Media Production Risk Management Plan
Name Sagar Gautam Date 06/09/12 Event Video Installation
Position Chief Director Venue/s Drama room Description
Organization FilmItCo Contact info. Ref:#
The Risk Likelihood Consequences Level of Risk Pre-emptive Response
People tripping over in the dark due to wires
unlikely moderate L – Low Risk Provide visible light + visible hazard tape signs in places where there is a wire at risk
First aider on hand
Electric shock from wires used in equipment.
unlikely moderate M – Moderate risk Faulty equipment check, ensure no loose currents
First aider on hand
Projector catching fire due to overheating
unlikely high H- High Risk Ensure projector does not over heat by checking regularly
First aider and fire estinguished on hand
Speakers or projector falling from tables onto vistors due to darkness
unlikely moderate L- Low risk Ensure hazard tape in areas where there is a hazard, advising spectates to stay away
First aider on hand