Network Rail 2010 Route Plans Update – Route K Route K: West of England Route Plans are generally published on an annual basis including the most up-to-date position at that point in time. In 2011 we will be publishing information on a route basis as part of our Initial Industry Plan in the Autumn covering CP5 and beyond. In the meantime we have retained the 2010 Route Plans, updated where appropriate with current information including our plans to the end of CP4. This document, therefore, should be read in conjunction with the equivalent 2010 Route Plan. Should you require any further information, please contact the Route Plan 2011 mailbox at [email protected]. Appendix A: Updated Route Map Appendix B: Updated list of CP4 enhancements Appendix C: Constraints and issues on the route ] Summary of alterations Reference Data Location in Route Plan Change Page 3 Route Map Page 3 Labels updated to match Appendix B. Figure 11 Forecast end of year PPM Page 12 First Great Western 90.1% CrossCountry 88.3% Stagecoach South West Trains 93.9% Arriva Trains Wales 94.1% The above is based on 2010/2011 Period 11 data.

Transcript of Route K: West of England...Network Rail 2010 Route Plans Update – Route K Route K: West of England...

Page 1: Route K: West of England...Network Rail 2010 Route Plans Update – Route K Route K: West of England Route Plans are generally published on an annual basis including the most up-to-date

Network Rail 2010 Route Plans Update – Route K

Route K: West of England

Route Plans are generally published on an annual basis including the most up-to-date position at that point in time. In 2011 we will be publishing information on a route basis as part of our Initial Industry Plan in the Autumn covering CP5 and beyond.

In the meantime we have retained the 2010 Route Plans, updated where appropriate with current information including our plans to the end of CP4. This document, therefore, should be read in conjunction with the equivalent 2010 Route Plan.

Should you require any further information, please contact the Route Plan 2011 mailbox at [email protected].

Appendix A: Updated Route Map

Appendix B: Updated list of CP4 enhancements

Appendix C: Constraints and issues on the route

]

Summary of alterations

Reference Data Location in

Route Plan

Change

Page 3 Route Map Page 3 Labels updated to match Appendix B.

Figure 11 Forecast end of

year PPM

Page 12 First Great Western 90.1%

CrossCountry 88.3%

Stagecoach South West Trains 93.9%

Arriva Trains Wales 94.1%

The above is based on 2010/2011 Period 11 data.

Page 2: Route K: West of England...Network Rail 2010 Route Plans Update – Route K Route K: West of England Route Plans are generally published on an annual basis including the most up-to-date

2

Network Rail 2011 Route Plans Update – Route K

Appendix A: Updated Route Map

Key to diagrams

Page 3: Route K: West of England...Network Rail 2010 Route Plans Update – Route K Route K: West of England Route Plans are generally published on an annual basis including the most up-to-date

KeyPrimarySecondaryRuralFreight only

The line shading indicatesstrategic route sectionswhich are numbered on the map

Route K West of England

Treviscoe branch

ParHarbour branch

Heathfield branch

Meldon Quarry

Moorswater branch

St BlazeyJnPar Loop Jn

Coombe Jn

St BudeauxJn

Newton AbbotWest Jn

Newton Abbot East Jn

Cowley Bridge Jn

Cogload Jn

Exeter St Davids JnExmouth Jn

PenwithersJn

Burngullow Jn

St Erth Jn

FoweyHarbour branch

Cattewaterbranch

NEWQUAY

LISKEARD EXMOUTH

PAIGNTON

PENZANCE

GUNNISLAKE

Bere Alston

ST IVES

FALMOUTH DOCKSLOOE

NEWTON ABBOT

EXETER ST DAVIDS

TAUNTON

BARNSTAPLE

PLYMOUTH

St ErthHayle

Lostwithiel

Camborne Truro St AustellRedruth

Perranwell

St Budeaux Victoria Road Ivybridge

Totnes

TeignmouthDawlish

Dawlish WarrenStarcross

Exeter St Thomas

Newton St Cyres Tiverton ParkwayCrediton

YeofordCopplestone

Morchard RoadLapford

EggesfordKings Nympton

Portsmouth ArmsUmberleigh

Chapelton

Bere Ferrers

Calstock

Carbis BayLelant

Lelant SaltingsPenryn

PenmereFalmouth Town

Keyham

St Budeaux Ferry Road

Dockyard

DevonportMenheniot

Coombe

Sandplace

Causeland

St Keyne

St Germans

Saltash

Par

BodminParkway

Exeter Central

St JamesPark

Polsloe Bridge

Digby & Sowton

Topsham

Exton

Lympstone Commando

Lympstone Village

Torre

Torquay

St Columb RoadRoche

Bugle

Luxulyan

Quintrel Downs

Route J

Dr. Days Jn

PORTBURY DOCK BRANCH

Feeder Bridge Jn

Thingley Jn

Bristol East Jn

Uphill Jn

Worle Jn

Route M

Stoke Works Jn

Route M

Route L

Route L

Tytherington branch

Sharpness branch

Horton Road JnBarnwood Jn

Abbotswood Jn

GloucesterYard Jn

StokeGiffordJn

Filton Jn Westerleigh

Yard

WesterleighJn

Wootton Bassett Jn

AVONMOUTHDOCKS

Yate JnsPatchway

Jn

BIRMINGHAM NEW STREET

DROITWICH SPA

WORCESTER FOREGATE STREET

WORCESTER SHRUB HILLHEREFORD

BRISTOL PARKWAY

NEWPORT

SWINDON

GLOUCESTER

CHELTENHAM SPA

BRISTOL TEMPLE MEADS

SEVERNBEACH

WESTON-SUPER-MARE

BATH SPA

St Andrews RoadAvonmouth

ShirehamptonSea Mills Redland

Montpelier

Keynsham Oldfield Park

CliftonDown

Parson Street

Bedminster

Nailsea & BackwellYatton

Worle

Highbridge & Burnham

Bridgwater

Weston Milton

Yate

Cam & Dursley

Ashchurch

Filton Abbey Wood

Stapleton RoadLawrence Hill

Chippenham

MORETON-IN-MARSH

CASTLE CARY

WESTBURY

WEYMOUTH

Dorchester Jn

Wilton Jn

Castle Cary Jn

Westbury South Jn

Westbury North Jn

Hawkeridge Jn

Bradford Jn

Bathampton Jn

Pen Mill Jn

Westbury East Loop

Route C

Route C

Route C

Route C

DORCHESTER WEST

Yeovil Pen Mill

Thornford

Yetminster

Chetnole

Maiden Newton

Warminster

Dilton Marsh

FreshfordAvoncliff

Bradford-on-Avon

Trowbridge

Melksham

NEWPORT

Narroways Hill Jn

Standish Jn

Route J

SALISBURY

Route J

Route J

Route L

YEOVIL JUNCTION

Bristol West Jn

Route J

99

01

02

03

06

07

08

09

10

11

12

13

14

99

99

99

99

99

99 99

18

98

98

98

99

04

05

99

16

17

15

A

B

C

D

E

F

G

1

2

3

A

A

B

BD

F

G

G

I

J

Page 4: Route K: West of England...Network Rail 2010 Route Plans Update – Route K Route K: West of England Route Plans are generally published on an annual basis including the most up-to-date

3

Netw

ork Rail 2011 R

oute Plans U

pdate –R

oute K

Appendix B: Infrastructure investment in CP4

Figure 15 Infrastructure investment in CP4 (formerly Proposed enhancements in CP4)

Implementation date Project Project description Output change Funding GRIP stage

2011/12 A Earthworks renewals Embankments renewals at Dauntsey Bowds Farm and Eckington

Renewal Network Rail Various

2011/12 B Telecoms renewals CIS, PA and CCTV renewals at Exeter St Davids and Plymouth

Renewal Network Rail 5

2010/11 Track renewals Project complete

2010 – 13 D Structures renewal Structures renewal at Royal Albert Bridge Renewal Network Rail 6

2011/12 Earthworks renewals Project deferred

2011/12 F Telecoms renewals CIS, PA and CCTV renewals at Bristol Temple Meads

Renewal Network Rail 5

2011/12 G Track renewals Track renewals at Dr Days Junction and Barnwood Junction

Renewal Network Rail Various

2012/13 Track renewals Project deferred

2013/14 I Westerleigh Junction – Barnt Green line upgrade

Options for linespeed increases up to 100mph Improved reliability and additional capacity and journey time savings between Bristol and Birmingham

Periodic Review 2008 4 – 6

2011/12 Signalling renewals Bristol TDM renewals Renewal Network Rail 5/6

2012/13 Plant renewals Renewal of signalling power distribution cables in the Gloucester area

Renewal Network Rail 5

2013/14 Track renewals Track renewals at Patchway Junction Renewal Network Rail 3

On-going until

2015/16

Signalling renewals Signalling renewal of the Bristol Signalling Centre area

Renewal Network Rail 3

On-going until

2017

Great Western Main Line

electrification

Electrification from London Paddington to Bristol

and Cardiff

Electrified network Department for

Transport

3

Page 5: Route K: West of England...Network Rail 2010 Route Plans Update – Route K Route K: West of England Route Plans are generally published on an annual basis including the most up-to-date

Netw

ork Rail 2011 R

oute Plans U

pdate – Route K

4

NRDF candidate schemes in CP4

Figure 16 Candidate NRDF schemes in CP4

Implementation date Project Project description Output change Funding GRIP stage

2011/12 J Bath Spa capacity enhancement

Repositioning of signals Improved reliability, additional capacity and reduced platform reoccupation times. Facilitates enhanced cross-Bristol service

Network Rail Discretionary Fund

6

GRIP stages: 1 Output definition, 2 Pre-feasibility, 3 Option selection, 4 Single option selection, 5 Detailed design, 6 Construction, test and commission, 7 Scheme hand back, 8 Project close out

Page 6: Route K: West of England...Network Rail 2010 Route Plans Update – Route K Route K: West of England Route Plans are generally published on an annual basis including the most up-to-date

5

Network Rail 2011 Route Plans Update – Route K

Appendix C Constraints and issues on the route

Capacity and operational constraints

A Westerleigh Junction – Bristol Parkway: two track section on highly utilised converging route B 5 AHB level crossings north of Cheltenham restrict linespeed to 100mph C Weston-super-Mare loop: single line restricts capacity and flexibility D Dorchester West – Castle Cary: single line sections prevent significant increases in train service frequency E Signalling headways between Newton Abbot and Plymouth F Royal Albert Bridge: single line section linking Devon and Cornwall G St Pinnock and East Largin viaducts: single line sections

Other Issues on Route

1 Somerset Levels – flooding

2 Flood plain to the north of Exeter requires constant monitoring

3 Dawlish Sea Wall defences require constant monitoring and enhanced maintenance