 2015 calendar year
Key benefits
More drilling metres for funds expended
Drill-rig mobilisation
Native title clearances will be undertaken by the
Department
Test DET CRC technology in the field, mineral
systems mapping concept and prospectivity indices
WUDINNAKIMBA WHYALLA
PORT AUGUSTA
IronDuke
PORT LINCOLN
MinotaurExploration
KingstonResources
Junior Explorers
Mineral Systems Drill Program – Target Region
Geoscientist Assistance Program (GAP) 2015
GAP Recommencing 2015– partnership with SACOME
2009 –2012 GAP Success– 33 placements with high
retention rate– 22 companies involved
AIG Report FindingsSignificant increase in exploration geoscientistsunemployment - 2014
15
Thank you