Rock Quarry Plan
1
install stop sign install f.s. lock gate 14 parking spots 25’ 25’ install f.s. lock gate install site id sign 25’ construct 3’ trailhead to lower climbing trail 4’ wide raised bed w/ natural vegetation barrier 4’ wide raised bed w/ natural vegetation barrier to salt lake to alta to wasatch resort storm drain install underground 3’ pressure-pad alarm system around property line existing road easement 10’ quarry silo to be converted into opperation center / storage garage for LCC power plant bay doors remnant concrete structures to remain. Future conversion into storage possible scale: 1/132” = 1’-0” N highway 210 concrete walking path connecting to trailhead 5’ asphalt access road
-
Upload
neil-howard -
Category
Documents
-
view
22 -
download
0
Transcript of Rock Quarry Plan
install stop sign
install f.s. lock gate
14 parking spots
25’
25’
install f.s. lock gate
install site id sign
25’
construct 3’ trailhead to lower climbing trail
4’ wide raised bed w/ natural vegetation barrier
4’ wide raised bed w/ natural vegetation barrier
to salt lake
to altato wasatch resort
storm drain
install underground 3’ pressure-pad alarm system around property line
existing road easement
10’
quarry silo to be converted into opperation center / storage garage for LCC power plant
bay doors
remnant concrete structures to remain. Future conversion into storage possible
scale: 1/132” = 1’-0” N
highway 210concrete walking path connecting to trailhead
5’
asphalt access road