    Roundabout Construction

    SP 373-01-0020

    LA 8 / US 171 Roundabout

    Leesville, LA

    Vernon Parish

  • 7/29/2019 S51_US 171 at LA 8 Roundabout - Before and After Safety and Operations_LTC2013

    2/37

    What this presentation covers

    Recognition for District 08 Design and Traffic

    Sections

    Difference between a circle and a roundabout

    Why did DOTD elect to construct theRoundabout?

    Public Meeting and Public Perceptions

    Barrier Curb and Gutter Modifications

    Challenges for Sequences of Construction

    Time Constraints

    General Public Comments andEnd Results

  • 7/29/2019 S51_US 171 at LA 8 Roundabout - Before and After Safety and Operations_LTC2013

    3/37

    Recognition for District 08 Design and Traffic Sections

    Dale Craig District 08 Traffic Section

    Recommended roundabout design and spearheaded

    the project to the design phase

    Jason Rachal District 08 Design Section

    The overall success for this project is greatly

    attributed to the project plans developed by Jason

    Rachal

    David Backstedt - District 08 Traffic Engineer

    David meet with me on the project site on numerous occasions

    in order to monitor the traffic flow after each constructionsequence change.

  • 7/29/2019 S51_US 171 at LA 8 Roundabout - Before and After Safety and Operations_LTC2013

    4/37

    Circle or Roundabout ?

    Circle

    Area = r2Roundabout

  • 7/29/2019 S51_US 171 at LA 8 Roundabout - Before and After Safety and Operations_LTC2013

    5/37

    Why did DOTD elect to construct theRoundabout?

    Permit request for

    access to a proposed

    Market Basket grocery

    store

    Traffic Study and

    Evaluation

    Buy-in from DOTD,

    Market Basket and City

    of Leesville

    Proposed

    Market

    Basket

    location

  • 7/29/2019 S51_US 171 at LA 8 Roundabout - Before and After Safety and Operations_LTC2013

    6/37

    Public Meeting andPublic Perceptions

  • 7/29/2019 S51_US 171 at LA 8 Roundabout - Before and After Safety and Operations_LTC2013

    7/37

    Public Meeting and Public Perceptions

  • 7/29/2019 S51_US 171 at LA 8 Roundabout - Before and After Safety and Operations_LTC2013

    8/37

    Public MeetingPublic Perceptions

  • 7/29/2019 S51_US 171 at LA 8 Roundabout - Before and After Safety and Operations_LTC2013

    9/37

    Class M Concrete Mix Design

    ModificationsRecommend not using Grade A (Size 57) coarse aggregate (100%

    passing the 1 US Sieve)

    Recommend changing mix design to max size Grade P (Size 67)

    coarse aggregate (100% passing the US Sieve)

    Barrier Curb and GutterModifications

    Installed continuous

    steel reinforcement in

    the barrier curb section

  • 7/29/2019 S51_US 171 at LA 8 Roundabout - Before and After Safety and Operations_LTC2013

    10/37

    Installed Bolster Blocks behind sharp angled corners of

    curb section

    Barrier Curb and GutterModifications

  • 7/29/2019 S51_US 171 at LA 8 Roundabout - Before and After Safety and Operations_LTC2013

    11/37

    Time Constraints

    Project Letting Date: July 21, 2010

    Work Order Date: September 24, 2010

    Roundabout Opening Date: August 1, 2011

    Market Basket Grand Opening Date: August 4, 2011

    Governors Ribbon Cutting Date: August 5, 2011

  • 7/29/2019 S51_US 171 at LA 8 Roundabout - Before and After Safety and Operations_LTC2013

    12/37

    Sequence of Construction - Phase I

  • 7/29/2019 S51_US 171 at LA 8 Roundabout - Before and After Safety and Operations_LTC2013

    13/37

    Sequence of Construction - Phase I

    Temporary Traffic Signals

    installed at intersection of LA

    8 and US 171

    Traffic congestion alongUS 171 South BoundLane

    Temporary Traffic

    Signals

  • 7/29/2019 S51_US 171 at LA 8 Roundabout - Before and After Safety and Operations_LTC2013

    14/37

    Sequence of Construction - Phase I

  • 7/29/2019 S51_US 171 at LA 8 Roundabout - Before and After Safety and Operations_LTC2013

    15/37

    Sequence of Construction - Phase I

  • 7/29/2019 S51_US 171 at LA 8 Roundabout - Before and After Safety and Operations_LTC2013

    16/37

    Sequence of Construction - Phase I

  • 7/29/2019 S51_US 171 at LA 8 Roundabout - Before and After Safety and Operations_LTC2013

    17/37

    Sequence of Construction - Phase I

  • 7/29/2019 S51_US 171 at LA 8 Roundabout - Before and After Safety and Operations_LTC2013

    18/37

    Sequence of Construction - Phase I

  • 7/29/2019 S51_US 171 at LA 8 Roundabout - Before and After Safety and Operations_LTC2013

    19/37

    Sequence of Construction - Phase I

  • 7/29/2019 S51_US 171 at LA 8 Roundabout - Before and After Safety and Operations_LTC2013

    20/37

    Sequence of Construction - Phase I

  • 7/29/2019 S51_US 171 at LA 8 Roundabout - Before and After Safety and Operations_LTC2013

    21/37

    Sequence of Construction - Phase I

  • 7/29/2019 S51_US 171 at LA 8 Roundabout - Before and After Safety and Operations_LTC2013

    22/37

    Sequence of Construction - Phase I

    Temporary Traffic Signals installed at

    intersection of LA 8 and US 171

  • 7/29/2019 S51_US 171 at LA 8 Roundabout - Before and After Safety and Operations_LTC2013

    23/37

    Sequence of Construction - Phase II

  • 7/29/2019 S51_US 171 at LA 8 Roundabout - Before and After Safety and Operations_LTC2013

    24/37

    Sequence of Construction - Phase II

  • 7/29/2019 S51_US 171 at LA 8 Roundabout - Before and After Safety and Operations_LTC2013

    25/37

    Sequence of Construction - Phase II

  • 7/29/2019 S51_US 171 at LA 8 Roundabout - Before and After Safety and Operations_LTC2013

    26/37

    Sequence of Construction - Phase II

  • 7/29/2019 S51_US 171 at LA 8 Roundabout - Before and After Safety and Operations_LTC2013

    27/37

    Sequence of Construction - Phase III

  • 7/29/2019 S51_US 171 at LA 8 Roundabout - Before and After Safety and Operations_LTC2013

    28/37

    Sequence of Construction - Phase III

  • 7/29/2019 S51_US 171 at LA 8 Roundabout - Before and After Safety and Operations_LTC2013

    29/37

    Sequence of Construction - Phase III

    Removed temporary traffic signals

    Staged flagmen at each access point into the

    roundabout

    Utilized dynamic message signs cautioning

    traveling public that roundabout is open and there

    is a yield condition ahead

    Installed do not enter signs on temporary stands at

    each connection point to the roundabout

  • 7/29/2019 S51_US 171 at LA 8 Roundabout - Before and After Safety and Operations_LTC2013

    30/37

    Sequence of Construction - Phase III

  • 7/29/2019 S51_US 171 at LA 8 Roundabout - Before and After Safety and Operations_LTC2013

    31/37

    General Public Comments andEnd Results

    All of the Politicians and most of the general public

    have very favorable comments in regards to the

    functionality of the Roundabout

    From 2007 to 2010 there was an average of 10

    injuries per year with only 1 fatality during that time

    period.

    Since 2010 there has only been one injury, which

    occurred in January 2013.

  • 7/29/2019 S51_US 171 at LA 8 Roundabout - Before and After Safety and Operations_LTC2013

    32/37

    End Results

    Si C i b t th Al d i

  • 7/29/2019 S51_US 171 at LA 8 Roundabout - Before and After Safety and Operations_LTC2013

    33/37

    Size Comparison between the AlexandriaSouth Traffic Circle and the LeesvilleRoundabout

    Photo of the intersection of LA 8 and

  • 7/29/2019 S51_US 171 at LA 8 Roundabout - Before and After Safety and Operations_LTC2013

    34/37

    Photo of the intersection of LA 8 andUS 171, prior to construction

    Proposed

    Market Basket

    location

  • 7/29/2019 S51_US 171 at LA 8 Roundabout - Before and After Safety and Operations_LTC2013

    35/37

    Completed Roundabout Aerial Photo of theintersection of LA 8 and US 171

    Photo taken by SURDEX Corporation

  • 7/29/2019 S51_US 171 at LA 8 Roundabout - Before and After Safety and Operations_LTC2013

    36/37

    Q ti ?