Minutes Mandatory Virtual Pre-Bid Meeting 1 Roebling Virtual Pre-Bid Meeting Minutes Meeting Name Pre-Bid Meeting Meeting Date August 12, 2020 Project Team Attendees Daryl Greer, KYTC Nick Reis, KYTC Tom Mathews, KYTC Cory Wilson, KYTC James Minckley, KYTC Tim Blaine, KYTC Luke Adkins, KYTC Craig Klusman, AECOM Kim Kutner, AECOM Tony Mette, THP Contractor Attendees Dakota Brown, Buckeye C&R Todd Kisor, Buckeye C&R Daniel Holland, Delong Concrete Byron Ogger, Intech Brad Wilder, Intech Jeff Houchin, Jave Ron Plaff, Jave Rob Dierig, Jurgensen Co. Mike King, Lang Masonry Cylus Reynolds, Lang Masonry Dawson Rogers, LRT Restoration Ryan Pummell, LRT Restoration Sara Jones, Judy C. Harp Co. Judy Harp, Judy C. Harp Co. Stephen Harp, Judy C. Harp Co. Seth Criswell, Master Builders Phil Mauney, M&M Services Becky Smith, M&M Services Jeff McMahon, M&M Services Gary Blankenship, SSRG Brad Rodgers, SSRG Bryan Erickson, SSRG Project Number CID 202920 6-10005.00 Time 9:00 AM Project Name Roebling Bridge Preventative Maintenance Repairs Location Conference Call Attendance Daryl Greer took attendance at the beginning of the meeting. An attendance affidavit is required to be sent to Daryl Greer by 4:30 pm on August 13, 2020. Introduction The pre-bid meeting was opened with a brief overview of the project team and schedule. 1. This pre-bid meeting is for the Roebling Bridge Preventative Maintenance Repairs. Attendance at this virtual meeting is required in order to be eligible to submit a bid on the project. 2. The purpose of the meeting is to introduce the project and provide an opportunity for the contractors to pose questions. 3. The mandatory on-site pre-bid meeting will be held August 13, 2020 at 9:30 am. Meeting Presentation Craig Klusman (AECOM) presented an overview of the project repairs using a PowerPoint presentation and the Contract Plans. Question & Answers 1. Stephen Harp: a. Question: Does the masonry surface need to be bush hammered? b. Answer: The surface treatment should match the profile of the stones in the vicinity of the repair. Addendums 1. The PowerPoint presentation will be uploaded on the KYTC Contract Procurement website under Project Related Information. The PowerPoint presentation should not be considered part of the Contract Documents and should be used for information purposes only. No other questions were asked, and the meeting adjourned at 10:00 am. End of Minutes.

Transcript of Roebling Virtual Pre-Bid Meeting Minutes...The mandatory on-site pre-bid meeting will be held August...

Page 1: Roebling Virtual Pre-Bid Meeting Minutes...The mandatory on-site pre-bid meeting will be held August 13, 2020 at 9:30 am. Meeting Presentation Craig Klusman (AECOM) presented an overview

Minutes Mandatory Virtual Pre-Bid Meeting

1

Roebling Virtual Pre-Bid Meeting Minutes Meeting Name Pre-Bid Meeting

Meeting Date August 12, 2020

Project Team Attendees Daryl Greer, KYTC Nick Reis, KYTC Tom Mathews, KYTC Cory Wilson, KYTC James Minckley, KYTC Tim Blaine, KYTC Luke Adkins, KYTC Craig Klusman, AECOM Kim Kutner, AECOM Tony Mette, THP

Contractor Attendees Dakota Brown, Buckeye C&R Todd Kisor, Buckeye C&R Daniel Holland, Delong Concrete Byron Ogger, Intech Brad Wilder, Intech Jeff Houchin, Jave Ron Plaff, Jave Rob Dierig, Jurgensen Co. Mike King, Lang Masonry Cylus Reynolds, Lang Masonry Dawson Rogers, LRT Restoration Ryan Pummell, LRT Restoration Sara Jones, Judy C. Harp Co. Judy Harp, Judy C. Harp Co. Stephen Harp, Judy C. Harp Co. Seth Criswell, Master Builders Phil Mauney, M&M Services Becky Smith, M&M Services Jeff McMahon, M&M Services Gary Blankenship, SSRG Brad Rodgers, SSRG Bryan Erickson, SSRG

Project Number CID 202920 6-10005.00

Time 9:00 AM

Project Name Roebling Bridge Preventative Maintenance Repairs

Location Conference Call

Attendance Daryl Greer took attendance at the beginning of the meeting. An attendance affidavit is required to be sent to Daryl Greer by 4:30 pm on August 13, 2020. Introduction The pre-bid meeting was opened with a brief overview of the project team and schedule.

1. This pre-bid meeting is for the Roebling Bridge Preventative Maintenance Repairs. Attendance at this virtual meeting is required in order to be eligible to submit a bid on the project.

2. The purpose of the meeting is to introduce the project and provide an opportunity for the contractors to pose questions. 3. The mandatory on-site pre-bid meeting will be held August 13, 2020 at 9:30 am.

Meeting Presentation Craig Klusman (AECOM) presented an overview of the project repairs using a PowerPoint presentation and the Contract Plans. Question & Answers

1. Stephen Harp: a. Question: Does the masonry surface need to be bush hammered? b. Answer: The surface treatment should match the profile of the stones in the vicinity of the repair.

Addendums

1. The PowerPoint presentation will be uploaded on the KYTC Contract Procurement website under Project Related Information. The PowerPoint presentation should not be considered part of the Contract Documents and should be used for information purposes only.

No other questions were asked, and the meeting adjourned at 10:00 am. End of Minutes.

Page 2: Roebling Virtual Pre-Bid Meeting Minutes...The mandatory on-site pre-bid meeting will be held August 13, 2020 at 9:30 am. Meeting Presentation Craig Klusman (AECOM) presented an overview

ROEBLINGREHABILITATION VIRTUAL PRE-BID MEETINGCID 202920ITEM NO. 6-10005.00AUGUST 12, 2020

Page 3: Roebling Virtual Pre-Bid Meeting Minutes...The mandatory on-site pre-bid meeting will be held August 13, 2020 at 9:30 am. Meeting Presentation Craig Klusman (AECOM) presented an overview

PRE-BID MEETING INFORMATION

u Pre-Bid Mandatory Virtual Meeting: August 12, 2020u Attendance via affidavit due August 13, 2020 4:30 PM

u Pre-Bid Mandatory Site Visit: August 13, 2020 9:30 AMu Meet between Anchorages 1 & 2 (Ohio) Checkerboard

u Central Riverfront Garage

u 2 attendees maximum per company

u Attendee Requirementsu Appropriate high-visibility PPE

u Wear masks

u Observe social distancing

Page 4: Roebling Virtual Pre-Bid Meeting Minutes...The mandatory on-site pre-bid meeting will be held August 13, 2020 at 9:30 am. Meeting Presentation Craig Klusman (AECOM) presented an overview

Agendau Project Team Introductionsu Project Scheduleu Repairs

u Tower Masonryu Anchorage 1 South Faceu Anchorage 2 Restorationu Deck & Sidewalk Repairsu Waterproofing Zipper Boot Retrofitu Suspender Collar Repairsu Anchor Bolt Retrofit – Towersu Anchor Bolt Retrofit – Anchorage 2u Tower Roof & Turret Repairs

u Questions

Page 5: Roebling Virtual Pre-Bid Meeting Minutes...The mandatory on-site pre-bid meeting will be held August 13, 2020 at 9:30 am. Meeting Presentation Craig Klusman (AECOM) presented an overview

PROJECT TEAM

u KYTC District 6

u AECOMu THP

Page 6: Roebling Virtual Pre-Bid Meeting Minutes...The mandatory on-site pre-bid meeting will be held August 13, 2020 at 9:30 am. Meeting Presentation Craig Klusman (AECOM) presented an overview

PROJECT SCHEDULE

u LETTING DATE: AUGUST 21, 2020

u MAINTENANCE OF TRAFFICu FULL CLOSURE: February 15, 2021 through November 15, 2021

u Liquidated damages enforced if one-lane not open by November 15, 2021

u ONE-LANE CLOSURE: NTP through December 31, 2021u PEDESTRIAN: Must maintain at least one sidewalk at all times

u COMPLETION DATE: December 31, 2021u Liquidated damages enforced if completion date not met

Page 7: Roebling Virtual Pre-Bid Meeting Minutes...The mandatory on-site pre-bid meeting will be held August 13, 2020 at 9:30 am. Meeting Presentation Craig Klusman (AECOM) presented an overview

MASONRY

Page 8: Roebling Virtual Pre-Bid Meeting Minutes...The mandatory on-site pre-bid meeting will be held August 13, 2020 at 9:30 am. Meeting Presentation Craig Klusman (AECOM) presented an overview

MASONRY PROJECT LIMITSu Upper 25’ of South & North Towers

u Remove North Tower Debris Collection System

u Anchorage 1 South Face

u Intrados of Anchorage 2 Arches

u Anchorage 2 South Face

Page 9: Roebling Virtual Pre-Bid Meeting Minutes...The mandatory on-site pre-bid meeting will be held August 13, 2020 at 9:30 am. Meeting Presentation Craig Klusman (AECOM) presented an overview

u 2018 In-Depth Inspectionu 4 Inspectors Rappelling

u AECOM Transcribed Locations onto Repair Plansu Written Field Notesu Photographsu Engineering Judgement

MASONRY REPAIREVALUATION

Page 10: Roebling Virtual Pre-Bid Meeting Minutes...The mandatory on-site pre-bid meeting will be held August 13, 2020 at 9:30 am. Meeting Presentation Craig Klusman (AECOM) presented an overview

MASONRY REPAIREVALUATIONu Determine Final Repair Types in Field

u S5 Masonry Repair Schemes

u Special Note for Masonry Repairs

u Additional quantity added to account for unknownsu Depth of sound concrete

u Deterioration since 2018 Inspection

u AECOM & THP to assist in masonry repairdeterminations in field

u Contractor to host bi-weekly meeting for KYTC, AECOM,and other necessary parties throughout construction

u Contractor to submit plan sheets showing final repairlocations and quantities for Patching, Dutchman & CrackRepairs per plan note #5 on S6

Page 11: Roebling Virtual Pre-Bid Meeting Minutes...The mandatory on-site pre-bid meeting will be held August 13, 2020 at 9:30 am. Meeting Presentation Craig Klusman (AECOM) presented an overview

Removal of Deteriorated Concrete& Repointing

u PURPOSEu Masonry Restoration

u Resolve Issue of Falling Masonry

u SCOPEu Throughout all Masonry Project Limit

Page 12: Roebling Virtual Pre-Bid Meeting Minutes...The mandatory on-site pre-bid meeting will be held August 13, 2020 at 9:30 am. Meeting Presentation Craig Klusman (AECOM) presented an overview

Masonry Patching Repair &Crack Repair

u PATCHING SCOPEu AREAS < 4” DEEP

u Includes previous repairs that aredebonded

u CRACK REPAIRu CRACKS > 1/8” WIDE

Page 13: Roebling Virtual Pre-Bid Meeting Minutes...The mandatory on-site pre-bid meeting will be held August 13, 2020 at 9:30 am. Meeting Presentation Craig Klusman (AECOM) presented an overview

Dutchman Repairu AREAS > 4” DEEP

Page 14: Roebling Virtual Pre-Bid Meeting Minutes...The mandatory on-site pre-bid meeting will be held August 13, 2020 at 9:30 am. Meeting Presentation Craig Klusman (AECOM) presented an overview

ANCHORAGE 1SOUTH FACE

Page 15: Roebling Virtual Pre-Bid Meeting Minutes...The mandatory on-site pre-bid meeting will be held August 13, 2020 at 9:30 am. Meeting Presentation Craig Klusman (AECOM) presented an overview

ANCHORAGE 1 SOUTH FACEu Masonry Repairs & Construction of East Bearing Seat

u Construction of seat shall be done during full-closure

Page 16: Roebling Virtual Pre-Bid Meeting Minutes...The mandatory on-site pre-bid meeting will be held August 13, 2020 at 9:30 am. Meeting Presentation Craig Klusman (AECOM) presented an overview

ANCHORAGE 2

Page 17: Roebling Virtual Pre-Bid Meeting Minutes...The mandatory on-site pre-bid meeting will be held August 13, 2020 at 9:30 am. Meeting Presentation Craig Klusman (AECOM) presented an overview

ANCHORAGE 2SUMMARY OF WORK

u Excavation over North & South Archesu Construction of Arch Slab & Drainage

Componentsu Masonry Anchors

u Placement of Backfillu Construction of Roadway Slabu Restoration of Bearing Areasu Masonry Repair of South Face of

Anchorage 2u Concrete Repair of North Face of

Anchorage 2u Masonry Repair of Arch Intrados

Page 18: Roebling Virtual Pre-Bid Meeting Minutes...The mandatory on-site pre-bid meeting will be held August 13, 2020 at 9:30 am. Meeting Presentation Craig Klusman (AECOM) presented an overview

ANCHORAGE 2 SECTION VIEW

Page 19: Roebling Virtual Pre-Bid Meeting Minutes...The mandatory on-site pre-bid meeting will be held August 13, 2020 at 9:30 am. Meeting Presentation Craig Klusman (AECOM) presented an overview

Deck & Sidewalk Repairs

Page 20: Roebling Virtual Pre-Bid Meeting Minutes...The mandatory on-site pre-bid meeting will be held August 13, 2020 at 9:30 am. Meeting Presentation Craig Klusman (AECOM) presented an overview

WaterproofingZipper Boot Retrofit

Page 21: Roebling Virtual Pre-Bid Meeting Minutes...The mandatory on-site pre-bid meeting will be held August 13, 2020 at 9:30 am. Meeting Presentation Craig Klusman (AECOM) presented an overview

Suspender Collar Repair

Page 22: Roebling Virtual Pre-Bid Meeting Minutes...The mandatory on-site pre-bid meeting will be held August 13, 2020 at 9:30 am. Meeting Presentation Craig Klusman (AECOM) presented an overview

Anchor Bolt Retrofit – Towers

Page 23: Roebling Virtual Pre-Bid Meeting Minutes...The mandatory on-site pre-bid meeting will be held August 13, 2020 at 9:30 am. Meeting Presentation Craig Klusman (AECOM) presented an overview

Truss Bearing Anchor Bolt Retrofit –Anchorage 2

Page 24: Roebling Virtual Pre-Bid Meeting Minutes...The mandatory on-site pre-bid meeting will be held August 13, 2020 at 9:30 am. Meeting Presentation Craig Klusman (AECOM) presented an overview

MISCELLANEOUS BRIDGE REPAIRS

Page 25: Roebling Virtual Pre-Bid Meeting Minutes...The mandatory on-site pre-bid meeting will be held August 13, 2020 at 9:30 am. Meeting Presentation Craig Klusman (AECOM) presented an overview

TOWER ROOF& RAIL REPAIRSu Railing Stone Repairs

u Drainage TroughRepairs

u Concrete Repairs ofRoof Surface

u Miscellaneous SteelCleaning & Painting

u Install WaterproofCoating

Page 26: Roebling Virtual Pre-Bid Meeting Minutes...The mandatory on-site pre-bid meeting will be held August 13, 2020 at 9:30 am. Meeting Presentation Craig Klusman (AECOM) presented an overview

TURRET &ANCHORAGEROOF REPAIRSu Installation of new Copper

Drainage Componentsu Cleaning & Installation of Water

Repellant on Brick Veneeru Miscellaneous Sealing

Page 27: Roebling Virtual Pre-Bid Meeting Minutes...The mandatory on-site pre-bid meeting will be held August 13, 2020 at 9:30 am. Meeting Presentation Craig Klusman (AECOM) presented an overview

Questions?

Page 28: Roebling Virtual Pre-Bid Meeting Minutes...The mandatory on-site pre-bid meeting will be held August 13, 2020 at 9:30 am. Meeting Presentation Craig Klusman (AECOM) presented an overview
Page 29: Roebling Virtual Pre-Bid Meeting Minutes...The mandatory on-site pre-bid meeting will be held August 13, 2020 at 9:30 am. Meeting Presentation Craig Klusman (AECOM) presented an overview

ATTENDENCE AFFIDAVIT PRE-BID VIDEO CONFERENCE

DISTRICT 6 ROEBLING BRIDGE REPAIRS

ITEM NO. 6-10005.00 CID Number 202990

The following persons attended the video conference for the subject pre-bid meeting:

Attested by: Company Name:

Printed Name:

Signature:

Title:

Company Address

City, State Zip

Phone:

Return a scanned copy or photo of the completed affidavit to [email protected] by 4:30 p.m. on August 13, 2020.

Delong concrete LLC
Daniel Holland
Daniel Holland
Project Manager
940 Delong Rd
Lexington, KY. 40515
859-533-9763
Page 30: Roebling Virtual Pre-Bid Meeting Minutes...The mandatory on-site pre-bid meeting will be held August 13, 2020 at 9:30 am. Meeting Presentation Craig Klusman (AECOM) presented an overview
Page 31: Roebling Virtual Pre-Bid Meeting Minutes...The mandatory on-site pre-bid meeting will be held August 13, 2020 at 9:30 am. Meeting Presentation Craig Klusman (AECOM) presented an overview

 

Page 32: Roebling Virtual Pre-Bid Meeting Minutes...The mandatory on-site pre-bid meeting will be held August 13, 2020 at 9:30 am. Meeting Presentation Craig Klusman (AECOM) presented an overview

 

Page 33: Roebling Virtual Pre-Bid Meeting Minutes...The mandatory on-site pre-bid meeting will be held August 13, 2020 at 9:30 am. Meeting Presentation Craig Klusman (AECOM) presented an overview
Page 34: Roebling Virtual Pre-Bid Meeting Minutes...The mandatory on-site pre-bid meeting will be held August 13, 2020 at 9:30 am. Meeting Presentation Craig Klusman (AECOM) presented an overview

 

Page 35: Roebling Virtual Pre-Bid Meeting Minutes...The mandatory on-site pre-bid meeting will be held August 13, 2020 at 9:30 am. Meeting Presentation Craig Klusman (AECOM) presented an overview

ATTENDENCE AFFIDAVIT PRE-BID VIDEO CONFERENCE

DISTRICT 6 ROEBLING BRIDGE REPAIRS

ITEM NO. 6-10005.00 CID Number 202990

The following persons attended the video conference for the subject pre-bid meeting:

Attested by: Company Name:

Printed Name:

Signature:

Title:

Company Address

City, State Zip

Phone:

Return a scanned copy or photo of the completed affidavit to [email protected] by 4:30 p.m. on August 13, 2020.

Dawson
Text Box
Ryan Pummell
Dawson
Text Box
Dawson Rogers
Dawson
Text Box
Lithko Restoration Technologies
Dawson
Text Box
Dawson Rogers
Dawson
Text Box
Project Manager
Dawson
Text Box
990 N Main St.
Dawson
Text Box
Monroe, OH 45050
Dawson
Snapshot
Dawson
Text Box
513-582-9793
Page 36: Roebling Virtual Pre-Bid Meeting Minutes...The mandatory on-site pre-bid meeting will be held August 13, 2020 at 9:30 am. Meeting Presentation Craig Klusman (AECOM) presented an overview
Page 37: Roebling Virtual Pre-Bid Meeting Minutes...The mandatory on-site pre-bid meeting will be held August 13, 2020 at 9:30 am. Meeting Presentation Craig Klusman (AECOM) presented an overview

ATTENDENCE AFFIDAVIT PRE-BID VIDEO CONFERENCE

DISTRICT 6 ROEBLING BRIDGE REPAIRS

ITEM NO. 6-10005.00 CID Number 202990

The following persons attended the video conference for the subject pre-bid meeting:

Attested by: Company Name:

Printed Name:

Signature:

Title:

Company Address

City, State Zip

Phone:

Return a scanned copy or photo of the completed affidavit to [email protected] by 4:30 p.m. on August 13, 2020.

Seth Criswell

Master Builders Solutions

Seth Criswell

Territory Sales Manager

889 Valley Park Dr

Shakopee, MN 55379

317-313-3465

Page 38: Roebling Virtual Pre-Bid Meeting Minutes...The mandatory on-site pre-bid meeting will be held August 13, 2020 at 9:30 am. Meeting Presentation Craig Klusman (AECOM) presented an overview
Page 39: Roebling Virtual Pre-Bid Meeting Minutes...The mandatory on-site pre-bid meeting will be held August 13, 2020 at 9:30 am. Meeting Presentation Craig Klusman (AECOM) presented an overview
Page 40: Roebling Virtual Pre-Bid Meeting Minutes...The mandatory on-site pre-bid meeting will be held August 13, 2020 at 9:30 am. Meeting Presentation Craig Klusman (AECOM) presented an overview
Page 41: Roebling Virtual Pre-Bid Meeting Minutes...The mandatory on-site pre-bid meeting will be held August 13, 2020 at 9:30 am. Meeting Presentation Craig Klusman (AECOM) presented an overview
Page 42: Roebling Virtual Pre-Bid Meeting Minutes...The mandatory on-site pre-bid meeting will be held August 13, 2020 at 9:30 am. Meeting Presentation Craig Klusman (AECOM) presented an overview
Page 43: Roebling Virtual Pre-Bid Meeting Minutes...The mandatory on-site pre-bid meeting will be held August 13, 2020 at 9:30 am. Meeting Presentation Craig Klusman (AECOM) presented an overview
Page 44: Roebling Virtual Pre-Bid Meeting Minutes...The mandatory on-site pre-bid meeting will be held August 13, 2020 at 9:30 am. Meeting Presentation Craig Klusman (AECOM) presented an overview
Page 45: Roebling Virtual Pre-Bid Meeting Minutes...The mandatory on-site pre-bid meeting will be held August 13, 2020 at 9:30 am. Meeting Presentation Craig Klusman (AECOM) presented an overview
Page 46: Roebling Virtual Pre-Bid Meeting Minutes...The mandatory on-site pre-bid meeting will be held August 13, 2020 at 9:30 am. Meeting Presentation Craig Klusman (AECOM) presented an overview
Page 47: Roebling Virtual Pre-Bid Meeting Minutes...The mandatory on-site pre-bid meeting will be held August 13, 2020 at 9:30 am. Meeting Presentation Craig Klusman (AECOM) presented an overview
Page 48: Roebling Virtual Pre-Bid Meeting Minutes...The mandatory on-site pre-bid meeting will be held August 13, 2020 at 9:30 am. Meeting Presentation Craig Klusman (AECOM) presented an overview
Page 49: Roebling Virtual Pre-Bid Meeting Minutes...The mandatory on-site pre-bid meeting will be held August 13, 2020 at 9:30 am. Meeting Presentation Craig Klusman (AECOM) presented an overview