Roleza Marzan Bridge Engineering Portfolio

7
Portfolio Roleza Jean V. Marzan, P Eng. Bridge Specialist 4/15/2015 1 Footer Text

Transcript of Roleza Marzan Bridge Engineering Portfolio

Page 1: Roleza Marzan Bridge Engineering Portfolio

Portfolio Roleza Jean V. Marzan, P Eng. Bridge Specialist

4/15/2015 1 Footer Text

Page 2: Roleza Marzan Bridge Engineering Portfolio

Portfolio

4/15/2015 Ongoing for P3 Tender 2

Valley Line LRT- for the City of Edmonton, Preliminary Design with AECOM LRT Extensions Churchill to Millwoods, and to Lewis Farms. One of the highlights of the design is the Proposed Signature Structure, an Extradosed bridge crossing the North Saskatchewan River. Valley Line is going for a P3 Delivery.

Coming out from a Sequentially excavated tunnel from the underground Churchil Station.

http://www.edmonton.ca/transportation/ets/future_transit/project-history-design.aspx

Page 3: Roleza Marzan Bridge Engineering Portfolio

Portfolio

4/15/2015 Completed 2013 3

3.3 KM North LRT Extension-Concept Design thru Detailed and Construction Administration. The Line connects Edmonton’s LRT network at Churchill Station through SEM tunnel beneath 104 Avenue, the new Epcor Tower and 101 Street. Tunnel portal at 105 Avenue/103 Street and continues at street level through McEwan Station to NAIT Station.

http://www.edmonton.ca/transportation/ets/lrt_projects/nlrt-project-overview.aspx

Page 4: Roleza Marzan Bridge Engineering Portfolio

Portfolio

4/15/2015 Completed 2011 4

The construction of the LRT tunnel cavity that also support the 30 story Epcor Tower Won Awards of Merits by the Consulting Engineers of Alberta (CEA) 2012 for AECOM

NLRT Extension, Churchill to NAIT Station Lands (Edmonton, Alberta, Canada)

http://www.canadianconsultingengineer.com/features/transportation-a-tunnel-and-a-tower/

Page 5: Roleza Marzan Bridge Engineering Portfolio

Bamban Bridge, Philippines, With Nippon Koei/PKII 174 m Long Span Neilsen Lohse Arch Bridge constructed in 1998, chosen to be a signature structure/Friendship Bridge to commemorate Philippine Singapore 40 years Diplomatic ties

4/15/2015 Completed 1998 5

Portfolio

Page 6: Roleza Marzan Bridge Engineering Portfolio

Subic-Clark-Tarlac Expressway Project, Philippines with Nippon Koei,PKII

A 90 km Bypass, Expressway project Constructed in 2010 consisting 6 major bridges, 8 interchanges and more than 20 other bridges. Part of the Base Conversion Projects of the Philippines

4/15/2015 Completed 2010 6

Portfolio

http://en.wikipedia.org/wiki/Subic%E2%80%93Clark%E2%80%93Tarlac_Expressway

Page 7: Roleza Marzan Bridge Engineering Portfolio

4/15/2015 Completed 2008 7

Portfolio

http://en.wikipedia.org/wiki/South_Luzon_Expressway#Rehabilitation

Rehabilitation and Retrofit of Alabang Viaduct, a 6 lane-25spans elevated tollway structure constructed in the 70’s, with slightly curving horizontal alignment and a total span length of 1.125km. The Viaduct is a part of the South Luzon Expressway Project, Philippines.