Roadway condition survey

34
CE : 452 Course Name : Transportation Engineering Lab-II Course Teachers : Minhajul Islam Khan, Nuzhat Azra 1

Transcript of Roadway condition survey

Page 1: Roadway condition survey

CE : 452

Course Name : Transportation

Engineering Lab-II

Course Teachers : Minhajul Islam Khan,

Nuzhat Azra

1

Page 2: Roadway condition survey

TANJIN MUNIRA KHAN : 11.01.03.081

MD. NAZMUL HUDA: 11.01.03.084

SHAMS TANVINA: 11.01.03.089

TAHMINA FERDOUS: 11.01.03.111

NURUN NAHAR HIMIKA: 11.01.03.117

SAMARA ZERIN: 11.01.03.121

TAREQ HASAN: 11.01.03.127

S.M.MAROOF HASAN NAHIN: 10.02.03.093

2

Page 3: Roadway condition survey

INTRODUCTION

OBJECTIVE OF STUDY

SCOPE OF STUDY

METHODOLOGY

DATA COLLECTION

DATA & PHOTO ANALYSIS

RECOMMENDATION

3

Page 4: Roadway condition survey

The methodology used for preparation of Road Condition is called Road Way Condition Survey.

Roadway Condition Survey will indicate the process to determine its surface, side and overall workability as per the demand of land use.

The Road- traffic system is a complex joint of 4 components- road, vehicles, road users & environment.

4

Page 5: Roadway condition survey

To draw detailed layout of roadway and intersection. To find road length, numbers of lane, median height

and width, shoulder height and width etc. Dimension and location of pedestrian refuge. Roadside land use pattern . To show various control devices like road sign,

marking, signal, speed breaker, street light etc. To find density of road obstructions (side roads,

manholes, speed breakers, potholes etc). To plan for reducing time in intersection. For betterment of existing situation of our study.

5

Page 6: Roadway condition survey

Provide general information of road width, lane quantity and width, surface quality, vehicle, pedestrians.

A uniform rating system for each side.

A means to monitor the condition of any section of pavement.

Improvement purpose.

6

Page 7: Roadway condition survey

MANUAL METHOD

o Walking survey

o Windshield survey

o Walking and windshield survey

AUTOMATIC METHOD

o Video camera

o Distance measuring instrument

o GIS method

o Automated road analyzer

7

Page 8: Roadway condition survey

Types Of Data Collection:

Engineering Data

Environmental Data

Social Data

Economic Data

8

Page 9: Roadway condition survey

Map view of the Location

9

Page 10: Roadway condition survey

Observation – Roadway Condition Survey

Method – Manual

Equipment – Tape, Chalk, Camera etc.

Location – Panthapath to Russell Square

Date - 23rd December, 2014 Day - Tuesday

Time - 03:00 pm to 07:00 pm Weather condition - Sunny

Duration – 4 hrs (short count)

Number of enumerators - 8

10

Page 11: Roadway condition survey

Geometric Roadway Layout

11

Page 12: Roadway condition survey

FROM P TO RS FROM RS TO P

Side roadno.

Length (m) Width (m)

1 49.6 3.6

2 80 4.1

3 229.6 3

4 299.5 6

5 350 1.9

6 592.3 3

7 783 4.5

8 892.2 2

Side roadno.

Length (m) Width (m)

1 52.92 0.97

2 63.13 2.61

3 86.88 1.9

4 109.25 3.19

5 278.9 4

6 311.9 4

7 357.91 3

8 372.61 3.31

12

Page 13: Roadway condition survey

Russell’s square intersection

INTERSECTIONS

13

Page 14: Roadway condition survey

INTERSECTIONS

Panthapath intersection

14

Page 15: Roadway condition survey

ISLAND

GEOMETRIC DESIGN CONDITION

15

Page 16: Roadway condition survey

SURFACE CONDITION

Cracking on the Road Surface

16

Page 17: Roadway condition survey

SURFACE CONDITION

POTHOLES

17

Page 18: Roadway condition survey

DEPRESSION

SURFACE CONDITION

18

Page 19: Roadway condition survey

SURFACE CONDITION

MANHOLES

19

Page 20: Roadway condition survey

ROAD SIGN & MARKINGS

20

Page 21: Roadway condition survey

ROAD SIGN & MARKINGS

PARKING SIGNALS

21

Page 22: Roadway condition survey

SIGNAL DEVICES

SIGNAL LIGHT

22

Page 23: Roadway condition survey

SIGNAL DEVICES

SIGNAL LIGHT

23

Page 24: Roadway condition survey

FOOTPATHS

Footpaths are blocked by small stores & heavy machines.

24

Page 25: Roadway condition survey

Some Major Problems

Broken bricks create obstruction on the road.

25

Page 26: Roadway condition survey

Some Major Problems

Illegal occupation by the rickshaws.

26

Page 27: Roadway condition survey

Some Major Problems

V notch & signals on intersections are blocked by signboard and tree.

27

Page 28: Roadway condition survey

Some Major Problems

Open gathering of garbage and construction materials on the road being

obstruction for people and vehicles.

28

Page 29: Roadway condition survey

Some Major Problems

Construction materials on the road blocking considerable space.

29

Page 30: Roadway condition survey

Some Major Problems

Erosion of constructed manhole surface creating danger for people & vehicles.

30

Page 31: Roadway condition survey

The surface of roadway was not good enough and the medians were not geometrically right. The marks on the road were invisible. So our recommendation is that we should be careful about regular maintenance of road.

The signs we observed on the roadway were old and not only covered by posters but also broken. So replacing these old sign plates with new ones is highly recommended.

We found different kind of small shops on the footpath/shoulder. So it is recommended that Dhaka City Corporation should take essential step to clear the footpath so that pedestrian can move easily.

There were no facilities for blind people and people who use wheelchair. So extra facilities for these people are recommended.

RECOMMENDATION

31

Page 32: Roadway condition survey

RECOMMENDATION

According to recommendation a complete roadway should be as…..

32

Page 33: Roadway condition survey

33

Page 34: Roadway condition survey

34

THANK YOU