    PPUUBBLLIICCWWOORRKKSSDDEEPPAARRTTMMEENNTT,,

    HHIIMMAACCHHAALLPPRRAADDEESSHH

    QQUUAALLIITTYYMMAANNAAGGEEMMEENNTTSSYYSSTTEEMMSS

    ((IISSOO99000011::22000088))(HPPWD Project Reference No.: - PW-SRC/RIDC/Procurement-ISO/2008)

    CCOONNSSTTRRUUCCTTIIOONNMMAANNUUAALL((WWOORRKKIINNSSTTRRUUCCTTIIOONNSS))

    RROOAADDCCOONNSSTTRRUUCCTTIIOONN

    H P R & I D

  • 7/21/2019 Road Construction Manual_ISO

    2/149

    Quality Management SystemConstruction Manual (Work Instructions) for

    Public Works Department of Himachal Pradesh (HPWD)

    TABLE OF CONTENTSTitle Page No.

    Chapters

    AMENDMENT SHEET .......................................................................................................... i1. INTRODUCTION ...........................................................................................................1-12. CONSTRUCTION MANAGEMENT ..............................................................................2-12.1. Supervision - Process and Product........................................................................ 2-12.2. Original Construction ..............................................................................................2-12.3. Steps involved - Planning and investigation ..........................................................2-22.4. Submission of Project Report .................................................................................2-42.5. Tendering................................................................................................................2-43. PROCESS FLOW..........................................................................................................3-14. QUALITY ASSURANCE PLAN FOR ROAD.................................................................4-1

    4.1. Background.............................................................................................................4-14.2. References..............................................................................................................4-14.3. Scope......................................................................................................................4-14.4. Abbreviations and Definitions.................................................................................4-14.5. Planning of Road Projects ......................................................................................4-34.6. Original Works / Maintenance ................................................................................4-35. QUALITY ASSURANCE REQUIREMENTS FOR ROADS ..........................................5-15.1. Project Report Preparation .....................................................................................5-15.2. Material Controls.....................................................................................................5-15.3. Process Controls ....................................................................................................5-15.4. Typical Quality Plan for Road and Bridge Construction ........................................5-25.5. Quality Assurance for Maintenance of Roads........................................................5-35.6. Planning QA Programme........................................................................................5-46. NON-CONFORMANCE (NC) AND CORRECTIVE ACTIONS.....................................6-16.1. Typical NCs with Product .......................................................................................6-17. TEST PLANS AND CHECKLISTS................................................................................7-17.1. Test Plan for Soil ....................................................................................................7-1

    7.2. Test Plan for Granular Sub-Base Material .............................................................7-27.3. Test Plan for Coarse and Fine Aggregates (Over Size / Size Metal) ....................7-37.4. Test Plan for Water.................................................................................................7-57.5. Test Plan for Stone Rubble ....................................................................................7-67.6. Test Plan for Cement.............................................................................................. 7-77.7. Test Plan for Admixture ..........................................................................................7-87 8 Test Plan for Reinforcement Steel 7-9

  • 7/21/2019 Road Construction Manual_ISO

    3/149

    Quality Management SystemConstruction Manual (Work Instructions) for

    Public Works Department of Himachal Pradesh (HPWD)

    7.20. Checklist for Publicity Utility Services ..................................................................7-237.21. Checklist for Curst Design Of Flexible Pavement................................................7-247.22. Checklist for Excavation For Road Work (Utility related)....................................7-257.23. Checklist for Excavation for Road Work (Tree related) .......................................7-267.24. Checklist for Excavation for Road Work ..............................................................7-277.25. Checklist for 95% PD Earth Work (To be Completed for each Layer) ................7-297.26. Checklist for 95% PD Earth Work (To be Completed for each Layer) ................7-32

    7.27. Checklist for 95% PD Earth Work (To be Completed for each Layer) ................7-347.28. Checklist for 95% PD Earth Work (To be Completed for each Layer) ................7-357.29. Checklist for 100% PD Earth Work ......................................................................7-367.30. Checklist for Hard Murrum for Side Shoulder ......................................................7-387.31. Checklist for Granular Sub Base..........................................................................7-397.32. Checklist for Water Bound Macadam (Gr.1) In Layers........................................7-417.33. Checklist for Water Bound Macadam (Gr.II) In Layers........................................7-447.34. Checklist for Water Bound Macadam (Gr.III) In Layers.......................................7-47

    7.35. Checklist for Road Side Gutter in Cement Concrete ...........................................7-507.36. Checklist for Tack Coat ........................................................................................7-537.37. Checklist for Bitumen Bound Macadam...............................................................7-557.38. Checklist for Surface Dressing .............................................................................7-577.39. Checklist for Surface Dressing .............................................................................7-587.40. Checklist for Bitumen Macadam...........................................................................7-607.41. Checklist for Bitumen Macadam...........................................................................7-637.42. Checklist for Bitumen Macadam...........................................................................7-647.43. Checklist for Bitumen Macadam...........................................................................7-65

    7.44. Checklist for Mix Seal Surface .............................................................................7-667.45. Checklist for Pre-Mix Carpet ................................................................................7-687.46. Checklist for Dense Bituminous Macadam ..........................................................7-707.47. Checklist for Dense Bituminous Macadam ..........................................................7-737.48. Checklist for Asphaltic Concrete ..........................................................................7-757.49. Checklist for Asphaltic Concrete ..........................................................................7-787.50. Checklist for Mastic Concrete...............................................................................7-807.51. Checklist for Mastic Concrete...............................................................................7-83

    7.52. Checklist for Concrete Pavement.........................................................................7-847.53. Checklist for Road Marking Paint - Thermoplastic Plant .....................................7-877.54. Checklist for Kerb Stone for Central Verge..........................................................7-897.55. Checklist for Kilometre Stone and 200 metre Stones..........................................7-917.56. Checklist for Cast Iron Pipe Railing and Parapets.............................................7-937.57. Checklist for Guard Stones ..................................................................................7-957 58 Checklist for Boundary Stones 7-97

  • 7/21/2019 Road Construction Manual_ISO

    4/149

    Quality Management SystemConstruction Manual (Work Instructions) for

    Public Works Department of Himachal Pradesh (HPWD)

    8.8. Test Report of Cement Sample..............................................................................8-88.9. Test Report on Aggregate Characteristics of Single Coat Surface Dressing........8-98.10. Test Report on Aggregate Characteristics of 20mm Thick Open Graded Premix

    Carpet / Seal Coat ................................................................................................8-108.11. Test Report on Aggregate of Built-up Spray Grout..............................................8-118.12. Test Report on Coarse Aggregate for Bituminous Concrete...............................8-128.13. Test Report on Aggregates Characteristic for SDBC ..........................................8-13

    8.14. Test Report on Aggregate Characteristics of Bituminous Macadam ..................8-148.15. Test Report on Aggregates Characteristic for Dense Graded Bituminous

    Macadam ..............................................................................................................8-15

    Annexures

    Annexure I. : Typical Letter for Public Representation ......................................................I-1Annexure II. : Typical Covering Letter from Division to Division.......................................II-1

    Annexure III. : Typical Routine Inspection Proforma for Maintenance of Road ..............III-1Annexure IV. : Annual Calendar for QA Checks for Road Maintenance........................ IV-1

    Appendixes

    Appendix I. : Proforma for New Road / Maintenance ........................................................I-1Appendix II. : Checklist for Proposal Preparation of Road ...............................................II-1

  • 7/21/2019 Road Construction Manual_ISO

    5/149

    Quality Management SystemConstruction Manual (Work Instructions) for

    Public Works Department of Himachal Pradesh (HPWD)

    AMENDMENT SHEET

    Sl. No. Document Description of change Page/para.No.

    Rev.No

    Date ofissue

  • 7/21/2019 Road Construction Manual_ISO

    6/149

    Quality Management SystemConstruction Manual (Work Instructions) for

    Public Works Department of Himachal Pradesh (HPWD)

    1. INTRODUCTION

    This manual intends to provide guidance to the HPPWD engineers in theirfunctions of investigation, designs, estimation inspection and assurance of qualityof construction and maintenance. It helps in the vendor control and gradation ofcontractors and is expected to aid in structured Quality Assurance activities ofHPPWD.

    Road construction is dependent on several challenges, right from selection of theterrain, soil conditions, materials, methods, type and design of construction tosupervision and assurance of quality in construction of new roads andmaintenance of the same after the area acquired.

    The enclosures would provide typical process flow of road construction, QualityAssurance requirements and test plans for Quality checks of materials used inconstruction.

    The checklists are the Level III documents of an established Quality ManagementSystem (QMS) as per ISO 9001:2008 The Quality Plan drawn up highlights on theprocess controls necessary for product realization and improvements.

    It is also intended to help the internal auditors while carrying out audits of theimplemented QMS of HPPWD.

    This document is an important adjunct to the Procedure Manual (Level II)document and takes into consideration the existing practices and codal needs of

    HPPWD. The formats to be used are the same as necessary for the QMS and thedepartmental code.

    For easy reference to the contents of the manual the following process has beenadopted:

    RCM refers to Road Construction Manual.

    TP refers to Test Plan

    CL refers to various Check list for process control.

    The test plans are identified as RCM/TP XX refers to the Serial No. of Test plan,similarly RCM/CL XX refers to the Serial No. of checklist as applicable. The testplan and checklist should be considered as work instructions necessary forconstruction and maintenance of building.

    The typical tests and test Performa are given in separate chapters for the purposef id t th it i lit t l t ff d l th t t

  • 7/21/2019 Road Construction Manual_ISO

    7/149

    Quality Management SystemConstruction Manual (Work Instructions) for

    Public Works Department of Himachal Pradesh (HPWD)

    2. CONSTRUCTION MANAGEMENT

    2.1. Supervision - Process and Product

    2.1.1. Process

    2.1.1.1 Monitoring Measuring Devices

    Test frequencies and calibration schedule

    Handling by skilled men.

    2.1.1.2 Quality control of materials (QC)

    Inspection and certification of materials, on receipt at site

    Sampling of materials to be tested.

    Testing of materials during construction

    Methodology of construction as per standards/codes. Competency of workers

    2.1.2. Product

    Workmanship

    Safety.

    Specification

    Quality Management System.

    2.2. Original Construction

    Public Representation

    o Letter from Public / Elected Public representative to Division (Annexure I).

    Feasibility study by Division

    o Economic profile and analysis.o Traffic survey.o Preliminary Topographical survey.o Soil survey and drainage studies.o Initial pavement designs.o Land acquisition estimate.o Traffic analysis and projection.o Line estimate for detail investigation.

  • 7/21/2019 Road Construction Manual_ISO

    8/149

    Quality Management SystemConstruction Manual (Work Instructions) for

    Public Works Department of Himachal Pradesh (HPWD)

    Upon receiving the amount for detail investigation* to Division, EE instructs theDivision to carry out the activity.

    Based on the investigation results, designs are prepared.

    On the basis of designs and by referring to current schedule of rates,applicable to concerned Circle, detailed estimate is prepared.

    Detailed Project Report** is submitted by Division to Technical committee(TC)/Board of Directors (BOD).

    TC/BOD scrutinizes all the proposals (completed in all aspects) received fromvarious Divisions.

    TC/BOD prioritizes proposals on the basis of need of the project for inclusionin the budget.

    Upon approval from the Govt. (Appearing in the Budget), TC/BOD intimates the

    concerned Division accordingly. The proposal which does not appear in the budget due to financial reasons, are

    stored back by TC/BOD, and are reviewed in the subsequent years.

    2.3. Steps involved - Planning and investigation

    2.3.1. Survey

    2.3.1.1 Detailed Topographical Survey

    Re-alignment, alternate alignment and Final alignment of Road.

    Detailed soil survey.

    Visibility / sight distance in horizontal and vertical profile.

    Carriageway shoulder width and formation width.

    Cross Drainage structures.

    Drainage system.

    Safety features.

    2.3.1.2 Socio-Economic Survey

    Land availability and acquisition.

    Economic profile data.

    Socio-economic status of the road influence area.

    Growth trends.

  • 7/21/2019 Road Construction Manual_ISO

    9/149

    Quality Management SystemConstruction Manual (Work Instructions) for

    Public Works Department of Himachal Pradesh (HPWD)

    2.3.1.4 Geographical Survey

    Study of maps and survey sheets.

    Study of GIS information.

    2.3.1.5 Environmental Impact Studies

    Environmental impact assessment.

    Environmental management action plan. Resettlement and rehabilitation action plan.

    2.3.1.6 Soil Survey

    Study of secondary data.

    Soil investigation for low embankments.

    Special investigation for high embankments.

    Soil investigation for cut sections.

    Special investigation for land-slide-prone area. Detailed investigation for flexible pavement design.

    2.3.1.7 Road Construction Materials Survey

    Naturally available aggregates for pavement layers.

    Manufactured aggregates.

    Water for construction purpose.

    2.3.1.8 Road Inventory and Condition Survey Riding quality.

    Widths of pavement, shoulders, formation.

    Vertical profile.

    Horizontal and vertical curves.

    Drainage Studies.o Objectives.o High flood level.o

    Low water table.o Depth of water table.o Special investigation for cut-sections.o Surface run-off.

    2.3.2. Designs

  • 7/21/2019 Road Construction Manual_ISO

    10/149

    Quality Management SystemConstruction Manual (Work Instructions) for

    Public Works Department of Himachal Pradesh (HPWD)

    2.3.3. Detailed Project Report (DPR) Preparation

    DPR verified and submitted to EE / SE / CE / TC/BOD.

    (Depending upon the amount involved and financial powers delegated).

    DPR consists of:

    Survey details (including land acquisition needs).

    Design details.

    Detailed estimate:

    It is based on Current Schedule of Rates (CSR) applicable for respective Circles.It includes-

    (a). General report detailing about present condition of the road, connectivity,proposed improvements.

    (b). Inspection Certificate by EE and EE.

    (c). Abstract - Detailing name of the work and estimated cost.

    (d). Detailed Estimate describing items, units, quantity, rate amount, etc.

    (e). Sub-estimates.

    (f). Rate Analysis.

    (g). Plans.

    (h). Index Map.(i). Bar chart for existing Road condition.

    (j). Bar chart for proposed improvements.

    (k). Data rate for non-CSR items.

    2.4. Submission of Project Report

    Submission of the DPR for Administrative Approval from Division to Divisionand in turn to competent authorities in accordance with the Delegation offinancial powers for administrative approval.

    After administrative approval, Technical Sanction is accorded by competentauthorities.

    Upon accord of technical sanction by competent authority, Division initiates thenext activity of tendering. The Division prepares Draft Tender Schedule (DTS)

  • 7/21/2019 Road Construction Manual_ISO

    11/149

    Quality Management SystemConstruction Manual (Work Instructions) for

    Public Works Department of Himachal Pradesh (HPWD)

    Preparation of Tender Documents, It Shall Contain:

    o Technical specifications.o Commercial conditions.o Dispute resolution methodology.

    Supply of Tender Documents

    Clarification of Tender Documentso Scope of Tender.o Eligibility criteria.o Amendment of Tender documents.

    Receipt of Tenders and Tender Opening

    Tender Evaluation to be in Accordance with Evaluation Criteria

    Preparation of Evaluation Report and Award of Contract

  • 7/21/2019 Road Construction Manual_ISO

    12/149

    Quality Management SystemConstruction Manual (Work Instructions) for

    Public Works Department of Himachal Pradesh (HPWD)

    3. PROCESS FLOW

    Project Identification

    Detailed Investigation

    Scrutiny and approval bycompetent authority

    Proposalappear in the

    Budget

    Preparing Plans and Estimates

    - Administrative Approval- Technical sanction

    Tendering / Award ofContract

    Handing overof site

    Scrutiny and Prioritizationby Technical Cell(Shelf of Project)

    Preparation of Designsand estimates

    Y

    N

  • 7/21/2019 Road Construction Manual_ISO

    13/149

    Quality Management SystemConstruction Manual (Work Instructions) for

    Public Works Department of Himachal Pradesh (HPWD)

    4. QUALITY ASSURANCE PLAN FOR ROAD

    4.1. Background

    A good road network has an important bearing on the economy of a country. Inthe changing scenario of globalization and economic liberalization, a great deal ofemphasis is already laid on development of infrastructure through construction of

    a dependable road network. Consequently, consistency in the quality has gainedparamount importance. In line with this need, the document is prepared to provideguidelines for Quality Assurance of Roads.

    4.2. References

    ISO 9000:2005 Fundamentals and Vocabulary.

    Indian Roads Congress (IRC).

    Ministry of Shipping, Road Transport and Highways (MOSRTH).

    Quality Manual, Procedure Manual, Manual of Forms and Formats.

    Bureau of Indian Standards (BIS).

    4.3. Scope

    These guidelines cover quality system for activities of road construction. Theseinclude steps towards planning and investigation, design and construction,Tendering, Closing NCs, etc.

    4.4. Abbreviations and Definitions

    4.4.1. Abbreviations

    IRCM Indian Road Congress

    No. Number

    Ref. Reference

    Const. Construction

    Est. Detailed Estimate

    CSR Current Schedule of Rate

    NIT Notification Inviting Tenders

    QC Q lit C t l

  • 7/21/2019 Road Construction Manual_ISO

    14/149

    Quality Management SystemConstruction Manual (Work Instructions) for

    Public Works Department of Himachal Pradesh (HPWD)

    4.4.2.2 Quality Assurance

    All those systematic and planned actions necessary to provide adequateconfidence that a product or service will satisfy given requirements for quality.

    4.4.2.3 Quality Plan

    A document specifying which procedures and associated resources shall beapplied by whom and when to a specific project, process or contract.

    4.4.2.4 Non-Conformity

    Non-fulfillment of specified requirements.

    4.4.2.5 Technical Sanction

    The name is given to the order of the competent authority sanctioning a properly

    detailed estimate of the cost of a work of construction or repair, to be carried outby the public works department. Ordinarily, such sanction can only be accordedby the government in the public works department or by such authorities of thedepartment to whom the power has been delegated by government. Sanctionaccorded to a work by any other department of government is regarded as anadministrative approval of the work.

    4.4.2.6 Administrative Approval

    This term denotes the formal acceptance, by the administrative departmentconcerned, of the proposals for incurring any expenditure in the public worksdepartment on a work initiated by or connected with the requirements of suchadministrative department. It is in effect, an order to the Public Works Departmentto execute certain specified works at a stated sum to meet the administrativeneeds of the department requiring the work. .

    Administrative Approval Technical Sanction

    Subject to appearing in the Budget For estimate of original work

    4.4.2.7 For Lump-sum Contract Architectural, Acoustic, Landscaping, electrical etc.

  • 7/21/2019 Road Construction Manual_ISO

    15/149

    Quality Management SystemConstruction Manual (Work Instructions) for

    Public Works Department of Himachal Pradesh (HPWD)

    4.5. Planning of Road Projects

    4.6. Original Works / Maintenance

    The term original works indicates new constructions whether of entirely newworks or of additions and alterations to existing works.

    When a portion of an existing structure or other work not being a road surface,road bridge, causeway, embankment, ferry approach, protective or training workin connection with a road, is to be replaced or remodeled (whether or not changeinvolves any dismantlement) and the cost of the change represents a genuineincrease in the value of the property, the work of replacement remodeling, as thecase may be shall be classified as original works.

    OriginalConstruction

    Maintenance

    AnnualMaintenance

    PeriodicalMaintenance

    Special / UrgentMaintenance

    ROAD

  • 7/21/2019 Road Construction Manual_ISO

    16/149

    Quality Management SystemConstruction Manual (Work Instructions) for

    Public Works Department of Himachal Pradesh (HPWD)

    5. QUALITY ASSURANCE REQUIREMENTS FOR ROADS

    5.1. Project Report Preparation

    Design and drawings, Contracts and contractors, Materials, quantity estimation,requirements of human resources, execution, inspection and testing, acceptance /reworking and asset acquisition

    5.2. Material Controls

    Testing of materials- Aggregates- coarse, fine, components (base, sub-base,pavement, shoulders).

    Test methods, Acceptance limits.

    Sampling and Frequency of testing.

    Availability of equipment- Monitoring and measurement.

    Reports of test results, calibration.

    5.3. Process Controls

    5.3.1. Alignment

    Edges, carriageway, horizontal alignment, vertical profile, pavement thickness

    5.3.2. Road Embankment

    Grade, sub base and fill. Grain size, Plasticity Index, of materials, moisture content, density.

    Sampling and frequency of testing, Test methods, testing equipment,calibration.

    Tests on finished profile.

    5.3.3. Granular Base Course Laying

    Material testing (Gradation, sizing, aggregate impact values, density).

    Frequency and sampling. Test equipment and test methods.

    Tests on surface profile (slope and evenness).

    5.3.4. Bituminous Pavement Laying

    Tests on aggregates bit men mi grading

  • 7/21/2019 Road Construction Manual_ISO

    17/149

    Quality Management SystemConstruction Manual (Work Instructions) for

    Public Works Department of Himachal Pradesh (HPWD)

    Tests on cores.

    Tests on concrete for Cross Drainage.

    5.4. Typical Quality Plan for Road and Bridge Construction

    Statement of policy and Objectives

    Quality Planning- Relevantdocuments, Flowcharts,Statement of duties andresponsibilities, Schedulingand controls

    Survey, estimation,construction, inspectionsampling, inspection, resultscalibration, report preparation,review and action.

    Defect notification, non-conformance reporting,corrective and preventiveactions, retesting, andprocedure modification ifrequired.

    Quality Audits- Scheduling,conduct, verification ofcompliance, reporting, non-compliance closing, safetyaudits, management reviewCorrective preventive actionst k i f ti l

    Duties andresponsibilities

    JE/AE /AEE/EE/SE/CE

    INPUTS

    PROCESS

  • 7/21/2019 Road Construction Manual_ISO

    18/149

    Quality Management SystemConstruction Manual (Work Instructions) for

    Public Works Department of Himachal Pradesh (HPWD)

    5.5. Quality Assurance for Maintenance of Roads

    The basic objective of QA in maintenance activity is to ensure safety and meetingcustomer requirements. The Quality Assurance activities assure that themaintenance activities are performed as per plans. Towards this, a calendar isdrawn up at the beginning of the year for both preventive and annual maintenanceof all assets- roads, buildings and bridges. Atypical maintenance plan is given

    below:

    5.5.1. Ordinary Repairs / Routine Maintenance/ Annual Maintenance

    Maintenance includes following nature of works:

    (a). Upkeep of road pavements and side shoulders.

    (b). Upkeep of roadside drainage system.

    (c). Upkeep of culverts and bridges, and earth retaining structures andparapets.

    (d). Keeping the sign boards; km stones and other traffic aids and furniture ingood shape and condition.

    5.5.2. Periodic Maintenance

    It covers periodic renewals to carriageway of graveled metalled or black toppedroads. It is maintained to ensure adequate level of serviceability. Typical RoutineInspection Performa for Maintenance of Road is given in (Annexure III).

    5.5.3. Special Repairs

    Maintenance

    AnnualMaintenance

    Periodic(preventive)Maintenance

    Special repairs(Corrective

    actions)

  • 7/21/2019 Road Construction Manual_ISO

    19/149

    Quality Management SystemConstruction Manual (Work Instructions) for

    Public Works Department of Himachal Pradesh (HPWD)

    5.6. Planning QA Programme

    5.6.1. Inventory of Road

    The first step in planning a maintenance operation is to know the existing road interms of physical condition, structural capacity, surface profile, etc. The followingdata are required to be collected. The various inputs are:

    Strip map.

    Surface history.

    List of roads - State Highway/ Major District Roads.

    GIS data if any.

    Traffic census details.

    Black spot study details, if applicable.

    Safety audit reports, if any.

    5.6.2. Condition Survey

    Condition surveys at fixed frequency are necessary for determining periodicrenewal requirements and long-term maintenance strategy.

    Type of Maintenance

    Type ofRoad Routine Special Routine Special Routine Special

    SH Sixmonthly

    Pre andPostmonsoon

    Bi monthly Pre andPostmonsoon

    Bi monthly Weekly

    MDR Quarterly

    Pre andpostmonsoon

    Bi monthly Bi monthlyDuringmonsoon

    Monthly Weekly

    It can be carried out by

    Visual inspection.

    Evaluation testing.

    The findings are recorded in the prescribed format

  • 7/21/2019 Road Construction Manual_ISO

    20/149

    Quality Management SystemConstruction Manual (Work Instructions) for

    Public Works Department of Himachal Pradesh (HPWD)

    6. NON-CONFORMANCE (NC) AND CORRECTIVE ACTIONS

    6.1. Typical NCs with Product

    6.1.1. Non-Conformance with Strength Requirements

    (a). The required strength and density for concrete should conform the

    specified and required strength. In the event of cube tests failures, itneeds to be re-worked and re-verified before approval.

    (b). The causes for such failures shall be identified and measures shall betaken to rectify the problem.

    6.1.2. Even for Non-Conformity Other than the Strength

    (a). Issue a notice in writing stating the facts and confirming the failures ofworks done to rectify the same at the cost of the contractor. The rectifiedwork needs to be re-verified before approval

    6.1.3. Non-Conformance with Required Finish

    Where the required finish is not attained to, then:

    (a). Approval of similar work shall be withheld.

    (b). All aspects of work shall be reviewed.

    (c). The cause of poor finish shall be identified.(d). Revised specifications/instructions to avoid further reoccurrence of non-

    conformance shall be issued.

  • 7/21/2019 Road Construction Manual_ISO

    21/149

    Quality Management SystemConstruction Manual (Work Instructions) for

    Public Works Department of Himachal Pradesh (HPWD)

    Annexure I. : Typical Letter for Public Representation

    Date:

    ToThe Executive Engineer

    Division,

    Pin No.-

    Sir,

    Sub: Submission of proposal (Tick mark the applicable)

    Ref.:

    I am /We are submitting a proposal in the prescribed format attached herewith forconstruction / Improvement / Maintenance of Roads / Buildings / Bridges /Culverts / Pave dip / causeway / others.

    I / We hope this proposal will be considered for obtaining necessary approval fromGovernment and work will be taken-up at the earliest.

    Thanking you.

    Yours truly,

    Enclosure:

    1. Performa for New Road / Maintenance (Appendix I).

  • 7/21/2019 Road Construction Manual_ISO

    22/149

    Quality Management SystemConstruction Manual (Work Instructions) for

    Public Works Department of Himachal Pradesh (HPWD)

    Annexure II. : Typical Covering Letter from Division to Division

    No./EE- /Case worker/ Subject / File No. / Year / Dispatch No. /Dispatch Date

    Date:

    To

    The Executive Engineer

    District>

    Pin. No.

    Sir,

    Sub: Proposal for (Strike out the non applicable product)

    Road / Bridge under

    Ref.: Public Representation dated -

    Attached herewith, I am hereby submitting a proposal, in the prescribed formatfor construction / Improvement / Maintenance of Roads / Bridges / Culverts / Pavedip / causeway / others.

    I hope this proposal will be considered for necessary approval from Governmentand work will be taken-up at the earliest.

    Thanking you,

    Yours truly,

    Executive Engineer

  • 7/21/2019 Road Construction Manual_ISO

    23/149

    Quality Management SystemConstruction Manual (Work Instructions) for

    Public Works Department of Himachal Pradesh (HPWD)

    Annexure III. : Typical Routine Inspection Proforma for Maintenance of Road

    SH / MDR No:

    Date of inspection:

    Place:

    Sl.No.

    Status ofcomponents

    KM KM KM KM KM

    1. Side drain

    2. Shoulder andSlope

    Camber.

    Pot holes.

    Erosion. Drain washouts.

    3. Carriageway

    Fill Patches.

    Fill Pot holes.

    Grit.

    4. Cross DrainDetails

    5. Encroachmentdetails

    6. Road Accessories

    Missing boards.

    Km Stones.

    Pavement.

    Other markings.

    7. Safety history

    Remarks: Actions on the following are required:

    Nature of actions: Immediate/ In due course

  • 7/21/2019 Road Construction Manual_ISO

    24/149

    Quality Management SystemConstruction Manual (Work Instructions) for

    Public Works Department of Himachal Pradesh (HPWD)

    Annexure IV. : Annual Calendar for QA Checks for Road Maintenance

    Sl.No.

    Items Jan-Mar Apr-Jun Jul-Sept Oct-Dec Remarks

    1. Repairs of Roadberms including

    jungle clearance.

    X X X

    2. Repairs tolongitudinal, sideshoulder and catchdrains.

    X X

    3. Collection of patchrepairs material forWBM roads.

    X X

    4. Collection of patchrepairs material forBT roads.

    X X X

    5. Patch repairsmaterial for WBMroads.

    X X X

    6. Patch repairsmaterial for BT

    roads.

    X X

    7. Repairs andrepainting ofsignage boards.

    X X X

    8. Painting ofhectometer / km /5km/ guard stones.

    X X X X

    9. Maintenance of

    roadside trees bypruning X X X X

    10. Removal ofencroachment andunauthorizedhoardings.

    X X X X

  • 7/21/2019 Road Construction Manual_ISO

    25/149

    Quality Management SystemConstruction Manual (Work Instructions) for

    Public Works Department of Himachal Pradesh (HPWD)

    Appendix I. : Performa for New Road / Maintenance

    1. Proposal for a New Road :o Connectivity.o Traffic Density.o Population benefited.o

    Location of School, Colleges, Hospitals etc.2. Name of the Road:

    3. Location :o Name of Villageo Name of Talukao Name of District

    4. Present condition of Road:

    5. Improvements required:

  • 7/21/2019 Road Construction Manual_ISO

    26/149

    Quality Management SystemConstruction Manual (Work Instructions) for

    Public Works Department of Himachal Pradesh (HPWD)

    Appendix II. : Checklist for Proposal Preparation of Road

    Sl.No.

    Particulars Project 1 Project 2 Project 3

    1. Name of the work:

    2. Name of District

    3. Name of Tehshil

    4. Name of constituency

    5. Name of proposed Road

    6. Category of Road

    7. Total length of Road8. Length of the Road

    proposed for improvement

    9. Estimated cost Rs. inLakhs.Based on S.R. for theyear.

    10. Estimated cost for detailed

    investigation11. Villages benefited

    12. Population benefited

    WBM

    From To

    BT

    From To

    WBM

    From To

    BT

    From To

    WBM

    From To

    BT

    From To

    13. Surface condition ofexisting Bridge/CrossDrain

    14. Proposed improvements15. Traffic census and year

    16. Name of the representative

    17. Priority level *

  • 7/21/2019 Road Construction Manual_ISO

    27/149

    Quality Management SystemConstruction Manual (Work Instructions) for

    Public Works Department of Himachal Pradesh (HPWD)

    (c). Low priority

    Roads which are asphalted but requires minimum improvements. Bridge/Cross Drains, which are asphalted but require minimum

    improvements. MDR but traffic intensity low. Minor District Road and traffic intensity low.

  • 7/21/2019 Road Construction Manual_ISO

    28/149

    Quality Management System

    Construction Manual (Work Instructions) forPublic Works Department of Himachal Pradesh (HPWD)

    Procedure No.: QMS/WI/RC-07/Test Plans and Checklists Issue 01, Rev 00

    Controlled Document Page No.: RC/7-1

    7. TEST PLANS AND CHECKLISTS7.1. Test Plan for Soil

    7.1.1. Material: - Earth / Murrum (Borrow Material)

    RCM/TP 01

    Name of Work : Estimated Cost :Agreement No.: Sanction No. and date:

    Sl.No.

    Test/Parameter Acceptance Standard Sample size Acceptance Criteria

    1. Physical Properties / Requirements. MOSRTH 305-2 Visual Freedom from defects

    2. CBR Test. IS2720 Part-8 As per IS Conformance to limits

    3. Optimum Moisture contents. IS2720 Part-7 Part-8 As per IS Conformance to limits

    4. Dry Density. IS2720 Part-8 As per IS Conformance to limits5. Atterberg limits (L.L. P.L, S.L., P.L.) IS2720 Part-5 As per IS Conformance to limits

    6. Deleterious content tests (SulphateTest on water).

    BS1377 Test-9 As per BS Conformance to limits

  • 7/21/2019 Road Construction Manual_ISO

    29/149

    Quality Management System

    Construction Manual (Work Instructions) forPublic Works Department of Himachal Pradesh (HPWD)

    Procedure No.: QMS/WI/RC-07/Test Plans and Checklists Issue 01, Rev 00

    Controlled Document Page No.: RC/7-2

    7.2. Test Plan for Granular Sub-Base Material

    The GSB material could be natural sand. Murrum, Gravel, Crushed Stone, Quarry Spoils, Oversize metal or combination of thesedepending upon grading required.

    RCM/TP 02

    Name of Work : Estimated Cost :Agreement No.: Sanction No. and date:

    Sl.No.

    Test/Parameter Acceptance Standard Sample size Acceptance Criteria

    1. Sieve analysis MOSRTH Table 400-2 As per standard Conformance

    2. Water absorption value of coarse.

    Aggregate = 2%

    If more than 2% soundness test.

    IS2886 (Part-3)IS383

    As per standardAs per standard

    ConformanceConformance

    SO/JE

  • 7/21/2019 Road Construction Manual_ISO

    30/149

    Quality Management System

    Construction Manual (Work Instructions) forPublic Works Department of Himachal Pradesh (HPWD)

    Procedure No.: QMS/WI/RC-07/Test Plans and Checklists Issue 01, Rev 00

    Controlled Document Page No.: RC/7-3

    7.3. Test Plan for Coarse and Fine Aggregates (Over Size / Size Metal)

    RCM/TP 03

    Name of Work : Estimated Cost :Agreement No.: Sanction No. and date:

    Sl.No.

    Test/Parameter Acceptance / PerformanceStandard

    Sampling Test for Assurance

    1. Pre-qualification of Source IS 383 One sample Lot wise2. Alkali Reactivity IS 383/IS 2386 New source or change in

    quality

    3. Chloride and Sulfide. MOSRTH-2001- Section 900 IS 2386

    One Sample / Week One Sample / Week

    4. Deleterious Material MOSRTH-2001- Section 900 IS 2386

    One Sample / Week One Sample / Week

    5. Crushing Value MOSRTH-2001- Section 900 IS 2386 Part-I

    New source / as perrequirement

    New source / as perrequirement

    6. Abrasion (Optical) MOSRTH-2001- Section 900 IS 2386 Part-IV

    New source / as perrequirement

    New source / as perrequirement

    7. Impact Value MOSRTH-2001- Section 900 IS 2386 Part-IV

    New source / as perrequirement

    New source / as perrequirement

    8. Soundless Value MOSRTH-2001- Section 900, IS 2386 Part-V

    New source / as perrequirement

    New source / as perrequirement

    9. Size and Gradation MOSRTH-2001- Section 900 IS 2386 Part-V

    New source / as perrequirement

    New source / as perrequirement

  • 7/21/2019 Road Construction Manual_ISO

    31/149

    Quality Management System

    Construction Manual (Work Instructions) forPublic Works Department of Himachal Pradesh (HPWD)

    Procedure No.: QMS/WI/RC-07/Test Plans and Checklists Issue 01, Rev 00

    Controlled Document Page No.: RC/7-4

    Name of Work : Estimated Cost :Agreement No.: Sanction No. and date:

    Sl.No.

    Test/Parameter Acceptance / PerformanceStandard

    Sampling Test for Assurance

    10. Flakiness / Elongation MOSRTH-2001- section-900 IS 2386 Part-1

    New Source / Perrequirement

    New source / as perrequirement

    11. Coating and Supplying of bitumen

    aggregate mixtures.

    MOSRTH-2001

    - section-900 IS 2386 Part-1

    New Source / Per

    requirement

    New Source / Per

    requirement

    12. Specific Gravity and absorption(normal aggregate).

    MOSRTH-2001- section-900 IS 2386 Part-III

    New Source / Perrequirement

    New Source / Perrequirement

    13. Specific Gravity and absorption(Heavy Ore)

    MOSRTH-2001- section-900 IS 2386 Part-III

    New Source / Perrequirement

    New Source / Perrequirement

    14. Density / Moisture Content. MOSRTH-2001- section-900 IS 2386 Part-III

    New Source / Perrequirement

    New Source / Perrequirement

  • 7/21/2019 Road Construction Manual_ISO

    32/149

    Quality Management System

    Construction Manual (Work Instructions) forPublic Works Department of Himachal Pradesh (HPWD)

    Procedure No.: QMS/WI/RC-07/Test Plans and Checklists Issue 01, Rev 00

    Controlled Document Page No.: RC/7-5

    7.4. Test Plan for Water

    RCM/TP 04Name of Work : Estimated Cost :Agreement No.: Sanction No. and date:

    Sl.No.

    Test/Parameter Acceptance / PerformanceStandard

    Sampling Acceptance Criteria

    1. Pre-qualification IS456, IS SP-23 New Source New Source

    2. Physical and Chemical Tests. Project Specification IS456, IS(Chemical Test).

    New Source / Thricein a year

    New Source / Thrice in Year

  • 7/21/2019 Road Construction Manual_ISO

    33/149

    Quality Management SystemConstruction Manual (Work Instructions) for

    Public Works Department of Himachal Pradesh (HPWD)

    Procedure No.: QMS/WI/RC-07/Test Plans and Checklists Issue 01, Rev 00

    Controlled Document Page No.: RC/7-6

    7.5. Test Plan for Stone Rubble

    RCM/TP 05Name of Work : Estimated Cost :Agreement No.: Sanction No. and date:

    Sl.No.

    Test/Parameter Acceptance / PerformanceStandard

    Sampling Test for Assurance

    1. Water absorption IS 1124MOSRTH 1004

    One Sample Weekly

    2. Physical Properties IS 1124MOSRTH 1004

    One Sample Weekly

  • 7/21/2019 Road Construction Manual_ISO

    34/149

    Quality Management SystemConstruction Manual (Work Instructions) for

    Public Works Department of Himachal Pradesh (HPWD)

    Procedure No.: QMS/WI/RC-07/Test Plans and Checklists Issue 01, Rev 00

    Controlled Document Page No.: RC/7-7

    7.6. Test Plan for Cement

    RCM/TP 06Name of Work : Estimated Cost :Agreement No.: Sanction No. and date:

    Sl.No.

    Test/Parameter Acceptance / PerformanceStandard

    Sampling Criteria Acceptance Criteria

    1. Physical and Chemical Test IS 4031 Every consignment. Conformance to specification

    2. Ordinary Portland cement. 33 Grade IS 269 Every consignment. Conformance to specification

    3. Portland Slag Cement. IS 445 Every consignment. Conformance to specification

    4. Portland Pozzolana cement. IS 1489 Every consignment. Conformance to specification

    5. Rapid hardening Portland cement. IS 8041 Every consignment. Conformance to specification

    6. Ordinary Portland cement 43 grade. IS 8112 Every consignment. Conformance to specification

    7. Ordinary Portland cement 53 grade. IS 12269 Every consignment. Conformance to specification

    8. Sulphate resistant Portland cement. IS 12330 Every consignment. Conformance to specification

    Note: Additional tests may be carried out whenever there is any change of source or in case of any disputes.

    Q lit M t S t

  • 7/21/2019 Road Construction Manual_ISO

    35/149

    Quality Management SystemConstruction Manual (Work Instructions) for

    Public Works Department of Himachal Pradesh (HPWD)

    Procedure No.: QMS/WI/RC-07/Test Plans and Checklists Issue 01, Rev 00

    Controlled Document Page No.: RC/7-8

    7.7. Test Plan for Admixture

    RCM/TP 07Name of Work : Estimated Cost :Agreement No.: Sanction No. and date:

    Sl.No.

    Test/Parameter Acceptance / PerformanceStandard

    Sampling Criteria Acceptance Criteria

    1. Pre-qualification andrecommendation.

    IS 9103/ASTMC 494 Before commencement ofwork and change ofsource

    Before start of work and whensource is changed.

    2. Test.

    i. Chemical Analysis IS SP 23IS 9103

    New Source / minimumonce in a year

    New Source / minimum oncein a year

    ii. Physical Analysis. IS SP 23IS 9103 New Source / minimumonce in a year New Source / minimum oncein a year

    iii. Performance ASTMC-494 New Source / minimumonce in a year

    New Source / minimum oncein a year

    Note: Additional tests may be carried out whenever there is any change of source or in case of any disputes.

    Q lit M t S t

  • 7/21/2019 Road Construction Manual_ISO

    36/149

    Quality Management SystemConstruction Manual (Work Instructions) for

    Public Works Department of Himachal Pradesh (HPWD)

    Procedure No.: QMS/WI/RC-07/Test Plans and Checklists Issue 01, Rev 00

    Controlled Document Page No.: RC/7-9

    7.8. Test Plan for Reinforcement Steel

    RCM/TP 08Name of Work: Estimated Cost:Agreement No.: Sanction No. and date:

    Sl.No.

    Test/Parameter Acceptance / PerformanceStandard

    Sampling Criteria Acceptance Criteria

    1. Physical test / Chemical compositionMild SteelGrade Designation S240

    IS 432 Part 1 Physical Test.For each consignmentChemical test.Once at the beginning /every source change.

    Conformance to specification

    2. H.Y.S.D. Steel Grade designation S415

    IS 1786 Physical Test.For each consignment

    Chemical test.Once at the beginning /every source change.

    Conformance to specification

    Note: Additional tests may be carried out, whenever there is any change of source or in case of any disputes.

    Quality Management System

  • 7/21/2019 Road Construction Manual_ISO

    37/149

    Quality Management SystemConstruction Manual (Work Instructions) for

    Public Works Department of Himachal Pradesh (HPWD)

    Procedure No.: QMS/WI/RC-07/Test Plans and Checklists Issue 01, Rev 00

    Controlled Document Page No.: RC/7-10

    7.9. Test Plan for Bitumen

    RCM/TP 09Name of Work: Estimated Cost:Agreement No.: Sanction No. and date:

    Sl.No.

    Test/Parameter Acceptance / PerformanceStandard

    Sampling Criteria Acceptance Criteria

    1. Pre-qualification of source Project Specification IS 73 New source / as perrequirement

    New source / as perrequirement

    2. Test.a) Physicalb) Chemical

    Project Specification IS 73Project Specification IS 73

    Each lotNew source / as perrequirement

    Once in weekNew source / as perrequirement

    Note: Additional tests may be carried out whenever there is any change of source or in case of any disputes.

    Quality Management System

  • 7/21/2019 Road Construction Manual_ISO

    38/149

    Quality Management SystemConstruction Manual (Work Instructions) for

    Public Works Department of Himachal Pradesh (HPWD)

    Procedure No.: QMS/WI/RC-07/Test Plans and Checklists Issue 01, Rev 00

    Controlled Document Page No.: RC/7-11

    7.10. Test Plan for CC/RCC Pipes and Collars

    RCM/TP 10Name of Work: Estimated Cost:Agreement No.: Sanction No. and date:

    Sl.No.

    Test/Parameter Acceptance / PerformanceStandard

    Sampling Criteria Acceptance Criteria

    1. Classification MOSRTH 10/ IS 458 Each Lot Conformance

    2. Dimensional Check IS 458 Each Lot Conformance

    3. Visual Inspection IS 458 Each Lot Conformance

    4. Strength IS 458 Each Lot Conformance

    Note : Additional tests may be carried out whenever there is any change of source or in case of any disputes

    Quality Management System

  • 7/21/2019 Road Construction Manual_ISO

    39/149

    Quality Management SystemConstruction Manual (Work Instructions) for

    Public Works Department of Himachal Pradesh (HPWD)

    Procedure No.: QMS/WI/RC-07/Test Plans and Checklists Issue 01, Rev 00

    Controlled Document Page No.: RC/7-12

    7.11. Test Plan for A.C. Pipes

    RCM/TP 11Name of Work: Estimated Cost:Agreement No.: Sanction No. and date:

    Sl.No.

    Test/Parameter Acceptance / PerformanceStandard

    Sampling Criteria Acceptance Criteria

    1. Visual Inspection MOSRTH 2706 Each lot Conformance

    2. Hydraulic Check MOSRTH 2706 Each lot Conformance

    Note: Additional tests may be carried out whenever there is any change of source or in case of any disputes.

    Quality Management System

  • 7/21/2019 Road Construction Manual_ISO

    40/149

    Q y g yConstruction Manual (Work Instructions) for

    Public Works Department of Himachal Pradesh (HPWD)

    Procedure No.: QMS/WI/RC-07/Test Plans and Checklists Issue 01, Rev 00

    Controlled Document Page No.: RC/7-13

    7.12. Test Plan for CC/RCC Pipes and Collars

    RCM/TP 12Name of Work: Estimated Cost:Agreement No.: Sanction No. and date:

    Sl.No.

    Test/Parameter Acceptance / PerformanceStandard

    Sampling Criteria Acceptance Criteria

    1. Ordinary Paint IS 164 One/ batch/lot

    (a) Normal physical tests. IS 164 MOSRTH 803.3 One/ batch/lot Conformance to spec.

    2. Hot applied thermoplastic paint. IS 164 One/ batch/lot Conformance to spec.

    (a) Normal physical test. ASTM-D-36/BS 3262 Part-1

    MOSRTH 803.4

    One/ batch/lot Conformance to spec.

    3. Reflectors paint MOSRTH One/ batch/lot Conformance to spec.

    4. Gradation. MOSRTH 803.4.3 One/ batch/lot Conformance to spec.

    5. Roundness MOSRTH 803.4.3 One/ batch/lot Conformance to spec.

    6. Refractive index MOSRTH 803.4.3 One/ batch/lot Conformance to spec.

    7. Free flowing properties MOSRTH 803.4.3 One/ batch/lot Conformance to spec.

    Note: Additional tests may be carried out whenever there is any change of source or in case of any disputes.

    Quality Management System

  • 7/21/2019 Road Construction Manual_ISO

    41/149

    y g yConstruction Manual (Work Instructions) for

    Public Works Department of Himachal Pradesh (HPWD)

    Procedure No.: QMS/WI/RC-07/Test Plans and Checklists Issue 01, Rev 00

    Controlled Document Page No.: RC/7-14

    7.13. Test Plan for CC/RCC Pipes and Collars

    RCM/TP 13Name of Work: Estimated Cost:Agreement No.: Sanction No. and date:

    Sl.

    No.

    Test/Parameter Acceptance Standard Sampling Criteria Acceptance Criteria

    1. Concrete IS 456 As per IS Conformance to IS

    2. Reinforcing steel IS 1786 As per IS Conformance to IS

    3. Bolts, nuts, washers IS 1367 As per IS Conformance to IS

    (a) High strength bolts IS 1367 As per IS Conformance to IS

    (b) Precision bolts nuts IS 1364 As per IS Conformance to IS

    4. Plates and supports IS 2062 As per IS Conformance to IS

    (a) Plates IS 2062 As per IS Conformance to IS

    (b) Supports IS 2062 As per IS Conformance to IS

    5. Aluminum sheets Designation 24345 or 1900 ofIS 736

    As per IS Conformance to IS

    6. Retro reflective sheets. MOSRTH 801.3 As per IS Conformance to IS

    7. Massage borders Layout check MOSRTH801.3.4

    As per IS Conformance to IS

    Quality Management System

  • 7/21/2019 Road Construction Manual_ISO

    42/149

    Construction Manual (Work Instructions) forPublic Works Department of Himachal Pradesh (HPWD)

    Procedure No.: QMS/WI/RC-07/Test Plans and Checklists Issue 01, Rev 00

    Controlled Document Page No.: RC/7-15

    7.14. Test Plan for Road Furniture

    RCM/TP 14Name of Work: Estimated Cost:Agreement No.: Sanction No. and date:

    Sl.No.

    Test/Parameter Acceptance Standard Sampling Criteria Acceptance Criteria

    1. 200 Metre Stones. IRCM-26 MOSRTH-804 As per Standard Conformance

    2. Kilometre Stones. IRCM-8 MOSRTH-804 As per Standard Conformance

    3. Road Delineators. IRCM-79 MOSRTH-805 As per Standard Conformance

    4. Boundary Stones. IRCM-25 MOSRTH-800 As per Standard Conformance

    5. Fencing. IS226 and DrawingMOSRTH-807 As per Standard Conformance

    6. Tubular Steel railing. IS1239 MOSRTH-804 As per Standard Conformance

    7. Metal beam crash barriers. MOSRTH 810 As per Standard Conformance

    8. Road traffic signals. IRCM-93 IS7537MOSRTH 11-811

    As per Standard Conformance

    Quality Management System

    C t ti M l (W k I t ti ) f

  • 7/21/2019 Road Construction Manual_ISO

    43/149

    Construction Manual (Work Instructions) forPublic Works Department of Himachal Pradesh (HPWD)

    Procedure No.: QMS/WI/RC-07/Test Plans and Checklists Issue 01, Rev 00

    Controlled Document Page No.: RC/7-16

    7.15. Test Plan for Geo Synthetics

    Synthetic Material: Geo Textile, Geo Grid, Geo net, Geo membrane, Geo Composite.

    RCM/TP 15Name of Work: Estimated Cost:Agreement No.: Sanction No. and date:

    Sl.No.

    Test/Parameter Acceptance Standard Sampling Criteria Acceptance Criteria

    1. Pre-qualification MORT and H 700 As per Standard Conformance

    2. Physical / Mechanical properties,colour, form, and other properties.

    As per Standard Conformance

    3. Geo systems. MORT and H 701.2.1 As per Standard Conformance

    4. Geo grid. MORT and H 701.2.2 As per Standard Conformance

    5. Geo net. MORT and H 701.2.3 As per Standard Conformance

    6. Geo membrane. MORT and H 701.2.4 As per Standard Conformance

    7. Geo composite. MORT and H 701.2.5 As per Standard Conformance

    Note: Additional tests may be carried out whenever there is any change of source or in case of any disputes.

    Quality Management System

    Construction Manual (Work Instructions) for

  • 7/21/2019 Road Construction Manual_ISO

    44/149

    Construction Manual (Work Instructions) forPublic Works Department of Himachal Pradesh (HPWD)

    Procedure No.: QMS/WI/RC-07/Test Plans and Checklists Issue 01, Rev 00

    Controlled Document Page No.: RC/7-17

    7.16. Checklist for General Inspection of Site

    RCM/CL 01

    Name of Work: Estimated Cost:Agreement No.: Sanction No. and date:

    Sl.No.

    Particulars Remarks (Y / N / NA / Observation if any)

    Date / / 200 / / 200 / / 200 / / 200 / / 200 / / 200

    1. Location / Chainage / Description of item

    2. Pre execution checks have been completeddate and reference.

    3. The site office, laboratory, godown andlabour camp are maintained in goodconditions.

    4. The first aid box is having with all thenecessary medicines.

    5. The furniture and equipments in site officeand laboratory are maintained in goodcondition.

    6. The machinerys provided in laboratory aremaintained properly in good conditions.

    7. Insurance of technical staff, supervisory staffand labour is updated.

    8. Approved copy of tender, plans and work

    order book is available and maintained ingood condition.

    9. Various Performa required for testing ofmaterials are available on site and are beingfilled up regularly.

    10. There is no stagnation of wastewater.

    11. Adequate traffic safety arrangement up to

    Quality Management System

    Construction Manual (Work Instructions) for

  • 7/21/2019 Road Construction Manual_ISO

    45/149

    Construction Manual (Work Instructions) forPublic Works Department of Himachal Pradesh (HPWD)

    Procedure No.: QMS/WI/RC-07/Test Plans and Checklists Issue 01, Rev 00

    Controlled Document Page No.: RC/7-18

    Name of Work: Estimated Cost:

    Agreement No.: Sanction No. and date:

    Sl.No.

    Particulars Remarks (Y / N / NA / Observation if any)

    Date / / 200 / / 200 / / 200 / / 200 / / 200 / / 200

    date.

    12. Labour registers are maintained up to date.

    13. CAR insurance policy is updated.

    14. Additional observation if any:15. Conclusion by inspecting officer:-

    The execution activities are satisfactory / notsatisfactory. If satisfactory, further roadconstruction activity to commence by.. ..If not satisfactory the contractors to reportthe corrective action taken and inform for there-inspection.

    16. Contractor / Authorized representativename:Designation and Signature.

    17. Inspecting Officer NameDesignation and Signature

    Quality Management System

    Construction Manual (Work Instructions) for

  • 7/21/2019 Road Construction Manual_ISO

    46/149

    Construction Manual (Work Instructions) forPublic Works Department of Himachal Pradesh (HPWD)

    Procedure No.: QMS/WI/RC-07/Test Plans and Checklists Issue 01, Rev 00

    Controlled Document Page No.: RC/7-19

    7.17. Checklist for Calibration of Inspection, Measuring and Test Equipment

    RCM/CL 02

    Name of Work: Estimated Cost:Agreement No.: Sanction No. and date:

    Sl.No.

    Particulars Remarks (Y / N / NA / Observation if any)

    Date / / 200 / / 200 / / 200 / / 200 / / 200 / / 200

    1. Location / Chainage / Description of item.

    2. All Surveying and Measuring Instrumentsare uniquely identified.

    3. All Sand M Instruments are calibrated.

    4. All S and M instrument calibrations havetractability to national standard.

    5. Range, accuracy, correction, factor,acceptance criteria, user details of all S andM instruments have been recorded.

    6. Due dates of next calibration have beenidentified and recorded on labels.

    7. Additional observations if any.

    8. Conclusion by inspecting officer Theexecution activities are satisfactory / notsatisfactory. If satisfactory, further roadconstruction activity to commence by.. .

    If not satisfactory, the contractors to reportthe corrective action taken and inform for re-inspection.

    9. Contractor / authorized representative name,designation, signature.

    10. Inspecting officer, name, Designation andSignature.

    Quality Management System

    Construction Manual (Work Instructions) for

  • 7/21/2019 Road Construction Manual_ISO

    47/149

    Construction Manual (Work Instructions) forPublic Works Department of Himachal Pradesh (HPWD)

    Procedure No.: QMS/WI/RC-07/Test Plans and Checklists Issue 01, Rev 00

    Controlled Document Page No.: RC/7-20

    7.18. Checklist for Surveying and Setting OutRCM/CL 03

    Name of Work: Estimated Cost:Agreement No.: Sanction No. and date:

    Sl.No.

    Particulars Remarks (Y / N / NA / Observation if any)

    Date / / 200 / / 200 / / 200 / / 200 / / 200 / / 200

    1. Location / Chainage / Description of item.

    2. The leveling instrument like dumpy levels /theodolites etc, are calibrated (refercalibration status of the instrument).

    3. The instruments and tripod are in goodworking condition (visual inspection).

    4. Required numbers of ranging roads andwooden pegs are available (refer

    requirement submitted by JE).5. Required quantity of cord, lime, paint etc,, is

    available for marking lettering etc,.. (referrequirement submitted by JE).

    6. Steel tapes of length 30 m and 15m areavailable in good condition, (visualinspection).

    7. Required quantity of red flags, traffic, cones

    etc,. are prepared for traffic safety (referrequirement submitted by JE/AE).

    8. Adequate trained labours are available.

    9. Level books, field books are available onsite (refer requirement submitted by JE/AE).

    10. Minimum two aluminum leveling staffs areavailable.

    Quality Management System

    Construction Manual (Work Instructions) for

  • 7/21/2019 Road Construction Manual_ISO

    48/149

    ( )Public Works Department of Himachal Pradesh (HPWD)

    Procedure No.: QMS/WI/RC-07/Test Plans and Checklists Issue 01, Rev 00

    Controlled Document Page No.: RC/7-21

    Name of Work: Estimated Cost:

    Agreement No.: Sanction No. and date:

    Sl.No.

    Particulars Remarks (Y / N / NA / Observation if any)

    Date / / 200 / / 200 / / 200 / / 200 / / 200 / / 200

    11. Benchmark is established at requiredintervals with respect to GTS benchmark.

    12. The benchmarks are established on

    permanent structures or built up in masonryetc,. so that the same are available in goodcondition till finalization of work.

    13. Additional observation if any.

    14. Conclusion by inspecting officer Theexecution activities are satisfactory / notsatisfactory. If satisfactory, further roadconstruction activity to commence by.. .

    If not satisfactory, the contractors to reportthe corrective action taken and inform for re-inspection.

    15. Contractor / authorized representative name,designation, signature.

    16. Inspecting officer, name, Designation andSignature.

    Quality Management System

    Construction Manual (Work Instructions) for

  • 7/21/2019 Road Construction Manual_ISO

    49/149

    Public Works Department of Himachal Pradesh (HPWD)

    Procedure No.: QMS/WI/RC-07/Test Plans and Checklists Issue 01, Rev 00

    Controlled Document Page No.: RC/7-22

    7.19. Checklist for Surveying and Setting OutRCM/CL 04

    Name of Work: Estimated Cost:Agreement No.: Sanction No. and date:

    Sl.No.

    Location and Ref, of GTsBench of work

    Value of GTS Bench Mark Location and Ref, ofpermanent bench markon site with sketch

    Value of permanentbench mark on site

    Remarks

    Signature of Junior Engineer Signature of Deputy Engineer

    Quality Management System

    Construction Manual (Work Instructions) for

  • 7/21/2019 Road Construction Manual_ISO

    50/149

    Public Works Department of Himachal Pradesh (HPWD)

    Procedure No.: QMS/WI/RC-07/Test Plans and Checklists Issue 01, Rev 00

    Controlled Document Page No.: RC/7-23

    7.20. Checklist for Publicity Utility Services

    RCM/CL 05

    Name of Work: Estimated Cost:Agreement No.: Sanction No. and date:

    Sl.

    No.

    Particulars Remarks (Y / N / NA / Observation if any)

    Date / / 200 / / 200 / / 200 / / 200 / / 200 / / 200

    1. Location / Chainage / Description of item.

    2. The execution check share completed dateand reference.

    3. Representative of concerned utilitiesservices is present during extension of work.

    4. Proper case is taken during excavation.

    5. If there is any damage for utility service, thesame is informed to the concerned authority.

    6. Additional observation if any.

    7. Conclusion by inspecting officer Theexecution activities are satisfactory / notsatisfactory. If satisfactory, further roadconstruction activity to commence by.. .If not satisfactory, the contractors to report

    the corrective action taken and inform for there-inspection.

    8. Contractor / authorized representative name,designation, signature.

    9. Inspecting officer, name, Designation andSignature.

    Quality Management System

    Construction Manual (Work Instructions) forP bli W k D t t f Hi h l P d h (HPWD)

  • 7/21/2019 Road Construction Manual_ISO

    51/149

    Public Works Department of Himachal Pradesh (HPWD)

    Procedure No.: QMS/WI/RC-07/Test Plans and Checklists Issue 01, Rev 00

    Controlled Document Page No.: RC/7-24

    7.21. Checklist for Curst Design Of Flexible Pavement

    RCM/CL 06

    Name of Work: Estimated Cost:Agreement No.: Sanction No. and date:

    Results of CBR valueSl.No.

    Location ofSample collectedwith date

    Ref. and Date ofsending sample fortesting

    Name oflaboratory

    Soaked Unsoaked

    Ref and Date ofreceipt of results

    Remarks

    1 2 3 4 5 6 7 8

    Signature of the JE/SO

    Quality Management System

    Construction Manual (Work Instructions) forPublic Works Department of Himachal Pradesh (HPWD)

  • 7/21/2019 Road Construction Manual_ISO

    52/149

    Public Works Department of Himachal Pradesh (HPWD)

    Procedure No.: QMS/WI/RC-07/Test Plans and Checklists Issue 01, Rev 00

    Controlled Document Page No.: RC/7-25

    7.22. Checklist for Excavation For Road Work (Utility related)

    RCM/CL 07

    Name of Work: Estimated Cost:Agreement No.: Sanction No. and date:

    Sl.No.

    Name of utilityservices

    Name of concerneddepartment

    Location andreferences

    Whether shifting /removal requiredyes / no

    If yes, dateand ref madeto concerned

    department

    Date of shifting /removal

    Remarks

    1 2 3 4 5 6 7 8

    Quality Management System

    Construction Manual (Work Instructions) forPublic Works Department of Himachal Pradesh (HPWD)

  • 7/21/2019 Road Construction Manual_ISO

    53/149

    Public Works Department of Himachal Pradesh (HPWD)

    Procedure No.: QMS/WI/RC-07/Test Plans and Checklists Issue 01, Rev 00

    Controlled Document Page No.: RC/7-26

    7.23. Checklist for Excavation for Road Work (Tree related)

    RCM/CL 08

    Name of Work: Estimated Cost:Agreement No.: Sanction No. and date:

    Sl.No.

    Location oftrees Chainage to Chainage

    No. of affected trees Date and Refintimation totree authority

    Date of jointinspection withtree authority

    Date of receiptof approval oftree authority

    Completion dateof removal /shifting of trees

    Remarks

    1 2 3 4 5 6 7 8

    Signature of Junior Engineer Signature of Asst. Engineer

    Quality Management System

    Construction Manual (Work Instructions) forPublic Works Department of Himachal Pradesh (HPWD)

  • 7/21/2019 Road Construction Manual_ISO

    54/149

    Public Works Department of Himachal Pradesh (HPWD)

    Procedure No.: QMS/WI/RC-07/Test Plans and Checklists Issue 01, Rev 00

    Controlled Document Page No.: RC/7-27

    7.24. Checklist for Excavation for Road Work

    RCM/CL 09

    Name of Work: Estimated Cost:Agreement No.: Sanction No. and date:

    Sl.No.

    Particulars Remarks (Y / N / NA / Observation if any)

    Date / / 200 / / 200 / / 200 / / 200 / / 200 / / 200

    1. Location / Chainage / Description of item.

    2. The execution inspection checks have beencompleted - date and reference.

    3. The traffic diversion and safetyarrangements have been made as per theapproved plan.(Refer traffic diversion plan).

    4. Equipment as verified in The execution

    check are available in good workingcondition.

    5. Required depth of excavation is achieved asper cross-sections.(Refer cross section).

    6. Camber, profile and gradient is maintainedas per approved drawing

    7. Usable material is stacked at specified

    dumping location.8. Usable material is tested and approved as

    per test plan noIf yes, date and reference.

    9. Care is taken to see that no portion ofexisting pavement designated for retention isloosened or disturbed.

    Quality Management System

    Construction Manual (Work Instructions) forPublic Works Department of Himachal Pradesh (HPWD)

  • 7/21/2019 Road Construction Manual_ISO

    55/149

    ub c o s epa t e t o ac a ades ( )

    Procedure No.: QMS/WI/RC-07/Test Plans and Checklists Issue 01, Rev 00

    Controlled Document Page No.: RC/7-28

    Name of Work: Estimated Cost:

    Agreement No.: Sanction No. and date:

    Sl.No.

    Particulars Remarks (Y / N / NA / Observation if any)

    Date / / 200 / / 200 / / 200 / / 200 / / 200 / / 200

    10. All utilities / trees / poles / drains / sewersetc,. found during excavation are protected.

    11. The finalized sub grade is protected from

    movement of vehicular traffic and conformsto approved c-section and l-sections.

    12. The final levels of excavation are taken withreference to GTS.Field Book No. Page No:

    13. The supervision of contractors is adequate(refer QA Plan).

    14. Additional observation if any:

    15. Conclusion by inspecting officer Theexecution activities are satisfactory / notsatisfactory. If satisfactory, further roadconstruction activity to commence by.. .If not satisfactory, the contractors to reportthe corrective action taken and inform for there-inspection.

    16. Contractor / authorized representative name,

    designation, signature.17. Inspecting officer, name, Designation andSignature.

    Quality Management System

    Construction Manual (Work Instructions) forPublic Works Department of Himachal Pradesh (HPWD)

  • 7/21/2019 Road Construction Manual_ISO

    56/149

    p ( )

    Procedure No.: QMS/WI/RC-07/Test Plans and Checklists Issue 01, Rev 00

    Controlled Document Page No.: RC/7-29

    7.25. Checklist for 95% PD Earth Work (To be Completed for each Layer)

    RCM/CL 10

    Name of Work: Estimated Cost:Agreement No.: Sanction No. and date:

    Sl.No.

    Particulars Remarks (Y / N / NA / Observation if any)

    Date / / 200 / / 200 / / 200 / / 200 / / 200 / / 200

    1. Location / Chainage / Description of item.

    2. Site is clean (visual inspection).

    3. Line out is approvedIf yes, date of approval ..

    4. Initial ground levels are taken with referenceto GTS and recorded in field book.If yes, Filed Book No: Page No:

    5. Ground is leveled and compacted tofacilitate the first layer of earthwork (visualinspection).

    6. Limits of embankment / sub grade aremarked by fixing battered pegs at regularinterval (visual inspection).

    7. Foundation embankment is in an area with

    stagnant water.If yes, water is removed (visual inspection).

    8. Material to be used for the earth work istested and approved as per test plannoIf, yes, date and reference.

    9. Height of embankment (value)

    Quality Management System

    Construction Manual (Work Instructions) forPublic Works Department of Himachal Pradesh (HPWD)

  • 7/21/2019 Road Construction Manual_ISO

    57/149

    Procedure No.: QMS/WI/RC-07/Test Plans and Checklists Issue 01, Rev 00

    Controlled Document Page No.: RC/7-30

    Name of Work: Estimated Cost:

    Agreement No.: Sanction No. and date:

    Sl.No.

    Particulars Remarks (Y / N / NA / Observation if any)

    Date / / 200 / / 200 / / 200 / / 200 / / 200 / / 200

    10. If height less than 3.0m minimum dry unitweight is 15.2 kN/Cum when tested as perIS 2720 (Part-8)

    11. Earthwork is required for sub grade / earthside shoulders / verges / back fill if yes, thendry unit weight.(should be minimum 17.5 kN/Cum. Whentested as per IS2720 (Part-8)]

    12. Borrowed material tested and proved if yes,date and reference.(test report shall be received 7 days beforethe date of commencement).

    13. Required quantum of material is available atsource. (Quarry inspection) site.

    14. Required numbers of labourers and workersare available on site.

    15. Adequate equipment are available and arein good working condition.(visual inspection)

    16. Contractors supervisory staff and laboursare adequate(refer QA Plan)

    17. Traffic diversion plan have been preparedand got approved from traffic authority. Ifyes, date and reference

    Quality Management System

    Construction Manual (Work Instructions) forPublic Works Department of Himachal Pradesh (HPWD)

  • 7/21/2019 Road Construction Manual_ISO

    58/149

    Procedure No.: QMS/WI/RC-07/Test Plans and Checklists Issue 01, Rev 00

    Controlled Document Page No.: RC/7-31

    Name of Work: Estimated Cost:

    Agreement No.: Sanction No. and date:

    Sl.No.

    Particulars Remarks (Y / N / NA / Observation if any)

    Date / / 200 / / 200 / / 200 / / 200 / / 200 / / 200

    18. Adequate traffic safety devices are procuredas per traffic safety plan approved byengineer-in-charge

    (refer approved traffic safety plan)19. Trees / utility services etc, are removed /shifted.

    20. Additional observation if any.

    21. Conclusion by inspecting officer Theexecution activities are satisfactory / notsatisfactory. If satisfactory, further road

    construction activity to commence by.. .If not satisfactory, the contractors to reportthe corrective action taken and inform for there-inspection.

    22. Contractor / authorized representative name,designation, signature.

    23. Inspecting officer, name, Designation andSignature.

    Quality Management System

    Construction Manual (Work Instructions) forPublic Works Department of Himachal Pradesh (HPWD)

  • 7/21/2019 Road Construction Manual_ISO

    59/149

    Procedure No.: QMS/WI/RC-07/Test Plans and Checklists Issue 01, Rev 00

    Controlled Document Page No.: RC/7-32

    7.26. Checklist for 95% PD Earth Work (To be Completed for each Layer)

    RCM/CL 11

    Name of Work: Estimated Cost:Agreement No.: Sanction No. and date:

    Sl.No.

    Particulars Remarks (Y / N / NA / Observation if any)

    Date / / 200 / / 200 / / 200 / / 200 / / 200 / / 200

    1. Location / chainage / description of item.

    2. The execution inspection checks have beencompleted date and reference.

    3. Graph of density against moisture contentsubmitted by contractor (refer graph).

    4. Relationship between density moisturecontent and C.B.R. for light / heavycompactive efforts submitted by contractors.

    5. Laying of embankment material is in uniformthickness of 300 mm over entire width ofembankment.

    6. Earthwork laid is as per specified grade andcamber.Refer field book no.. Page no.

    7. The moisture content is as per IS2720

    (Part-2) at the site of placement prior tocompaction

    8. The static weight of vibratory roller used forcompaction is within 80 to 100 KN (referweigh bridge challan).

    9. The each layer thoroughly compacted toachieve least 95% of PD (refer EWF-2).

    Quality Management System

    Construction Manual (Work Instructions) forPublic Works Department of Himachal Pradesh (HPWD)

  • 7/21/2019 Road Construction Manual_ISO

    60/149

    Procedure No.: QMS/WI/RC-07/Test Plans and Checklists Issue 01, Rev 00

    Controlled Document Page No.: RC/7-33

    Name of Work: Estimated Cost:

    Agreement No.: Sanction No. and date:

    Sl.No.

    Particulars Remarks (Y / N / NA / Observation if any)

    Date / / 200 / / 200 / / 200 / / 200 / / 200 / / 200

    10. The field density least are carried out as perIS2720 (Part 28) (should be at least 95%PD).

    11. The cross fall of surface of the embankment/ sub-grade is maintained as specified (Referapproved C/S and L/S).

    12. Traffic safety arrangements have beenmade and maintained in good conditions.(Refer approved traffic diversion plan).

    13. Contractors supervision is adequate. (ReferQA Plan).

    14. Contractors supervision is adequate.15. Additional observation if any.

    16. Conclusion by inspecting officer Theexecution activities are satisfactory / notsatisfactory. If satisfactory, further roadconstruction activity to commence by.. .If not satisfactory, the contractors to reportthe corrective action taken and inform for the

    re-inspection.17. Contractor / authorized representative name,designation, signature.

    18. Inspecting officer, name, Designation andSignature.

    Quality Management System

    Construction Manual (Work Instructions) forPublic Works Department of Himachal Pradesh (HPWD)

  • 7/21/2019 Road Construction Manual_ISO

    61/149

    Procedure No.: QMS/WI/RC-07/Test Plans and Checklists Issue 01, Rev 00

    Controlled Document Page No.: RC/7-34

    7.27. Checklist for 95% PD Earth Work (To be Completed for each Layer)

    RCM/CL 12

    Name of Work: Estimated Cost:Agreement No.: Sanction No. and date:

    Compacted thickness at every 30 mSl.No.

    Particulars ofItem

    Location Layer

    Edge Center Edge

    Type of rollerand weight

    No. ofpasses

    Remarks

    1 2 3 4 5 6 7 8 9 10

    Signature of -Contractor Signature of Engineer

    No of passes required shall be decided by the Engineer-in-charge after ascertaining the required field density.

    Quality Management System

    Construction Manual (Work Instructions) forPublic Works Department of Himachal Pradesh (HPWD)

  • 7/21/2019 Road Construction Manual_ISO

    62/149

    Procedure No.: QMS/WI/RC-07/Test Plans and Checklists Issue 01, Rev 00

    Controlled Document Page No.: RC/7-35

    7.28. Checklist for 95% PD Earth Work (To be Completed for each Layer)

    RCM/CL 13

    Name of Work: Estimated Cost:Agreement No.: Sanction No. and date:

    Moisture contenttest (2720 Part 2)

    Field content test(IS2720 Part 28)

    CBR Test (IS2720 (Part 6)

    Value

    Sl.No.

    Particularsof Item

    Location/ layer oftest

    QuantumExecuted

    Value QuantumExecuted

    Value QuantumExecuted

    Soaked Un-marked

    Resultsacceptable/ not

    acceptable

    Remarks

    1 2 3 4 5 6 7 8 9 10 11 12

    Signature of Contractor Signature of Engineer

    *One test per 250 Cum. of work ** One test per 1000 Sq.m. of work ***One test per 3000 Cum. of work.

    Quality Management System

    Construction Manual (Work Instructions) forPublic Works Department of Himachal Pradesh (HPWD)

  • 7/21/2019 Road Construction Manual_ISO

    63/149

    Procedure No.: QMS/WI/RC-07/Test Plans and Checklists Issue 01, Rev 00

    Controlled Document Page No.: RC/7-36

    7.29. Checklist for 100% PD Earth Work

    RCM/CL 14

    Name of Work: Estimated Cost:Agreement No.: Sanction No. and date:

    Sl.No.

    Particulars Remarks (Y / N / NA / Observation if any)

    Date / / 200 / / 200 / / 200 / / 200 / / 200 / / 200

    1. Location / chainage / description of item.2. The execution inspection checks have been

    completed date and reference.

    3. Graph of density against moisture contentsubmitted by contractor (refer graph).

    4. Relationship between density moisturecontent and C.B.R. for light / heavycompactive efforts submitted by contractors.

    5. Laying of embankment material is in uniformthickness of 300 mm over entire width ofembankment.

    6. Earthwork laid is as per specified grade andcamber.Refer field book no.. page no.

    7. The moisture content is as per IS2720(Part-2) at the site of placement prior to

    compaction8. The static weight of vibratory roller used for

    compaction is within 80 to 100 KN (referweigh bridge challan).

    9. The each layer thoroughly compacted toachieve least 95% of PD

    10. The field density least are carried out as per

    Quality Management System

    Construction Manual (Work Instructions) forPublic Works Department of Himachal Pradesh (HPWD)

  • 7/21/2019 Road Construction Manual_ISO

    64/149

    Procedure No.: QMS/WI/RC-07/Test Plans and Checklists Issue 01, Rev 00

    Controlled Document Page No.: RC/7-37

    Name of Work: Estimated Cost:

    Agreement No.: Sanction No. and date:

    Sl.No.

    Particulars Remarks (Y / N / NA / Observation if any)

    Date / / 200 / / 200 / / 200 / / 200 / / 200 / / 200

    IS2720 (Part 28) (should be at least 95%PD).

    11. The cross fall of surface of the embankment

    / sub-grade is maintained as specified (referapproved C/S and L/S).

    12. Traffic safety arrangements have beenmade and maintained in good conditions.(refer approved traffic diversion plan)

    13. Contractors supervision is adequate. (ReferQA Plan).

    14. Additional observation if any.

    15. Conclusion by inspecting officer Theexecution activities are satisfactory / notsatisfactory. If satisfactory, further roadconstruction activity to commence by.. .If not satisfactory, the contractors to reportthe corrective action taken and inform for r-re-inspection.

    16. Contractor / authorized representative name,designation, signature.

    17. Inspecting officer, name, Designation andSignature.

    Quality Management System

    Construction Manual (Work Instructions) forPublic Works Department of Himachal Pradesh (HPWD)

  • 7/21/2019 Road Construction Manual_ISO

    65/149

    Procedure No.: QMS/WI/RC-07/Test Plans and Checklists Issue 01, Rev 00

    Controlled Document Page No.: RC/7-38

    7.30. Checklist for Hard Murrum for Side Shoulder

    RCM/CL 15

    Name of Work: Estimated Cost:Agreement No.: Sanction No. and date:

    Sl.No.

    Particulars Remarks (Y / N / NA / Observation if any)

    Date / / 200 / / 200 / / 200 / / 200 / / 200 / / 200

    1. Location / chainage / description of item.2. Pre execution inspection checks are

    completed date and reference.

    3. Adequate safety devices are provided.

    4. Spreading of hard murum is done as perclause 305.3.5.1. of MOSRTH-

    5. Compaction is carried out as per the clause305.3.6. of MOSRTH.

    6. Necessary surface drawing arrangement isprovided The execution.

    7. The finishing operations are carried out asper the clause of 305.3.9 of MOSRTH.

    8. Additional observations if any.

    9. Conclusion by inspecting officer Theexecution activities are satisfactory / notsatisfactory. If satisfactory, further roadconstruction activity to commence by.. .If not satisfactory, the contractors to reportthe corrective action taken and inform for there-inspection.

    10. Contractor / authorized representative name,

    designation, signature.

    Quality Management System

    Construction Manual (Work Instructions) forPublic Works Department of Himachal Pradesh (HPWD)

  • 7/21/2019 Road Construction Manual_ISO

    66/149

    Procedure No.: QMS/WI/RC-07/Test Plans and Checklists Issue 01, Rev 00

    Controlled Document Page No.: RC/7-39

    7.31. Checklist for Granular Sub Base

    RCM/CL 16

    Name of Work: Estimated Cost:Agreement No.: Sanction No. and date:

    Sl.No.

    Particulars Remarks (Y / N / NA / Observation if any)

    Date / / 200 / / 200 / / 200 / / 200 / / 200 / / 200

    1. Location / chainage / description of item.2. Pre execution inspection checks have been

    completed date and reference.

    3. Mixing any ingredients of GSB is done asper MOSRTH clause 401.2.1.

    4. Is there any deficiency of moisture in mix?(refer from GSBF)If Yes, additional water sprinkled.

    5. The static weight of vibratory roller used forcompaction is within 80 to 100 KN whenthickness exceeds 100 mm (refer weighbridges challan).

    6. Rolling being done from lower edgesforwards upper edges.(Visual inspection).

    7. The field density tested as per IS 2720

    (should be 98% of dry density) refer formGSBF).

    8. Traffic safety arrangements have beenmade and maintained in good condition(refer approved traffic diversion plan).

    9. Contractors supervision adequate (refer QAPlan).

    Quality Management System

    Construction Manual (Work Instructions) forPublic Works Department of Himachal Pradesh (HPWD)

  • 7/21/2019 Road Construction Manual_ISO

    67/149

    Procedure No.: QMS/WI/RC-07/Test Plans and Checklists Issue 01, Rev 00

    Controlled Document Page No.: RC/7-40

    Name of Work: Estimated Cost:

    Agreement No.: Sanction No. and date:

    Sl.No.

    Particulars Remarks (Y / N / NA / Observation if any)

    Date / / 200 / / 200 / / 200 / / 200 / / 200 / / 200

    10. Final grade and camber of the GSB layer isas per approved C/S and L/S (refer fieldbook no page no.).

    11. Additional observations if any.

    12. Conclusion by inspecting officer Theexecution activities are satisfactory / notsatisfactory. If satisfactory, further roadconstruction activity to commence by .If not satisfactory, the contractors to reportthe corrective action taken and inform for there-inspection.

    13. Contractor / authorized representative name,designation, signature.

    14. Inspecting officer, name, Designation andSignature.

    Quality Management System

    Construction Manual (Work Instructions) forPublic Works Department of Himachal Pradesh (HPWD)

  • 7/21/2019 Road Construction Manual_ISO

    68/149

    Procedure No.: QMS/WI/RC-07/Test Plans and Checklists Issue 01, Rev 00

    Controlled Document Page No.: RC/7-41

    7.32. Checklist for Water Bound Macadam (Gr.1) In Layers

    RCM/CL 17

    Name of Work: Estimated Cost:Agreement No.: Sanction No. and date:

    Sl.No.

    Particulars Remarks (Y / N / NA / Observation if any)

    Date / / 200 / / 200 / / 200 / / 200 / / 200 / / 200

    1. Location / chainage / description of item.2. The execution inspection checks are

    completed date and reference..

    3. The grade-1 metal is uniformly spread onprepared sub-grade / sub-base to properprofiles by using template placed across theroad at 6m apart

    4. The grade-1 metal laid is of required

    thickness to get compacted layer of 0.115mafter compaction.

    5. The segregation of metal is controlled whilespreading to avoid any pocket of thematerial.

    6. The rolling is done with vibratory roller of 80to 100 kN static weight.(Refer weigh bridge challan and form)

    7. Rolling is done from lower edges towardsCentro and from inner edge to the outeredges for super elevation portion.

    8. Polled surface is checked transversely andlongitudinally with templates.

    9. The shoulders are built up simultaneouslyalong with WBM

    Quality Management System

    Construction Manual (Work Instructions) forPublic Works Department of Himachal Pradesh (HPWD)

    N f W k E ti t d C t

  • 7/21/2019 Road Construction Manual_ISO

    69/149

    Procedure No.: QMS/WI/RC-07/Test Plans and Checklists Issue 01, Rev 00

    Controlled Document Page No.: RC/7-42

    Name of Work: Estimated Cost:

    Agreement No.: Sanction No. and date:

    Sl.No.

    Particulars Remarks (Y / N / NA / Observation if any)

    Date / / 200 / / 200 / / 200 / / 200 / / 200 / / 200

    10. The surface is applied over rolled surface indry condition.

    11. Dry rolling is done after application ofscreenings.

    12. Brooming and spreading is done during dryrolling till all the voids are filled.

    13. The water is sprinkled, swept and rolled afterdry rolling.

    14. The sprinkling, sweeping and rollingoperation is continued till the coarseaggregate are thoroughly keyed, wellbonded and firmly set in its full depth.

    15. After final compaction the surface is allowedto dry over night.

    16. The hungry spots are filled with screeningafter next day.

    17. Adequate machinery and equipment areavailable on site.(refer QA Plan)

    18. Adequate traffic safety arrangements are

    provided. (refer approved traffic safetydiversion plan).

    19. Required field tests namely, aggregateimpact value, grading, flakiness index andelongation index, Atterberg limit of bindingmaterials have been taken and recordmaintained in the form WBMF-2.

    Quality Management System

    Construction Manual (Work Instructions) forPublic Works Department of Himachal Pradesh (HPWD)

    Name of Work: Estimated Cost:

  • 7/21/2019 Road Construction Manual_ISO

    70/149

    Procedure No.: QMS/WI/RC-07/Test Plans and Checklists Issue 01, Rev 00

    Controlled Document Page No.: RC/7-43

    Name of Work: Estimated Cost:

    Agreement No.: Sanction No. and date:

    Sl.No.

    Particulars Remarks (Y / N / NA / Observation if any)

    Date / / 200 / / 200 / / 200 / / 200 / / 200 / / 200

    20. Additional observation if any.